Documente Academic
Documente Profesional
Documente Cultură
APR
AWP
BAU
BEE
BIS
CBB
CDM
CII
CP
CPAP
CPC
CPRI
CSH
CSP
CSTB
C-WET
DEA
DPR
DST
EOI
EOP
ERC
ESCOs
FACE
Fraunhofer ISE
FSP
FYP
GBC
GEF
GHG
GIZ
GOI
GW
IEA
IIT
IITB
INR
IREDA
ISO
ITW
JNNSM
kgoe
kWth
LFR
M&E
MNRE
MoEF
Mt
MTE
Mtoe
MW
NABARD
NAPCC
NFTDC
NPC
NPD
NPM
OECD
PAC
PCRA
PIF
PIR
PMU
PPG
PPP
PPR
PSC
PTC
QPR
R&D
RGGVY
RPO
RTA
SBAA
SEC
SERC
SNA
tCO2
ToRs
UAC
UNDAF
UNDP APRC
UNDP CO
UNDP
UNFCCC
USAID
USD or US$
TABLE OF CONTENTS
PART C. ANNEXES............................................................................................................................ 79
ANNEX A. RISK ANALYSIS ....................................................................................................................... 79
ANNEX B. AGREEMENTS........................................................................................................................ 85
ANNEX C. TERMS OF REFERENCE .............................................................................................................. 88
ANNEX D. EMISSION REDUCTIONS CALCULATION ......................................................................................... 91
ANNEX E. SOLAR CONCENTRATOR TECHNOLOGIES ...................................................................................... 93
ANNEX F. SUMMARY OF 11 ENERGY AUDITS & 4 INDIAN CSH CASE STUDIES ............................................... 94
ANNEX G. LIST OF CSH INSTALLATIONS IN INDIA ....................................................................................... 101
ANNEX H. SUMMARY REPORT ON STAKEHOLDERS CONSULTATIONS.............................................................. 105
ANNEX I. LIST OF CSH MANUFACTURERS ................................................................................................. 108
ANNEX J. LIST OF LEADING INTERNATIONAL GROUPS INVOLVED IN TESTING OF SOLAR CONCENTRATORS ............. 110
ANNEX K. SEQUENCE OF ACTIVITIES FOR DEMONSTRATION AND REPLICATION PROJECTS .................................. 111
ANNEX L. PROJECT ANNUAL TARGETS............................................................................................... 113
1.
India is currently the second fastest growing major economy and is the fourth largest in the
world in purchasing power parity (PPP) terms, with steady progress achieved since the start of
2
economic liberalisation reforms in 1991 . The International Monetary Fund predicts 8.3 % growth for
3
India for the year ending 31 March 2011 . The Eleventh Five-Year Plan (2007-2012) predicts an
energy demand of 547 Mtoe in 2011-12 and between 1,350-1,700 Mtoe by the year 2030. The per
4
capita primary energy consumption in India in 2008 was about 540 kgoe/year, which is well below
that of developed countries. While the countrys per capita energy consumption will remain much
lower than that of industrialized countries for the foreseeable future, Indias total energy consumption
is expected to continue to increase significantly for many decades as it continues to develop.
2.
The industrial sector is the second largest energy consuming sector in India after the
residential sector. Industrial sector demand was 114.8 Mtoe of energy in 2008, which is 28% of the
total energy demand of the country5. Growth in industrial energy demand is projected to grow at a rate
of 4.7% per year during the period of 2005-2015. International Energy Agency (IEA) projections are
that the industrial sectors energy demand will increase to 34% of Indias total energy demand in
20306. Electricity is a relatively smaller constituent of industrial energy demand compared to other
major economies; in 2008, only 21% of industrial energy demand was in the form of electricity (Figure
1). The rest of the demand was met by fuels coal, biomass, oil products and gas, which indicate that
a large amount of energy in the industrial sector is used to provide thermal energy/heat. Oil products
accounted for 20% of total industrial demand.
Electricity
21%
Coal
31%
Biomass
25%
Gas
3%
Oil products
20%
http://en.wikipedia.org/wiki/Economy_of_India
http://www.ibef.org/artdisplay.aspx?tdy=1&cat_id=60&art_id=27253
4
http://www.iea.org/stats/indicators.asp?COUNTRY_CODE=IN accessed on 25.12.2010
5
International Energy Agency, http://www.iea.org/stats/balancetable.asp?COUNTRY_CODE=IN accessed on 15.01.2011
6
International Energy Agency. World Energy Outlook 2007.
7
Integrated Energy Policy: Report of the Expert Committee, Government of India, Planning Commission, August 2006.
3
rising oil consumption and relatively flat production has left India increasingly dependent on imports to
meet its petroleum needs. In 2009, India was the sixth largest net importer of crude oil in the world,
importing about 70 per cent, of its needs. India is expected to become the fourth largest net importer
of oil in the world by 2025, behind the United States, China, and Japan. This raises serious concerns
about Indias energy security, in particular its ability to physically source the necessary oil
requirements, the impact of any constrained global supply, and the impact of any consequent increase
in oil prices on the Indian economy.
4.
Increased energy consumption will lead to more greenhouse gas (GHG) emissions; in
particular, given the predominant usage of coal in the countrys energy sector. India's
GHG emissions rose by 58 per cent between 1994 and 2007 from 1,252 million tonne CO2e in 1994 to
8
1,905 million tonne in 2007 at a compounded annual growth rate of 3.3% . Per capita GHG emissions
9
are still relatively low, at 1.25 tonnes of carbon dioxide equivalent (CO2e) per person in 2008.
8.
The Government of India has enacted several policies to support the expansion of
renewable energy:
o Electricity Act 2003: Mandates that each State Electricity Regulatory Commission (SERC)
must establish minimum renewable power purchases; allows for the Central Electricity
Regulatory Commission to set a preferential tariff for electricity generated from renewable
energy technologies; and provides open access of the transmission and distribution system to
licensed renewable power generators.
o National Electricity Policy 2005: Allows SERCs to establish preferential tariffs for electricity
generated from renewable sources.
India: Greenhouse Gas Emissions 2007, Ministry of Environment and Forests, May 2010
http://www.iea.org/stats/indicators.asp?COUNTRY_CODE=IN accessed on 25.12.2010
10
Indian Renewable Energy Status Report. Background paper for DIREC 2010. NREL/TP-6A20-48948 October 2010
9
National Tariff Policy 2006: Mandates that each SERC must specify a renewable purchase
obligation (RPO) with distribution companies in a time-bound manner with purchases to be
made through a competitive bidding process.
Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) 2005: Supports extension of electricity
to all rural and below poverty line households through a 90% subsidy of capital equipment
costs for renewable and non-renewable energy systems.
Eleventh Plan 20072012: Establishes a target that 10% of power generating capacity shall
be from renewable sources by 2012 (a goal that has already been reached); it also supports
the phasing out of investment-related subsidies in favour of performance-oriented incentives.
9.
In June 2008, Indias first National Action Plan on Climate Change (NAPCC) was
released. It outlined existing and future policies and programs addressing climate mitigation and
adaptation. The plan identifies eight core National Missions running through to 2017. The Jawaharlal
Nehru National Solar Mission (JNNSM) is part of the NAPCC. JNNSM has a target for the deployment
2
of 20,000 MW of solar power, 20 million m of solar thermal collector area and 20 million solar lighting
systems by 2022.
10.
The objective of JNNSM is to create a policy and regulatory environment which provides a
predictable and effective incentive structure that enables rapid and large-scale capital investment in
solar energy applications and encourages strong technical innovation and the lowering of costs. The
th
Mission will adopt a 3-phase approach, spanning the remaining period of the 11 Five Year Plan
th
th
(FYP) and first year of the 12 FYP (up to 2012-13) as Phase 1, the remaining 4 years of the 12 Plan
th
(2013-17) as Phase 2 and the 13 FYP (2017-22) as Phase 3. At the end of each FYP, and mid-term
th
th
during the 12 and 13 Plans, there will be an evaluation of JNNSM progress and a review of capacity
and targets for subsequent phases to be based on emerging cost and technology trends, both
domestic and global. MNRE is running a subsidy programme for CSH systems in the context of and to
support the goals of the JNNSM.
Table 1: Targets under JNNSM
S. No.
Application
Segment
Solar collectors
7 million m
200 MW
1,000 MW
2,000 MW
1,000-2,000 MW
4,000-10,000 MW
20,000 MW
20 million m
Note: There are no specific targets for CSH. But the tentative targets are 25,000 m , 50,000 m and 75,000 m
2
in each phase respectively. As of 2007, the installed capacity of CSH is about 5,000 m .
11.
The mission will be implemented by an autonomous Solar Energy Authority and (or) an
autonomous and enabled Solar Mission, embedded within the existing structure of MNRE. Phase I of
the three-phase programme has already been approved by the government and is underway, with a
budget of INR.43.37 billion ($950 million) [@ 46.65 INR = 1 USD] approved.
11
fossil fuels and negative emission consequences of fossil fuel consumption along with large
o
requirements for process heat below 250 C are the key drivers of the strong focus on the development
of solar thermal applications in India. The solar water heating industry in India is fairly well developed
and is already on an accelerated growth path. The use of solar concentrators to meet the process
heat requirement of community, industrial and commercial establishments (concentrated solar heat
CSH) is an emerging and exciting market opportunity in India, and is the target of this project.
14.
The promotion of CSH in India is part of the off-grid programme under JNNSM. MNRE is
2
2
providing a capital subsidy of INR 5,400/m (~ USD 116) and INR 6,000/m (~ USD 129) for CSH
12
systems with single-axis and double-axis tracking respectively . This capital subsidy/unit area of
collector is based on the assessment of MNREs benchmark cost of collectors. Alongside the capital
subsidy, MNRE is also offering a soft loan at a very attractive - interest rate of 5%.
12
Guidelines for off-grid and decentralised solar applications, Ministry of New and Renewable Energy, dated 16.06.2010.
15.
India has witnessed a high growth in renewable energy (table 2) in the last decade.
However, compared to other MNRE programmes in renewable energy (e.g. wind power), which have
been promoted for a much longer time and have achieved large capacity additions, the CSH
programme is relatively new and is smaller in size.
13 14
13
14
XIth Plan Proposals for New and Renewable Energy, Ministry of New and Renewable Energy, December 2006.
NREL. Indian Renewable Energy Status Report, October 2010.
additional environmental finance and supporting activities on the ground that will safeguard
environmental resources. A special focus will be placed on energy efficiency in order to contribute to
the reduction of greenhouse gas emissions in energy intensive industries, transport and the
commercial sector, where a burgeoning population and on-going strong economic growth have
resulted in a growing gap between energy demand and the indigenous and sustainable energy supply
capacity of India.
20.
The Government of India, through its designated nodal department, the DEA, has
exercised the necessary national ownership and direction of UNDP program activities by approving
and signing the Country Programme Action Plan (CPAP) 2008-2012 with UNDP. The CPAP aligns
with the Indian governments Eleventh FYP as it stresses the need to ensure that growth is resource
efficient and environmentally benign in key sectors such as industry, infrastructure and agriculture.
The several multilateral environmental agreements to which India is a signatory climate change,
biodiversity, desertification, chemical management and ozone depleting substances - offer an
enormous opportunity to address global environmental concerns through appropriate action at Indian
national and local levels. The various policy instruments under these agreements (e.g., the Global
Environment Facility, the Multilateral Fund for the implementation of the Montreal Protocol, the Clean
Development Mechanism) are being increasingly used to leverage financing and additional support in
terms of the deployment of state-of-art technologies and capacity development in India.
21.
Under the UNDAF Outcome 4; the Country Program (CP) 2008-2012 has as CP outcome
4.3 Progress towards meeting national commitment under multilateral environmental agreements
with the related output strengthened capacity for low carbon development and sustainable
management of natural resources, while the CPAP specifically refers to GEF as source of funding
through UNDP for climate-related activities.
2.
22.
Solar concentrator systems use lenses or mirrors to focus a large area of sunlight onto a
small area and thus it is possible to achieve higher temperatures than are possible with nonconcentrator technologies (figure 3). The use of solar concentrators for power generation (CSP) and
for process heat generation (CSH) is not new, where in 1912 the first parabolic trough collectors were
used for steam generation to run a 45 kW steam engine pump in Meadi, Egypt and in the 1960s, the
first linear Fresnel collectors were developed in Europe. Since the first oil shocks of the modern era
(1973/74 and 1979/80) a range of solar concentrator technologies have been developed and
deployed, with a primary focus on power applications (concentrator solar power CSP). In California
(USA) nine parabolic trough power plants were built between 1984 and 1991 to produce electricity
with a total capacity of 354 MW, and these plants are still successfully operating today. Subsequently,
two further power plants of 50 MW each (using the same basic technology) were built in 2006 in
Spain, and many more are planned in a number of countries, including India. CSH applications use
the same basic mirrors and technologies as CSP applications but can be much less expensive as fluid
temperatures required are in the range of 120-250C (the focus of this UNDP GEF MNRE CSH
project) rather than the much higher temperatures required for viable CSP projects. India accounts for
70 of the 100 CSH applications installed worldwide to date. India is one of the most promising
countries for CSH large scale deployment as many of its industries are at a small and medium scale, a
scale below where coal fired thermal heat supply systems are best deployed, and where clean
burning, controllable and low cost natural gas is not widely reticulated to industrial zones as is the
case in many other countries. CSH technologies and applications have experienced growing interest
and a large increase in actual working applications from around the year 2000 as global oil prices
have rose.
Process
Drying
Washing
15
Pasteurizing
Boiling
Sterilizing
Heat Treatment
Cleaning
30 - 90
40 - 80
80 - 110
95 - 105
140 - 150
40 - 60
60 - 90
Washing
16
Bleaching
Dyeing
Boiling
Distilling
Various
processes
40 - 80
60 - 100
100 - 160
95 - 105
110 - 300
120 - 180
Metal treatment
(galvanizing, anodizing,
and painting)
Textile Industry
Chemical Industry
Rubber Industry
Vulcanization
All Sectors
Pre-heating
feed-water
chemical
17
of
170
boiler
30 - 100
15
Pasteurization is a process of heating food, usually liquid, to a specific temperature for a definite length of time, and then
cooling it immediately. This process slows microbial growth in food.
16
Bleaching is one of the processes during textile manufacturing in which fabric is bleached to make it whiter and lighter
(remove the gum if it is in yarn stage or remove colours on the fabric). Hot water is required for the bleaching process.
17
Vulcanization is a chemical process for converting rubber or related polymers into more durable materials via the addition of
sulfur or other equivalent curatives.
10
24.
It must be noted that the temperature given in the table above is the process temperature
required for a specific operation. In all these processes, heat is provided at the user point through a
working fluid which is generally pressurized hot water, steam, hot air or hot oil. For heat transfer to
take place, the temperature of the energy carrier must be higher than the required process
temperature.
25.
o
o
o
o
o
There are five main solar concentrator technologies of relevance to this CSH project: Vacuum tube collectors with a CPC (Compound Parabolic Concentrator)
Parabolic Trough Concentrator (PTC)
Linear Fresnel Reflector (LFR)
Parabolic dish with fixed focus (e.g. Scheffler)
Parabolic dish with moving focus (e.g. Arun)
26.
A detailed description of the five solar concentrator collector technologies used in CSH
applications is provided in Annex E. The five technologies differ considerably in their output
(temperature, specific thermal power), cost, module size, area required and weight. Each of these
parameters has a bearing on the selection of the CSH technology used for a particular application.
While CPC collectors and Scheffler (a type of parabolic dish with fixed focus) are better suited for
temperatures lower than 130C and 150C respectively, the other three technologies can deliver
higher temperatures of up to 250C. CPC collectors have the additional advantage that they also
utilise diffuse solar radiation18. Some of the salient features of these technologies are given in Table 4.
Table 4: Comparison of the five CSH technologies
Collector type
CPC vacuum tube
Parabolic dish with fixed
focus (e.g. Scheffler)
Parabolic dish with moving
focus (e.g. ARUN)
Parabolic trough
Linear Fresnel
19
Collector temp
o
( C)
90-130
Specific thermal
20
2
power (kW/m )
0.60-0.65
100-150
0.21-0.31
130 (China);
450-900 (Europe)
250-300 (India)
150-250
0.34-0.50
500-600 (India)
120-250
100-200
0.50-0.56
0.50-0.56
650 (Europe)
650-900 (Europe)
Cost (US $/ m )
27.
In practice, the world-wide experience to date in actual working CSH applications is rather
limited. A survey conducted under the IEA Task 33 Solar Heat for Industrial Processes in 2007,
showed that there were then about 10 CSH installations world-wide (the survey excluded India). As
per the most updated information from MNRE, there are around 70 CSH installations in India (refer
Annex G for the list of the installations). It is estimated that there are around 100 working CSH
installations worldwide. This places India as one of the leading countries in the practical CSH market
deployment domain. The current experience in CSH applications, sector wise is summarized below in
Table 5.
18
As sunlight passes through the atmosphere, some of it is absorbed, scattered, and reflected by air molecules, water vapor,
clouds, dust from human activities and environmental changes, pollutants, smoke from forest fires, and dust from natural
sources and volcanoes. This is called diffuse solar radiation. The solar radiation that reaches the Earth's surface without being
diffused is called direct beam solar radiation. Most solar concentrators are only able to utilize the direct beam radiation
component of sunlight. CPC - which is an evacuated tube collector backed by a concentrator - is able to utilize both diffuse as
well as direct beam radiation.
19
Dr Uli Jakob. International experience and status on solar thermal concentrator technology for process heat applications.
December 2010
20
Specific thermal power output (kW/m2): It is defined as the thermal energy output rate per unit collector area over its operating
time.
11
Sector
Country
Cooling
Hospital
Ipswich, Australia
Thane, Maharashtra
Harnosand, Sweden
Morocco
Gurgaon, India
Chennai, India
Bergamo, Italy
Long Island, USA
Germany
Doha, Qatar
Dalaman, Turkey
Jordan
Newcastle, Australia
Antalya, Turkey
Abu Dhabi (Masdar), UAE
Abu Dhabi, UAE
Rosenfeld, Germany
Seville, Spain
Newcastle, Australia
Gebze, Turkey
Grombalia, Tunisia
More than 50 installations in
India
India
Burkina Faso
Argentinean Altiplano,
Argentina
Latur and Sangli, India
Marrakech, Morocco
Chakan, India
Ankara, Turkey
Germany
Long Island, USA
Fritolay, Turkey
India
Dalaman, Turkey
Kota, India
Industry
Stadium
Hotel
Shopping Mall
Supermarket
Office Building
University/Technology Institute
Food production
Steam Cooking
Baking of bread
Winery
Institutions: hostels, religious,
hotels, etc.
Bakery
Dairy (pasteurization)
Auto industry (7-tank process)
Ball-Bearing Factory
Metal Factory
Piano Factory
Beverage Factory
Laundry
Evaporation
Nuclear Facility
28.
A detailed report was prepared during project preparation phase; however an executive
summary of CSH systems is presented in Annex E. A summary of one of the case studies is
presented in Box 1 for reference. Table 6 provides a summary of the four case-studies main features.
Table 6: Summary of International CSH Case Studies
Industry/
Institution
Location
Case Study 1
Piano Factory
Case Study 2
Winery
Case Study 3
Hotel
Case Study 4
Ipswich Hospital
Grombalia,
Tunisia
Dalaman, Turkey
Queensland,
Australia
12
End-use
application
Year
of
installation
Working Fluid
Type
of
Collector
Aperture Area
Collector
mounting
Thermal Energy
output
Case Study 1
Process heating
and cooling
2010
Case Study 2
Process cooling
Pressurized
hot
o
water @ 200 C
Pressurized
hot
o
water @ 200 C
and
16
bar
pressure
Linear Fresnel
Parabolic Trough
532 m
Roof
430 MWh/annum
(predicted)
2008
Case Study 3
Laundry
and
space cooling
2003
Case Study 4
Space cooling
Pressurized
hot
o
water @ 180 C
Parabolic Trough
Parabolic Trough
2008
o
574 m
Roof
th
Designed to
produce 30% of
the hospitals
peak energy
requirement for
cooling.
360 MWh/annum
(predicted)
88 m
Ground
360 m
Ground
No data available
On 24 May 2007
the energy from
parabolic trough
collectors
was
approximately 590
kWh/day and met
46% of that days
cooling demand
13
Baseline
29.
The main industries/sectors requiring process heat which have an appreciable potential for
21
CSH applications in India are listed in Table 7. Steam is the most widely used working fluid for
o
providing industrial heat at up to 250 C. Apart from steam, the other working fluids employed are
pressurized hot water, hot oil and hot air. The process heat using sectors are divided into two broad
categories (a) those having medium to large steam requirements (steam requirement of > 5 tons/hour)
(b) those having small steam requirements (steam requirement of < 5 tons/hour). The industries
having medium to large steam requirements are characterized by the use of less expensive solid fuels
(in particular coal) which results in a longer pay-back period for CSH systems; also the size and
investment in a typical CSH installation would be large to meet such a substantial steam demand.
Most of the existing CSH installations in India are in industries and for applications having small steam
requirements and using higher cost fuels (in particular furnace oil). Discussions with the CSH industry
during the CSH projects design phase have strongly suggested that in the foreseeable future the
most promising applications for CSH will also be in sectors with small steam needs and using higher
cost fossil fuels, in particular furnace oil. For these reasons, such industries and applications were
studied during the energy audits undertaken during this CSH projects preparation phase.
Table 7: Classification of thermal energy using industries
Remarks for solar concentration
applications
Medium and large steam users ( > 5 tons/h steam requirement)
1. Textile (composite mills, grey Coal
- Longer pay-back periods as in most
Lignite
cloth mills, mills engaged in
cases cheaper solid fuels (coal, lignite,
Furnace oil
finishing operations)
biomass) are used.
Natural gas
2. Pulp and paper (composite
- Large steam requirements and in several
Biomass
paper mills)
cases e.g. pulp and paper, fertilizer and
3. Fertilizer and petro-chemical
petro-chemical, high pressure (> 40 bar;
4. Chemical (dye and
250oC) steam is required.
pigments; organic chemicals;
- High initial investment and large area
rubber processing )
required for CSH collector field to supply
5. Pharmaceutical (bulk drugs)
a significant part of the steam demand.
- No existing CSH demonstration
applications to date
Small steam users ( < 5 tons/h steam requirement)
Predominantly
6. Textile (garments, yarn)
- Pay-back periods are shorter as costlier
Petroleum fuels
7. Paper (recycled paper mills)
petroleum fuels generally used.
8. Chemical (paints and resins)
- The steam requirement is generally small
9. Pharmaceuticals (active
and at low pressures (< 10 bar)
pharmaceutical ingredients
- Smaller initial investment and area of the
and formulations)
CSH collector field for supplying a
10. Food processing (fruit
significant part of the steam demand.
preservation, bread making,
- CSH systems already demonstrated in
drying of plantation products)
India for food processing, hotels,
11. Hotels
institutional cooking, dairy, metal
12. Hospitals
treatment, evaporation and space
13. Institutional cooking (hostels,
cooling applications.
armed forces, religious
institutions, catering, etc.)
14. Dairy processing
15. Laundry
16. Metal treatment (galvanizing,
anodizing, and painting)
17. Space cooling using vapour
Industry/ Application
Fuel used
21
Steam, hot water, hot air, and hot mineral oil are examples of working fluids. A working fluid is commonly generated centrally
and then distributed to various points of use in an industrial or commercial site.
14
absorption cycle
30.
The energy audits conducted during the course of the CSH project preparatory phase
covered several potential CSH application target markets. Detailed information of the results of these
energy audits is attached as Annex F. A summary of the energy audit results is shown in Table 8.
Analysis of the energy audit results shows that availability of adequate space for the CSH collectors
can be a major limiting factor while planning a CSH system. In several cases, the free area available
in the applicable industries is small and hence only a fraction of the thermal energy demand can be
met through CSH technologies. In only 3 out of the 11 industries/facilities surveyed would it be
possible to meet a high fraction (45-100%) of the annual thermal energy demand. In two
industries/facilities a medium fraction (15 - 45%) of the demand could be met by CSH systems. In the
remaining six industries/facilities only a small fraction (<15%) could be met by CSH system mainly due
to inadequate free space for the installation of CSH collectors. Sectors such as hotels/hospitals are
limited by space available for the CSH installations. Other sectors have peak heat demand periods
which fall out of the operating hours when the CSH systems are at their peak. In order to popularize
and infuse the technology into the market, other sectors needs to be explored that have process heat
requirements in the medium temperature range. The results also indicate that there may be many
more promising candidate industries for the application of CSH than originally envisaged in the early
CSH project development stages. At this nascent stage of technology development status of CSH
technologies and systems, the project should aim at supporting CSH applications in the widest
possible range of industries. Restricting this CSH project to only certain industries (as previously
envisaged during the PIF preparation stage) is now seen as unnecessarily restricting the scope of the
project at a stage when the best applications for CSH mass market takeoff in India are not yet fully
clear.
Table 8: Summary of Energy Audits
Sector/Industry
Small dairy farm, Mumbai
(Maharashtra)
Metal treatment, Chennai
(Tamil Nadu)
Pharmaceutical Industry,
Vadodara (Gujarat)
Hospital, Belgaum
(Karnataka)
Chemical (Paint and
Resins), Bawal (Haryana)
Salt making, Tuticorin (Tamil
Nadu)
Metal treatment, Mumbai
(Maharashtra)
Spice drying, Palghar
(Maharashtra)
Pharmaceutical Industry,
Ambernath (Maharashtra)
Hospital, Mumbai
(Maharashtra)
Edible oil, Adilabad (Andhra
Pradesh)
Typical thermal
energy demand
(kcal/hour)
Estimated % of
annual thermal
energy demand
that could be met
through CSH
40,000
1,000
100
200,000
5,400
50
250,000
1,500
46
500,000
1,000
22
450,000
1,500
16
2,000,000
2,000
13
500,000
1,000
11
350,000
450
1,200,000
1,000
250,000
120
<1
4,000,000
600
<1
31.
The MNRE of the Government of India (GOI) is currently supporting CSH installations for
process applications in India with a subsidy scheme that is based on collector area. The 71 systems
2
which are commissioned or under installation totals to about 20,000 m (refer Table G-1 in Annex G;
ProDoc: UNDP GEF Concentrated Solar Heating Project (India CSH)
15
list of the installations provided). The case studies of four installations are provided in Annex F. The
distribution of these systems in terms of applications, technology and size is given in Table 9 below.
To date, the predominant application of CSH in India has been for steam cooking and the predominant
CSH technology in India is Scheffler.
Table 9: Distribution of CSH systems in India (technology, system size and applications)
71
52
Cooking systems
Solar cooling
Other applications (food processing, evaporation,
hotel, hospital, institutional cooking, dairy, metal
treatment )
5
13
2,502 m
54 m
41
2
22
2
298 m
18,500 m
1,500 m
22
32.
A recent technical paper has estimated 2-5 years simple payback for Scheffler and 4-8
23
this is after
years payback period for ARUN CSH systems at furnace oil prices of INR 36/litre
including the relevant government subsidies and accelerated depreciation benefits. Annual fuel
savings are a function of CSH system characteristics, solar energy availability and the cost of the fuel
saved. The calculations have been done for specific system characteristics based on performance
claims of the manufacturers, a range of furnace oil prices and considering different values of annual
sunshine hours. In the absence of the necessary measured performance data of existing CSH
installations, unfortunately a full financial analysis of the existing CSH systems in India is not yet
possible.
33.
Figure 5 shows the direct normal solar resource on the map of India. Except for CPC, all
the other CSH technologies can only utilise the direct normal solar radiation component. The map
shows that western, southern and central India have a higher direct normal radiation compared to
north, east and north-eastern states. The map also shows that the 5 states having the most CSH
systems in India are Gujarat, Maharashtra, Andhra Pradesh, Tamil Nadu and Karnataka - all of them
belonging to the higher Direct Normal solar resource regions of India.
