Product Instruction
230RE01 (YD476SM)
(Mechanism
Part)
1. Application
This machine is provided for Malaysia project, which is used for
scraping and reclaiming bulk material such as gypsum and limestone.
After stacker has finished stack according the rules, the machine will
reclaim according to the pre-program in order to reach the purpose of
uniformity. The machine is applied to work indoors.
300
26
gypsum
3
Density of material(t/m ):
limestone
1.2
1.4
Angle of repose:
38
1
tension
27.7m
Height of stockpile:
11.704m
Power Voltage:
415V 50Hz
Control Voltage:
240V 50Hz
300t/h
Reclaiming Mode:
4m
Model of Rail:
QU80
Shunting Speed:
10m/min
5.5kw
Motor type:
M2QA132M6B
945r/min
Reducer type:
B4DH7
Reducer ratio:
224
Braker type:
YWZ9200/30
0.171.7m/min
1.5kw
1410r/min
Reducer type:
Z38-M90L4
Reducer ratio:
9
2
DLK110
5200mm( fixed end beam)
1500mm( swing end beam)
710mm
34t
2
wheel dia.:
wheel press: (max.)
drive device quantity:
scraper reclaim system:
bend wheel center distance for scraper cantilever head wheel:
26m
tension traveling distance for chain: 250mm
scraper size
1500X260mm
scraper distance
500mm
scraper chain running speed: 0.41m/s
driving power
55kw
motor type
M2QA250M4A
motor rotation speed
1478r/min
reducer type
B4DH11
C
reducer ratio
125
hydrodynamic clutch
YOX450
cantilever frame swing range-4+48
power cable reel
typeJDO1250DT
cable typeYCW395+135
control cable reel
typeJDO650DKT37
cable typeCEFR37X2.5
hoist
typeFDR-PRO-20-6.3
motor power13.7kw/2.2kw
steel rope speed 12m/min for fast
1.84m/min for exactitude
cable roll length 108m
Performance Parameter for electronic
Driving power415V 50HZ
controlling power supply240V 50HZ
controlling typePC program controlling
3
handle controlling
maintenance controlling
wireless communication
total unit power115KW
Note: the two motors cant in same working condition. When start
one motor, another motor must be in stop running state.
5. Operation
This reclaimer adopts 3 operating ways, thats auto-control,
manual-control on the machine and near the machine controlling
(maintain). These operations are carried out by transforming
switches of working state.
5.2 Auto-control
Under the way of the auto-controlled, the stacker is controlled by
central controlling room or on the stacker control. In auto-control state,
starting order as following:
a. Starting outlet belt conveyor (linkage signal)
b. Starting hoist system
c. Starting scraper boom rising in the position of 48.
5
5.4 Shunting
The scraper boom must be risen in +48position, and then
reaches the area of specify reclaim.
6.2 Lubricate
According to table 1 and the running condition to having a
lubrication.
6.3 Maintenance
6.3.1 The chain of claimer system is one of important parts, operator
must check lubricating system.
Table 1 lubricating point for reclaimer
6
traveling
mechanism
roller bearing
for wheel
group
Roller bearing
for retaining
wheel
Power cable reel
Controlling cable reel
Roller bearing
for head chain
group
Slid bearing
for bend chain
group
Roller bearing
for tail chain
group
Scraper
Tension
reclaim
device rail
system
Oil
gun
Oil
gun
Oil
gun
Oil
gun
Oil
gun
Paint
Chain
Oil
drop
Reducer
B4DH11
Chang
e oil
YOX450
Liquid
coupling
Electric
roll
Hoist
system
Lubric
ating
type
Chang
e oil
Chang
e oil
Chang
e oil
Lubricator
Standard
Name
code.
Oil
quantity
L
Changing
time
Remark
GB5903-66
1.25
Once a shift,
have cleaning
once a year
Once a shift,
have cleaning
once a year
Once a shift,
have cleaning
once a year
Once a shift,
have cleaning
once a year
Once a shift,
have cleaning
once a year
Once every
three hours
Steel rope
Paint
Roller bearing
for slid wheel
group
Chang
e oil
Slid bearing
for hang bar
Chang
e oil
ZJ-S
lubricate
ZG-3
Calcium
lubricate
ZG-3
Calcium
lubricate
SY1507-6
5
According
condition
GB491-65
Full
Once a shift,
have cleaning
once a year
GB491-65
Full
Once a shift,
have cleaning
once a year
6.3.2 If the chain pitch is damaged partly, the damaged chain pitch can be
7
40L
Oil box
capacit
y
changed singly, but the two corresponding part must be changed in same
time.
