Sunteți pe pagina 1din 4

Engr.

Uzma Imran
Pak Add: House No.A-39 Block II, Saadi Town, Karachi
Cell# 00923337054946 (PAK)
Email:engruzma296@gmail.com, Date of Birth 07th April, 1975
Skype ID: imranfrank
Marital Status: Married

Objective
To join an esteemed and well-reputed organization with a professional environment to utilize my best abilities to
seek a path leading to growth oriented, dynamic, challenging accordingly rewarding career.
Profile
Environmental Engineer with Masters in Environmental Management and bachelors in Civil Engineering with
more than 16 years professional experience in the field of Environment, Civil Engineering, Management, EIA,
IEE & EMP Report writing, Progress Monitoring for various types of Environment & Civil Engineering Projects
mainly in buildings, structural engineering, water, air, noise & land pollution control. Appropriate knowledge of
laws related to EPA and other international Environmental Rules and Regulations. Water sampling, Quality control
and compliance with NEQS & WHO standards with knowledge of latest Standards set by International bodies such
as JICA, National Laws etc. using the latest tools and techniques for overall Environemntal Management &
Monitoring.

EDUCATION
2011 - 2013
1993 - 2000

Master of Engineering Management (Environmental), NED University of


Engineering and Technology Karachi
Bachelor of Engineering (Civil), Mehran University of Engineering and Technology
Jamshoro Hyderabad

TRAININGS

STELLA 10.1
Effective Teaching by USAID
Firefighting Training, EMC
Hazardous Chemical Handling & Storage, EMC
Environmental Monitoring Sampling Techniques, EMC
Computer Aided Project Management with Microsoft Project (MS Project)
ETAB, SAFE, SAP, ECOL
Auto CAD 2000
ISO 9001, Mehran University
English Language PACC, Hyderabad (Level-V and advanced)

PROFESSIONAL EXPERIENCE
6th July 2015 to date

U.S-Pakistan center for Advanced Studies in Water- USPCASW, MUET

Position:

Assistant Professor

Jan. 2014 to 4th July 2015


Position:
Responsibilities:

Environmental Management Consultants (EMC) Pakistan Pvt. LTD.


Environmental Engineer

Preparation, Review and Followup of Environmental Impact Assessment (EIA), Initial


Environmental Examination (IEE), Environmental Management Plan (EMP),
Environmental Monitoring Plan (EMP)

Water Quality Analysis

Facilitating Stakeholder Consultation Meetings all over the Pakistan.

Baseline Studies from Primary & Secondary Data, Field surveys and Environmental
Audit of various national and multinational companies

Developing various Environmental Plans focusing on any special aspect relating to


Environment such as Spill Prevention Plan, Fire Protection Plan and and Seepage
Prevention Plan

Environmental Assessment relating to various phases of project such as Pre-construction,


Construction and Operational phases of the project

Coordination with various specialists such as Sociologists, Environmental Engineers,


Environmental Scientists, IT Managers, HSE Managers, Environmental Auditors, Field
Surveryors, and Sampling Experts

Meetings with Regulatory Authorities such as SEPA, BEPA, PEPA, KPKEPA

Meetings with Clients

Office Coordination and Management

Projects

o
o
o
o
o
o
o
o

EIA of 132 KV supply line for The Indus Hospital, Korangi


EIA of Bahria Garden City, Nawabshah
EIA of Bahria Town, Karachi
EIA of Lakhra Thermal Power Plant by JICA
EIA of K2, K3 projects
EIA of 350 MW Coal fired thermal power plant
Monitoring Reports of OGDCL Hala Game Reserve
IEE of Exploration, Drilling and Production Activities in KPK and
Balochistan by OGDCL
o
EMP of Ranipur Sugar Mills
o
EMP of Philip Morris, Kotri Unit (RO Plant, Boiler & Absorbent Chiller)
o
EMP of Mosajee Adam and Sons, LTD
o
EMP of Artistic Milners for chemical Handling
o
EMP of Yunus Textile Mills for Chemical Handling
o
EMP of Engro Vopac Terminal Limied for Hazardous Chemical
May 2009 to December 2013
Position:
Responsibilities:

July 2007 to April 2009


Position:
Project:
Responsibilities:

Zulfiqar Associates
Environmental & Structural Engineer

Planning, Designing and Management of various construction projects

Assessing the Environemntal Impacts of various Multistorey Building Construction


Projects

Model making on various Engineering Softwares and preparation of structural drawings


ARENCO Pakistan (PVT) LTD
Structural Engineer
Al- Furjan Yathrab Central Jabel Al, Dubai, UAE

7 Blocks of B+G+3, B+G+4 and B+G+5 storey height residential apartments (313 units
with club house)

Solving practical problems related to design

Model making with the aid of different Engineering Softwares and preparation of
structural drawings

Beam Scheduling, changes in roof and upper roof level and ETABS model as well in
beams, columns, slabs and wall schedules

Project:

Fanar Towers, Mixed use development (residential, office and shopping mall, alshariah-I, Fujairah, UAE

Responsibilities:

38 storeys residential towers, 38 storeys of Office Tower-I and 28 storeys of Office


Tower-II

4 levels of car park, 2 level for retail + entertainment facilities and land scaping at level
V

Beam schedule of podium and office tower I & II

Modeling slabs of podium , residential tower and office tower I & II by using SAFE

Flat slab design

Column schedule and wall reinforcement detail of podium, residential tower and Office
Tower I & II
Dubai Industrial City, UAE

05 blocks of G+5, G+6 and G+11 residentail buildings

Modeling G+6 building by using ETABS and SAFE

Beam schedule and foundation design of G+5 and G+6 buildings

Modeling and designing Slabs of G+5 and G+6 buildings


Village Center, UAE

G+18+roof building

Checking beam schedule


Dubai Police Academy, UAE

Indoor outdoor sports facilities, graduation hall, evening classes, multipurpose test hall,
polic band rehersal building and football field

Modeling, Analyzing, Designing and Detailing all structural members of indoor outdoor
sports facilities buildings by using ETABS and SAFE

Designing steel trusses for indoor outdoor spors facilities and graduation hall buildings
by using SAP 2000

Changes in graduation hall and multipurpose test hall models (ETABS & SAFE) and
correcting structural drawings accordingly

Project:
Responsibilities:

Project:
Responsibilities:

Project:
Responsibilities:

August 1999 to December 2006


Position:
Responsibilities:
Project:

ANCON Engineers
Civil Engineer
Designing and construction of various Petrol Pumps & Buildings

Checking drawings, measurements, scheduling, calculations of quantities, soil


testing, material testing and surveying.

Undertaking of construction projects keeping in compliance with environmental and HSE


parameters

Assessing the Environemntal Impacts of various building Construction Projects and


devising mitigation measures

Monitor the execution of Works relative to the approved schedules, cost estimates and
highlight any variances.

Controlling the project program to ensure timely and economic completion, ensuring that
effective corrective actions are taken on identified problems.

August 2004 to Date


Position:
Responsibilities:

G.M. Sons Builders & Developers


Civil Engineer on Call Basis (Part Time)

Planning, Designing and Management of various construction projects

Assessing Environemntal Impacts and suggesting mitigation measures for various


Building Construction Projects

Teaching
Position:
Responsibilities:

Various Schools, Colleges & Academies


Lecturer Part time

PROFESSIONAL
MEMBERSHIPS
REFERENCES

Teaching, Evaluating Students, Preparing Examination Papers and Invagiliation etc.

Member of Pakistan Engineering Council (PEC) / CIVIL 20163


Furnished Upon Request

S-ar putea să vă placă și