22
V R Sardeshpande and I R Pillai . Solar concentrador for Industrial Thermal Applications Indian Scenario, Proceedings of
the Second IASTED International Conference Solar Energy (SOE 2010), July 15-17, 2010, Banff, Alberta, CANADA
23
Furnace oil prices corresponding to a crude price of around US$ 100-120/ barrel
16
Gujarat (3,598)
Maharashtra (6,961)
Andhra Pradesh (1,592)
Karnataka (3,666)
17
24
34.
The MNRE subsidy scheme appears to be generally accessible, simple enough to
understand, and sustainable into the foreseeable future. It has been a very useful support mechanism
in most of the 71 installations to date in India. However, in its present form the MNRE subsidy scheme
does not sufficiently differentiate between the different available CSH technologies on the basis of
their performance, and hence the MNRE subsidy scheme in practice serves to promote the extension
of the simplest and lowest cost existing CSH technologies currently available in India (in particular
Scheffler) even in applications where other technologies (e.g. Arun or international CSH technologies
not yet deployed in India) may be more appropriate.
35.
The current MNRE CSH support programme is also not focused on providing support for
the development of standard CSH technology application information packages, testing and
standardisation, capacity building and focused CSH market creation. The absence of any systematic
monitoring of in-use process oriented CSH applications means that the performance of existing CSH
applications is not quantified and hence the necessary technical learning from the operation of the
existing CSH applications in India is limited to date. In the absence of such properly monitored real
field CSH performance data, the credibility of the actual performance of the existing CSH technologies
in real applications in India is low, and this is a key barrier to the increased uptake of CSH in India.
There is also a shortage of site-specific applicable direct beam solar radiation data. As the
performance of the solar concentrator systems under consideration (except for CPC which also works
under diffuse radiation) depends on the available direct solar radiation, the absence of direct beam
solar radiation data hinders the realistic estimation of CSH applications performance in India.
36.
The potential end users of the CSH industry in India are not exposed to the latest
international CSH technology developments, which are primarily occurring in IEA/OECD countries.
Equally, the existence and scale of existing and future Indian commercial CSH applications remains
essentially unknown to global CSH technology developers in Europe and other IEA/OECD countries,
thereby limiting the growth of CSH markets outside India.
37.
There are 10 existing CSH manufacturers in India that are known to MNRE (Annex I,
Table I-1). One manufacturer is involved in the making of ARUN parabolic dish with moving focus and
2- axis tracking, the rest are manufacturers of the simpler Scheffler CSH systems. A further eight
prospective potential CSH suppliers were identified during the CSH projects design stage (Annex I,
Table I-2). The prospective CSH suppliers products were either indigenous CSH technologies that are
still under development or internationally sourced CSH technologies. However, most of the existing
and new CSH suppliers are small or medium sized companies and therefore they have only limited
financial and technical capacity to develop their indigenous technologies or to access new
technologies available internationally.
38.
In India, out of the five solar concentrator technologies, only two i.e. parabolic dish with
fixed focus (Scheffler) and parabolic dish with moving focus (ARUN) have been used for thermal
applications to date. Parabolic trough, linear Fresnel and CPC technologies have not yet been used
for commercial CSH applications in India. No specific work is yet underway to support the introduction
of CPC evacuated tube technologies for lower temperature process heat applications in India, where it
is a particularly promising low cost mass-market technology option. The lack of a full suite of
applicable CSH technologies in India means that there is often a mismatch between the technology
deployed and the real process application temperature requirements.
39.
A handful of Indian academic institutions (e.g. the Indian Institute of Technology - Bombay
and Indian Institute of Technology - Madras) have faculty members actively working on CSH
technologies and applications. The number of Masters and PhD level students working on CSH
technologies and applications is still limited. It is widely agreed that the existing CSH skill resource
base is inadequate to support the envisaged CSH market growth. A clearly and widely acknowledged
risk is that the high profile and official GOI supported CSP deployment plans may siphon off the
limited CSH expertise, and thus severely limit CSH market growth in India.
40.
Annual data on CSH installations, let alone their performance, has not been recorded on a
suitable sector wise basis. CSH projects approved by MNRE for financial subsidy in the year 2006-07
24
MNRE is providing a capital subsidy of INR 5,400/ m2 and INR 6,000/m2 for CSH systems with single-axis and double-axis
tracking respectively24. The capital subsidy/unit area of collector is based on the MNREs assessment of the benchmark cost of
collectors. Besides the capital subsidy, MNRE is also offering a soft loan at an attractive 5% interest rate.
18
25
only total 1,400 m , with a marginal increase to 1,732 m in 2009-10 . In the absence of specific,
integrated and multiple barrier removal actions (one of the prime objectives of this UNDP GEF MNRE
CSH project), installed capacity figures from new CSH applications are not expected to appreciably
increase in the next five years from the baseline situation. The necessary technology development
and the economies of scale required to increase awareness, underpin credibility, and reduce CSH
prices to drive Indian CSH market growth by a factor of 6-8 in the next 5 years, will only occur with the
implementation of the initiatives under this UNDP GEF MNRE CSH project.
Alternative Scenario
2
41.
Under the baseline scenario, the annual rate of installation is currently around 2,000 m
2
with a projected marginal increase of 3,000 m per year over the next five years. The cumulative area
2
of CSH installations would thus reach 35,000 m by the year 2015-16. In the alternate scenario, a
targeted CSH market development approach with specific integrated and multiple barrier removal
actions would be undertaken with GEF funded interventions and total Indian CSH installations would
2
2
go up by an additional 45,000 m - resulting in a total Indian CSH installed working area of 80,000 m
at project end. The additional CSH installed collector area gain would be from 30 demonstration
2
2
projects totalling 15,000 m with the remaining 30,000 m coming from 60 replication projects. The
2
annual rate of CSH installations in India would reach 15,000 m annually as the project nears its end which is an increase by 6 to 8 times of the current annual rate of Indian CSH new installations.
90,000
80,000
Baseline scenario
70,000
Project scenario
60,000
50,000
40,000
30,000
20,000
10,000
0
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
Year
Table 10: Year-wise projected CSH installations in m of collector area (2011-12 to 2015-16)
Year
2011-12
25
BAU (m )
Demonstration
2
projects (m )
3,000
Replication
2
projects (m )
3,000
Total (m )
6,000
Annual
emission
reductions
*
(tCO2/year)
1,050
19
Year
BAU (m )
Demonstration
2
projects (m )
Replication
2
projects (m )
2012-13
3,000
3,000
4,000
2013-14
3,000
6,000
5,000
2014-15
3,000
6,000
6,000
2015-16
3,000
0
12,000
Total
15,000
18,000
27,000
*
2
Annual emission reductions = year wise installations * 0.35 tCO2/m /year
3.
Total (m )
10,000
14,000
15,000
15,000
60,000
Annual
emission
reductions
*
(tCO2/year)
2,450
5,250
8,400
15,750
32,900
BARRIER ANALYSIS
2
42.
The Eleventh FYP proposed an aspirational target for the installation of 250,000 m of
CSH systems to occur during the 2007-12 period. However, the actual achievement of CSH
2
th
installation was only 15,000 m during first the 3.5 years of the 11 five year plan. This clearly shows
that there are a number of major additional barriers to the dissemination of the CSH technology in
India that are not being fully addressed by existing MNRE baseline CSH support activities. The key
additional CSH barriers that this UNDP GEF MNRE CSH project will address are presented in Table
11.
Table 11: Barrier Analysis
Barrier
Description
(1)
Technology package barriers
Only two examples of CSH technologies (ARUN and
The full set of concentrated
Scheffler) - out of the five applicable broad CSH technology
solar technologies developed
types developed worldwide to date - are currently deployed
and available worldwide for
in India under real field conditions. In particular, Linear
process heat (CSH)
Fresnel Reflector (LFR), Parabolic Trough Concentrator
applications are yet to be
(PTC) and Compound Parabolic Concentrator (CPC)
demonstrated in India
technologies are yet to be deployed and operated in the
commercial and industrial sector in India. The different CSH
technologies offer a mix of specific features in terms of
thermal output and hours of heat production, collector area
required, weight of the system, heating fluid temperature
range produced, etc. It is imperative that the entire set of
CSH technologies are made available and deployed in India
as a pre-requisite for developing the necessary full widerange of CSH technology application packages.
To date, CSH applications in India have been primarily
Non-availability of a full range
of CSH technology application focused on the use of the Scheffler CSH technology for
institutional cooking. There are more than 50 such
packages in India
installations from several CSH suppliers, successfully
establishing the applicability of Scheffler based CSH
technology for this sector in India. Some further Indian CSH
applications have already been demonstrated in the
cooling, dairy pasteurisation, laundry, automotive, and
heavy water production sectors. Standard technology
application packages covering an integrated combination of
process integration, CSH technology, heat storage and
other key success factors are lacking for these and other
promising applications to systematically capture the results
and lessons learned from these early demonstration
projects and extend this to additional promising CSH
application sectors in India.
Non-availability of performance In the absence of standardised performance measurement
measurement standards and
standards and protocols, it is very difficult to measure the
ProDoc: UNDP GEF Concentrated Solar Heating Project (India CSH)
20
26
21
CSH industry/experts
27
Furnace oil price corresponding to the crude price of around US$ 100-120/ barrel
V R Sardeshpande and I R Pillai. Solar concentrators for Industrial Thermal Application Indian Scenario, Proceedings of the
Second IASTED International Conference Solar Energy (SOE 2010), July 15-17, 2010, Banff, Alberta, CANADA
28
22
4.
KEY STAKEHOLDERS
43.
A large number of stakeholders from Government, industry, national and international
research and academic institutions, international organizations and financial institutions need to work
closely and seamlessly together for the successful development of the CSH market in India. A brief
description and proposed role of key stakeholders is presented in Table 12.
Table 12: Key stakeholders involved in CSH
Stakeholder
Government
Ministry of New and Renewable
Energy (MNRE)
Role
29
29
This column describes the role of the stakeholder in the implementation of the CSH, or the role of the stakeholder in the
implementation of the proposed project.
23
Stakeholder
Petroleum Conservation
Research Association (PCRA)
Role
29
the identified areas of SERI work. DST will be invited to join the
CSH Project Advisory Committee.
MoEF is the GEF focal point for GEF projects in India and thus will
liaise with GEF and provide overall coordination of the project.
The SNAs are the state level agencies for promotion of renewable
energy and will have a role in the MNRE subsidy disbursement
component for the CSH projects 30 demonstration and 60
replication projects.
PCRA works on behalf of the Ministry of Petroleum and Natural
Gas on the conservation of petroleum products leading to
environment protection, energy security and sustainable
development. As most of the CSH applications would be to
substitute for existing petroleum products use, PCRA will be
invited to join the CSH Project Advisory Committee.
It is an autonomous, non-profit, national level organization to
promote an enhanced productivity culture in India. National
Productivity Council was established as a registered society in
1958 by the Government of India. It provides training, consultancy
and undertakes research in the area of productivity. National
Productivity Council would be a potential candidate for being one of
the component managers for the CSH projects component 3
(Planning and operationalising demonstration projects).
Industry / Associations
Confederation of Indian
Industries Sohrabji Godrej
Green Business Centre (CIIGodrej GBC)
24
Stakeholder
TERI University
International Organizations
US Agency for International
Development (USAID)
Deutsche Gesellschaft fr
Internationale Zusammenarbeit
(GIZ, formerly GTZ)
Role
29
Financial Institutions
Indian Renewable Energy
Development Agency (IREDA)
25
Stakeholder
Institut fr Thermodynamik und
Wrmetechnik (ITW), University
of Stuttgart, Germany
German Aerospace Centre
(DLR), Cologne, Germany
Le Centre Scientifique et
Technique du Btiment (CSTB),
France
Solar Institute Julich, Germany
Role
29
26
27
6.
Policy Conformity
49. The UNDP GEF MNRE CSH project fully conforms to the Strategic Programme (SP-3)
Promoting Market Approaches for Renewable Energy under the Climate Change focal area strategy of
GEF-4.
Country Eligibility
50.
India ratified the United Nations Framework Convention on Climate Change (UNFCCC) on
1 November 1993. India has completed and submitted its First National Communication and is
currently preparing its Second National Communication.
7.
28
54.
In the absence of performance data on existing CSH systems, the credibility of existing
CSH technologies in real applications is low, and this is a key barrier to the increased uptake of CSH
in India. The performance assessment of existing installations (Activity 1.1.1.1) will provide data on
ProDoc: UNDP GEF Concentrated Solar Heating Project (India CSH)
29
actual field performance which will be required for technology assessments (Activity 1.1.1.2) as well
as for awareness programmes on CSH (Activity 2.1.5.2). Energy audits were conducted for three units
with installed CSH during PPG. This has given some useful understanding which is presented in this
document in Annex F. But it is proposed to conduct more energy audits in order to capture seasonal
performance in more number of units. The activity will start in the third quarter of Year 1 and will be of
one-year duration. The first step in the activity will be enumeration of existing installations and
selection of 15 installations from these for performance assessment. Factors such as the type and
make of CSH systems, their collector area, application, location, operational lifetime and solar
resource availability will be considered for the selection of suitable CSH installations. Available
performance monitoring data will be reviewed. A review of the design basis, review of operating
performance, and onsite testing and measurement will be the required tasks during the performance
assessment. For onsite testing and measurement, available monitoring protocols along with inputs
from the work being undertaken on developing performance monitoring protocols (Activity 1.2.1.1) will
be utilised.
55.
CSH is a developing field and hence periodic technology assessments that cover the
technical features, cost, applications, technology outlook, technology development areas/needs, etc.
for each of the solar concentrator technologies are needed. A comprehensive solar concentrator
technology assessment (Activity 1.1.1.2) covering all the five key solar concentrator technologies
(CPC, Linear Fresnel, Parabolic trough, Parabolic dish with fixed focus and Parabolic dish with moving
focus) will be carried out. There will be two assessments, one at the start of the project during Years 1
& 2 and the other towards the end of the project in Year 5. The first assessment will start in the last
quarter of Year 1 for one-year duration. The assessment will cover the technical features, cost,
applications, technology outlook, technology development areas/needs, etc. for each technology. This
assessment will provide inputs for the development of technology application information packages
(Activity 1.1.1.4) and guidance for the selection of demonstration projects. The second assessment in
Year 5 will update the first assessment based on the results from the demonstration and replication
projects. It will be a shorter exercise compared to the first assessment but will be critical for preparing
an end-of-the-project strategy for technology development. The assessments will be undertaken by a
joint team of international and national consultants.
56.
The understanding of the market potential for CSH is presently limited and current market
development efforts lack focus, thus slowing down CSH proliferation in India. Activity 1.1.1.3 on
market assessment will provide insights into a whole range of issues solar radiation, actual process
temperature range requirements, system-size, economics, industry/sector outlook, etc. which impact
CSH performance and will clarify the precise segments of the process heat market which CSH can
viably address and the volumes corresponding to such segments. Like technology assessment, the
market assessment too will be done twice. The first assessment will be a more detailed study that will
be done towards the beginning of the project i.e. in Year 2. The second assessment will be carried out
in Year 5 and will be utilized for preparing the end-of-the-project strategy for on-going market
development. The market assessment study will draw from interim findings and results of Activity
1.1.1.1 and Activity 1.1.1.2.
57.
The issues of integrating CSH into the existing energy systems of the applicable user
industries/ sectors will be analysed and then develop technology application information packages
consisting of guidelines for selection of CSH technology, design and integration issues, installation,
best operating and maintenance practices and computation of benefits and costs specific to the
selected sector. The technology application information packages will bring about standardization and
predictability in terms of sizing and boundary conditions for CSH performance. Ten technology
application information packages will be developed (two in Year 2, three each in Years 3 and 4, and
the remaining two in Year 5). An indicative list of technology application information packages to be
considered for development is given in Table 14. The list may get modified based on the results of the
market assessment study. The outline of a typical technology application information package is given
in Box 2.
30
information
zero-waste
information
processing
58.
The possible impacts of this outcome are increased number of companies that are
interested in the CSH installations, increased number of technology package suppliers and companies
that are using CSH technology application information packages.
GEF support is required for the necessary technical assistance in the performance, technology and
market assessments and developing technology application information package.
Outcome 1.2: Adoption of standards and specifications for guidance of manufacturers and users for
assurance of CSH quality, safety, and performance
59.
Standards and specification on quality, safety and performance forms the basis for
comparing various technological options, developing minimum standards and specifications by the
governments, and guiding the direction of future technology development. Development of standards
and specifications is an important milestone in development of any technology. The performance
standards and technology specifications for CSH systems are yet to be developed fully in India, as
well as internationally. This outcome addresses the need to adopt the developed suitable performance
31
standards and technical specifications that can be used by CSH manufacturers, the government and
the users for assuring the quality, safety and performance of CSH systems.
Table 15: Activities for Delivering Output 1.2.1
Output
Activities
1.2.1 Developed CSH
1.2.1.1 Development of performance measurement standards, test
performance standards
protocols, and minimum performance norms for CSH
and technology
applications
specifications
1.2.1.2 Development of field performance monitoring guidelines for
CSH end-use applications
1.2.1.3 Development of specifications for materials/ components/
systems for CSH applications
1.2.1.4 Completion of the process for consideration and adoption
as draft national standards by BIS
1.2.1.5 Completion of the process for standards and specifications
adoption as international standards by ISO
60.
CSH producers, customers, intermediaries, advisors and policy-makers need suitable
neutral and widely accepted standards pertaining to the quality, safety and performance of CSH
technologies and applications. Under Activity 1.2.1.1, one performance measurement standard and
five test protocols (for the five CSH technologies) along with minimum performance norms for each
CSH technology will be developed. The performance measurement standard will provide an equitable
basis for comparing different types of CSH systems and applications. The development of the
standards will take into consideration the existing work done in India by IIT Bombay and SEC under
MNRE sponsored projects and technical guidelines already issued by MNRE 30. It will also take into
consideration any international standards that are available at the time of undertaking this activity.
Specific test protocols and minimum performance norms based on the performance measurement
standards will be developed for the five main CSH technologies. Once the minimum performance
norms are established, it will be possible to start the elimination of sub-standard products and improve
the quality of the CSH systems available in the Indian market. Minimum performance norms will also
be useful for end-users to measure and compare the performance of the different CSH technologies.
The work on the performance measurement standard will start in the third quarter of Year 1 and will be
completed by the end of Year 2. The work on protocols and norms will continue until the end of Year
3.
61.
While it is possible to measure and characterise the performance of individual modules of
solar concentrator collectors in dedicated test lab facilities, the performance of the CSH system (solar
concentrator + balance of systems consisting of piping, storage, controls, etc.) can only be measured
in the field under the actual working conditions. Field performance monitoring guidelines (Activity
1.2.1.2) will be developed for monitoring the field performance of CSH systems. The guidelines will
cover monitoring of the wider CSH system i.e. the CSH technology as well as balance of system
elements. The guidelines will specify the data to be collected, instruments to be used, performance
parameters to be calculated and the procedures for calculation and presentation of results. This work
will be undertaken in Year 2. These guidelines will be used for the monitoring of the demonstration
and replication projects (Component 3).
62.
Development of specifications for materials, components and systems (Activity 1.2.1.3)
will help in standardising the entire CSH systems (and not only the solar concentrator part of CSH
systems) and will result in better quality CSH installations. The specifications can cover piping,
insulation, storage, instrumentation and control, tracking systems, civil works and support structures,
safety features, measuring instruments, etc. This work will be undertaken from Year 2 until Year 5.
30
Please refer to MNRE brief technical note minimum technical specifications of various components of solar steam generating
systems which is available on MNRE website http://www.mnre.gov.in/
32
The development of these specifications will be carried out by technical groups having due
representation from the CSH industry.
63.
BIS is the body responsible for the development and promotion of all national technical
standards in India. Activity 1.2.1.4 will be undertaken to ensure that the standards developed in the
project will become national standards and adopted as draft national standards under the BIS
framework. As the formulation of BIS standards is a long process, the process for adoption as draft
national standards BIS standards will be initiated. However, the finalization of the BIS standards may
extend beyond the project implementation period. Since MNRE is the implementing partner of this
UNDP GEF MNRE CSH project, which is responsible entity to continue to provide advocacy and
influence the finalization, approval and adoption of the standards even if this activity goes beyond the
project duration. This activity will then be integrated as a part of project exit strategy if not completed
during project implementation period.
64.
The International Organization for Standardization (ISO) is the world's largest developer
and publisher of International Standards. ISO is a network of the national standards institutes
of 163 countries, with one member per country, and with a Central Secretariat in Geneva, Switzerland
that coordinates the system. As currently there are no ISO standards for CSH systems, it would be
very useful for the Indian project to coordinate and be a leading player in any process to develop ISO
CSH standards. The BIS represents India in ISO. Under the activity (Activity 1.2.1.5) need based
technical support to the BIS for performance standards and specifications submission to ISO and the
MNRE will be provided to participate in the formulation of ISO standards for solar concentrators/ CSH
systems.
65.
The possible impacts of this outcome are a number of Indian CSH system components
and equipment manufacturers comply with BIS standards, few have entered into international CSH
business through meeting international standards i.e. ISO.
GEF support is required for the technical assistance in the development of performance measurement
standards, field performance monitoring guidelines, and specifications needed for material, system
components required for CSH end-use applications. Support is also needed from international and
national experts to standards setting bodies to enable standard setting bodies to make use of
technical standard setting procedures. Assistance is also needed to cover the incremental cost of
equipment to conduct field assessments.
Outcome 1.3: Adequately capable and operational testing laboratories for verification
manufacturer claims and guidance of CSH users to enable informed decisions
of
66.
Testing facilities have yet to be developed and made available for the laboratory and field
testing of CSH systems in India. Also, while two types of parabolic dish technologies have been used
for thermal applications in India, other key CSH technologies available internationally, in particular
CPC, parabolic trough and Linear Fresnel are yet to be deployed and tested in India. This outcome
addresses the need for proof-of-concept testing in Indian conditions of some of the internationally
available CSH technologies and establishing in place one national and one regional facility to test
CSH technologies and systems. The SEC will take the lead and will coordinate all the activities
planned under this output.
Table 16: Activities for Delivering Output 1.3.1
Output
1.3.1 Developed CSH system
components and
equipment testing facilities
Activities
1.3.1.1 Proof-of-concept testing of new technologies at SEC
1.3.1.2 Establishment of a national testing facility for CSH
technologies and applications at SEC
1.3.1.3 Strengthening of one regional testing facility for CSH
technologies and applications
33
67.
Under Activity 1.3.1.1, sample modules of the selected CSH technologies which have not
yet been demonstrated in India will be imported and installed at SEC. The basic objective of this
activity will be to test these CSH technologies under Indian conditions. The SEC staff which will be
trained in testing of CSH technologies (Activity 2.1.4.1) will be responsible for the testing of these
technologies. This activity will start in Year 2 with the purchase of suitable CSH technology sample
modules and testing will continue till the end of the project. Partial financial assistance for the import of
the new (to India) CSH technologies will be provided. The existing rules and regulations that govern
partial financial assistance from government programs shall be applied. If the existing rules and
regulations are not applicable, or there are no such things in existence, the appropriate rules and
regulations will be developed for the provision of this partial financial assistance.
68.
Under Activity 1.3.1.2, SEC will be developed as the national testing facility for CSH
technologies. SEC is already in the process of setting-up a 1 MW CSP facility in association with IIT
Bombay. A solar cooling system and a steam generation system using solar concentrators are also
being planned. SEC is also a testing centre for solar water heaters (flat plate and evacuated tube
collectors). Thus SEC has the necessary basic instrumentation and some useful expertise in testing of
solar thermal systems. The existing capacities of SEC will be supplemented by making available
trained human resources as well as providing partial support for the purchase of equipment for testing
of CSH technologies. A mobile CSH testing facility which can be used for field testing and
performance monitoring of CSH systems will be set up under this activity. As SEC has limited human
resources and hiring of new manpower is not an easy option for it, SEC will explore the possibility of
having a tie-up with a reputed testing centre, e.g. Shriram Institute of Industrial Research, for providing
human resources for operation of the testing facility during the project. This activity will start mid-way
through the second year and will then continue till the end of the project.
69.
The technical capacity of one regional CSH test centre in southern or western India
(Activity 1.3.1.3) will be strengthened following the basic objective of having a regional CSH test
centre catering to the regional CSH testing requirements in southern and western India, where CSH
technologies already have a strong foothold and where there is a particularly good solar energy
resource. This activity will start from the third year and will continue till the end of the project.
70.
Given the vision of global leadership for Indian CSH industry, pertinent knowledge, as
required and as available, will be drawn from foreign sources for development of the Indian CSH
testing facilities. In this context, one or more of the leading international groups involved in the testing
of solar thermal systems will be contacted for potential knowledge sharing. A list of some of the
leading international groups involved in the testing of solar thermal systems is provided in Annex J.
71.
The possible impacts of this outcome are availability of accredited test facilities in India for
CSH components and equipment and a number of manufacturers and equipment suppliers utilize the
services provided by these facilities. Also it is anticipated that some of the international CSH system
component and equipment manufacturers approach these test facilities to enable marketing of their
products in India.
GEF assistance is required to cover the incremental costs in the deployment of CPC, parabolic trough
and Linear Fresnel technologies at SEC in India. Also technical assistance needed to ensure test
facilities, national and regional, are established as per international standards.
Component 2: Awareness enhancement and capacity building
Outcome 2.1: Strengthened technical capacity and awareness of stakeholders of CSH systems for
industrial/ institutional process heat applications
72.
This component deals with the awareness creation and capacity building of key CSH
stakeholders. It is proposed that the entire component be managed by the Project Management Unit
34
(PMU) and for this purpose a Project Manager (Awareness and dissemination) will be hired at the
PMU.
73.
Key main barriers in the promotion of CSH technologies for process heat applications in
India are the lack of awareness amongst potential user segments, limited technical ability at the end
user level to properly operate and maintain CSH systems, and a shortage of trained technical and
scientific manpower to serve the CSH industry.
Table 17: Activities under Output 2.1.1
Output
2.1.1 Trained manufacturers/
vendors, installers and
CSH users
Activities
2.1.1.1 Training needs assessment
2.1.1.2 Development of training programmes and materials for
different stakeholders
2.1.1.3 Organisation and conduct of training programmes
2.1.1.4 Organisation and conduct of an international study tour
74.
CSH manufacturers and their vendors, installers and end-users are important
stakeholders in the manufacturing, installation and proper use of CSH systems. There is a need to
further develop the required technical capacities of all these stakeholders. The training of CSH
manufacturers and vendors will focus on all five main CSH technologies - to supplement the current
focus on the Scheffler open source CSH technology. The capacity building of installers will be across
all technologies and manufacturers/suppliers. For the training of the end users, two technical persons
for each of the new CSH systems (30 demonstration and 60 replication projects) will be trained in the
basics of CSH technologies, systems and their proper operation and maintenance. Specific training
modules will be developed for these three segments after conducting a training needs assessment
exercise in year 2. In all six (6) CSH training programmes for manufacturers, their vendors and
installers and nine (9) training programmes for end-users are planned. In total fifteen (15) training
programmes will cover 300 participants. The training programmes will be phased as follows: none in
year 1; three in year 2; five each in year 3 and 4; and two in year 5.
75.
To date, most of the Indian CSH industry has had only limited interactions with the latest
international CSH technology developments. Although India accounts for the great majority of known
global CSH projects, linkages are still very weak between the international development of CSH
technologies and Indian CSH technology and applications experience. The latest technical
developments in IEA/OECD countries offer CSH technical advances that would be very useful in India,
but appear to be largely unknown by the nascent India CSH industry. A study tour for key players in
the Indian CSH industry will be organised to visit international best practice/ innovative CSH
technology developers and installations and interact with the designers and users of these CSH
systems. This exposure to international developments will help the Indian CSH industry to further
improve its products. The study tour will be organised in year 2 of the project. The UNDP GEF MNRE
CSH project will cover 50% of the tour cost of the carefully selected Indian CSH private sector
participants, the remaining 50% of the tour cost will be contributed by their parent organisations and/or
the Indian CSH industry. The study tour will be of at least 2-weeks duration.