6.3.3 When the transport chain is worn more than 2%, operator must
change the chain.
6.3.4 Adjust bolt and nut to make the two scraper chain obtain the same
pre-tension.
6.3.5 If the scraper teeth is worn, please change an other one.
6.3.6 Changed anti-friction plate for scraper: when worn degree of
anti-friction plate endanger scraper, should change it.
6.3.7 The driving chain wheel and tail chain wheel of scraper reclaiming
system are separating assembling structure, the rim is used bolt and hub
to fix together, check the wearing case of gear loop regularly.
6.3.8 When the hoist steel wire is worn or broken and reached the reject
stated value, must change it on time.
6.3.9 Every 2000 hours, operator must have a check to rail underlay plate,
if the underlay plate is loosen, please fix it.
7Installation
Installers should read and study carefully this director
and drawings of equipment and understand the main structure
and functions of the equipment. The installers should master
technical terms about reclaimer. The installation is as
following steps and requirements.
7.3Installation of RailYD476-3P
8
tighten strength is 18000N, and the spring shrink is not less than
50mm.
59 Nm
M12
100 Nm
M16
250 Nm
M20
490 Nm
M24
840 Nm
local condition to install them, confirm the installed position, weld the
support frame and limited block on the interrelated parts.
8. Commission
8.1 Preparing before the commission
The content and requirements please see table 3.
Table 3 Preparation Before commission
No.
1
2
3
4
5
6
7
8
Content
Requirements
Safe measure: brake, traveling State in order, action flexible, exact safety, and stable
switch, fuse, and overall switch.
reliable, appropriate gap.
Appearance of metal structure
Without broken, damage, inform, paint take off, welding
seam accordance with requirement.
Transmission mechanism and Assemble rightly, without damage, uninstall; connected
parts
bolt fastness; hinge point turn flexible; chain take-up
appropriate.
Hydraulic system
Assemble rightly, such as pump and each parts.
Lubricating point and lubrication Sure lubricating point oil normally, as require having
system
enough oil or grease.
Electrical system and protected Without joint head, reliable chain lock, motor turning
unit, switch and illumination
right, switch, device and light use well.
Adjust counter weight blocks
Having safe measure, increase gradually.
Cable reel and cable
Cable reel disk right, without damage and burning.
Item
Content
Scraper
transmission
Swing running
Traveling running
Claimer linkage
commission
Linkage
commission with
stacker
9.
Name
Qt. of
per unit
D777-1-3P
Chain
216piece YD476-1P
D273-3-1-14
Sliding bearing
D1004-4-2P
D273-3-1-1
Chain wheel
D1004-4-2P
D302-3-4P
HG4-339-66
D1004-4-2P
HG4-339-66
D302-3-4P
GB288-87
Bearing 53548
D1004-4-2P
GB288-87
Bearing 53322
D302-3-4P
D302-3-5P
Scraper
108
YD476-1P
D302-3-5-1P
Scraper
108
D302-3-5P
10
D302-3-5-2
Liner
108
D302-3-5P
11
D249-3-6-3
Scraper
864
D302-3-5P
12
D238-9-3-1
Wheel
D280-3-1P
D273-10-8P
13
GB288-87
Bearing 3053134
D280-3-1P
D273-10-8P
14
D1004-5-1-3
Electromagnetism
clutch
YD476-2-1P
YD476-2-2P
15
GB281-84
Bearing 1218
D273-11-6P
16
D249-4-4-1
Shield wheel
D273-11-6P
17
GB276-89
Bearing 222
12
D302-6-1P
D273-7P
18
D273-6-1-4
Slide wheel
D302-6-1P
D273-7P
No.
equipment
Drawing No.
Note: The wearing parts for hoist and reducer is not including in
this list.
13
Director:
Check:
Standard:
Draw Up:
Date:
14