Checklist for Painting works

Project
Client

:
:

SITE

Doc. No.
Project Location
LOCATION

Painting for Walls


1

Check for any wall cracks, Curing period completed or not

Check the material/paints as approved make

Check color shade approved

Cleaning of walls to be checked (Scrapping), Surface finishing

Cracks, Dampness, any leakages to be identified and repaired.

Apply primary coat

Application of coat as per specs to be checked

Check others materials covered neatly with masking tape (protection of other
materials from damage like Electrical switches plate, door/window joints, glass
partitions, wardrobes)

Check for no of coat applied & final touch up work are completed

Check for overall coverage andy brush marks

10

Check for cleaning in flooring, window/door glasses & joinery


fitting after painting

11

Check for any incomplete and addition and alteration


12 Check for floor polishing before final coat ( in case of Marble flooring)

Remarks of Quality Assurance Engineer:

Signature
Checked By:
Approved By:

Date