GEF support is required for technical assistance in the training needs assessment, design of the
training courses and the cost for implementation of training programmes. Also to cover the
incremental cost involved in the international study tour.
Table 18: Activities for Delivering Output 2.1.2
Output
2.1.2 More trained technical consultants that
provide technical services to both CSH
system components & equipment
manufacturers and user
Activities
2.1.2.1 Development of training programme and
material
2.1.2.2 Organisation and conduct of 4 training
programmes
35
76.
Industry/ sector process experts, energy auditors and Energy Service Companies
(ESCOs) have direct access to potential CSH end-users and, if properly trained, they will be able to
identify potential CSH applications and will become an important interface between the CSH
manufacturers/suppliers and end-users. Hence, a capacity building programme to train 100 technical
consultants in CSH will be developed and undertaken. The technical consultants will be trained to
carry-out pre-feasibility and feasibility studies and prepare detailed project reports for CSH systems.
There will be four training programmes -- one each during years 2, 3, 4 and 5. Activity 2.1.2.1 -- to
prepare the training programme and training material -- will be undertaken during year 2. This will be
followed by activity 2.1.2.2 under which the four training programmes will be conducted.
GEF support is required for the technical assistance in the development of training courses and the
cost for implementation of training programmes for technical consultants.
Table 19: Activities for Delivering Output 2.1.3
Output
Activities
2.1.3.1 Design and implementation of an academic
2.1.3 Established and supported industryprogram involving courses and applied research of
academic partnership through research
CSH technologies.
programmes to build future technical
capacities
77.
Expanding the CSH industry in India by a factor of 6-8 will require a large expansion in the
available trained technical manpower for the design, in-house R&D, production, marketing, installation
and O&M of CSH technologies and systems. During the project design stage, the Indian CSH industry
reported spending significant time and resources on training their necessary technical manpower. A
shortage of high-end technical manpower is a significant constraint in expanding the number of
successfully operating CSH systems in India. The greater availability of high-end technical manpower
having a good basic knowledge and understanding of CSH technologies and systems is vital for the
required growth of the Indian CSH industry. Almost all the CSH industry players are also involved in
some in-house R&D/pilot testing, and yet generally have only limited collaboration with suitable
academic institutions. Development of closer interactions between the CSH industry and academic
institutions will promote applied research in CSH technologies in academic institutions; improving the
Indian CSH knowledge base and increasing the pool of technical skilled manpower, both are required
for the Indian CSH industry to develop and grow annual CSH installation numbers by the required
factor of 6-8. To address both of these requirements, 10 fellowships (06 for M Tech and 04 for PhD
level studies) will be awarded (three fellowships every year) to train high-end technical manpower for
the Indian CSH industry as well as in undertaking specific joint academic/industry CSH R&D projects.
Efforts will be made to ensure that at least some of the scholarships are provided to female students.
Some of the CSH post-graduate fellows supported through these fellowships may also join academic
institutions as faculty members which in-turn would strengthen academic institutions in undertaking
teaching and research in CSH. Some of the fellowships can also be available to international students
with an aim to develop joint research projects between international and Indian academic institutions
in the field of CSH technologies and applications. The research topics for these M Tech and PhD CSH
fellowships will be jointly decided by the CSH industry and academic institutes. It is also expected that
some of the students availing these fellowships will be working professionals in the CSH industry. It is
envisaged that 5 Indian academic institutions will participate in this initiative. Apart from fellowships,
work with premier educational institutes will be carried out to develop curriculum and course material
for a Masters level course on CSH. The development of the curriculum will be taken up in during year
2 and 3. Vice Chancellors of Universities, Principals, and Head of the Departments of Colleges
offering post-graduate programmes in energy/renewable energy will be consulted to start offering this
course as an elective course.
GEF support is required for the technical assistance in the design and development of curriculum for
academic institutions. Assistance is also required to cover the incremental cost of the fellowships with
specific joint academic/industry CSH R&D projects and other experimental research.
36
Activities
2.1.4.1 Organisation and conduct of international training
programme on testing
2.1.4.2 Organisation and conduct of national training
programmes on testing
78.
Output 2.1.4 is linked with Output 1.3.1 and is aimed at training the required human
resources for the testing of CSH systems in India. Under activity 2.1.4.1, a one-week training of
trainers programme to train 5 solar professionals in the testing of CSH systems, will be organised at a
leading international institution engaged in CSH testing during the beginning of year 2. Some of the
possible international institutions where such a programme could be conducted are Fraunhofer ISE,
Germany (www.ise.fraunhofer.de); ITW Stuttgart, Germany (www.itw.uni-stuttgart.de); DLR, Germany
(www.dlr.de) and CSTB, France (www.cstb.fr), Solar Institute Julich, Aachen, Germany (http://www.fhaachen.de/energy_systems.html). Under activity 2.1.4.2, a national training programme will be
organised at SEC to train personnel involved in CSH testing at SEC and regional testing centre. The
trainers trained in the international training programme will be the faculty for this training programme.
The programme will be organised once the SEC testing facility has become fully functional, tentatively
this programme is scheduled towards the end of year 2.
GEF assistance is required for the cost of implementation of training programmes on the testing for
national and regional test facility staff, and incremental cost involved in the international study tour.
Table 21: Activities for Delivering Output 2.1.5
Output
2.1.5 Completed awareness enhancement
programmes for policy makers,
academicians, industries, financial
institutions, etc. to facilitate
replications
Activities
2.1.5.1 Organisation and conduct of International CSH
conference and exhibition in year 2 and 4.
2.1.5.2 Organisation and conduct of awareness
programmes (20 numbers)
79.
Under activity 2.1.5.1, the international CSH conferences and exhibitions planned in year
2 and 4 will be the flagship event for interaction between the CSH industry, researchers, policy
makers, end-users, financial institutions, etc. in India. International participation from researchers and
industries from other countries involved in CSH development, e.g. Austria, Germany, Australia, USA,
Sweden, Italy, Spain, China, etc. will be sought and will help to establish a strong link between the
Indian CSH programme and international developments and key market players. The students who
have been awarded CSH fellowships will also participate and present their research work findings at
the international CSH conferences held in India. It is expected that a total of 20 papers will be
presented in these two conferences which are useful for the policy makers and CSH industry in
general. Each conference will have approximately 200 participants, including 20 international
participants. The number of exhibitors at the associated CSH exhibitions will be at least 20.
80.
Under activity 2.1.5.2, twenty (20) awareness programmes will be undertaken and will
focus on creating awareness about CSH application opportunities amongst potential CSH end-users,
government officials, financial institutions, etc. Several of these programmes will be organised in
collaboration with industry/sector/cluster level associations and chambers of commerce & industry.
The locations and sectors for awareness programmes will be influenced by the results of the market
assessment study (activity 1.1.1.3). The awareness programmes will play an important role in
supporting the on-going market development of CSH technologies and applications in India. With an
average of 80 participants for each programme, a total of 1,600 people will be reached in this activity.
Four (4) programmes will be organised every year.
37
GEF support is required for technical assistance and to cover the incremental cost in organising and
implementation of international conference and exhibition; and costs for the implementation of
awareness programmes.
Table 22: Activities for Delivering Output 2.1.6
Output
2.1.6 Completed promotional
campaign for CSH
Activities
2.1.6.1 Design and publication of advertisements in industrial
magazines, design and display of hoardings in industrial clusters,
participation in industrial exhibitions and trade fairs
81.
The promotional campaigns will be targeted at CSH high-potential sectors and segments
and this will be achieved through advertisements in industrial/trade magazines (5 magazines),
hoardings in high-potential industrial clusters (10 industrial clusters), and participation in industrial
exhibitions and trade fairs (5 exhibitions and fairs). Additional MNRE funds will be requested and used
in the design and editing of the promotional materials and it is envisaged that post-project this activity
would be continued by MNRE and the Indian CSH industry. This activity will be integrated as a part of
the project exit strategy. The selection of magazines, location of clusters and identification of industrial
exhibitions/fairs will be influenced by the results of the market assessment study (Activity 1.1.1.3).
GEF assistance is required for to cover the incremental costs involved in the design and editing of the
material that goes for publications, advertisements and display hoardings to make those more
prominent.
Table 23: Activities for Delivering Output 2.1.7
Output
2.1.7 Established Concentrating
Solar Heat Technology
Platform and is operational
Activities
2.1.7.1 CSH Technology Platform formation and facilitation
82.
The CSH industry in India is currently at a nascent stage of development, and as such
does not yet have a CSH industry association to represent its interests. There is a recently formed
Solar Thermal Federation of India (STFI) for the growing number of solar flat plate and evacuated tube
manufacturers in India, but STFI does not cover CSH. In the absence of an existing CSH industry
association or other platform to focus on the key issues regarding the necessary development of the
CSH sector in India, the formation and operation of a CSH technology platform will be facilitated. This
Concentrating Solar Heat Technology Platform (or similar title that will be chosen by the CSH industry
in India) will be include all the key stakeholders involved in the development of CSH technologies and
applications (CSH manufacturers, researchers, consultants, testing centres, MNRE, etc.) and will be a
platform for knowledge sharing and developing strategies for future development of the sector. The
platform will be initially facilitated by the PMU. The platform will organise meetings of its members at
least twice a year. Meetings will be organised on a rotation basis at different locations and will be
jointly funded by the project and the host institution/industry. The platform will also constitute task
forces to study and report on specific issues. The various study reports, test protocols; etc. prepared
under the project will be presented to and discussed at the meetings of the platform. The platform can
also provide suggestions on the yearly action plans of the project.
83.
The possible impacts of this outcome are a number of stakeholders that make use of this
platform in addressing issues/problems concerning the energy performance and marketing of CSH
products. Apart from this there will be an increase in the number of technology suppliers; companies
that install CSH systems, the rest of the three technologies are available in India and an increase in
the number of financial institutions. The ideas and recommendations from the presented papers at the
conferences are expected to be useful in assisting the policy makers in decision making process.
38
GEF support is required for the technical assistance in assessing experiences elsewhere and to
prepare a charter document for such institutions. Also assistance is needed for the development of
stakeholders network.
Outcome 2.2: CSH project deliverables facilitated and/or influenced the widespread replication of
CSH technology applications in India
Table 24: Activities for Delivering Output 2.2.1
Output
2.2.1 Documentations on the project outputs,
case studies, best practices and lessons
learnt disseminated to ensure larger
replication
Activities
2.2.1.1 Design, launching and operation of project
website
2.2.1.2 Publication of quarterly project newsletter
2.2.1.3 Production and publication of brochures,
case study reports, and a compendium that
includes process documentation and project
results
84.
The project website (activity 2.2.1.1) will be the main tool for dissemination of information
and knowledge gained during the project. The project website will provide information of UNDP GEF
MNRE CSH project, provide links to the MNRE CSH and other relevant programmes, CSH
technologies, links to technology suppliers websites, testing facilities, technology application
information packages, reports of the studies conducted under the project, case studies on
demonstration and replication projects, project newsletters, project announcements, presentations
made in the awareness programmes and international conferences, process documentation etc. The
project website will be updated monthly under the guidance of the PMU. Hit rates will be monitored
and feedback provision provided to improve the quality of website.
85.
The quarterly project newsletter (activity 2.2.1.2) will primarily provide information on the
project activities. It will be disseminated both in printed as well as in e-newsletter formats. This activity
will be starting from the third quarter of first year.
86.
Under activity 2.2.1.3 project brochures will be prepared. The brochures will be updated
every year. Case studies on the demonstration and replication projects will also be prepared, each
demonstration case study will be of 4-6 pages and replication case studies will be 2-4 pages. The
case studies will be made available both in printed and e-formats. Process documentation will be
prepared to capture the steps, outcomes, and lessons learnt, etc. This document will be printed and
provided on e-format. It will be about 200 to 250 pages in length. An audio-visual capsule will be
prepared on CSH. This will be provided to TV channels for telecast as well as will be shown during
awareness programmes, conferences, exhibitions, etc. As stated earlier, all this information will be
available on project website. The possible impacts of this outcome are expected to be an increase in
number of CSH replication projects including wide scale use of information, enhanced knowledge and
understanding of CSH.
GEF assistance is required to design and produce a high quality promotional material such as
newsletter, brochures and compendium. Technical assistance is also needed to develop a strategy
and disseminate promotion material which otherwise not expected to reach wider stakeholders and
ensure its sustainability.
Component 3: Pilot demonstration of CSH technologies for various applications
Outcome 3.1:
87.
In India, out of the five key worldwide CSH technologies, only two i.e. parabolic dish with
fixed focus (e.g. Scheffler) and parabolic dish with moving focus (e.g. ARUN) have been used to date
for thermal process applications in India. Parabolic trough, linear Fresnel and CPC technologies have
ProDoc: UNDP GEF Concentrated Solar Heating Project (India CSH)
39
not yet been used for commercial CSH applications in India. The lack of a full suite of applicable CSH
technologies in India means that there is often a mismatch between the technology deployed and the
real process application temperature requirements or other CSH system attributes needed. In
addition, the absence of a systematic monitoring of in-use process CSH applications means that the
performance of existing CSH applications is not quantified and hence the necessary technical learning
from the operation of the existing CSH applications in India is limited. In the absence of proper
monitored performance data, the credibility of the existing CSH technologies actual performance in
real applications in India is low, and this is a key barrier to the increased uptake of CSH in India. This
component will support 30 demonstration projects which will demonstrate the application of solar
concentrator technologies which have not been used so far in India, as well as new CSH applications
or significant improvements over the CSH technology packages currently available. In addition, 60
replication projects will also be supported, which will either be replications of the CSH packages
demonstrated during the project or will use already available CSH packages. The performance of all
the demonstration and replication projects will be monitored. The improved technical and economic
performance knowledge and the greatly increased number of operational CSH projects will increase
future CSH users confidence in the technology and lead to faster dissemination of CSH technologies
and applications in India in the future. Also this assistance is intended to be a risk mitigation measure
considering the high investments involved in the process integration of CSH for thermal applications.
Due to the lack of existing systems performance data, risks are anticipated by the end-users in the
operation of these systems, and the lack of performance and quality standards for equipment used
and skill sets at all levels. The expected good results from the targeted support that will be provided
under the project are anticipated to encourage private sector to participate in demonstration or
replication projects.
88.
As mentioned in some of the above sections, the MNRE subsidy scheme is relatively
accessible to all those who are interested to implement CSH systems for process based heat
applications. As part of the existing procedure, a project proponent needs to complete a document (of
four to five page) with listed parameters which doesnt require detailed information of a project
(including critical technical evaluation parameters and data & financial parameters) and also lacks
assessment. This has resulted in ignorance of feasibility studies and its importance to see a difference
between technologies and financial analysis. Although there are 71 installations in India as on date, its
performance data is not available. Obviously, this has resulted in the promotion of simple and low cost
CSH technologies.
89.
A total of 30 demonstration projects involving the installation of an approximate overall
collector area of 15,000 m2 (approx. 500 m2 per project) and 60 replication projects involving the
2
2
installation of an approximate overall collector area of 30,000 m (approx. 500 m per project) will be
supported. Salient features of the demonstration and replication projects are given in Box 3 and Box 4
respectively.
Box 3: Demonstration Projects
Thirty (30) demonstration projects will be implemented under this UNDP GEF MNRE CSH project.
Qualification
The Demonstration Projects Component will support projects demonstrating CSH technologies or
applications which, although at or near commercial viability and having potential for replication,
currently face market barriers due to lack of expertise, knowledge or market confidence and as such
have not been successfully demonstrated previously. Projects that offer significant improvement over
already demonstrated CSH technologies or applications will also be considered as demonstration
projects.
Key selection criteria
- The demonstrations will initially focus on key sectors having large replication potentials e.g. dairy,
hotel, hospital, textile, pharmaceutical, chemical, metal treatment, food processing, institutional
ProDoc: UNDP GEF Concentrated Solar Heating Project (India CSH)
40
cooking, etc. The market assessment study will assist in identifying the most promising sectors
for demonstration projects.
Improvements in CSH technical and/or economic performance, e.g., performance improvement
2
2
(higher kW th/m ), cost reduction (lower INR/m ), improvement in cost/performance ratio (lower
INR/kW th), performance consistency (reliability, durability over component life), improvements at
component level (e.g. mirrors, tracking system), improvements in life of components (e.g.
degradation of mirrors), improvements at system level (e.g. integration with process, integration
with existing energy system, integration with auxiliary/ backup system, automated operation,
control strategy and control system, system configuration optimisation, system with storage
(short-term/ long-term), performance monitoring system, operation with different working fluids,
and scale-up with attendant improvement in technology parameters.
Expected date of commissioning.
41
technology packages or implement the application of CSH technology packages demonstrated during
the project.
Assistance available for replication projects
- Reimbursement of cost of feasibility study (up to US $ 2,000).
- Technical training of two technical persons in CSH operation and maintenance per site.
- Financial support to a maximum of US$ 6,000 for procuring and installing the performance
monitoring equipment.
Obligations under replication project scheme
- The participant must agree to report performance data in the specified format at the specified
periodicity.
- The participant must agree to site visits by staff of the project and/or its designated agent(s) for
the purposes of technical or verification inspection, and to carry out performance monitoring.
- Obligations will be in force for a period of 1 year from commissioning of the replication project.
90.
For the management of this component the PMU will engage the services of two or more
suitably qualified support institutions. These institutions will act as Component Managers for this
project component. One Component Manager will be responsible for North, East and Central India;
the other will be responsible for South and West India. The selection of the Component Managers will
be through a call for proposals. Expertise in renewable energy and energy-efficiency, experience in
conducting feasibility studies and preparation of DPRs, experience in performance monitoring and
network and reach in the industry will be some of the most important criteria for selection of the
Component Managers. The selection of the two Component Managers will be completed before the
end of Year 1.
91.
The main tasks of the Component Managers will be to: (a) Manage the preparation of
feasibility studies and DPRs; (b) Act as a regional technical resource centre for CSH (c) Assist the
PMU in the selection of the demonstration and replication projects (d) Carry out periodic supervision
of the implementation process of demonstration and replication projects (e) Collect and analyse the
data on the performance of the demonstration and replication projects (f) Prepare case studies of the
demonstration and replication projects.
92.
Under this component, 90 feasibility studies, 30 DPR preparation, 30 demonstration
projects and 60 replication projects will be supported. The phasing of work is shown in Table 25. A
detailed list of sequence of activities for the demonstration and replication projects is provided in
Annex K.
Table 25: Phasing of work under Component 3
Completion of
Feasibility studies
Completion of DPRs
Installation and
commissioning of
Demonstration
projects
Installation and
commissioning of
Replication projects
Year 1
Year 2
Year 3
Year 4
Year 5
Total
10
30
40
10
90
10
10
10
30
12
30
10
12
24
60
42
Output
3.1.1 Completed feasibility
studies for demonstration
and replication projects of
various CSH technology
applications
Activities
3.1.1.1 Conduct of the feasibility studies and approval of
applications for support for completed feasibility studies
93.
Through an EOI, several consultancy organisations will be short-listed to conduct
feasibility studies for CSH projects based on a set criteria and evaluation. Awareness workshops and
other means will be the venues to identify prospective user industries and are sensitized about CSH
potentials. Such user industries will be encouraged and supported to submit EOI for the UNDP GEF
MNRE CSH project supporting feasibility studies being undertaken. The industries will be able to use
the services of a short-listed consultancy organisation for the preparation of the feasibility study. The
cost of the study will be reimbursed after the review of the feasibility study report and following the
host sites management plans to act on the feasibility report.
GEF support is required for the technical assistance in the preparation of Expression of Interest (EOI)
and design & set the criteria for the evaluation of EOIs for both consultancy organizations that conduct
feasibility studies as well as prospective users.
Table 27: Activities for Delivering Output 3.1.2
Output
3.1.2 Completed Detailed
Project Reports (DPRs) for
demonstration projects
Activities
3.1.2.1 Preparation of DPRs and approval of applications for
support for completed DPR
94.
Through an EOI, several consultancy organisations will be short-listed to prepare DPR
studies for CSH projects based on a set criteria and evaluation. EOI for the preparation of DPRs for
demonstration project will be sought from prospective users. It is envisaged that most of these
requests will come from the industries where feasibility studies have already been undertaken.
31
Through a selection process , industries will be selected for the demonstration projects. The
industries will be able to use the services of a short-listed consultancy organisation for the preparation
of the DPR. The cost of DPR preparation will be reimbursed after the review of the DPR report and
following the host sites management plan to act on the DPR.
GEF support is required for the technical assistance in the preparation of Expression of Interest (EOI)
and design & set the criteria for the evaluation of EOIs for both consultancy organizations that prepare
DPRs as well as prospective users.
Table 28: Activities for Delivering Output 3.1.3
Output
3.1.3 Developed and commissioned
demonstration projects in at least 5
sectors
Activities
3.1.3.1 Installation and commissioning of
demonstration projects
3.1.3.2 Conduct of continuous performance
monitoring of commissioned and operational
demonstration projects for at least one month
95.
The installation and commissioning will be undertaken by the CSH vendor and the industry
as per the DPR. After the commission of the project, the industry will submit a report to the PMU with
31
Co-financing letters from industries that will apply CSH technologies will not be available during the CEO
Endorsement stage since the host demonstration companies and the potential replicants will be identified and
selected only during the project implementation. The selection will be carried out through a transparent process.
ProDoc: UNDP GEF Concentrated Solar Heating Project (India CSH)
43
at least one -month of continuous performance data for the installed CSH system. On receipt of this
actual CSH performance report, the 50% of initial GEF contribution to the demonstration project cost
will be released.
GEF support is required for meeting the incremental cost in the implementation of monitoring protocol
for demonstration projects through installation of additional devises in order to monitor and record the
data.
Activities
3.1.4.1 Performance monitoring and analysis
of demonstration projects
3.1.4.2 Evaluation of demonstration projects
96.
The CSH demonstration project site will collect the necessary CSH performance data and
submit this data to the project management unit (PMU) at the end of each of the first two years of
successful CSH system operation. The data of the first full year of successful CSH system operation
will be analysed by the Component Manager and will be verified through a visit to the relevant CSH
demonstration site. After the analysis and verification of first full year of successful CSH system
operational and performance data (in terms of technical and financial aspects), the remaining 50% of
the GEF contribution to the demonstration project will be released. These performance data will be
used for an independent third party evaluation of the projects in terms of technical and financial
aspects and prepare case studies. The data reported by the CSH site at the end of second full year of
successful CSH system operation will be used to update the case studies. The possible impacts of
this outcome are expected to be an increase in number of CSH replication projects including wide
scale use of information pertain to the developed application information packages.
GEF assistance is required for implementing performance monitoring protocol (recording and
maintaining data), development of an evaluation strategy for demonstration projects evaluation and to
prepare case studies.
Outcome 3.2: Improved technical and economic performance of commercial and near-commercial
CSH technologies in an increased diversity of applications
Table 30: Activities for Delivering Output 3.2.1
Output
3.2.1 Documentation of results
of demonstration and
replication projects
Activities
3.2.1.1 Development and maintenance of CSH projects database
3.2.1.2 Preparation of case studies
97.
A database of all CSH projects in India will be developed and will be accessible through
the project website. Through a search option, data can be filtered and also online reports can be
generated. Wherever it is requested to maintain the data confidentiality, it will be followed, for example
process related data in terms of production quantities etc. During the project implementation period,
the database will be operated and maintained by the PMU. Eventually at the end of the project, the
database will be handed over to MNRE as part of project exit strategy. One case study will be
completed for each demonstration project. The case study will utilise the data submitted at the end of
first full year of successful CSH system operation and will be updated based on performance data for
the second full year of successful CSH system operation.
GEF support is required for the technical assistance in the development of database, collection of data
from the projects and maintenance of the database.
44
Activities
3.2.2.1 Set the criteria for selection and approval of applications for
support of replication projects
3.2.2.2 Installation and commissioning of replication projects
3.2.2.3 Performance monitoring and analysis of replication projects
3.2.2.4 Conduct of the overall evaluation of demo and replication
projects
98.
It is anticipated that many of the replication projects may result from the feasibility study
support from the UNDP GEF MNRE CSH project, but it is also anticipated that some of the replication
projects will arise from on-going baseline CSH marketing activities. The registration of replication
projects will therefore be a continuous exercise. All projects coming to MNRE for subsidy support
through its CSH programme will be given an option to be considered as replication projects under this
UNDP GEF MNRE CSH project. For replication projects, the installation and commissioning will be
undertaken by the CSH vendor and the industry as per the relevant DPR. After the commissioning of
the replication project, the industry will submit a report with one-month of continuous successful
performance data for the relevant CSH system. On receipt of this report, the full 100% financial
assistance to the replication project will be released. The relevant CSH site will collect the relevant
CSH systems performance data and will submit it to the PMU at the end of a year-long successful
CSH system operation. The data will be analysed by the Component Manager. The possible impacts
of this outcome are expected to be an increase in number of CSH replication projects where all the
five concentrated solar heat technologies of successfully demonstrated and replicated.
GEF assistance is required for meeting the incremental cost in the implementation of monitoring
protocol for demonstration projects through installation of additional devises in order to monitor and
record the data as required.
Component 4:
Outcome 4.1: Enhanced understanding of the financial viability of CSH technologies and measures
to mitigate investment risks
Table 32: Activities for Delivering Output 4.1.1
Output
4.1.1 Documented financial viability
of CSH technologies,
applications, and mitigation
approaches of investment
risks
Activities
4.1.1.1 Analysis of financial viability of CSH technologies and
applications, and comparative evaluation with alternative or
competing solutions such as biomass energy or energy
efficiency
4.1.1.2 Assessment of alternative financial options for mitigation
of investment risks
99.
In realizing the ambitious goals (for the year 2022) outlined under the National Solar
Mission, suitable financial incentives in the form of subsidies and low interest loans will be made
available. Therefore, the intension in the project is not to formulate new financial support schemes
right away, rather develop and improve/enhance the existing MNRE CSH subsidy scheme considering
the close gap between expected and actual payback periods. This gap is further expected to close by
the end of the project due to the reduction in technology development costs and availability of the
system components in the country due to indigenous production. In the absence of high quality and
long-term performance data of the CSH technologies and applications, it is currently impossible to
accurately analyse the financial viability of CSH technologies and applications. Hence, the need to
gather more information (through studies and surveys) to solidly establish the economics of the local
application of CSH technologies in industries. It is expected that the results of such studies will provide
the relevant basis for formulating appropriate policies and influencing the approval and enforcement of
ProDoc: UNDP GEF Concentrated Solar Heating Project (India CSH)
45
such policies that will support the creation and implementation of performance based subsidy
schemes. The feedback during the stakeholder consultations indicated that for most CSH applications,
the current simple pay-back period for CSH systems is in the range of 5 to 10 years after considering
existing incentives (subsidy, depreciation benefits, etc.) available from MNRE. Therefore, in the third
year of the project, when several CSH technology and application packages are available and in use,
and data from CSH demonstration and replication projects will start becoming available, a detailed
analysis of the financial viability of CSH technologies will be undertaken.
100.
The study of CSH financial viability will be followed-up by an assessment of alternative
financial options for the mitigation of CSH investment risks. This assessment will also look into the
possibilities of alternative financial models e.g. ESCO model or accessing Clean Development
Mechanism (CDM) revenue. If found suitable, some of the demonstration and replication projects may
then be undertaken considering alternative financial options. The possible impacts of this outcome are
availability of feasible financial options and increased use of such options by demonstration and
replication projects. Also more number of banks and/or financial institutions agreed to finance CSH
projects. The replication projects are expected from the year 1 whereas the installation and
commissioning of demonstration projects will start from the year 2. By the year 3, at least two potential
and feasible financial options for the application of CSH technologies are expected to be identified and
promoted, so that the project will have further two more years to implement demonstrations and
replications as per the updated project scenario. Since the Executing Partner of the project is MNRE
and selected projects will have to follow set guidelines of the UNDP-GEF project in order to avail of
the benefits listed under project. It that regard, it can be assured that any new developments or
recommendations generated during the project implementation period can be enforced, including
possible modifications to the existing MNRE subsidy scheme.
GEF support is required for the necessary technical assistance in the analysis of financial viability of
CSH technologies in comparison with alternative or competing solutions and assessment of
alternative financial options.
Outcome 4.2: Promulgation of favourable financial policies that promote increased use and
promotion of CSH technologies for low and medium temperature process heat
applications
Table 33: Activities for Delivering Output 4.2.1
Output
4.2.1 Formulated recommendations for financial
and promotional policies and strategies for
adoption by Government of India
Activities
4.2.1.1 Assessment and recommendations for
policies on financial incentives, schemes and
mechanisms
101.
Mid-way through the project in year 3, after completion of the study on CSH financial
viability, a study will be undertaken to assess MNREs policies on financial incentives. This will also
identify and analyse the effectiveness of MNRE CSH support schemes and measures for
improvement. The study will come out with recommendations which can then be considered and
implemented by MNRE. The possible impacts of this outcome are increased number of projects
benefit from such policies and a number of banks and/or financial institutions agreed to finance CSH
projects.
GEF support is required for the necessary technical assistance in the assessment of existing policies
and formulation of policies and guidelines for the financial options in order to promote alternative
financial options to mitigate investment risks.
8.
Indicators
102.
46
a) Failure to secure effective on-going support from MNRE (the main project implementing
agency and provider of most of the projects co-financing) for example due to adverse
impact changes in MNRE leadership, and/or reduced focus on off-grid solar energy
programme, and/or reduced focus on CSH vis--vis CSP or solar thermal technologies and
applications.
b) Failure to appropriately strengthen the human capacities at MNRE and/or at the SEC to
effectively implement this UNDP GEF MNRE CSH project. An example of possible causes
would be the frequent shifting/transfer of expert government staff across agencies and
departments leading to the loss of capacity that has already been built for the existing MNRE
CSH support programme and/or for this GEF CSH project.
c) The demonstration and replication projects will be strongly reliant on the continued existence
and accessibility of CSH subsidies from the MNRE solar support programme. However, the
current MNRE CSH subsidy programme does not sufficiently distinguish between the
performances of the different CSH technologies, and has been essentially developed for the
Scheffler CSH technology. Any failure to link the MNRE CSH subsidy with CSH performance
will continue to deter high performance CSH technologies from entering the Indian CSH
market and undermine this UNDP GEF MNRE CSH projects viability.
d) A dramatic reduction in the international price of oil or large subsidies for oil products such as
furnace oil for process heat applications in India, and/or a significant reduction in the price of
electricity and and/or a major improvement in the reliability of electricity supply hence
significantly undermining the economics of CSH in India.
106.
47
eventually withdrawn. Without the supply of improved quality and a much-larger variety of
CSH systems, the projects effectiveness will be adversely affected.
b) Failure to trigger a positive response from the Indian CSH user industries, which may happen
if relevant interest rates rise, or the Indian economy dramatically slows down, or in particular if
the awareness generation and capacity building efforts from the project are not ineffective.
c) Shortage/unavailability of necessary expert manpower to work in CSH research and industry
For all its activities, whether it is development of CSH information packages, development of
standards, development of testing facilities, capacity building, or implementation of
demonstration and replication projects, the India CSH project will require manpower with
expertise in CSH. However, the available human resource base for CSH research and
industry in India is very limited. The Indian energy industry, particularly the renewable energy
industry, is growing at a very rapid pace and there is an overall shortage of skilled human
resources, and strong competition to attract what human resources exist. Within the Indian
solar energy field, with the launch of the JNNSM, the main focus is now on large gridconnected power generation plants and there is a risk that the CSH field could lose human
resources to the higher profile CSP industry in the short to medium term.
d) Delays in completing the recruitment process for component managers and other India CSH
project consultancy assignments.
e) The project is unable to hire competent consultants on account of particularities and
constraints in the process of selection.
f)
A major escalation in the necessary remuneration rate for project staff or consultants placing
pressure on project budgets.
107.
A detailed risk-analysis table is available in Annex A. This also includes suggestions for
countermeasures to deal with outlined risks to ensure successful implementation of this UNDP GEF
MNRE CSH project.
Assumptions
108.
The assumptions for this project revolve around expectations from both the government
and market sides. All the feedback received during the project preparatory phase is that the Indian
government (through MNRE) will continue to support CSH development through on-going subsidies
and soft loans, and will strengthen the team working on CSH in the Ministry and at the SEC. Suitable
and timely revision in MNREs subsidy programme and the rapid design and implementation of a
results-oriented R&D programme in CSH will be very important project success factors. The
assumption is that CSH will gain more prominence in India and will attract increased support within
MNRE.
109.
On the other hand, the project also depends on a positive response from the market
consisting of the CSH manufacturers/supply chains and user industries/institutions. The assumption is
that the CSH industry and interest of the user industries/institutions will grow from the current levels
with the interventions provide by this UNDP GEF MNRE CSH project.
9.
110.
As mentioned, India is heavily dependent on import of fossil fuel to meet the growing
thermal energy demand for process based heat applications in various industries, communities and
commercial establishments. The country has the potential to harvest renewable energy resources,
especially solar energy, to contain the fossil fuel use as well as mitigate GHG emission reductions
through reduced fossil fuel use. The Government of India recognized the potential and benefits of
deploying CSH technologies. The estimated potential is about 5,000 trillion kWh per year. The incident
2
solar energy over Indias land area is at an average of 5-7 kWh/m /day. The market development and
promotion of solar concentrators for process heat and other thermal applications is an emerging and
ProDoc: UNDP GEF Concentrated Solar Heating Project (India CSH)
48
exciting market opportunity in India, and is the target of UNDP GEF MNRE CSH project. With the
various interventions that will be carried out under this proposed project and the expected outputs, it is
2
estimated that by the end of this project, for each m area of solar concentrator installations, 0.35 t
CO2 per year would be replaced on a conservative basis. The proposed project will facilitate the
realization of these outcomes through the barrier removal activities and other capacity building and
technical assistance activities that will be implemented under the project. Therefore, the approach of
replacing fossil fuel use through solar concentrator technology is considered as more appropriate,
holistic and cost effective considering the fact that process heat and other thermal applications in
industries, communities and commercial establishments is quite large.
111.
This UNDP GEF MNRE CSH project has been designed as a fully integrated and suitably
funded and co-funded series of components and activities to remove the multiple barriers facing the
widespread adoption of CSH in India. The project will support and be supported by the on-going
MNRE CSH programme.
112.
In the absence of the UNDP GEF MNRE CSH projects interventions, the rate of
2
penetration of CSH systems will be at 3,000 m per year, the market for CSH systems will remain
stagnant and essentially at the current level of sales, the number of CSH technology application
packages will remain limited, there will not be any systematic effort to develop the market for CSH
technologies, the human-resource base will remain small and inadequate, and the number of active
CSH manufacturers will remain small and inadequate.
113.
The GEF contribution of USD 4.4 million will result in cumulative direct emission reduction
2
2
of 32,900 tCO2 from the demonstration (15,000 m ) and replication projects (30,000 m ) during the 5year lifetime of the project. Assuming economic lifetime of the CSH systems as 20 years, the direct
emission reduction will be 315,000 tCO2. If the GEF contribution (USD 4.4 million) is divided by the
combined direct and direct post-project emission reductions, this gives a corresponding direct GHG
32
unit abatement cost (UAC) (i.e. GEF$ per tCO2) of USD 13.97/tCO2 .
114.
After the UNDP GEF MNRE CSH project completion, investments will be affected by the
long-term impacts of the barrier-removal activities, e.g., increase in technical capacity and sustainable
financial approach. The corresponding CO2 emissions reduction is referred to as indirect emission
reduction. A replication factor of 3 has been chosen as a conservative estimate for CSH systems use
in process based heat applications. Thus, indirect emission reductions (bottom-up) over 10-year are
estimated at 315,000 t CO2 * 3 = 945,000 t CO2. In the alternative scenario, it is estimated that about
2
50,000 m of CSH systems area is expected to deploy annually. The cumulative amount of emission
reductions achieved would be 1,095,150 t CO2 over the period 2011/12-2025/26 (that is, a total
duration of 15 years during the project implementation period and 10 years of post-project scenario).
Of course, this potential cannot be fully attributed to the GEF interventions alone as other projects
may have an influence over the CSH systems promotion and implementation. Uptake of CSH
technologies would also takes place to some extent due to on-going (and future) national efforts and
future donor-funded initiatives. It is proposed to apply conservatively a causality factor 4 of 80%. This
gives an indirect emission reduction (top-down) of 1,095,150 t CO2 * 80% = 876,120 t CO2. The range
of indirect CO2 emission reductions is 876,000 945,000 tonne CO2.
10.
Sustainability
115.
After completion of the proposed UNDP GEF MNRE CSH project, it is expected that the
impetus for developing the CSH market would continue in India. Sustainability of this GEF-supported
project will be ensured by:
32
This value is relatively lower than the current CDM secondary CER price, which is about US$ 20/tonne CO2
(PointCarbon, 7 June)
ProDoc: UNDP GEF Concentrated Solar Heating Project (India CSH)
49
o
o
o
o
o
o
Emergence of a stronger and more diverse CSH manufacturing and supply industry in
India.
A significantly increased number of successful CSH projects working at high performance
levels as promised at the time of sale.
Availability of well-documented case studies and technical literature in the public-domain.
High level of awareness of CSH amongst the high-potential end-use industries in India.
A robust and well-functioning CSH testing infrastructure in place.
Academic and research programmes in the CSH field at 5-10 Indian universities.
Replicability
116.
The implementation of 90 demonstration and replication projects with well-documented
performance data will showcase the relevance, usefulness and cost-effectiveness of CSH
technologies in real applications in India. The availability of 10 technology application packages
consisting of 5 different solar concentrator technologies will form the basis for a rapid increase in the
replication projects post project-end.
117.
India has the largest number of CSH systems in the world and perhaps has one of the
largest potentials for CSH applications. The success in India for CSH is highly likely to lead to similar
initiatives being launched in other countries. The work done on testing protocols and standards can
form the basis for future international CSH protocols and standards.
50
51
Enhanced
understanding of
CSH technologies,
applications and
markets
Output 1.1.1:
Developed
technology
application
information
packages and
characterised
technologies,
applications, and
markets
Baseline
0
Means of Gauging
Success
Target
32,900
20,000
80,000
71
161
18
30
60
71
131
90
15
Critical Assumptions
Annual reports of
MNRE
- Technology and
market assessment
reports available at
the EOP
- Project impact
assessment report
- Annual reports of
MNRE
- Reports available
on Performance
assessment of
existing
installations
- Reports available
on technology
assessment of
CSH technologies
- Availability of report
on market
assessment for
solar process heat
52
Strategy
Baseline
Means of Gauging
Success
Target
Critical Assumptions
applications
Outcome 1.2:
Adoption of
standards and
specifications for
guidance of
manufacturers and
users for assurance
of CSH quality,
safety, and
performance
Output 1.2.1:
Developed CSH
performance
standards and
technology
specifications
10
30
10
- Project impact
assessment report
- Annual reports of
MNRE
- Technology and
market assessment
reports available at
the EOP
- Project impact
assessment report
- Annual reports of
MNRE
- A report on
performance
measurement
standard available
- A report on number
of test protocols
available
- A report on
performance norms
available
- A report on field
performance
monitoring
guidelines available
- A report on number
of technology
specifications
available
- Confirmation from
BIS regarding
submission
- Standards issued
as BIS standards
53
Strategy
Outcome 1.3:
Adequately capable
and operational
testing laboratories
for verification of
manufacturer claims
and guidance of CSH
users to enable
informed decisions
Output 1.3.1:
Developed CSH
system components
and equipment
testing facilities
Baseline
0
Means of Gauging
Success
Target
1
28
18
30
0
0
60
10
- Confirmation from
ISO regarding
submission
- Standards issued
as ISO standards
- Certification by a
certifying
/accrediting
agency
- Project impact
assessment report
- Test reports
produced by testing
facilities
Critical Assumptions
- Number of reports
available on proofof-concept testing
carried out at SEC
- A policy decision by
respective
ministry/SEC
- Number of test
reports by national
testing facility
- A policy decision by
respective
ministry/SEC
- Number of test
reports by regional
testing facility
- Technology and
market assessment
reports available at
the EOP
- Project impact
assessment report
- Annual reports of
MNRE
- Survey conducted
54
Strategy
Baseline
1
Means of Gauging
Success
Target
3
15
70
15
300
10
Indicator
EOP due to increased awareness and capacity
No. of banks/financial institutions that agreed
to finance CSH projects and CSH system
component & equipment manufacturing as a
result of the awareness enhancement
programs by EOP
No. of papers presented in conference that
were used by policy makers in decision making
on technology applications, in general, and
CSH technology applications, in particular, by
year 4
% of conference participants expressed
satisfaction about the conference by EOP
Training needs assessment completed by year
2
Critical Assumptions
during conference
- Post conference
report and analysis
produced by
organizers of
conference
- Report on Training
needs assessment
available
- Three types of
training modules
are produced one
each for
manufacturers/
vendors, installers
and CSH users
- Completion/posttraining reports of
training
programmes
- After-training
evaluations
completed by
participants
- Completion/posttraining report of
study tour
- After-training
evaluation
completed by
participants
55
Strategy
Output 2.1.2: More
trained technical
consultants that
provide technical
services to both CSH
system components
& equipment
manufacturers and
users
Output 2.1.3:
Established and
supported industryacademic partnership
through research
programmes to build
future capacities
Output 2.1.5:
Completed awareness
Baseline
0
Means of Gauging
Success
Target
1
100
0
0
2
6
10
- Training
programme
calendar and
structure
- Training modules
are completed and
available
- Completion reports
for training
programmes
- After-training
evaluations
completed by
participants
- Project impact
assessment report
- Annual reports of
MNRE
- Reports published
by respective
institutions of (a)
no. of fellowships
awarded (b) no. of
fellows receiving
degrees (c) no. of
fellows sponsored
by CSH industry,
(d) no. of fellows
absorbed in CSH
industry
- Completion report
of training
programme
- After-training
evaluations
completed by
participants
- Conference
brochures,
Critical Assumptions
56
Strategy
enhancement
programmes for
policy makers,
academicians,
industries, financial
institutions, etc. to
facilitate replications
Baseline
0
Target
200
20
20
20
Means of Gauging
Success
Output 2.1.6:
Completed
promotional
campaign for CSH
Output 2.1.7:
Established
20
1,600
10
01 Jan 12
agendas,
completion reports
Number of
registered
participants
Number of
registered
international
participants
Number of
abstracts /
conference
presentations /
conference papers
/ posters submitted/
presented
Number of
registered
exhibitors
Completion reports
for awareness
programmes
Post-programme
evaluations
completed by
participants
Advertising agency
records
Project impact
assessment report
Annual reports of
MNRE
Visit reports shared
by manufacturers
/suppliers
- Platform charter
document
Critical Assumptions
stakeholders will be interested and
willing to share their experiences and
work, learn from that of others, and
initiate interactions of commercial
nature.
57
Strategy
Concentrating Solar
Heat Technology
Platform and is
operational
Baseline
0
Means of Gauging
Success
Target
8
100
15
0
0
60
80
70
70
18
200
01 Jan 14
1,000
01 Jan 12
2,000
90
1,000
Critical Assumptions
- Number of
members and their
distribution (by type
of stakeholder,
region etc.)
- Number of
meetings held
- Project impact
assessment report
- Annual reports of
MNRE
- Web based
feedback for audiovisual capsule
- Survey of recipients
of the published
compendium
- Number of people
visiting website
(click count)
- All the information
including audio
visual capsule of
project is available
on the web and
downloadable
- Hard and soft copy
of the brochure
booklet available
- Project impact
assessment report
58
Strategy
Indicator
Baseline
33
compendium by EOP
Component 3: Pilot demonstration of CSH technologies for various applications
Means of Gauging
Success
Target
Outcome 3.1:
Increased number of
commercial and nearcommercial CSH
technologies for
diversity of
applications
Output 3.1.1:
Completed feasibility
studies for
demonstration and
replication projects of
various CSH
technology
applications
Output 3.1.2:
Completed Detailed
Project Reports
(DPRs) for
demonstration
projects
Output 3.1.3:
Developed and
commissioned
demonstration
projects in at least 5
sectors
60
90
- Feasibility study
reports for
supported projects
30
- Detailed project
reports for
supported projects
30
30
- Project
commissioning
reports and all
other required
documents for
demonstration
projects
30
15
33
Critical Assumptions
- Feasibility study
reports of projects
- Project impact
assessment report
- Annual reports of
MNRE
Potential users having interest in
examining CSH viability in their
applications respond and eliminated
users with only marginal or passing
interest.
All the feasibility studies get converted
into serious prospective projects.
- Performance
evaluation report is
available
A compendium is inclusive of all individual brochures/case studies (90 nos) each with 4-5 pages
59
Strategy
Baseline
0
Target
15
Outcome 3.2:
Improved technical
and economic
performance of
commercial and nearcommercial CSH
technologies in an
increased diversity of
applications
Output 3.2.1:
Documentation of
results of
demonstration and
replication projects
60
90
90
90
Outcome 4.1:
Enhanced
understanding of the
financial viability of
CSH technologies
and measures to
mitigate investment
30
Means of Gauging
Success
- Feasibility study
reports of projects
- Project impact
assessment report
- Annual reports of
MNRE
- Number of projects
information
included in
0
30
database
- Number of case
study reports
available
Output 3.2.2:
0
90 - Annual reports on
No. of performance monitoring reports of demo
Completed
Performance
and replication projects completed by EOP
performance
monitoring of
monitoring, analysis
replication projects
and overall evaluation
available
for demo and
0
2 - Overall evaluation
Overall evaluations of demonstration and
replication projects
reports on
replication projects completed by EOP
demonstration and
replication projects
available
Component 4: Sustainable financial approach in the adoption of CSH technologies and applications in India
Critical Assumptions
- Project impact
assessment report
- Annual reports of
MNRE
- A report on
analysis of financial
viability of CSH
60
Strategy
Baseline
Means of Gauging
Success
Target
risks
Output 4.1.1:
Documented financial
viability of CSH
technologies,
applications, and
mitigation
approaches of
investment risks
Outcome 4.2
Promulgation of
favourable financial
policies that promote
increased use and
promotion of CSH for
low and medium
temperature process
heat applications
Output 4.2.1
Formulated
recommendations for
financial and
promotional policies
and strategies for
adoption by
Government of India
28
technologies
available
- A report on
assessment of
alternative finance
models available
- A report on
assessment and
recommendations
for policies
available
Critical Assumptions
61
61446
Project ID:
77828
Award Title:
Market Development and Promotion of Solar Concentrators based Process Heat Applications in India
Business Unit:
IND 10
Market Development and Promotion of Solar Concentrators based Process Heat Applications in India
GEF Outcome /
Atlas Activity
Outcome 1.1
Enhanced
understanding of
CSH
technologies,
applications and
markets
Outcome 1.2:
Adoption of
standards and
Responsible
Party
(Implementing
Agency)
UNDP
UNDP
Source
GEF
62000
GEF
62000
Budget
Code
ERP/ATLAS Budget
Description/Input
71200
71300
71600
72100
72200
72500
72600
72800
73100
73400
74200
74500
Sub-total
71200
71300
71600
International Consultants
Local Consultants
Travel
Subcontracts
Equipment and Furniture
Supplies
Grants
Info Tech Equipment
Rental and Main Premises
Rental and Main Equipment
Audio Visual and Printing
Miscellaneous
International Consultants
Local Consultants
Travel
Year 2
13,500
84,750
16,700
0
0
0
0
0
0
0
22,500
4,800
142,250
18,000
42,938
13,400
Year 3
6,000
22,500
5,200
0
0
0
0
0
0
0
15,000
1,500
50,200
13,500
30,937
10,300
Year 4
0
22,500
3,400
0
0
0
0
0
0
0
15,000
1,200
42,100
6,000
8,438
3,300
Total
(USD)
Year 5
4,500
29,250
5,800
0
0
0
0
0
0
0
10,000
1,500
51,050
6,000
8,437
3,300
28,500
174,750
34,800
0
0
0
0
0
0
0
62,500
10,600
311,150
52,500
99,750
34,800
1
2
3
4
5
6
7
3
62
GEF Outcome /
Atlas Activity
Responsible
Party
(Implementing
Agency)
specifications for
guidance of
manufacturers
and users for
assurance of
CSH quality,
safety, and
performance
Outcome 1.3:
Adequately
capable and
operational
testing
laboratories for
verification of
manufacturer
claims and
guidance of
CSH users to
enable informed
decisions
Outcome 2.1:
Strengthened
technical
capacity and
awareness of
stakeholders of
CSH systems for
industrial/
institutional
UNDP
UNDP
Source
Budget
Code
ERP/ATLAS Budget
Description/Input
Year 1
72100
72200
72500
72600
72800
73100
73400
74200
74500
Sub-total
71200
71300
71600
72100
72200
72500
GEF
72600
62000
72800
73100
73400
74200
74500
Sub-total
Component 1 TOTAL
GEF
62000
71200
71300
71600
72100
72200
72500
72600
72800
Subcontracts
Equipment and Furniture
Supplies
Grants
Info Tech Equipment
Rental and Main Premises
Rental and Main Equipment
Audio Visual and Printing
Miscellaneous
International Consultants
Local Consultants
Travel
Subcontracts
Equipment and Furniture
Supplies
Grants
Info Tech Equipment
Rental and Main Premises
Rental and Main Equipment
Audio Visual and Printing
Miscellaneous
International Consultants
Local Consultants
Travel
Subcontracts
Equipment and Furniture
Supplies
Grants
Info Tech Equipment
Year 2
Year 3
Year 4
Total
(USD)
Year 5
0
5,000
0
0
0
0
0
0
1,100
28,600
0
4,875
750
0
0
0
0
0
0
0
0
300
5,925
0
15,000
0
0
0
0
0
0
4,300
93,638
0
27,000
4,050
0
130,000
0
0
0
0
0
0
10,600
171,650
0
10,000
0
0
0
0
0
0
2,600
67,337
0
27,000
4,050
0
5,000
0
0
0
0
0
0
2,800
38,850
0
0
0
0
0
0
0
0
600
18,338
0
27,000
4,050
0
5,000
0
0
0
0
0
0
2,800
38,850
0
0
0
0
0
0
0
0
600
18,337
0
27,000
4,050
0
5,000
0
0
0
0
0
0
2,800
38,850
0
30,000
0
0
0
0
0
0
9,200
226,250
0
112,875
16,950
0
145,000
0
0
0
0
0
0
19,300
294,125
60,075
0
0
2,500
24,000
0
0
24,000
0
407,538
72,000
60,000
85,100
112,600
0
0
38,400
0
156,387
0
0
2,500
124,000
0
0
24,000
0
99,288
0
0
2,500
129,000
0
0
0
0
108,237
0
0
2,500
59,000
0
0
0
0
831,525
72,000
60,000
95,100
448,600
0
0
86,400
0
9
3
10
11
12
13
14
63
GEF Outcome /
Atlas Activity
Responsible
Party
(Implementing
Agency)
Budget
Code
ERP/ATLAS Budget
Description/Input
73100
73400
74200
74500
Sub-total
71200
71300
71600
72100
72200
72500
GEF
72600
62000
72800
72600
73400
74200
74500
Sub-total
Component 2 TOTAL
Travel
Subcontracts
Equipment and Furniture
Supplies
Grants
Info Tech Equipment
Grants
Rental and Main Equipment
Audio Visual and Printing
Miscellaneous
71200
71300
71600
72100
72200
72500
72600
72800
73100
73400
74200
74500
International Consultants
Local Consultants
Travel
Subcontracts
Equipment and Furniture
Supplies
Grants
Info Tech Equipment
Rental and Main Premises
Rental and Main Equipment
Audio Visual and Printing
Miscellaneous
Source
Year 1
process heat
applications
Outcome 2.2:
CSH project
deliverables
facilitated and/or
influenced the
widespread
replication of
CSH technology
applications in
India
Outcome 3.1:
Increased
number of
commercial and
near-commercial
CSH
technologies for
diversity of
applications
UNDP
UNDP
GEF
62000
International Consultants
Local Consultants
Year 2
Year 3
Year 4
Total
(USD)
Year 5
0
0
11,500
0
62,000
0
0
0
0
11,500
13,785
393,385
0
0
0
0
11,500
13,407
175,407
0
0
0
0
11,500
13,407
156,407
0
0
0
0
11,500
0
73,000
0
0
0
0
57,500
40,600
860,200
0
0
0
35,000
0
0
0
0
0
0
24,000
0
59,000
0
35,000
0
0
0
0
0
0
26,980
0
61,980
0
55,000
0
0
0
0
0
0
34,000
0
89,000
0
55,000
0
0
0
0
0
0
34,000
0
89,000
0
55,000
0
0
0
0
0
0
34,000
0
89,000
0
235,000
0
0
0
0
0
0
152,980
0
387,980
121,000
0
21,105
3,200
0
0
0
20,000
0
0
0
0
0
455,365
13,500
96,876
14,700
0
0
0
260,000
0
0
0
0
0
264,407
9,000
100,260
19,000
0
0
0
320,000
0
0
0
0
300
245,407
0
96,876
17,200
0
0
0
340,000
0
0
0
0
0
162,000
0
42,888
6,500
0
0
0
80,000
0
0
0
0
400
1,248,180
22,500
358,005
60,600
0
0
0
1,020,000
0
0
0
0
700
15
16
17
18
3
19
64
GEF Outcome /
Atlas Activity
Outcome 3.2:
Improved
technical and
economic
performance of
commercial and
near-commercial
CSH
technologies in
an increased
diversity of
applications
Outcome 4.1:
Enhanced
understanding of
the financial
viability of CSH
technologies
and measures to
mitigate
investment risks
Outcome 4.2:
Promulgation of
favourable
financial policies
Responsible
Party
(Implementing
Agency)
UNDP
UNDP
UNDP
Source
Budget
Code
Sub-total
71200
71300
71600
72100
72200
72500
GEF
62000
72600
72800
73100
73400
74200
74500
Sub-total
Component 3 TOTAL
GEF
62000
GEF
62000
71200
71300
71600
72100
72200
72500
72600
72800
73100
73400
74200
74500
Sub-total
71200
71300
71600
72100
ERP/ATLAS Budget
Description/Input
International Consultants
Local Consultants
Travel
Subcontracts
Equipment and Furniture
Supplies
Grants
Info Tech Equipment
Rental and Main Premises
Rental and Main Equipment
Audio Visual and Printing
Miscellaneous
International Consultants
Local Consultants
Travel
Subcontracts
Equipment and Furniture
Supplies
Grants
Info Tech Equipment
Rental and Main Premises
Rental and Main Equipment
Audio Visual and Printing
Miscellaneous
International Consultants
Local Consultants
Travel
Subcontracts
Total
(USD)
Year 1
44,305
0
16,848
2,400
0
0
0
36,000
0
0
0
0
0
55,248
Year 2
385,076
0
16,848
2,400
0
0
0
48,000
0
0
0
0
0
67,248
Year 3
448,560
0
25,848
3,800
0
0
0
60,000
0
0
0
0
300
89,948
Year 4
454,076
9,000
25,848
6,500
0
0
0
72,000
0
0
0
0
300
113,648
Year 5
129,788
9,000
21,348
5,800
0
0
0
144,000
0
0
0
0
200
180,348
1,461,805
18,000
106,740
20,900
0
0
0
360,000
0
0
0
0
800
506,440
99,553
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
452,324
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
538,508
12,000
36,000
9,000
0
0
0
0
0
0
0
0
1,700
58,700
18,000
18,000
8,100
0
567,724
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
310,136
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,968,245
12,000
36,000
9,000
0
0
0
0
0
0
0
0
1,700
58,700
18,000
18,000
8,100
0
20
21
3
5
22
23
3
65
GEF Outcome /
Atlas Activity
Responsible
Party
(Implementing
Agency)
that promote
increased use
and promotion of
CSH
technologies for
low and medium
temperature
process heat
applications
Source
Budget
Code
Year 1
72200
72500
72600
72800
73100
73400
74200
74500
Sub-total
Component 4 TOTAL
71200
71300
International Consultants
Local Consultants
Local Consultants
(Contractual ServicesIndividual
Travel
Subcontracts
Equipment and Furniture
Supplies
Grants
Info Tech Equipment
Rental and Main Premises
Rental and Main Equipment
Professional Services Audits
Audio Visual and Printing
Miscellaneous
71400
Component 5
Project
management
GEF
62000
UNDP
ERP/ATLAS Budget
Description/Input
71600
72100
72200
72500
72600
72800
73100
73400
74100
74200
74500
Sub-total
Component 5 TOTAL
TOTAL
Year 2
Year 3
Total
(USD)
Year 4
Year 5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,300
45,400
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,300
45,400
0
0
0
0
0
0
104,100
15,000
4,500
0
0
0
0
15,000
4,500
104,100
30,000
9,000
23,400
23,400
23,400
23,400
23,400
117,000
24
5,850
0
0
2,250
0
0
0
0
5,850
0
0
2,250
0
0
0
0
8,450
0
0
2,250
0
0
0
0
5,850
0
0
2,250
0
0
0
0
8,450
0
0
2,250
0
0
0
0
34,450
0
0
11,250
0
0
0
0
3,000
3,000
3,000
3,000
3,000
15,000
25
1,000
5,250
40,750
1,000
5,250
40,750
1,000
5,250
62,850
1,000
5,250
40,750
1,000
5,250
62,850
5,000
26,250
247,950
40,750
321,378
40,750
1,355,977
62,850
1,126,252
40,750
953,169
62,850
643,223
247,950
4,400,000
66
67
23. 24 person/weeks of local short-term consultancy for assessment and recommendations for policies on financial incentives, schemes and mechanisms
24. 168 person/weeks of local consultancy for Project management
25. Professional services for annual financial auditing
68
Donor
GEF
MNRE
Others - industries and
financial institutions
Total
Year 1
Year 2
Year 3
Year 4
Year 5
Total
321,378
578,450
1,355,977
1,390,761
1,126,252
1,480,405
953,169
1,858,806
643,233
2,041,579
4,400,000
7,350,000
800,000
1,866,667
2,400,000
3,200,000
3,733,333
12,000,000
1,699,828
4,613,405
5,006,657
6,011,975
6,418,135
23,750,000
USD
253,500
1,306,120
76,250
294,700
683,600
175,000
0
1,374,400
0
0
0
0
72,980
163,450
4,400,000
1
81,000
387,375
0
2
72,000
0
0
86,550
95,100
683,600
346,400
10,480
40,600
1,248,180
175,000
0
62,500
39,100
831,525
Components
3
40,500
864,745
0
4
30,000
54,000
0
5
30,000
0
76,250
81,500
17,100
14,450
904,000
77,500
1,968,245
0
3,000
104,100
0
0
124,000
0
0
0
3,250
247,950
69
Outcome
Total
GEF
MNRE
Others
366,150
311,150
55,000
312,500
226,250
86,250
668,950
294,125
374,825
1,214,600
860,200
354,400
387,980
387,980
7,461,805
1,461,805
2,000,000
4,000,000
12,506,440
506,440
4,000,000
8,000,000
58,700
58,700
45,400
45,400
727,475
247,950
479,525
23,750,000
4,400,000
7,350,000
12,000,000
70
13.
MANAGEMENT ARRANGEMENTS
71
from Ministry of Small and Mirco Enterprises, BIS, BEE, and UNDP. Other members (e.g. Director
General of Boiler Control, IREDA, NABARD, research institutes, industry associations, etc.) can be
invited by the decision of the PAC on an as needed basis, however, taking care that the PAC remains
small enough to be effective.
Project Management Board
UNDP
Implementing
partner
(MNRE)
Dept of
Economic
Affairs (DEA)
National
Project
Director (NPD)
Project Manager
(Awareness &
dissemination)
2 nos of Component
Managers
(Component 3)
Solar Energy
Centre (Output
1.3.1)
Project Manager
(Admin &
Accounts)
72
General
UNDP support service
123.
MNRE may enter into an agreement with UNDP for support services in the form of
procurement of goods and services during the project implementation process. In such a case,
appropriate cost recovery will be charged as per UNDP rules and regulations. The support services
will be outlined in the form of Letter of Agreement signed between MNRE and UNDP.
Collaborative arrangements with related projects
124. The proposed project was approved by DEA under the CPAP Framework Programme of
Supporting National Development Objectives with Co-Benefits of Mitigating Climate Change with the
following specific outputs:
a) Energy efficiency improvements in selected energy-intensive sectors
b) Framework developed for inclusive planning and delivery of clean energy services
c) Strategic partnerships to leverage environmental financing
d) Knowledge sharing and inputs provided for environmental and climate policy regimes
125. Thus the project Market Development and Promotion of Solar Concentrator based
Process Heat Applications in India (India CSH) was approved during the CPAP 2008-2012 under
the specific output b) above.
126. The proposed project will establish the necessary communication and coordination mechanisms
34
through its PMU and PSC with the Project Management Board to ensure proper coordination
between the various projects there under. UNDP India will also take the lead in ensuring adequate
coordination and exchange of experiences. In addition, the project will seek to coordinate its actions
with other UNDP energy and climate change activities in India. Similarities in the strategy of the
proposed project may extend an opportunity to share lessons and exploit synergies, in particular in the
areas of harmonization and mutual recognition. Also, the proposed project will also seek to coordinate
actions with other existing government commitments and non-government initiatives.
127. MNRE will ensure that the activities on CSH are properly coordinated with the other activities
which MNRE is undertaking or promoting, such as CSP for power generation, JNNSM programme, as
well as linking with incentive programs of MNRE.
128. MNRE will ensure co-finance and cooperation from programs implemented by other agencies;
MNRE provides approximately one third of the project cost of CSH
Industry provides an equity of one third
Industry leverages loan from Financing Institutions to an extent of one third. IREDA, a
financing institution closely associated with MNRE and their programme will also support
financing CSH project.
Table 38a: Details of total of co-financing share between MNRE, Industries and IREDA
Particulars
The current benchmark cost for solar concentrator systems in
India (irrespective of available technology [among two
2
technologies] and application), US$/m
34
Quantity
400-450
Implementing Partners are Ministry of Environment and Forests (MoEF), Ministry of New and Renewable Energy (MNRE),
Ministry of Power (MoP), Bureau of Energy Efficiency (BEE) and state governments and is co-chaired by UNDP and
Department of Economic Affairs (DEA)
73
400
500
200,000
45,000
18,000,000
6,000,000
6,000,000
6,000,000
Audit Clause
130.
The project will be audited according to UNDP Financial Rules and Regulations and
applicable audit policies.
Agreement on the intellectual property rights and use of logo on the projects deliverables
131.
In order to accord proper acknowledgement to GEF for providing funding, a GEF logo
should appear on all relevant GEF-supported project publications, including among others, project
hardware, if any, purchased with GEF funds. Any citation on publications regarding projects funded by
GEF should also accord proper acknowledgement to GEF. Alongside GEF and UNDP logo, MNRE
logo may also feature as the Implementing Partner of the proposed project.
Communications and visibility requirements:
132.
Full compliance is required with UNDPs Branding Guidelines. These can be accessed at
http://intra.undp.org/coa/branding.shtml, and specific guidelines on UNDP logo use can be accessed
at: http://intra.undp.org/branding/useOfLogo.html. Amongst other things, these guidelines describe
when and how the UNDP logo needs to be used, as well as how the logos of donors to UNDP projects
needs to be used. For the avoidance of any doubt, when logo use is required, the UNDP logo needs
to be used alongside the GEF logo. The GEF logo can be accessed at:
http://www.thegef.org/gef/GEF_logo. The UNDP logo can be accessed at
http://intra.undp.org/coa/branding.shtml.
133.
Full compliance is also required with the GEFs Communication and Visibility Guidelines
(the GEF Guidelines). The GEF Guidelines can be accessed at:
http://www.thegef.org/gef/sites/thegef.org/files/documents/C.40.08_Branding_the_GEF%20final_0.pdf.
Amongst other things, the GEF Guidelines describe when and how the GEF logo needs to be used in
project publications, vehicles, supplies and other project equipment. The GEF Guidelines also
describe other GEF promotional requirements regarding press releases, press conferences, press
visits, visits by Government officials, productions and other promotional items.
134.
Where other agencies and project partners have provided support through co-financing,
their branding policies and requirements should be similarly applied.
74
14.
Project Start
135.
A Project Inception Workshop will be held within the first two months of project start with
attendance by those assigned roles in the project organization structure, UNDP country office (CO)
and where appropriate/feasible UNDP regional technical and program advisors as well as other
stakeholders. The Inception Workshop will be crucial to building ownership for the project results and
to plan the first year Annual Work Plan (AWP). The Inception Workshop will address a number of key
issues including:
Understanding objectives & other outputs and activities.
Assisting all partners to fully understand and take ownership of the project. Detail the roles,
support services and complementary responsibilities of UNDP CO and UNDP APRC staff
vis--vis the project team. Discuss the roles, functions, and responsibilities within the
project's decision-making structures, including reporting and communication lines, and
conflict resolution mechanisms. The Terms of Reference for project staff will be discussed
again as needed.
Based on the project results framework and the relevant GEF Tracking Tool, if appropriate,
finalize the first AWP. Review and agree on the indicators, targets and their means of
verification, and recheck assumptions and risks.
Provide a detailed overview of reporting, monitoring and evaluation (M&E) requirements.
The Monitoring and Evaluation work plan and budget should be agreed and scheduled.
Discuss financial reporting procedures and obligations, and arrangements for annual audit.
Plan and schedule Project Steering Committee (PSC) meetings. Roles and responsibilities
of all project organization structures should be clarified and meetings planned. The first PSC
meeting should be held within the first 12 months following the inception workshop.
136.
An Inception Workshop report is a key reference document and must be prepared and
shared with participants to formalize various agreements and plans decided during the meeting.
Quarterly Review
137.
Progress achieved, monitored in the UNDP Enhanced Results Based Management Platform.
Based on the initial risk analysis submitted, the risk log shall be regularly updated in ATLAS.
Risks become critical when the impact and probability are high. Note that for UNDP GEF
projects, all financial risks associated with financial instruments such as revolving funds,
microfinance schemes, or capitalization of ESCOs are automatically classified as critical on
the basis of their innovative nature (high impact and uncertainty due to no previous
experience justifies classification as critical).
Based on the information recorded in Atlas, Project Progress Reports (PPR) can be
generated in the Executive Snapshot.
Other ATLAS logs can be used to monitor issues, lessons learned, etc. The use of these
functions is a key indicator in the UNDP Executive Balanced Scorecard.
Annual Review
138.
Annual Project Review/Project Implementation Reports (APR/PIR): These key reports are
prepared to monitor progress made since the project start and in particular for the previous reporting
period (30 June to 1 July). The APR/PIR combines both UNDP and GEF reporting requirements. The
APR/PIR includes, but is not limited to, reporting on the following:
75
Progress made towards project objective and project outcomes - each with indicators,
Responsible Parties
Implementing Partner
(National Project Director and
National Project Coordinator)
UNDP CO, UNDP GEF
UNDP GEF RTA/Project
Coordinator will oversee the
hiring of specific studies and
institutions, and delegate
responsibilities to relevant
team members.
Time frame
Within first two
months of project
start up
Start, mid and end of
project (during
evaluation cycle) and
annually when
required.
76
Type of M&E
activity
Measurement of
Means of
Verification for
Project Progress
on output and
implementation
ARR/PIR
Periodic status/
progress reports
Mid-term
Evaluation
Responsible Parties
Final Evaluation
Project Terminal
Report
Audit
Visits to field sites
Time frame
Annually prior to
ARR/PIR and to the
definition of annual
work plans
Annually
Quarterly
None
At the mid-point of
project
implementation.
Yearly
US$ 200,000
(4.54% of Total Budget)
End of Project:
142.
An independent Final Evaluation will take place three months prior to the final Project
Board meeting and will be undertaken in accordance with UNDP and GEF guidance. The final
evaluation will focus on the delivery of the projects results as initially planned (and as corrected after
the mid-term evaluation, if any such correction took place). The final evaluation will look at impact and
sustainability of results, including the contribution to capacity development and the achievement of
global environmental benefits/goals. The Terms of Reference for this evaluation will be prepared by
the UNDP CO based on guidance from the UNDP-APRC and UNDP-GEF.
143.
The Terminal Evaluation should also provide recommendations for follow-up activities and
requires a management response which should be uploaded to PIMS and to the UNDP Evaluation
Office Evaluation Resource Center (ERC).
144.
The relevant GEF Focal Area Tracking Tools will also be completed during the final
evaluation.
145.
During the last three months, the project team will prepare the Project Terminal Report.
This comprehensive report will summarize the results achieved (objectives, outcomes, outputs),
lessons learned, problems met and areas where results may not have been achieved. It will also lay
out recommendations for any further steps that may need to be taken to ensure sustainability and
replicability of the projects results.
77
15.
LEGAL CONTEXT
149.
This document together with the CPAP signed by the Government and UNDP, which is
incorporated by reference, constitute together a Project Document as referred to in the Standard Basic
Assistance Agreement (SBAA) and all CPAP provisions apply to this document.
150.
Consistent with the Article III of the SBAA, the responsibility for the safety and security of
the implementing partner and its personnel and property, and of UNDPs property in the implementing
partners custody, rests with the implementing partner.
151.
a)
b)
152.
UNDP reserves the right to verify whether such a plan is in place, and to suggest
modifications to the plan when necessary. Failure to maintain and implement an appropriate security
plan as required hereunder shall be deemed a breach of this agreement.
153.
The implementing partner agrees to undertake all reasonable efforts to ensure that none
of the UNDP funds received pursuant to the Project Document are used to provide support to
individuals or entities associated with terrorism and that the recipients of any amounts provided by
UNDP hereunder do not appear on the list maintained by the Security Council Committee established
pursuant to resolution 1267 (1999). This provision must be included in all sub-contracts or subagreements entered into under this Project Document. The list can be accessed via:
http://www.un.org/Docs/sc/committees/1267/1267ListEng.htm.
78
PART C. ANNEXES
ANNEX A. RISK ANALYSIS
Table 39: Summary of Risk Log and counter measures
No.
Description
Date
Identified
Type
Impact and
Probability
(on a scale of
1 (low) to 5
(high))
Countermeasures/
Management Response
Owner
Submitted,
updated by
UNDP
UNDP CO
UNDP
UNDP CO
UNDP
UNDP CO
Lack of interest
from Indian
manufacturers of
solar concentrator
technologies.
30 April
2011
Lack of interest
from foreign
manufacturers of
solar concentrator
technologies
30 April
2011
Strategic
Probability = 2
Impact = 3
Lack of interest
from existing users.
30 April
2011
Strategic
Probability = 3
Impact = 3
Strategic
Probability = 1
Impact = 5
Last
update
Status
79
No.
Description
Lack of interest
from prospective
users.
Date
Identified
30 April
2011
Type
Strategic
Impact and
Probability
(on a scale of
1 (low) to 5
(high))
Probability = 2
Impact = 5
Countermeasures/
Management Response
Owner
Submitted,
updated by
UNDP
UNDP CO
UNDP
UNDP CO
UNDP
UNDP CO
Failure to obtain
cooperation
(sharing of
information,
accessibility for
discussions) from
Indian
manufacturers of
solar concentrator
technologies.
30 April
2011
Strategic
and
Operational
Probability = 2
Impact = 5
Failure to obtain
cooperation
(sharing of
information,
accessibility for
discussions) from
foreign
manufacturers of
30 April
2011
Strategic
and
Operational
Probability = 3
Impact = 3
Last
update
Status
80
No.
Description
solar concentrator
technologies.
Failure to obtain
cooperation
(sharing of
information,
accessibility for
discussions,
access to
installations) from
existing and
prospective users.
Date
Identified
30 April
2011
Type
Strategic
and
Operational
Impact and
Probability
(on a scale of
1 (low) to 5
(high))
Probability = 2
Impact = 5
Countermeasures/
Management Response
Owner
Submitted,
updated by
UNDP
UNDP CO
UNDP
UNDP CO
UNDP
UNDP CO
Professional
capacity to develop
standards is limited
and/ or unavailable.
30 April
2011
Probability = 1
Impact = 3
Work on
development of
standards is
initiated in parallel
or is already
underway in
national/
international
standards bodies.
30 April
2011
Probability = 1
Impact = 3
Last
update
Status
81
No.
10
Description
Date
Identified
30 April
2011
Type
Operational
Impact and
Probability
(on a scale of
1 (low) to 5
(high))
Probability = 3
Impact = 3
Countermeasures/
Management Response
11
Testing facilities
that are established
are not used.
30 April
2011
Strategic
Probability = 2
Impact = 3
12
13
Unavailability of
national/
international
experts to deliver
training.
Limited interest
within academia in
undertaking
research in CSH
area.
30 April
2011
Operational
Probability = 1
Impact = 3
30 April
2011
Strategic
Probability = 1
Impact = 3
Owner
Submitted,
updated by
UNDP
UNDP CO
UNDP
UNDP CO
UNDP
UNDP CO
UNDP
UNDP CO
Last
update
Status
82
No.
14
15
16
Description
Failure to trigger
positive response
from energy
efficiency /
renewable energy
consultants and
other such service
providers for
involvement and
development of
capabilities in CSH
area.
Feasibility Studies
and Detailed
Project Reports do
not get converted
into prospective
projects.
MNRE CSH
subsidy scheme is
discontinued or
changed
substantially.
Date
Identified
Type
Impact and
Probability
(on a scale of
1 (low) to 5
(high))
Countermeasures/
Management Response
Owner
Submitted,
updated by
30 April
2011
Strategic
Probability = 2
Impact = 3
UNDP
UNDP CO
30 April
2011
Strategic
Probability = 3
Impact = 5
UNDP
UNDP CO
30 April
2011
Regulatory
Probability = 2
Impact = 4
UNDP
UNDP CO
Last
update
Status
83
No.
Description
Date
Identified
Type
Impact and
Probability
(on a scale of
1 (low) to 5
(high))
Countermeasures/
Management Response
Owner
Submitted,
updated by
UNDP
UNDP CO
UNDP
UNDP CO
17
30 April
2011
Operational
Probability = 2
Impact = 4
18
Delays in
commissioning of
demonstration and
replication projects
and availability of
results
After the project is
commissioned,
demonstration and
replication project
participants do not
comply fully with
the stipulated terms
and conditions.
CSH industry
growth is limited
due to greater
growth of CSP
industry due to
greater policy
emphasis, greater
interest of
manufacturers, and
larger scale of CSP
projects.
30 April
2011
Operational
Probability = 3
Impact = 3
30 April
2011
Operational
Probability = 1
Impact = 3
UNDP
UNDP CO
30 April
2011
Strategic
and
Regulatory
Probability = 3
Impact = 4
UNDP
UNDP CO
19
20
Last
update
Status
84
ANNEX B. AGREEMENTS
Co-financing letter
85
86
87
88
89
Coordinate the organization of the two international conferences and expos on CSH
Organize the development, launch and management of the project website and various
publications under the project
Coordinate the award of fellowships and their progress
Organize promotion and publicity for CSH technologies
Network with all stakeholders to strengthen the awareness, capacity building and dissemination
work under the project
Establish national testing facility for solar concentrator technologies for CSH applications
at SEC.
Provide technical support for establishing the regional test facility.
A detailed list of National and International Consultants providing services to the Project is attached in
Annex C of the GEF CEO Endorsement Request.
90
The 30 demonstration (15,000 m ) and 60 replication CSH projects (30,000 m ) supported by the India
CSH project installed during the projects 5-year implementation phase will result in direct greenhouse
gas emission reductions over their economic lifetime. An economic lifetime of 20 years is assumed,
noting that the largest and latest SEGS (Solar Energy Generating Systems) CSP units at Harper Lake
35
in the US have been successfully commercially operating continuously now since 1989/90 .
As a result of this India CSH projects demonstration and replication projects installed with project
support during the project implementation period of 5 years, direct greenhouse gas emission
reductions totalling 315,000 tonnes of CO2 equivalent36 will be achieved over the lifetime of the
investments of 20 years. In the non-GEF base case, these energy needs would be satisfied by
furnace oil with an emission factor of 3.75 tCO2/tonne fuel oil.
Direct Post-Project Emission Reductions
The project does not explicitly include the establishment of financial mechanisms that will continue to
operate post-project end, although changes to the MNRE CSH subsidy scheme to be more
performance based will clearly persist post-project end. There may also be new CSH financial support
mechanisms established by MNRE. However, as a conservative assumption, no direct post-project
greenhouse gas emission reductions are claimed.
Indirect emissions reductions
The India CSH project has strong capacity building elements in an explicit overall barrier removal
framework. As such, the projects interventions are explicitly designed to have a strong indirect
37
emissions reduction impact. Using the GEF bottom-up methodology , indirect emission reductions
attributable to the project are 945,000 tonnes of CO2 equivalent. This figure utilises a replication factor
of 3 as per GEF typical market transformation programs (see para 43(c), GEF/ C.33/ Inf.18, April 16,
2
2008). In the alternative scenario, it is estimated that about 50,000 m of CSH systems area is
expected to be deployed annually. The cumulative amount of emission reductions that will be
achieved due to the deployment and use of CSH systems would be 1,095,150 t CO2 over the period
2011/12-2025/26 (that is, a total duration of 15 years during the project implementation period and 10
years of post-project scenario). Of course, this potential cannot be fully attributed to the GEF
interventions alone as other projects may have an influence over the CSH systems promotion and
implementation. Uptake of CSH technologies would also takes place to some extent due to on-going
(and future) national efforts and future donor-funded initiatives. It is proposed to apply conservatively a
causality factor 4 of 80%. This gives an indirect emission reduction (top-down) of 1,095,150 t CO2 *
80% = 876,120 t CO2. The range of indirect CO2 emission reductions is 876,000 945,000 tonne CO2.
35
http://en.wikipedia.org/wiki/Solar_Energy_Generating_Systems
The output of the improved versions of parabolic dish solar concentrators used for heating applications in India are expected
to range between 1.66 to 4.19 kWh/ day/m2 at operating temperature of 120oC [Presentation by Dr S B Kedare, Indian Institute
of Technology, Bombay, November 2010] . The output of the LFR and PTC would also lie in this performance band. Taking 300
days of usage and assuming that solar concentrator would replace Furnace Oil (FO) used in boilers, the annual CO2 savings
are expected to range between 0.2 to 0.5 tCO2/year/m2. As the project is considering 5 technologies and the final distribution of
technologies in the demonstration and replication projects is not yet known, an average CO2 savings of 0.35 tCO2/year/m2 of
solar collector area is assumed for calculating CO2 savings.
37
Manual for calculating GHG benefits of GEF projects: Energy Efficiency and Renewable Energy. GEF/ C.33/ Inf.18, April 16,
2008.
36
91
Cost effectiveness
If the GEF contribution (USD 4.4 million) is divided by the direct emission reductions of 315,000
tonnes of CO2 equivalent, this then gives a corresponding unit abatement cost (UAC) (i.e. GEF$ per
38
tCO2) of USD 13.97/tCO2 .
38
This is relatively lower than the current CDM CER prices. Secondary CER (EUA Dec 2011) as of 7 June =
12.56/tonne CO2 (about US$ 20/tonne CO2).
ProDoc: UNDP GEF Concentrated Solar Heating Project (India CSH)
92
39
This is an executive summary drawn from a technical report produced during the PPG phase of this project.
93
94
Particulars
Annual turnover
Fuels used
Heat requirement
120-5,400 m
No. of dishes
Scheffler*: 4-105
Arun*: 1-12
Scheffler: 64-1,680 m
Arun: 169-2,028 m
Heat generated
0.007-0.40 Mkcal/hr
18-935 Mkcal/yr
0.3-114 %
1600
1400
1200
1000
800
600
400
200
0
Figure F-1. Size of solar systems (x-axis denotes number of units surveyed)
Figure F-2 shows the annual heat generation possible from the solar systems as a function of their
size. The heat output of ARUN systems is greater than that for Scheffler systems.
95
1000
900
800
700
600
500
400
300
200
Scheffler
100
Arun
0
0
500
1000
1500
2000
2500
Aperture area, m2
Figure F-3 shows the thermal energy contribution as a function of size of the solar systems. The
contribution is mostly under 20 %; it is less than 10 % in about half of the cases, and is greater than
around 50 % in about one-fourth of the cases. The contribution is mostly under 20 % for both small as
well as large systems.
120
Scheffler
100
Arun
80
60
40
20
0
0
500
1000
1500
2000
2500
Aperture area, m2
Figure F-4 shows the simple payback period vs. size of solar systems. The payback period varies
between 3.7 to 38 years for Scheffler systems, and between 5 to 38 years for Arun systems. The
payback is influenced primarily by the fuel being replaced; it is low for petroleum fuels such as LDO
and HSD, and considerably higher for fuels such as coal and wood. The payback period also depends
on the utilisation of the solar system; for units that operate for all days of the year, the savings are
greater. Payback periods are lower for Scheffler systems than Arun systems as the subsidy from
MNRE forms a greater proportion of the capital cost of Scheffler systems. The simple payback
calculations do not take into account future increase in fossil fuel prices.
96
45
40
35
30
25
20
Scheffler
15
Arun
10
5
0
0
500
1000
1500
2000
2500
Aperture area, m2
97
F.3 Case Study of CSH application in a Hospital for Space Cooling- Chhatrapati
Shivaji Maharaj Hospital, Thane
Introduction: The hospital is situated in Thane city which is part of Mumbai Metropolitan Region. The
hospital has an indoor patient capacity of 550 with an average occupancy of 60%.
Thermal Energy Requirements and System Installed: There is requirement of thermal energy in the
Kitchen, Laundry, Autoclave unit and for Air Conditioning (double effect VAM). The steam requirement
in VAM section is high compared to the other systems which are being fed by oil fired boilers. The airconditioning load of the facility is 160 TR of which 80 TR load is met by steam based VAM. The peak
steam requirement in the VAM is 340 kg/hr.
2
The steam requirement of the 80 TR VAM is met by 92 Scheffler dishes (each dish is of 13.6 m ; the
2
total aperture area is 1251 m ) that have been installed on the terrace of the hospital. There is also a
backup Briquette Fired Boiler having 600 kg/hr rated capacity for the VAM. During operation the
excess steam from this boiler is sent to other steam requiring areas like the kitchen.
The Process Flow: The steam produced from the Scheffler dish system is conveyed to a main header
where a tapping from the backup boiler is also provided. The VAM draws steam from the header and
condensate from generator side of VAM is stored in a Condensate tank. The condensate is pumped to
a Hot Water Tank which is installed at a height of 10 m above ground level. The hot water is supplied
to the Liquid Desiccant Dehumidification System (L.D.D.S) by gravity. Return water from LDDS
system is sent to the Condensate tank. A steam connection from the Hot Water Tank to the LDDS is
also provided to maintain hot water supply to the LDDS in case of failure of condensate transfer pump.
The Scheffler Dish System: The Scheffler dish system has been installed by Sharda Inventions. A pair
of dishes concentrates solar radiation on a common receiver with standing and sleeping dish
orientation. The system has an automatic timer based tracking mechanism to track the Sun from the
East to the West and a manual seasonal arrangement for tracking the Sun from North to South. The
system uses PV cells to drive the motor of the automatic solar tracking system.
Performance: The yearly average solar beam radiation on the area is 260 W/m2. On site measurement
of the parameters on a December day showed that the VAM was able to provide 70 TR on an
nd
average. On 22 December, 2010, the steam output from the Scheffler dish system was measured as
2
1,770 kg/day (approx. 300 kg/hr for 6 hours/day) at a pressure and temperature of 7 kg/cm and
o
2
2
170 C. The specific thermal power output of the dish is calculated as 0.24 kg/hr/m or 0.16 kW/m .
F.4 Case Study of CSH application in a hospital for Space Cooling Muni Seva
Ashram, Goraj (Near Vadodara)
Introduction: The Muni Seva Ashram is situated in Goraj, Gujrat (30 km from Vadodara). The facility
contains Kailash Cancer Hospital and Research Center and Akshar Purshottam Aarogya Mandir
which is a multi-specialty 95 bed hospital. Around 45,000 OPD patients are attended to in these
hospitals daily.
Thermal Energy Requirements and System Installed: There is requirement of thermal energy in the
kitchen, Autoclave unit and for Air Conditioning (double effect VAM). The facility has 4 VAMs of rated
capacities 100 TR x 2 no., 200 TR x 1 no., 400 TR x 1 no. These are operated as per the load
requirements. The major consumption of steam is in the VAM (peak requirement of 3,200 kg/hr of
steam). This however varies with the cooling load and is quiet low in the winter season. In summers,
one of the 100 TR VAMs and either 200 TR or 400 TR VAMs are operated. Either 100 TR or 200 TR
VAM is operated in winter as per requirement. The table below states the requirement of steam in the
different areas of the Cancer Hospital.
98
Thermal
Energy
Consumption Areas
Pressure
2
(kg/cm )
Maximum
Temperature
Requirement (C)
Steam
Consumption
Kg/day
VAM
8.5
180
Variable
Kitchen
1 to 2.5
95
100
Auto-Clave (sterilization)
120
30
To meet the steam requirement, 2 boilers which produce steam @ 1.5 TPH and 3 TPH using fuel
2
2
wood and 100 Scheffler Dishes (each dish of 12.5 m area; total aperture area is 1,250 m ) have been
used. The dishes are designed to provide steam @ 400 kg/hr and can meet up to 100 TR load. Fair
amount of solar energy is available for about 7-8 hours in a day so the steam from the Scheffler is
used first and the boilers are started as per requirement. As another measure to reduce boiler fuel
requirements the condensate from the VAM is supplied to the boiler feed water tank.
The Scheffler Dish System: The installer of the system is Gadhia Solar. The dishes are installed in 4
rows with a pair of dishes concentrating solar radiation on the common receiver. Each pair has one
standing and one sleeping dish. This leads to increased concentration efficiency and reduced space
for installation. The system is equipped with an automatic timer based tracking mechanism to track the
sun from East to West and a manual seasonal arrangement for tracking the sun from North to South.
The steam from the system is sent to the steam header after which it enters the boiler steam drum
where steam pressure is increased in case it's less. If steam requirement is higher, boiler feed water is
used with steam from solar system.
Performance: On 21st December, 2010, the steam output from the Scheffler dish system was
measured as 2,460 kg/day (approx. 400 kg/hr for 6 hours/day) at a pressure and temperature of 8
2
o
2
kg/cm and 175 C. The specific thermal power output of the dish is calculated as 0.32 kg/hr/m or 0.24
2
kW/m .
F.5 Case Study of CSH application in dairy for pasteurization 3 Chitale Dairy,
Sangli
Introduction: Chitale dairy is located in Bhilwadi, around 40 km from Sangli and around 250 km from
Pune in Maharashtra. 4000,000 litres of milk is processed here every day. The dairy functions for 24
hrs in a day and for the whole year.
Thermal Energy Requirements and System Installed: There is requirement of heat for pasteurization
o
o
of milk. Cold raw milk at 4 C is heated to around 70 C and kept at this temperature for at least 30
minutes. The dairy has installed 2 nos. of ARUN dishes for steam generation. There is also a backup
boiler provided which is used for 14 16 hrs/day when the output from the solar concentrator is not
available. By using steam, hot water is generated and stored in a thermal storage tank which is used
for the pasteurization process as per requirement.
The ARUN Dish System: The system has been installed by Clique Developments Pvt. Ltd. The
2
2
aperture area of each dish is 169 m , thus for the two dishes the aperture area is 338 m . On an
2
average, in good solar radiation conditions 400 kg/hr of steam can be generated at 8 kg/cm pressure.
The dishes have been mounted on the roof of the plant.
Performance: The December, 2010 data (for December 1st to 24th) provided by BG Chitale for one
operational dish gives average output as 188.5 kg/hr of steam, which is 94% of the rated output i.e.,
2
@ 200 kg/hr. The specific thermal power output of the dish is calculated as 1.11 kg/hr/m or 0.85
2
kW/m .
99
40
IIT Bombay (2006). DEVELOPMENT, INSTALLATION AND EVALUATION OF LARGE SCALE CONCENTRATING SOLAR
COLLECTOR FOR MEDIUM TEMPERATURE INDUSRIAL THERMAL APPLICATIONS, MNRE R & D Project Ref. No.
15/9/2002-ST, Energy Systems Engineering, Indian Institute of Technology Bombay
100
No.
State/Establishment
Capacity
2
(m )
Status (as on
September
2010)
76
Commissioned
95
Commissioned
Andhra Pradesh
IGP Grey Hounds
(Police)
Rishi Valley School
Sanghi Mills
95
Commissioned
Tirumala Tirupati
Devasthanams
1,006
Commissioned
VEDA Educational
Development
Association
320
Commissioned
Application
Type of
solar
concentrator
Scheffler
Under installation
Scheffler
60
Under installation
Scheffler
Scheffler
Scheffler
Scheffler
Scheffler
1,592
6
Chhatisgarh
Ramakrishan Mission
Ashram
300
300
Gujarat
Adarsh Niwasi Shala
190
Commissioned
Brahmachari Shri
Bhagwati Nandji
Educational Trust
95
Commissioned
Scheffler
10
Brahmachari Shri
Bhagwati Nandji
Educational Trust
95
Commissioned
Scheffler
11
Brahmachari Shri
Bhagwati Nandji
Educational Trust
200
Commissioned
Scheffler
12
Deevalaya
95
Commissioned
Scheffler
13
Eklavvya Modal
Residential School
95
Commissioned
Scheffler
14
Jivan Shala
Ambardeep
95
Commissioned
Scheffler
15
Kasturba Kanya
Chhatralaya
60
Under installation
Scheffler
16
Kedi Residential
School Nagaria
95
Commissioned
Scheffler
Scheffler
101
No.
State/Establishment
17
Manthan Apang
Kanya Sewa Sankul
Muni Seva Ashram
64
Status (as on
September
2010)
Under installation
1,250
Commissioned
People's Welfare
Society
Pragyachaksu, Mahila
Sewa Kunj
Sanskardham
288
Commissioned
95
Commissioned
96
Commissioned
Sarvanaman Vidya
Mandir Atmiyadham
Shri Bhimnath
Mahadev Seva Samaj
Tapi Food Product
95
Commissioned
60
Under installation
95
Commissioned
The Agricultural
Produced Mkt.
The Times of India
Relief Funds
Veeryatan Vidyapith
190
Commissioned
95
Commissioned
95
Commissioned
Vivekanad Vidyalaya
run by Muni Seva
Ashram
95
Commissioned
18
19
20
21
22
23
24
25
26
27
28
Capacity
2
(m )
Application
Cooking for 400
persons
Solar Air Conditioning
50 TR (tons
refrigeration)
Steam generation for
1500 persons cooking
Steam generation for
500 persons cooking
Steam generation for
500 persons cooking
Steam generation for
500 persons cooking
Steam generation for
200 persons cooking
Industrial Process
Heat
Steam generation for
500 persons cooking
Steam generation for
500 persons cooking
Steam generation for
500 persons cooking
Steam generation for
500 persons cooking
Type of
solar
concentrator
Scheffler
Scheffler
Scheffler
Scheffler
Scheffler
Scheffler
Scheffler
Scheffler
Scheffler
Scheffler
Scheffler
Scheffler
3,598
29
Himachal Pradesh
National Institute of
Technology
96
Proposal
Received
Scheffler
54
Under installation
Scheffler
240
Commissioned
Scheffler
320
Under installation
614
NA
Installed
Defence &
Employment
Company, Leh
Defence &
Employment
Company, Leh
Transit Camp
Steam generation for
500 persons cooking
Scheffler
96
30
31
32
Haryana
Air Force
Communication
Center
Brahma Kumari
Educational Society
M/s. Magnetic Mareli
Power Train Pty. Ltd.
33
14 Corp Head
Quarter
34
3 Infantry Division
NA
NA
35
36
Leh
Transit Camp
NA
95
NA
Commissioned
Scheffler
Scheffler
Scheffler
Scheffler
95
Karnataka
102
No.
State/Establishment
37
288
Status (as on
September
2010)
Commissioned
96
Commissioned
500
Commissioned
95
Commissioned
41
Shri Tontada
Siddalingeshwar
Kainkarya (Dasoha)
Seva Sangh (Regd.)
192
Fresh Application
42
Sree Siddaganga
Math
Sringeri Math
1,760
Fresh Application
Steam Cooking
Scheffler
589
Commissioned
Scheffler
96
Under installation
50
Commissioned
Scheffler
Scheffler
Scheffler
Scheffler
38
39
40
43
44
45
Capacity
2
(m )
Application
Type of
solar
concentrator
Scheffler
Scheffler
Scheffler
Scheffler
Scheffler
Scheffler
3,666
46
Maharashtra
Adharashram
67.2
Commissioned
47
Gujraj Cleaners
240
Commissioned
48
Jawahar Navodaya
Vidyalaya
Jnana Prabodhini
Solapur
Kirloskar, Copeland
Ltd.
M/s B.G. Chitale
Mahananda Dairy
Mahindra & Mahindra
Mahindra & Mahindra
101
Under installation
96
Commissioned
64
Commissioned
320
160
1,120
338
Sanctioned
Commissioned
Under installation
Under installation
Rajaji Sahmbhaji
Bhoshali Sainik
School
Sanjivan Public
School
Shri Sai Baba
Sansthan Trust
Shri Sai Baba
Sansthan Trust
Thane Municipal
Corporatration
Vidyabharti
Shaishanik Mandal
84
Commissioned
190
Commissioned
376
Commissioned
1,168
Commissioned
2,502
Sanctioned
135
Commissioned
49
50
51
52
53
54
55
56
57
58
59
60
Scheffler
Scheffler
Scheffler
ARUN
ARUN
Scheffler
ARUN
Scheffler
Scheffler
Scheffler
Scheffler
Scheffler
103
Capacity
2
(m )
Status (as on
September
2010)
No.
State/Establishment
61
New Delhi
ITC Maurya
176
Under installation
62
ITC Maurya
320
Under installation
Application
Type of
solar
concentrator
6,961
Solar steam
generation
Process Application
(laundry, kitchen and
hot water generation)
Scheffler
Scheffler
Scheffler
Installed
Institute
Scheffler
Under installation
Scheffler
ARUN
496
63
64
65
66
Rajasthan
Brahma Kumari Gyan
Sarovar Complex
Global Hospital
Heavy Water Plant
Hotel Clarks Amer,
Jaipur
180
Commissioned
252
Commissioned
320
80
Under installation
Fresh Application
Scheffler
ARUN
Scheffler
832
67
68
69
Tamil Nadu
Avinashlingam
University for Woman
Sathyabama
University, Jeppiaar
Nagar
Turbo Energy/TVS
260
Commissioned
224
Under installation
760
Under installation
Scheffler
Scheffler
1,244
70
Uttar Pradesh
Dayal Bagh
Educational Institute
71
Uttarakhand
Sri Ved Mata Gayatri
Trust
80
80
Grand Total
160
160
2
19,734m
104
CSH Technology Packages: CSH needs good integration with existing or back-up heating system:
Solar radiation is available for 250-300 days in a year and 6-8 hours per day. This intermittent
feature of solar energy requires very good integration of CSH systems with existing or back-up
heating system to ensure availability of uninterrupted heating service to the industry. The
development of CSH technology packages to suit different types of industrial applications should
be a highest priority.
Expectations from the end-user industry: The main considerations by end-user industries while
considering CSH options are: initial investment, pay-back period, integration with the existing
system, high reliability like any other good quality industrial equipment, guaranteed performance
as per claims, area required for installing CSH system, weight of the CSH system in case it has to
be installed on roof, good reference from end-users.
Lack of Awareness: Awareness on solar concentrator option is low amongst industries of all
categories.
MNRE subsidy scheme: The MNRE subsidy scheme appears to be generally accessible, simple
enough to understand, and sustainable into the foreseeable future. It has been able to result in
more than 70 installations in India However in its present form, the MNRE subsidy scheme does
not sufficiently differentiate between the different available CSH technologies on the basis of their
performance, and hence the MNRE subsidy scheme in practice serves to promote the extension
of the simplest and lowest cost CSH technologies (Scheffler).
Lack of performance data: The absence of systematic monitoring of in-use process CSH
applications means that the performance of existing CSH applications is not quantified and hence
the necessary technical learning from the operation of the existing CSH applications in India is
limited. In the absence of real monitored performance data, the credibility of the existing CSH
technologies in real applications in India is low, and this is a key barrier to the increased uptake of
CSH in India.
Shortage of accurate solar radiation data: There is also a shortage of site-specific applicable direct
beam solar radiation data. As the performance of any solar concentrator system depends on the
available direct solar radiation, the absence of direct beam solar radiation data hinders the
realistic estimation of CSH applications performance.
Mirrors for CSH systems: It was informed that the life of mirrors is emerging as an important issue
and several of the manufacturers are now trying out imported solar mirrors in their installations.
Potential applications of CSH: The participants in general were optimistic about a good potential
for CSH, given the dependence of a large section of Indian industry on imported petroleum fuels
for meeting low and medium temperature requirements. Some of the potential CSH applications
discussed during the stakeholder consultations were:
1. Textile (composite mills, grey cloth mills, mills engaged in finishing operations, garments)
2. Chemical (dye and pigments; organic chemicals; rubber processing, paints and resins)
3. Pharmaceutical (bulk drugs, Active pharmaceutical ingredients and formulations)
105
A debriefing meeting was conducted on 26 November 2010 at the MNRE premises to appraise the
MNRE and UNDP officials on the progress being made in the preparation of the FSP and seek their
inputs. The debriefing meeting was organized towards the end of the mission of the two international
consultants Mr. Frank Pool and Dr Uli Jakob.
On behalf of the Consultants team a presentation was made by Mr. Frank Pool and Dr Sameer
Maithel
The main points made during the discussions on the presentation are as follows:
o
Secretary, MNRE was of the view that there should be a close synergy between the proposed
project and the MNRE programme and the proposed UNDP-GEF project should strengthen
the MNRE programme.
Dr. Nayanika Singh was of the opinion that the project should keep a window for
accommodating a few new solar concentrator technologies apart from the 5 mentioned in the
presentation. Dr. Singhal said that instead of naming the technologies by their brand/popular
names they should be named by their generic names.
Dr. Ashvini Kumar said the project should have a strong end-use sectoral focus and should
aim at demonstration of technology application packages.
The consultant team was asked to define the term fairly mature with reference to the two
technologies currently available in India.
Secretary, MNRE was interested in knowing how the demonstration projects would be
selected and implemented. The discussion on this topic resulted in the following points being
made:
o Instead of waiting for the project to start, MNRE can already start the process of
selecting some demonstration projects (time frame of 3-6 months), so that several
demonstration projects can be taken up early in the project.
o The demonstration projects would require performance specifications as well as
criteria for selection. The selection of the demonstration projects can be taken up
through an expression of interest.
o Ministry is working closely with the Indian Army for using solar concentrators for
cooking in the Ladakh region and it is estimated that 600 solar concentrator systems
would be required in Ladakh alone.
106
Secretary, MNRE was of the view that there is no need at this point of time to proactively seek
co-financing from international agencies for demonstration of technologies from international
suppliers. Some of the bi-lateral agencies are already in touch with the Ministry for such
projects. He said that under the JNNSM, MNRE has the required funds to procure and install
these technologies for proof of concept under Indian conditions. He added that the project
should be open to seeking international support in the field of testing, capacity building, etc.
Secretary, MNRE informed that MNRE already has a plan for testing centres for solar
concentrator technologies. Dr. Ashivini Kumar added that IIT, Bombay has been entrusted
with the task for preparing the testing procedure for solar concentrators.
Mr. Ajit Gupta advised the consultant team to clearly articulate the concepts of
demonstration and replication projects.
107
Phone/Fax/Email etc.
Tel: 02632-236703/237408
Mobile: 09820700189 (Mr. Badal, MD)
Email: badal@gadhia.solar.com
Website: www.gadhia-solar.com
Tel: 079-40035857, 40040888
Mobile: 09712933390 (Mr. Dharmendra Gor),
09925133390 (Mr. Sameer Patel)
Email: info@tss-india.com, dharma@tssindia.com
Website: www.tss-india.com
Tel: 0253-2352444
Mobile: 09822018810 (Mr. Kapadia, MD)
Fax: 0253-2336014
Email: solarvihar@yahoo.com
Website: www.shardainventions.com
Tel. 020-25542263, 64674230
Mobile: 09923022249 (Mr. A. Lahari)
Fax: 020- 25541226
Email: solar@thermaxindia.com
Ph: 91 80 22289663, 22355238, 22289290
Mobile: 09880022272 (Mr. Shivanand Nashi)
Fax: 91 80 22289294
E-mail: unisun@vsnl.com
Web: www.unisun.net
Tel: 91- 141- 6532575, 2290712
Mobile: 09829050554 (Mr. Jitender Sharma)
Fax: 91-141-2291260
Website: www.nilloynewsun.co.in
E-mail: j_31nilloy@rediffmail.com
Telefax: 0291- 2630432, 2639045
Mobile: 09829022899 (Mr. Sanjeev Kachhwaha)
Email : kachhwaha@yahoo.com
108
Note: This list is not exhaustive and is based on the information available in the Ministry. These
manufacturers are supposed to install systems as per MNRE specifications available at its website:
www.mnre.gov.in. Beneficiaries may, therefore, ensure that the systems supplied by them are
installed as per these specifications for which they may consult Technical Back up Units cum Regional
Test Centers & State nodal agencies of Ministry, if necessary. List of these Units/Centres/Agencies
are given at website.
Table I -2. List of potential CSH manufacturers/suppliers (other than those mentioned on MNRE
website)
Contact person (name and email)
Website
Solar
Concentrator
Technology
www.aksonsolar.com
Scheffler
Company
Akson's Solar
Equipments Private
Limited, Pune
ROVER Automation,
Mumbai
Aditya M Akole
(info@aksonsolar.com)
Dr. Praveen Salinkar
(dr.salinkar@gmail.com)
Linear Fresnel
Reflector
KG Design Services
Private Limited,
Coimbatore
KIE Solatherm Pvt.
Ltd., Pune
Dr S P Viswanathan,
(spv@kggroup.com)
Linear Fresnel
Reflector
Parabolic
Trough
ATE Envirotech
Private Limited, Pune
Maharishi Solar
Technology Pvt Ltd,
Noida
Megawatt Solutions
Pvt. Ltd.
ARKA Power Pvt. Ltd,
Mumbai
Dr Vishal Sardeshpande
(v.l.sardeshpande@ateindia.com)
Pradeep Khanna
(pradeep@maharishisolar.com)
Parabolic dish
2
3
4
5
6
7
8
Sidharth Malik
(smalik@megawattsolutions.co.in)
Serveshresht Sawhney
(servo@arkapower.com)
www.maharishisolar.com
Parabolic
Trough
Parabolic dish
www.arkapower.com
Linear Fresnel
Reflector
109
110
Description
Call for Expression of Interest (EoI) for the feasibility study.
Creating awareness on project objectives direct / indirect
benefits to industries for participation through industrial
associations and awareness workshops with an aim to
encourage industry to respond to the EoI for feasibility study
Action
Component Manager, PMC
Component Manager, PMC
(Activity 2.1.5.2)
Industry
4
5
7
8
Component Manager
Industry
Description
Preparation of DPR for the Demonstration Project
Action
Empanelled Consultant,
Industry
3
4
Industry
Component Manager
10
Component Manager
11
12
Component Manager
Industry
13
6
7
8
Component Manager
Component Manager
Component Manager
PMC
nd
year of operation
Component Manager
111
Description
Implementation of the project in accordance with guidelines for
the replication project
Training conducted for 2 technical personnel in operation of the
CSH system during project implementation.
Filing of completion report with operating data for minimum 1
month.
Release of 100 % of the GEF project contribution
Filing of operating data for 1 year
Analysis of data by Component Manager & queries for any
clarifications required
Preparation of case study in the desired format on the project
along with calculations of CO2 savings and submission to PMC
Action
CSH vendor, Industry
PMC (Activity 2.1.1.3)
Industry
Component Manager
Industry
Component Manager
Component Manager
112
Target
32,900
1
1,050
2
2,450
60,000
6,000
7,000
90
12
Annual Targets
3
5,250
4
8,400
5
15,750
11,000
12,000
24,000
14
18
24
28
60
10
12
24
60
10
12
24
90
14
18
24
28
15
10
30
10
20
113
Strategy
10
Annual Targets
3
0
0
Target
5
0
10
5
1
0
0
1
0
2
0
2
1
1
0
10
10
28
5
1
1
0
0
1
0
0
1
0
0
0
0
12
114
Strategy
awareness of stakeholders of
CSH systems for industrial/
institutional process heat
applications
Target
Annual Targets
3
8
10
10
0
60
10
6
0
15
5
12
0
24
0
10
70
70
70
1
3
0
0
1
3
0
0
0
0
0
0
15
300
60
100
100
40
10
10
100
25
25
25
25
4
6
2
6
5
1
2
0
0
2
2
2
0
0
2
1
2
0
2
1
0
0
0
2
0
0
0
2
2
0
115
Strategy
Output 2.1.4: Trained staff at
SEC and staff at regional
testing centre
1
5
0
0
Annual Targets
3
0
1
5
0
10
2
200
20
Target
5
0
0
0
0
10
0
0
0
1
100
10
0
0
0
1
100
10
0
0
0
20
10
10
20
08
12
20
1,600
400
400
400
400
400
10
01 Jan 12
01 Jan 12
100
15
25
30
30
15
116
Strategy
41
60
80
6
0
Annual Targets
3
8
10
0
0
70
70
18
Target
5
12
0
24
80
70
70
200
200
200
200
200
200
01 Jan 14
01 Jan 14
1,000
01 Jan 12
2,000
0
01 Jan 12
2,000
0
0
2,000
200
0
2,000
300
0
2,000
500
0
2,000
90
14
18
24
28
1,000
1,000
60
10
12
24
A compendium is inclusive of all individual brochures/case studies (90 nos) each with 4-5 pages
ProDoc: UNDP GEF Concentrated Solar Heating Project (India CSH)
117
Strategy
Output 3.1.1: Completed
feasibility studies for
demonstration and replication
projects of various CSH
technology applications
Output 3.1.2: Completed
Detailed Project Reports
(DPRs) for demonstration
projects
Output 3.1.3: Developed and
commissioned demonstration
projects in at least 5 sectors
Output 3.1.4: Results of the
performance monitoring,
analysis, and evaluation for
demonstration projects
Target
Annual Targets
3
30
40
90
10
30
10
30
30
5
10
10
10
12
12
30
16
15
15
60
10
12
24
90
14
18
24
28
90
14
18
52
90
10
30
30
20
30
16
118
Strategy
Target
Annual Targets
3
6
14
5
18
52
10
10
10
28
119
MONIQUE BARBUT
OUR
PLANET
1818 HStreet, NW
Washington, DC 20433 USA
Tel: 202.473.3202
Fax: 202.522.3240/3245
E-mail: mbarbutTheGEF.org
Attachment:
Copy to:
Project Document
Country Operational Focal Point
GEF Agencies, STAP, Trustee
Inv.,
TA or Expected Outcomes
STA2
TA
2. Awareness
TA
enhancement and
capacity building
1.1. Enhanced
understanding of
CSH technologies,
applications and
markets
1.2. Adoption of
standards and
specifications for
guidance of
manufacturers and
users for assurance of
CSH quality, safety,
and performance
1.3. Adequately
capable and
operational testing
laboratories for
verification of
manufacturer claims
and guidance of CSH
users to enable
informed decisions
2.1. Strengthened
technical capacity
and awareness of
stakeholders of CSH
systems for
industrial/
institutional process
heat applications
Expected Outputs
1.1.1. Developed technology
application information
packages and characterised
technologies, applications,
and markets
1.2.1. Developed CSH
performance standards and
technology specifications
1.3.1. Developed CSH system
components and equipment
testing facilities
1,248,180
78
354,400
22 1,602,580
user
2.1.3. Established and
supported industry-academic
partnership through research
programmes to build future
technical capacities
2.1.4. Trained staff at SEC
and staff at regional testing
centre
2.1.5. Completed awareness
enhancement programmes for
policy makers, academicians,
industries, financial
institutions, etc. to facilitate
replications
2.1.6. Completed promotional
campaign for CSH
2.1.7. Established
Concentrating Solar Heat
Technology Platform and is
operational
2.2.1. Documentation on the
project outputs, case studies,
best practices and lessons
learnt disseminated to ensure
larger replication
3. Pilot
3.1.1. Completed feasibility
TA/In 3.1. Increased
demonstration of v.
number of
studies for demonstration and
CSH
commercial and near- replication projects of various
technologies for
commercial CSH
CSH technology applications
various
technologies for
3.1.2. Completed Detailed
applications
diversity of
Project Reports (DPRs) for
applications
demonstration projects
3.2. Improved
3.1.3. Developed and
technical and
commissioned demonstration
economic
projects in at least 5 sectors
performance of
3.1.4. Results of the
commercial and near- performance monitoring,
commercial CSH
analysis, and evaluation for
technologies in an
demonstration projects
increased diversity of 3.2.1. Documentation of
applications
results of demonstration and
replication projects
3.2.2. Completed performance
monitoring, analysis and
overall evaluation for
demonstration and replication
projects
4. Sustainable
4.1. Enhanced
4.1.1. Documented financial
TA
financial
understanding of the viability of CSH technologies,
approach in the
financial viability of applications, and mitigation
adoption of CSH
CSH technologies
approaches of investment
technologies and
and measures to
risks
applications in
mitigate investment 4.2.1. Formulated
India
risks
recommendations for financial
4.2. Promulgation of and promotional policies and
1,968,245
10 18,000,0001
104,100 100
90 19,968,245
104,100
The project cost of solar concentrator installation in industrial unit will essentially have the funding from three streams namely,
grants (subsidy from MNRE), equity from industrial unit, and loan from financial institution (IREDA has given a letter of support).
CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
247,950
4,400,000
34
19
479,525
19,350,000
66
727,475
81 23,750,000
List the $ by project components. The percentage is the share of GEF and Co-financing respectively of the total amount for the component.
Inv. = Investments, TA = Technical Assistance; STA = Scientific & Technical Analysis.
B. SOURCES OF CONFIRMED CO-FINANCING FOR THE PROJECT (expand the table line items as necessary)
Project
Name of Co-financier
%*
Classification
Type
(USD)
(source)
MNRE
Government
Grant Subsidy
6,000,000
31
In Kind
1,350,000
7
Industries
Private
In Cash
6,000,000
31
Financial Institutions
Private
In Cash
6,000,000
31
19,350,000
100
Total co-financing
*Percentage of each co-financiers contribution at CEO endorsement to total co-financing.
Project
b
Total
c=a+b
100,000
4,400,000
4,500,000
100,000
19,350,000
19,450,000
200,000
23,750,000
23,950,000
Agency Fee
450,000
For comparison:
GEF and Cofinancing at PIF *
4,400,000
19,350,000
450,000
23,750,000
Estimated
person weeks
(GEF)
74.50
1,288.16
1,362.66
GEF amount
($)
223,500
966,120
1,189,620
Co-financing
($)
Project total
($)
0
139,125
139,125
223,500
1,105,245
1,328,745
GEF
amount
($)
126,000
30,000
57,500
Co-financing
($)
273,000
0
172,075
Project total
($)
399,000
30,000
229,575
34,500
247,950
34,500
479,525
68,900
727,475
Total Estimated
person weeks
(GEF)
168
10
178
** (a) Cost of office space rental for the PMU, equipment such as computers and their peripherals, document reproduction
equipment as well as office supplies (e.g., stationeries), purchase and use of telecommunication equipment and the monthly
CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
payment for the communication costs (e.g., phone bills, internet service fees, etc.). (b) Travel expenses for the Project
Personnel (including Component Managers) for their project monitoring work across various states India.
No
Measurement of
Means of Verification
of project results
(baseline and end-ofproject impact study)
Measurement of
Means of Verification
for Project Progress on
output and
implementation
ARR/PIR
Periodic status/
progress reports
Mid-term Evaluation
Responsible Parties
Final Evaluation
Project Terminal
Report
Audit
Visits to field sites
Time frame
Within first three months
of project start up
Annually prior to
ARR/PIR and to the
definition of annual work
plans
Annually
Quarterly
None
At the mid-point of
project implementation.
Yearly
Responsible Parties
Time frame
http://en.wikipedia.org/wiki/Economy_of_India
http://www.ibef.org/artdisplay.aspx?tdy=1&cat_id=60&art_id=27253
4
http://www.iea.org/stats/indicators.asp?COUNTRY_CODE=IN accessed on 25.12.2010
5
International Energy Agency, http://www.iea.org/stats/balancetable.asp?COUNTRY_CODE=IN accessed on 15.01.2011
6
International Energy Agency World Energy Outlook 2007
3
India accounts for 70 of around 100 CSH applications installed worldwide to date. India is one of the most
promising countries for CSH large scale deployment as many of its industries are at a small and medium scale, a
scale below where coal fired thermal heat supply systems are best deployed, and where clean burning,
controllable and low cost natural gas is not widely reticulated to industrial zones as is the case in many other
countries. CSH technologies and applications have experienced growing interest and a large increase in actual
working applications from around the year 2000 as global oil prices have risen with the gradual end of low cost
light sweet crude conventional global oil supply capacity.
In practice, the world-wide experience to date in actual working CSH applications is rather limited. A survey
conducted under the IEA Task 33 Solar Heat for Industrial Processes in 2007, showed that there were then
only around 10 CSH installations world-wide (the survey excluded India). As per the most updated information
from MNRE, there are around 70 CSH installations in India. It is estimated that there are around 100 working
CSH installations worldwide. This places India as the leading countries in the practical CSH market deployment
domain. India is well positioned to lead the world in practical CSH technology deployment in the foreseeable
medium term (5 -10 years) future.
The Ministry of New and Renewable Energy (MNRE) of the Government of India (GOI) is currently supporting
Concentrating Solar Heat (CSH) installations for process applications in India with a subsidy scheme that is
based on CSH collector area. The total area for the 71 CSH systems which have been commissioned or are
under installation in India is about 20,000 m2. However, the deployment of CSH installations in India continues
to be slow due to a range of inter-twined barriers, as follows:
This UNDP GEF MNRE CSH project has been designed as a fully integrated and suitably funded and cofunded series of components and activities to remove the multiple barriers facing the widespread adoption of
CSH technologies and applications in India. The project has been designed to fully support and compatible with
the on-going MNRE CSH support programme.
The proposed UNDP GEF MNRE CSH project will remove the key barriers (summarised as above) to enable
the annual collector area of new CSH applications in India to be increased 6-8 times in the five-year project
duration. The overarching rationale for the project is to position the Indian CSH industry for further on-going
CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
sustained growth after the formal end of this UNDP GEF MNRE CSH project. More specifically, the proposed
project will:
(1) Address technology package barriers by supporting the development of 10 technology information
packages for commercial CSH deployment in selected key specific sectors. The technology information
packages will each refer to one or more of the five applicable CSH technologies that match the required
process temperature, available CSH area for deployment, and other specific CSH and process attributes.
These technology information packages will include: descriptions of the applicable process heat
requirements in the relevant sector; related process integration and energy efficiency considerations that
should be considered alongside the CSH technologies; any heat storage requirements and applicable
heat storage technologies; estimated CSH costs and expected performance; the results of previous CSH
applications in the applicable sector (if any) in India or internationally; and any lessons learned to date.
(2) Address awareness and capacity building barriers to the increased uptake of CSH in India by improving
the awareness of CSH technologies and applications amongst key stakeholders, as well as increasing
the capacity of all those involved in the CSH supply chain in India. These awareness and capacity
building activities will include: increasing the capacity and awareness of CSH amongst current and
prospective system manufacturers, vendors, energy auditors and advisors and other relevant
professionals; increasing the knowledge base of relevant CSH success factors and key issues amongst
academics, policy makers, and other CSH industry key stakeholders; undertaking promotional
campaigns for CSH; promoting enhanced academic-industry partnerships; obtaining high-level
management commitment to trialling CSH applications in relevant sectors; and documenting and
disseminating best practices and lessons learnt. This will then ensure the wider on-going post projectend replication of CSH applications in India.
(3) Identify, implement and document the results from 30 demonstration projects to illustrate CSH
technology applications in specific and real commercial field applications in India. In addition, 60 CSH
replication projects will be supported during the project implementation. The replication projects
results will be also monitored (albeit at a lower level of detail than for the formal demonstration
projects). The results and lessons learned from the demonstration and replication projects will be
incorporated in updated technology information packages and other materials during the latter stages of
this UNDP GEF MNRE CSH project. The technology information packages will provide the technical
basis for the 6-8 fold increase in annual CSH market installations that will be achieved by the end of
this project.
(4) Identify and remove financial barriers to the increase of the solar collector area of annual CSH
installations in India by a factor of 6-8 during the UNDP GEF MNRE CSH project implementation.
This will involve: documenting the actual financial and payback performance of CSH installations in
India; the development and support of an updated performance based MNRE CSH subsidy scheme; and
the support of additional CSH financing mechanisms and capacity building of relevant financial
institutions.
B. DESCRIBE
THE CONSISTENCY
PRIORITIES/PLANS:
OF
THE
PROJECT
WITH
NATIONAL
AND/OR
REGIONAL
India has a strong potential to accelerate the use of its renewable energy resources to power its growing
economy with more secure and affordable energy supplies. The Government of India recognizes that
development of local and renewable resources is critical to ensure that it is able to meet both its economic and
environmental objectives, and it has promoted this development through significant and on-going real policy
actions. The Ministry of New and Renewable Energy (MNRE) is the nodal ministry of the Government of India
for all matters related to new and renewable energy.
As of June 2010, India has over 17.5 GW of installed renewable energy capacity, which is approximately 10%
of Indias total installed capacity. Wind represents 11.8 GW, small hydro represents 2.8 GW, and the majority
of the remainder is from biomass installations. PV installations have reached 15 MW of cumulative capacity
installation for both on- and off-grid applications. In the current, Eleventh Five-Year Plan (Eleventh Plan; 2007CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
2012), the Government of India targets capacity additions of 15 GW of renewable energy, which, if achieved,
would bring the cumulative installed capacity to over 25 GW in 2012.
In June 2008, Indias first National Action Plan on Climate Change (NAPCC) was released. It outlined existing
and future policies and programs addressing climate mitigation and adaptation. The NAPCC suggests that up to
15% of Indias energy could come from renewable sources by 2020. The NAPCC identifies eight core
National Missions running through to 2017. The Jawaharlal Nehru National Solar Mission (JNNSM) is part
of the NAPCC for CSH applications in India. The objective of JNNSM is to create a policy and regulatory
environment which provides a predictable incentive structure that enables rapid and large-scale capital
investment in solar energy applications and encourages on-going technical innovation and the lowering of solar
energy costs. Consistent with the JNNSM, MNRE is running a subsidy programme for CSH systems. The
JNNSM will adopt a 3-phase approach, spanning the remaining period of the 11th Five Year Plan (FYP) and
first year of the 12th FYP (up to 2012-13) as Phase 1, the remaining 4 years of the 12th Plan (2013-17) as Phase
2 and the 13th FYP (2017-22) as Phase 3. At the end of each FYP, and mid-term during the 12th and 13th Plans,
there will be an evaluation of JNNSM progress and a review of capacity and targets for subsequent phases to
be based on emerging cost and technology trends, both domestic and global. MNRE is running a subsidy
programme for CSH systems in the context of and to support the goals of the JNNSM.
C. DESCRIBE THE CONSISTENCY OF THE PROJECT WITH GEF STRATEGIES AND STRATEGIC PROGRAMS:
The proposed project conforms to the Strategic Programme (SP-3) Promoting Market Approaches for
Renewable Energy under the Climate Change focal area strategy of GEF-4.
D. JUSTIFY THE TYPE OF FINANCING SUPPORT PROVIDED WITH THE GEF RESOURCES:
Without support from GEF, MNRE would continue implementing its small CSH support programme. CSH
projects approved by MNRE for financial subsidy in the year 2006-07 only totalled 1,400 m2, with a marginal
increase to 1,732 m2 in 2009-107. In the absence of specific, integrated and multiple barrier removal actions,
installed capacity figures from new CSH applications are not expected to appreciably increase in the next five
years from the baseline situation. The necessary technology development and the economies of scale required to
increase awareness, underpin credibility, and reduce CSH prices to drive Indian CSH market growth by a factor
of 6-8 in the next 5 years, will only occur with the implementation of the integrated set of initiatives under this
India-CSH GEF project.
E. OUTLINE THE COORDINATION WITH OTHER RELATED INITIATIVES:
MNRE has been promoting solar water heating over last two to three decades. With MNRE being the executing
partner for the project, the UNDP GEF MNRE CSH project would be fully integrated with the on-going MNRE
programme on CSH and the Jawaharlal Nehru Solar Mission (JNNSM) of the Government of India. Other
initiatives such as Global Solar Water Heater Project, one of the focused countries is India, supported by
GEF/UNEP/UNDP apart from few other countries. This project is being implemented in India by MNRE to
accelerate the penetration of solar water heaters. MNRE is also involved in promoting industrial process heat
applications and solar thermal power generation. The UNDP GEF MNRE CSH project will also coordinate with
recently endorsed GEF UNIDO FSP, Promoting energy efficiency and renewable energy in selected micro
SME clusters in India in this regard as it has one or two interventions focusing solar concentrators in dairy
industries. Thus experiences from other projects will be shared, helps to leverage and complement the on-going
efforts as MNRE is the implementing or coordinating agency for most of such initiatives.
F. DISCUSS THE VALUE-ADDED OF GEF INVOLVEMENT IN THE PROJECT DEMONSTRATED THROUGH
INCREMENTAL REASONING :
The use of CSH for process heat applications is still at an early development stage - with less than 100 known
working examples worldwide. India is leading the world with around 71 CSH applications. Two CSH
technologies are now commercially available and proven in India, with annual CSH sales of around 2,000 m2/
year. The majority of Indian CSH installations are for institutional cooking; other existing CSH applications are
in dairy, food processing, metal treatment and space cooling. The Ministry of New and Renewable Energy
7
(MNRE) is already providing CSH subsidies and some technology support, but MNRE is not operating and does
not have a planned comprehensive barrier removal approach to facilitating large increases in CSH installations in
India. The UNDP GEF MNRE CSH project will complement MNREs efforts by removing CSH technology,
awareness, capacity, market and financial barriers. This will increase annual CSH sales to 15,000 m2/year by
2016. The projects Component 1 provides technology application packages, support for the introduction of three
further CSH technologies, and standardisation of CSH performance measurement; Component 2 provides
awareness and capacity building; Component 3 supports 30 demonstration projects (15,000 m2) and 60
replication projects (30,000 m2); while Component 4 addresses financial barriers. Direct emission reductions
from the demonstration and replication CSH projects during the 5-year GEF project duration will be 32,900
tCO2. Over the economic lifetime of 20 years for the project-supported CSH applications, cumulative direct
emission reductions will be 315,000 tCO2. Considering the total avoided GHG emission reductions that are
attributable to the project, the corresponding unit abatement cost (UAC8) (i.e. GEF$ per tCO2) is USD
13.97/tCO29.
After the completion of UNDP GEF MNRE CSH project completion, investments will be affected by the longterm outcomes of the barrier-removal activities, e.g. increase in technical capacity and sustainable financial
approach. The corresponding CO2 emissions reduction is referred to as indirect emission reduction. A replication
factor of 3 has been chosen as a conservative estimate for CSH systems use in process based heat applications.
Thus, indirect emission reductions (bottom-up) over 10-year are estimated at 315,000 t CO2 * 3 = 945,000 t CO2.
In the alternative scenario, it is estimated that about 50,000 m2 of CSH systems area is expected to deploy
annually. The cumulative amount of emission reductions achieved would be 1,095,150 t CO2 over the period
2011/12-2025/26 (that is, a total duration of 15 years during the project implementation period and 10 years of
post-project scenario). Of course, this potential cannot be fully attributed to the GEF interventions alone as other
projects may have an influence over the CSH systems promotion and implementation. Uptake of CSH
technologies would also takes place to some extent due to on-going (and future) national efforts and future
donor-funded initiatives. It is proposed to apply conservatively a causality factor 4 of 80%. This gives an
indirect emission reduction (top-down) of 1,095,150 t CO2 * 80% = 876,120 t CO2. The range of indirect CO2
emission reductions is 876,000 945,000 tonne CO2.
G. INDICATE RISKS, INCLUDING CLIMATE CHANGE RISKS, THAT MIGHT PREVENT THE PROJECT OBJECTIVE(S)
FROM BEING ACHIEVED AND OUTLINE RISK MANAGEMENT MEASURES:
A summary of risks and mitigation measures to address them is given in the UNDP ProDoc in Section 8 and in
its Annex A. The main risks and the mitigating actions are described in the table below.
Table 1: Overview of risks and the mitigating actions for the promotion of CSH systems
Risk
Level of
Risk
Mitigating Actions
Only direct emission reductions are considered for 10 years of economic lifetime as per GEF guidelines. There are no direct postproject emissions pertain to the project. Therefore, GEF finance of USD 4,400,000/315,000 tCO2.
9
This value is relatively lower than the current CDM secondary CER price, which is about US$ 20/tonne CO2 (PointCarbon, 7
June)
CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
Risk
Level of
Risk
Unavailability of national/
international experts to deliver training
Mitigating Actions
- Existing users would also be interested in the
improvement in performance of their systems as a result
of developments under the project, and thus would be
expected to be interested.
- Most existing users have received support from MNRE
for project implementation. Hence, informal influence
can be exercised
- All existing projects have only been possible with
support from MNRE, and prospective users will be aware
of their need to also secure support from MNRE. The
need for MNRE support will generate interest in the
UNDP/MNRE GEF India CSH project.
- Local manufacturers and users are already sharing some
information with MNRE as part of the process of
obtaining CSH subsidies for new CSH installations.
However, this information is not yet in the public
domain. Issues such as confidentiality of specific data
and aggregation of data such that the identity of
individual users is not revealed will need to be resolved
when linked to the realization of MNRE CSH subsidies.
- The interest of foreign manufacturers in the Indian
market will support the necessary cooperation as CSH
users try to utilize advanced CSH technologies at their
sites.
- Information requirements will be defined which are of a
non-proprietary nature
- Suitable standards for solar hot water heating systems
have been successfully developed, which indicates that
this necessary capacity exists in India.
- Work on standards for CSP is already underway and
there are many areas common to both CSP and CSH.
- The national standards body, BIS, is an important
stakeholder and will be a member of the Project Advisory
Committee. This will ensure the necessary coordination
of actions.
- Through BIS, contact and follow-up with the relevant
international standards body (ISO) will be maintained.
- Since several persons will be trained, if some of them are
transferred it may lead to a temporary slowdown but will
not lead to a complete stoppage of testing.
- As the CSH industry grows, there will be greater
recognition by both manufacturers and users of the need
and value of testing.
- Development of standards undertaken under this project,
and the regulatory requirement of conformity of CSH
installation with such standards will also drive the need
for testing.
- Proper planning along with prior commitments from /
agreements with national and international experts for
their availability for trainings.
- Under the Jawaharlal Nehru National Solar Mission
10
Risk
Level of
Risk
Delay in commissioning of
demonstration and replication projects
and availability of results
After the project is commissioned,
demonstration and replication project
participants do not comply fully with
the stipulated terms and conditions.
CSH industry growth is limited due to
greater growth of CSP industry arising
from greater policy emphasis, greater
interest of manufacturers, and larger
scale of CSP projects.
Mitigating Actions
(JNNSM), MNRE is supporting the introduction of
renewable energy courses in universities which should
lead to greater faculty interest.
- The response will depend on industry growth and their
perception of business opportunities in CSH. The
promotion and development activities of MNRE under
the Jawaharlal Nehru National Solar Mission and of this
project should lead to improved perception.
- By defining suitable selection criteria for providing
support for these studies, projects having greater
likelihood of implementation will be supported.
- MNRE has been extending financial support for CSH
applications for a finite period now since its inception.
The Jawaharlal Nehru National Solar Mission, under
which this support is being extended now, is part of the
National Action Plan on Climate Change. Hence, there is
less likelihood of abrupt changes in such policies.
- The users are generally aware of and familiar with the
terms and conditions of the existing schemes
- The status of projects will be regularly reviewed and any
necessary corrective steps will be promptly taken.
- Support will be terminated to projects which are not in
compliance, and there will be provisions for cost
recovery in such cases. Other projects will then be
considered for support.
- Over the time frame of the project, this may have limited
impact, but in the long term, this is a distinct possibility
which will have to be addressed as both markets develop.
The above table is further described in detail in Annex A, Part C of the UNDP Project Document (ProDoc).
H. EXPLAIN HOW COST-EFFECTIVENESS IS REFLECTED IN THE PROJECT DESIGN:
This UNDP GEF MNRE CSH project has been designed as a fully integrated and suitably funded and cofunded series of components and activities to remove the multiple barriers facing the widespread adoption of
CSH in India.
India is heavily dependent on import of fossil fuel to meet the growing thermal energy demand for process
based heat applications in various industries, communities and commercial establishments. The country has the
potential to harvest renewable energy resources, especially solar energy, to contain the fossil fuel use as well as
mitigate GHG emission reductions through reduced fossil fuel use. The Government of India recognized the
potential and benefits of deploying CSH technologies. The estimated potential is about 5,000 trillion kWh per
year. The incident solar energy over Indias land area is at an average of 5-7 kWh/m2/day. The market
development and promotion of solar concentrators for process heat and other thermal applications is an
emerging and exciting market opportunity in India, and is the target of UNDP GEF MNRE CSH project. With
the various interventions that will be carried out under this proposed project and the expected outputs, it is
CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
11
estimated that by the end of this project, for each m2 area of solar concentrator installations, 0.35 t CO2 per year
would be replaced on a conservative basis. The proposed project will facilitate the realization of these outcomes
through the barrier removal activities and other capacity building and technical assistance activities that will be
implemented under the project. Therefore, the approach of replacing fossil fuel use through solar concentrator
technology is considered as more appropriate, holistic and cost effective considering the fact that process heat
and other thermal applications in industries, communities and commercial establishments is quite large.
In the absence of the UNDP GEF MNRE CSH projects interventions, the rate of penetration of CSH systems
will be at 3,000 m2 per year, the market for CSH systems would remain at or around the current modest level of
sales, the number of CSH technology application packages will remain limited, there will not be any systematic
effort to develop the market for CSH technologies, the human-resource base will remain small and inadequate,
and the number of active CSH manufacturers will remain small and inadequate.
The GEF contribution of USD 4.4 million will result in direct emission reduction of 32,900 tCO2 from the
demonstration (15,000 m2) and replication projects (30,000 m2) during the 5-year lifetime of the project.
Assuming the economic lifetime of the CSH systems is 20 years, the cumulative direct emission reduction will
be 315,000 tCO2. Dividing the GEF contribution (USD 4.4 million) by the combined direct and direct postproject emission reductions gives a corresponding unit abatement cost (UAC) (i.e. GEF$ per tCO2) of USD
13.97/tCO2.
12
Implementing
partner
(MNRE)
Dept of
Economic
Affairs (DEA)
National
Project
Director (NPD)
Project Manager
(Awareness &
dissemination)
2 nos of Component
Managers
(Component 3)
Solar Energy
Centre (Output
1.3.1)
Project Manager
(Admin &
Accounts)
13
PART IV: EXPLAIN THE ALIGNMENT OF PROJECT DESIGN WITH THE ORIGINAL PIF:
During the PPG phase, five extensive stakeholder consultations were held at Pune, Delhi, Ahmedabad and
Hyderabad during the period November 17-30, 2010. More than 150 participants representing the CSH industry,
CSH users, energy consulting companies, MNRE, State Nodal Agencies, International and National Consultants,
Academic and research institutes, UNDP, Municipal Corporations have participated in the these consultations. This
had subsequently led to a fine tune and reorganization of outputs and related budget allocation. The overall
contribution of GEF and co-financing will remain the same. Apart from these changes re-positioning, re-budgeting
and editing the text of the various outputs in the project framework, there is no major re-alignment from the original
project design as presented in the PIF.
Table 2: Overview of Changes from PIF to ProDoc
Expected Outputs
GEF-Approved PIF
Project Document
Component 1. Technology
Component 1. Technical capacity
package development and
development
standardization
Outcome a) Technology
packages developed
Outputs:
a i) Four technology
packages developed at SEC
for process heat applications
(Fresnel, Scheffler, ARUN
Solar, and Concentrator
Trough).
a ii) The process integration
requirements for 5 sectors
identified and system
configuration established
outcome b) Standardisation and
certification facility developed
Outputs:
b i) Developing test
protocols for solar
concentrators for different
applications (for four
technologies and five
sectors).
b ii) Developing
performance guidelines for
the solar concentrator
packages for identified
sectors.
b iii) Developing Standards
for solar concentrator
technology packages
b iv) Establishing the
national certification facility
at SEC.
Component 2. Awareness
and Capacity Building
Outcome: Awareness and
Expected Outputs
capacity and awareness of
technical capacity of the
stakeholders of CSH systems for
concerned stakeholders
developed and strengthened industrial/ institutional process heat
to plan, design, develop, use applications
Output 2.1.1. Trained manufacturers/
and manage solar
concentrators for industrial/ vendors, installers and CSH users
Output 2.1.2. More trained technical
institutional process heat
consultants that provide technical
applications in India.
services to both CSH system
components & equipment
Outputs:
manufacturers and user
a) Capacity of
manufacturers (producers of Output 2.1.3. Established and
supported industry-academic
solar concentrators)
partnership through research
developed/strengthened. At
programmes to build future technical
least 10 (existing or new)
capacities
b) Capacity development to
Output 2.1.4. Trained staff at SEC
assist as interface between
and staff at regional testing centre
manufacturers and users.
About 500 industry specific Output 2.1.5. Completed awareness
enhancement programmes for policy
consultants will be trained.
makers, academicians, industries,
c) Technical capacity
financial institutions, etc. to facilitate
building: Promoting
replications
industry academic
Output 2.1.6. Completed promotional
partnership. This will be
campaign for CSH
done through promoting
Output 2.1.7. Established
research programmes to
Concentrating Solar Heat
build future capacities for
replication and expanding to Technology Platform and is
operational
other sectors. (15
fellowships programmes
Outcome 2.2. CSH project
will be supported)
d) Developing the technical deliverables facilitated and/or
influenced the widespread replication
capacity of the staff at the
of CSH technology applications in
Solar Energy Centre.
India
e) Awareness programmes
Output 2.2.1. Documentation on the
for policy makers,
project outputs, case studies, best
academicians, industries,
financial institutions, etc. to practices and lessons learnt
disseminated to ensure larger
facilitate replications.
replication
f) Capacity building of
professionals (50 nos) to
develop Detailed Project
Report (DPR)
g) media campaign to
promote solar concentrators
h) Documentation and
dissemination of good
practices and lessons learnt
to ensure larger replication.
Component 3. Planning and Component 3. Pilot demonstration of
Operationalizing
CSH technologies for various
Demonstration projects
applications
Outcome: 30 demonstration Outcome 3.1. Increased number of
projects in 5 sectors
commercial and near-commercial
developed
CSH technologies for diversity of
applications
Outputs:
Output 3.1.1. Completed feasibility
a) Identification of
studies for demonstration and
CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
Expected Outputs
replication projects of various CSH
demonstration sites/ units
technology applications
b) 30 Detailed Project
Output 3.1.2. Completed Detailed
Report (DPRs) for the
Project Reports (DPRs) for
identified units developed
demonstration projects
and approved
Output 3.1.3. Developed and
c) The system package
installed and commissioned commissioned demonstration
projects in at least 5 sectors
in 30 units.
Output 3.1.4. Results of the
d) Performance analysis
performance monitoring, analysis,
carried out, database
and evaluation for demonstration
established and lessons
projects
learnt documented and
disseminated
Outcome 3.2. Improved technical and
economic performance of
commercial and near-commercial
CSH technologies in an increased
diversity of applications
Output 3.2.1. Documentation of
results of demonstration and
replication projects
Output 3.2.2. Conducted
performance monitoring, analysis
and overall evaluation for
demonstration and replication
projects
Component 4. Identification Component 4. Sustainable financial
and removal of financial
approach in the adoption of CSH
barriers in the adoption of
technologies and applications in
solar concentrators
India
technology in India
Outcome 4.1. Enhanced
Outcome: New and viable
understanding of the financial
financial mechanisms to
promote solar concentrators viability of CSH technologies and
measures to mitigate investment risks
technology at a mass scale
Output 4.1.1. Documented financial
developed.
viability of CSH technologies,
applications, and mitigation
Outputs:
approaches of investment risks
a) Study present
promotional mechanisms
Outcome 4.2. Promulgation of
and identify financial gaps
and constraints and develop favourable financial policies that
promote increased use of CSH
financial mechanisms.
technologies for low and medium
b) Regional and national
temperature process heat applications
level consultations for
Output 4.2.1. Formulated
finalization of the financial
recommendations for financial and
strategy for adoption by
promotional policies and strategies
Government of India.
for adoption by Government of India
OTHERS
Project Management:
Project Management:
16
Andrew
Hudson
UNDP/ GEF
Officer-inCharge
Signature
Date
(Month,
day, year)
October
10th 2011
Project
Contact
Person
Martin
Krause,
UNDP
APRC,
Bangkok
Climate
Change
Mitigation
Telephone
Email Address
+66-22882722
Martin.krause@undp.org
17
The project will contribute to achieving the following Country Program Outcomes (as defined in CPD):
Outcome: Progress towards meeting national commitments under multilateral environmental agreements (CP, Outcome 4.3)
Output: Strengthened capacity for low carbon development and sustainable management of natural resources (CP, output 4.3)
Output indicators: Number of clean technologies/mechanisms piloted.
CPAP outcomes and indicators:
Outcome: Progress towards meeting national commitments under multilateral environmental agreements (CPAP, Outcome 4.3)
Output: Supporting national development objectives with co-benefits of mitigating climate change
Output indicators: (a) Annual reductions in greenhouse gas (GHG) emissions in India; (b) million USD flowing annually to India from
GEF through UNDP for this programme; (c) number of additional UNDP initiatives for achieving global and national targets under
multilateral environmental agreements.
Primary applicable key environment and sustainable development result area:
Strengthened national capacities to mainstream environment and energy concerns into national development plans
Applicable GEF strategic objective and program:
Strategic Objective: Off-grid renewable energy
Strategic Program: Strategic Programme (SP-3) Promoting Market Approaches for Renewable Energy under the Climate Change focal
area strategy of GEF-4
Applicable GEF expected outcomes:
18
Strategy
Indicator
Project objective:
Increased use and
promotion of CSH
systems for low and
medium temperature
process heat applications
Baseline
0
Means of Gauging
Success
Target
32,900
20,000
80,000
71
161
18
30
60
71
131
90
15
10
Critical Assumptions
Annual reports of
MNRE
- Technology and
market assessment
reports available at
the EOP
- Project impact
assessment report
- Annual reports of
MNRE
Enhanced
understanding of
CSH technologies,
applications and
markets
technology application
information packages
and characterised
technologies,
applications, and
markets
- Reports available on
Performance
assessment of
existing installations
- Reports available on
technology
assessment of CSH
technologies
- Availability of report
on market assessment
for solar process heat
applications
- Project impact
19
Strategy
Baseline
Means of Gauging
Success
Target
30
10
assessment report
- Annual reports of
MNRE
- Technology and
market assessment
reports available at
the EOP
- Project impact
assessment report
- Annual reports of
MNRE
- A report on
performance
measurement
standard available
- A report on number
of test protocols
available
- A report on
performance norms
available
- A report on field
performance
monitoring guidelines
available
- A report on number
of technology
specifications
available
- Confirmation from
BIS regarding
submission
- Standards issued as
BIS standards
- Confirmation from
ISO regarding
submission
- Standards issued as
ISO standards
20
Critical Assumptions
Strategy
Outcome 1.3:
Adequately capable and
operational testing
laboratories for
verification of
manufacturer claims
and guidance of CSH
users to enable informed
decisions
Output 1.3.1: Developed
CSH system components
and equipment testing
facilities
Baseline
0
Target
2
28
18
30
0
0
60
10
15
Means of Gauging
Success
Critical Assumptions
- Certification by a
certifying
/accrediting agency
- Project impact
assessment report
- Test reports produced
by testing facilities
- Number of reports
available on proof-ofconcept testing
carried out at SEC
- A policy decision by
respective
ministry/SEC
- Number of test
reports by national
testing facility
- A policy decision by
respective
ministry/SEC
- Number of test
reports by regional
testing facility
- Technology and
market assessment
reports available at
the EOP
- Project impact
assessment report
- Annual reports of
MNRE
- Survey conducted
during conference
- Post conference
report and analysis
produced by
organizers of
conference
21
Strategy
Baseline
Means of Gauging
Success
Target
0
0
70
1
15
300
10
100
- Report on Training
needs assessment
available
- Three types of
training modules are
produced one each
for manufacturers/
vendors, installers
and CSH users
- Completion/posttraining reports of
training programmes
- After-training
evaluations
completed by
participants
- Completion/posttraining report of
study tour
- After-training
evaluation completed
by participants
- Training programme
calendar and
structure
- Training modules are
completed and
available
- Completion reports
for training
programmes
- After-training
evaluations
completed by
participants
- Project impact
22
Critical Assumptions
Strategy
and supported industryacademic partnership
through research
programmes to build
future capacities
Baseline
0
Means of Gauging
Success
Target
6
0
0
2
6
10
200
20
20
20
20
assessment report
- Annual reports of
MNRE
- Reports published by
respective institutions
of (a) no. of
fellowships awarded
(b) no. of fellows
receiving degrees (c)
no. of fellows
sponsored by CSH
industry, (d) no. of
fellows absorbed in
CSH industry
- Completion report of
training programme
- After-training
evaluations
completed by
participants
- Conference
brochures, agendas,
completion reports
- Number of registered
participants
- Number of registered
international
participants
- Number of abstracts /
conference
presentations /
conference papers /
posters submitted/
presented
- Number of registered
exhibitors
- Completion reports
for awareness
23
Critical Assumptions
research fellowships.
Faculty will be interested in research in
CSH area.
Sufficient research areas/ topics are
identified by CSH industry.
Strategy
Baseline
0
Target
1,600
10
01 Jan 12
100
15
0
0
60
80
70
70
Output 2.2.1:
Documentations on the
Project outputs, case
18
200
Means of Gauging
Success
Critical Assumptions
programmes
- Post-programme
evaluations
completed by
participants
- Advertising agency
records
- Project impact
assessment report
- Annual reports of
MNRE
- Visit reports shared
by manufacturers
/suppliers
- Platform charter
document
- Number of members
and their distribution
(by type of
stakeholder, region
etc.)
- Number of meetings
held
- Project impact
assessment report
- Annual reports of
MNRE
- Web based feedback
for audio-visual
capsule
- Survey of recipients
of the published
compendium
- Number of people
visiting website
(click count)
24
Strategy
Indicator
CSH
stakeholders
(CSH
system manufacturers,
studies, best practices
suppliers, importers, installers, maintenance service
and lessons learnt
providers and users)starting year 1
disseminated to ensure
larger replication
Audio-visual capsule uploaded and accessible from
project website by year 3
No. of users of the audio-visual capsule by the EOP
Project website established and operational by year
1
No. of CSH stakeholders that use the project
website for information each year starting year 1
No. of brochures on CSH technology applications
produced and disseminated by EOP
No. of copies of printed and disseminated
compendium10 by EOP
Component 3: Pilot demonstration of CSH technologies for various applications
Outcome 3.1: Increased
number of commercial
and near-commercial
CSH technologies for
diversity of applications
Output 3.1.1: Completed
feasibility studies for
demonstration and
replication projects of
various CSH technology
applications
Output 3.1.2: Completed
Detailed Project Reports
(DPRs) for
demonstration projects
10
Baseline
Means of Gauging
Success
Target
01 Jan 14
0
0
1,000
01 Jan 12
2,000
90
1,000
60
90
30
- Feasibility study
reports of projects
- Project impact
assessment report
- Annual reports of
MNRE
- Feasibility study
reports for supported
projects
- Detailed project
reports for supported
projects
A compendium is inclusive of all individual brochures/case studies (90 nos) each with 4-5 pages
Critical Assumptions
25
Strategy
Baseline
0
Target
30
30
30
15
15
60
90
90
90
30
90
Means of Gauging
Success
- Project
commissioning
reports and all other
required documents
for demonstration
projects
Critical Assumptions
After the project is commissioned,
demonstration project participant comply
fully with the stipulated terms and
conditions.
Users will be attracted by the support to
be provided for demonstration projects.
- Performance
evaluation report is
available
- Feasibility study
reports of projects
- Project impact
assessment report
- Annual reports of
MNRE
- Number of projects
information included
in database
- Number of case study
reports available
- Annual reports on
Performance
monitoring of
replication projects
available
- Overall evaluation
reports on
demonstration and
26
Strategy
Baseline
Means of Gauging
Success
Target
Critical Assumptions
replication projects
available
Component 4: Sustainable financial approach in the adoption of CSH technologies and applications in India
Outcome 4.1: Enhanced
understanding of the
financial viability of
CSH technologies and
measures to mitigate
investment risks
Output 4.1.1:
Documented financial
viability of CSH
technologies,
applications, and
mitigation approaches of
investment risks
Outcome 4.2
Promulgation of
favourable financial
policies that promote
increased use and
promotion of CSH for
low and medium
temperature process
heat applications
Output 4.2.1 Formulated
recommendations for
financial and
promotional policies and
strategies for adoption by
Government of India
30
28
- Project impact
assessment report
- Annual reports of
MNRE
- A report on analysis
of financial viability
of CSH technologies
available
- A report on
assessment of
alternative finance
models available
- A report on
assessment and
recommendations for
policies available
27
ANNEX B: RESPONSES TO PROJECT REVIEWS (from GEF Secretariat and GEF Agencies, and Responses to
Comments from Council at work program inclusion and the Convention Secretariat and STAP at PIF)
RESPONSES TO GEFSEC COMMENTS (19 AUGUST 2011)
Comments and Responses
COMMENTS ON CEO ENDORSEMENT (FSP)
Comment: Component 4 is currently limited to studies. Possibly, some
more cofinancing and the reallocation of GEF funding could serve for the
development of an actual financial scheme for the promotion of the
technology after the end of the project, so as to assure the project's
replication effect.
Response:
As mentioned in the ProDoc, the users want a simple payback of 2 to 4
years. During the PPG phase, it was in fact identified that 2-5 years simple
payback is possible for Scheffler and 4-8 years payback period for ARUN
CSH systems. The MNRE subsidy scheme11 is relatively accessible to all
those who are interested to implement CSH systems for process heat
applications. MNRE is also offering a soft loan at a very attractive - interest
rate of 5%. This scheme is providing subsidies for CSH applications based
on the collector area of CSH installed, but not account for the CSH system
performance. Thus, it favours low-cost and low-efficiency CSH
technologies which require large collector areas. This may undermine realworld CSH application aspects such as CSH systems integration with
actual process requirements, the adoption of allied highly cost effective
energy efficiency opportunities, or the need for short, medium or longer
term heat storage.
In realizing the ambitious goals (for the year 2022) outlined under the
National Solar Mission, suitable financial incentives in the form of subsidies
and low interest loans will be made available. Therefore, the intention in the
project is not to formulate new financial support schemes right away, but
develop and improve/enhance the existing MNRE CSH subsidy scheme
considering the close gap between expected and actual payback periods.
This gap is further expected to close by the end of the project due to the
reduction in technology development costs and availability of the system
components in the country due to indigenous production. In the absence of
high quality and long-term performance data of the CSH technologies and
applications, it is currently impossible to accurately analyse the financial
viability of CSH technologies and applications. Hence, the need to gather
more information (through studies and surveys) to solidly establish the
economics of the local application of CSH technologies in industries. It is
expected that the results of such studies will provide the relevant basis for
formulating appropriate policies and influencing the approval and
enforcement of such policies that will support the creation and
Reference
ProDoc, Part
A, Section 1,
Para 14, p 7;
Part A, para
31, p15;
Part A,
Section 2,
Para 34, p 18
&
Section 3,
Table 11, p 22
ProDoc, Part
A, para 10, p7
&
Part B,
Section 7,
Para 99 &
100, p 45
11
MNRE is providing a capital subsidy of INR 5,400/ m2 and INR 6,000/m2 for CSH systems with single-axis and double-axis tracking respectively. The capital
subsidy/unit area of collector is based on the MNREs assessment of the benchmark cost of collectors. Besides the capital subsidy, MNRE is also offering a soft loan
at an attractive 5% interest rate.
28
Reference
ProDoc, Part
B, para 45,
point 4, p 27
Question 9.1: The project framework and the outputs are clear and
consistent. The following issues should be addressed:
1. According to the Table 25 in the ProDoc the installation and
commissioning of demonstration and replication projects will start in year
2. Since these projects will concern the technologies that haven't yet been
demonstrated in India, they are much dependent on the other project
outputs which are not expected to be delivered so early. Especially, the
formulation of recommendations for differentiated financial support
schemes for the new technologies is expected at the second half of the
project, so they will not be available when most of the demonstration and
replication projects will be initiated, and there is no assurance that the
recommendations will be enforced by the government. That given, please
explain how it will become possible to stimulate the private sector interest
and financing for the new technologies, and especially to start the
installations at the year 2.
Response:
- Financial assistance is given through the project to conduct feasibility
study and Detailed Project Report (DPR) to set up a demonstration
project. Where reimbursement is given up to US$ 2,000 for feasibility
study, US$ 8,000 is given for DPR. Additional financial support in the
form of O&M, establishing of performance evaluation equipment are
the kind of supports through the project which is foreseen to spur the
private sector, especially in the S&M sector to take the step of
integrating a new technology. Also this assistance is intended to be a
risk mitigation measure considering the high investments involved in
the process integration of CSH for thermal applications. Due to the lack
of existing systems performance data, risks are anticipated by the endusers in the operation of these systems, and the lack of performance and
quality standards for equipment used and skill sets at all levels. The
expected good results from the targeted support that will be provided
under the project are anticipated to encourage private sector to
participate in demonstration or replication projects.
- The project has been designed to fully support and be compatible with
the on-going MNRE CSH support programme. India accounts for 70 of
the 100 CSH applications installed worldwide to date and this is merely
due to the involvement of private sector as well as promotional
measures taken by MNRE. However, the drawback of MNRE subsidy
scheme is release of subsidy based on the installed CSH collector area
than the performance of CSH system. Therefore, it is not intended to
formulate new financial schemes right away, rather develop and
improve/enhance the existing MNRE CSH subsidy scheme. In the
absence of high quality and long-term performance data of the CSH
CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
ProDoc, Para
89, Box 3
Demonstratio
n projects, p
41
ProDoc, Part
B, Section 7,
Para 87, p 40
ProDoc, Part
A, Section 2,
Para 22, p 9
&
Para 34, p 18
29
Reference
ProDoc, Part
B, Section 7,
Para 99, p 45
ProDoc, Part
B, Section 7,
Para 100, p 46
Question 9.2: 2. Please clarify what is the purpose of creating two different
sets of installations that will be provided with different levels of financial
and technical support (demonstration and replication installations) instead
of having one set of installations supported directly by the project. Also, it is
not clear how each set will be selected. It should be noted that the
obligations under the replication project scheme are much lighter than
those under the demonstration project scheme, without any clear
justification.
Response:
- This distinction is to promote the commercial and near-commercial
CSH technologies for diversity of applications and also to encourage
engagement of private sector.
- Out of the five key worldwide CSH technologies, only two i.e.
parabolic dish with fixed focus (e.g. Scheffler) and parabolic dish with
moving focus (e.g. ARUN) have been used to date in India for thermal
process applications. Parabolic trough, linear Fresnel and CPC
technologies have not yet been used for commercial CSH applications
in India. The full suite of applicable CSH technologies in India means
that there is often a mismatch between the technology deployed and the
real process application temperature requirements or other CSH system
attributes needed.
- In addition, the absence of a systematic monitoring of in-use process
CSH applications means that the performance of existing CSH
applications is not quantified and hence the necessary technical learning
CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
ProDoc, Part
B, section 7,
para 87, p 39
30
Reference
ProDoc, Part
B, section 7,
para 89, Box 3
and Box 4, p
41
ProDoc, Part
A, Section 2,
Para 23, p 10
31
Reference
ProDoc, Part
B, section 7,
para 87, p 40
ProDoc, Part
B, section 9,
para 113, p 49
CER, Part I,
Table A, p 2
& Table F, p
3.
ProDoc,
section 12,
Table 35, p
61; Table 36a,
36b, p 68 and
Table 37, p 69
Question 22: The cofinancing letter form the government of India does not
specify that 6 million USD will be grant financing and the rest in-kind.
Please clarify the linkage between the 6 million USD grant, the existing
MNRE subsidy scheme, and the size of the expected investments. Also,
since there are no cofinancing letters from the private sector and the
financial institutions, please provide a clear calculation of the costs of the
investments that will be undertaken under the project scheme, in order to
justify the proposed cofinancing.
Response:
- The co-financing details are provided in Part I, Table B of the CEO
Endorsement Request. MNRE provides US$ 6 million co-financing as
grant through its existing subsidy scheme for demonstration and
replication units. The project cost of solar concentrator installation in
industrial unit will essentially have the funding from three streams
namely, grants (subsidy from MNRE), equity from industrial unit, and
loan from financial institution (IREDA has given a letter of support).
Approximately, the expected funding ratio for the three funding sources
is anticipated to be 1:1:1. The total allocation from MNRE is US$ 6.0
million, while it is expected that industries will invest US$ 6 million
and leverage loans of US$ 6 million. IREDA has extended their
willingness to provide loan. From the discussions with MNRE, IREDA
will support the demonstrations through the provision of loans of up to
US$ 6 million.
Particulars
CER, Part I,
Table A, p 2,
footnote 1;
Table B, p 3.
and
ProDoc,
Section 13,
para 128, p
72.
Quantity
32
Reference
400-450
400
500
200,000
45,000
18,000,000
6,000,000
6,000,000
6,000,000
ProDoc, Part
C, Annex B, p
85&86
ProDoc, Part
B, section 7,
para 94, p 43
Reference
Comment 1:
Technological Package: Concentrated solar power (CSP) is a known technology, but its
large-scale adoption for small-scale process heat applications in small and medium
enterprises (SMEs) or large scale power generation is still emerging, due to various
factors including technology costs. Four types of CSP systems are being considered. Will
all the four types be demonstrated or the performance of different CSP systems is known?
STAP recommends exploring whether all the four designs sufficiently developed for largescale demonstration and application?
Response:
CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
33
Reference
ProDoc,
Section 2,
Para 24-26,
p 11 & Para
40, p 19
ProDoc,
Section 2,
Para 40, p
19
ProDoc,
Section 7,
Para 59, p
30 & Box 2,
Table 14, p
31
Response:
Financial barriers were carefully considered during the project preparatory stage. The
analysis to date has shown that the MNRE CSH subsidies are very likely to be sustainable
for the foreseeable future in India, and that the complexity and time-consuming
development of new financial incentives is probably not required for the proposed
enhanced uptake of CSH applications in the full project implementation phase. However,
a change to the MNRE subsidy scheme to recognise different levels of CSH performance
is widely recognised and MNRE is clearly interested in such enhancements to their CSH
subsidy scheme once the full scale UNDP GEF MNRE CSH project provides the
necessary analytical and case study basis of a more CSH performance based MNRE
subsidy scheme.
There are no direct focused activities under the UNDP GEF MNRE CSH project for the
cost reduction of CSH systems. However, the project will work towards this aspect by
integrating it as one of the key selection criteria for the selection of demonstration projects
i.e. improvement in CSH technical and/or economic performance and cost reduction
CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
ProDoc,
Section 7,
Box 3, p 40
&
34
Reference
Para 74, p
35
&
Para 76-77,
p 36
ProDoc,
Section 2,
Para 31, p
16
Response:
In the Indian process heat supply situation, most of the applicable industries already have
a fossil fuel (generally fuel oil, as piped natural gas is rarely available) energy source and
this fossil fuel would continue to be the backup energy source when CSH technologies are
installed with minimal capital and O&M cost extra costs if CSH is also used. Heat storage
has been identified as a key CSH success factor, and will be strongly supported in the
project, but it will be rare that the cost of back up fossil fuel is so high that year round heat
storage is justified, not least because much of India has minimal direct solar radiation
resource during the monsoon season. It is envisaged that most CSH applications would
operate as fossil fuel use reduction options, not as a base load heat supply.
Comment 5:
Barriers: Awareness and capacity building activities do not adequately address the
barriers of high cost of the technology and the technology performance related issues. A
systematic analysis of barriers may be necessary to identify and rank the barriers to
enable focused activities.
Response:
A detailed barrier analysis of technology package, awareness and capacity, demonstration
and replication and financials has been provided in the UNDP ProDoc, Part A and section
3.
ProDoc,
Section 3,
Table 11, p
20
Reference
Comment 1:
The main question relates to the Indian authorities' readiness to set up the
necessary structural measures that will guarantee a successful market penetration
CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
35
Reference
ProDoc,
Section 2,
Para 30, p
15
With the exception of the list of the policy decisions taken at the National level,
there is no mention of the role, involvement and responsibility of the local/state
authorities. The responsibility of implementing, adjusting and, in certain cases,
encouraging additional measures lie in the local authorities hands. Their role is
of the utmost importance.
According to the project document, a study seeking to address the first matter of
concern will be undertaken in the course of the project progress. One would
recommend the study to take stock of the role, involvement and responsibility of
the local/state authorities. If this study had been conducted prior to the beginning
of the project, the conclusions of the study would have given valuable indications
on the prospect of CSP technology in India.
Response:
With the Jawaharlal Nehru National Solar Mission (JNNSM) under Indias first National
Action Plan on Climate Change (NAPCC), there is already strong central government
support for CSH technology applications in India. In the project preparation phase
extensive stakeholder consultation was undertaken, and in no cases was state or local
government support identified as a critical necessary element of the projects design.
However, it is envisaged that state and municipal governments will provide support for the
implementation aspects of this full scale India CSH project as required, but the project
does not rely on this support as a critical project success factor.
Comment 3:
The concerns raised by the STAP as regards energy shortage and requirement of
energy backup is well understood and shared. This question is not discussed in the
document. For the CSP technology process to function all year-round (dairy
industry), additional back-up energy devices may be put in place.
Response:
In the Indian process heat supply situation, most of the applicable industries
already have a fossil fuel (generally fuel oil, as piped natural gas is rarely
available) energy source and this fossil fuel would continue to be the backup
energy source when CSH technologies are installed - with minimal capital and
O&M cost extra costs if CSH is also used. Heat storage has been identified as a
key CSH success factor, and will be strongly supported by the project, but it will
be rare that the cost of back up fossil fuel is so high that year round heat storage is
CEO Endorsement Template-December-08.doc 11/22/2011 5:56:44 PM
ProDoc,
Section 5,
Para 41,
bullet (1), p
27
36
Reference
ProDoc,
Section 2,
Para 29-40,
p 12-19
Response
Concentrated solar heat for process applications (CSH) use four technologies used
for concentrated solar power (CSP) applications as well as the CPC (Compound
Parabolic Concentrator) technology that is not applicable to CSP applications. For
CSH applications, the solar collector side of the technology is a mature enough
technology for the 120C to 250C process heat applications envisaged. Further
solar collector technical development is of course to be welcomed but there is no
need to wait for such developments before large scale CSH implementation can
begin in India.
With large scale commercial CSH applications being sought under the project, it
was widely agreed by all stakeholders in India that the technologies have to be
driven primarily by commercial considerations, and this includes commercial
provision of CSH solar concentrator and other system elements. It was also widely
agreed that there is both a need and a strong desire for the Indian CSH industry to
cooperate in jointly growing the Indian CSH market, while at the same time
vigorously competing within common standards of defining system performance.
As such, private sector involvement in CSH technology development is seen as
critical to project success.
37
Reference
Comment 1:
The United States believes that the proposal would have been strengthened by a
more thorough implementation plan including a discussion of the strengths and
capabilities of the implementers regarding their ability to achieve the goals of the
proposal. However, the significant cost share from industry ($6m) and the
financial community ($6m) indicates that they will be sufficiently involved to
ensure success of the project.
Response:
During the course of the project preparation phase there were extensive discussions with
all the existing and proposed CSH manufacturers and vendors in India. There are three
manufacturers with a reasonable scale and reasonably proven CSH systems with
manufacturing and installation capacity. This is detailed in the ProDoc.
ProDoc,
Annex G, p
98
& Annex I,
p 105
However, at the same time care has been taken to avoid discouraging the many new CSH
market entrants with too detailed a discussion of their capacities or lack thereof, as at this
early stage of CSH market development in India it is not clear which of the existing or
future CSH players will become major future players, and it is important that this
manufacturer development and success or failure is primarily driven by commercial
considerations, as is proposed in this project.
Comment 2:
ProDoc,
Section 4,
Table 12, p
25
38
Estimated
person
weeks
750
130
97,500
Project Officer
(Awareness and
Dissemination)
750
26
19,500
Programme
evaluation
expert National
Total
750
12
9,000
Position title
National
National Project
Manager
(NPM)
168
Total
(in USD)
Tasks to be performed
126,000
39
Position title
International
Programme
evaluation expert International
Total
USD/
person
week
Estimated
person
weeks
3,000
10
30,000
10
30,000
Total
(in USD)
Tasks to be performed
Technical Assistance
National Consultants
USD/
person
week
Estimated
person
weeks
CSH expert
Performance
monitoring
Solar thermal
technology expert
Market assessment
expert
Energy technology
and process expert
CSH testing and
standards expert
750
32
24,000
750
29
21,750
750
60
45,000
750
112
84,000
750
133
99,750
750
150.16
112,620
Technical Training
Expert
750
80
60,000
Component
Manager for
component 3
750
620
465,000
Position title
Total
(in USD)
Tasks to be performed
40
Position title
Financial analysis
and business
development expert
Policy expert
Total
USD/
person
week
Estimated
person
weeks
Total
(in USD)
750
48
36,000
750
24
1,288.16
18,000
966,120
Tasks to be performed
the project along with calculations of CO2 savings and
submission to NPM; smooth and synergistic relationship
among owners, suppliers, bankers, consultants and others
involved in demonstration and replication projects.
Study on analysis of financial viability of CSH systems;
Assessment of business models.
Policies on financial incentives, schemes and mechanisms
International Consultants
Position title
Solar thermal/
CSH
Technology
Expert
CSH standards
and testing
expert
Technical
training expert
CSH testing
expert
CSH
application
expert
Financing and
policy expert
Total
USD/
person
week
3,000
Estimated
person
weeks
9.5
3,000
17.5
52,500
3,000
12
36,000
3,000
12
36,000
3,000
13.5
40,500
3,000
10
30,000
74.5
223,500
Total
(in USD)
28,500
Tasks to be performed
- Advisory support for technology assessment of solar
concentrator technologies;
- Development of technology application information
packages.
- Advisory support for the development of performance
measurement standard and test protocols and minimum
performance norms for solar concentrator technologies for
CSH applications;
- Initiation of process for adoption as international standards
by ISO.
- Development of technical training modules.
- Technical assistance for national testing facility and training
of technical personnel for testing
- Technical assistance for the demonstration and replication
projects
- Technical assistance for financing and policy options.
41
ANNEX D:
A.
EXPLAIN IF THE PPG OBJECTIVE HAS BEEN ACHIEVED THROUGH THE PPG ACTIVITIES
UNDERTAKEN.
In September 2009, UNDP submitted the PIF and PPG request to the GEF Secretariat, which was cleared by the
GEF CEO in March 2010. In 2010, suitable international and national consultants were recruited, supported by the
PPG grant, to advise on the development of the project and elaborate the necessary documentation for GEF
submission through UNDP. As a main achievement of the PPG phase was the drafting of (a) CEO Endorsement
request and (b) the UNDP Project Document. Overall the PPG exercise has achieved this objective.
The Logical Framework Analysis (resulting in a Project Planning Matrix) that was carried out by the team together
with the stakeholders resulted in the detailed design of the project components, expected Outcomes, Outputs and
planned activities. As a result, the Project Planning Matrix (refer Annex A, Project Results Framework) was
developed in cooperation with the stakeholders. The available data and information gathered during this phase was
also used in the project design. The discussions with the key stakeholders and project partners (MNRE, SEC) have
made possible the identification of relevant issues and barriers that need to be addressed and considered in the
development and implementation of this project. Intensive discussions with the CSH industry, end-user
industries/segments and energy audits conducted during the PPG phase have made it possible for the project team to
fully understand the nature and extent of these issues/barriers (refer to Section 3, of the UNDP ProDoc for more
details).
B.
DESCRIBE IF ANY FINDINGS THAT MIGHT AFFECT THE PROJECT DESIGN OR ANY CONCERNS ON
PROJECT IMPLEMENTATION. N/A
C.
PROVIDE DETAILED FUNDING AMOUNT OF THE PPG ACTIVITIES AND THEIR IMPLEMENTATION
STATUS IN THE TABLE BELOW:
Project Preparation
Activities Approved
1.Evaluation of 4 solar
concentrator technology
packages and their
applicability in 5
identified sectors
2. Identification,
evaluation and selection
of demonstrations
3. Assessment of the
barriers to the
widespread production
and application of solar
concentrators
4. Conduct of Logical
Framework Analysis
(LFA) with the project
stakeholders
5. Detailed Design of
Project Components &
Activities
6. Coordination
Mechanisms and Other
Institutional Work
7. Drafting of the Project
Document
Implementation
Status
completed
Amount
Approved
20,000
Uncommitte
d Amount*
-
Co-financing
($)
20,000
completed
15,000
13,135.00
1865.00
20,000
completed
15,000
15,000.00
20,000
completed
25,000
14,082.22
10,917.78
10,000
completed
21,000
8,808.07
12,191.93
15,000
completed
4,000
20.67
3,979.33
5000
completed
5000
42
8. Finalization and
Submission of the
ProDoc and CEO
Endorsement Request
completed
5000
100,000
70,268.53
29,731.47
100,000
* Uncommitted amount should be returned to the GEF Trust Fund. Please indicate expected date of refund transaction to Trustee.
43