Sunteți pe pagina 1din 3

PVSYST V6.

40

13/07/16 Page 1/3

Grid-Connected System: Simulation parameters


Project :

Navalakha Transline, Osmanabad

Geographical Site

Navalakha Transline, Osmanabad

Country

Situation
Time defined as

Latitude
Legal Time
Albedo
Navalakha Transline, Osmanabad

17.9N
Longitude
Time zone UT+5.5
Altitude
0.20
Synthetic - NASA-SSE

Meteo data:

Simulation variant :

India
75.8E
520 m

New simulation variant


Simulation date

13/07/16 12h37

Simulation parameters
Tracking plane, Horizontal E-W Axis
Rotation Limitations

Minimum Tilt

Models used

Transposition

Horizon

Free Horizon

Near Shadings

No Shadings

10

Normal azimut to axis


Maximum Tilt
Diffuse

Erbs, Meteonorm

Si-poly
Model
Manufacturer
Number of PV modules
In series
Total number of PV modules
Nb. modules
Array global power
Nominal (STC)
Array operating characteristics (50C)
U mpp
Total area
Module area

RSM72-6-315P
Risen Energy Co., Ltd
19 modules
In parallel
7296
Unit Nom. Power
At operating cond.
2298 kWp
630 V
I mpp
Cell area
14157 m

384 strings
315 Wp
2077 kWp (50C)
3296 A
12765 m

Model
Manufacturer
Operating Voltage

Solar Ware 1000 - PVL-L1000E


TMEIC
605-950 V
Unit Nom. Power

1000 kWac

2 units

2000 kWac

PV Array Characteristics
PV module
Custom parameters definition

Inverter
Custom parameters definition

Characteristics
Inverter pack

Nb. of inverters

Perez

0
80

Total Power

PV Array loss factors


Array Soiling Losses
Thermal Loss factor

Uc (const)

Wiring Ohmic Loss


Global array res.
Serie Diode Loss
Voltage Drop
LID - Light Induced Degradation
Module Quality Loss
Module Mismatch Losses
Incidence effect, ASHRAE parametrization
IAM =
User's needs :

PVsyst Evaluation mode

Unlimited load (grid)

20.0 W/mK
3.2 mOhm
0.7 V

1 - bo (1/cos i - 1)

Loss Fraction
Uv (wind)

2.0 %
0.0 W/mK / m/s

Loss Fraction
Loss Fraction
Loss Fraction
Loss Fraction
Loss Fraction
bo Param.

1.5 % at STC
0.1 % at STC
2.0 %
-0.8 %
1.0 % at MPP
0.05

PVSYST V6.40

13/07/16 Page 2/3

Grid-Connected System: Main results


Project :

Navalakha Transline, Osmanabad

Simulation variant :

New simulation variant

System type
Main system parameters
PV Field
Tracking,
Orientation
horizontal axis E-W, Normal azimut to axis
PV modules
Model
PV Array
Nb. of modules
Inverter
Model
Inverter pack
Nb. of units
User's needs
Unlimited load (grid)
Main simulation results
System Production

Produced Energy
Performance Ratio PR

s
y
s
V
P

Grid-Connected
Normal azimut to axis
RSM72-6-315P
Pnom
7296
Pnom total
Solar Ware 1000 - PVL-L1000E
2.0
Pnom total

3961 MWh/year
78.7 %

Specific prod.

Normalized productions (per installed kWp): Nominal power 2298 kWp


8

PR : Performance Ratio (Yf / Yr) : 0.787

0.8

Performance Ratio PR

Normalized Energy [kWh/kWp/day]

1723 kWh/kWp/year

Performance Ratio PR
1.0

Lc : Collection Loss (PV-array losses)


1.2 kWh/kWp/day
Ls : System Loss (inverter, ...)
0.08 kWh/kWp/day
Yf : Produced useful energy (inverter output) 4.72 kWh/kWp/day

0
315 Wp
2298 kWp
1000 kW ac
2000 kW ac

0.6

0.4

2
0.2

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

0.0

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

New simulation variant


Balances and main results
GlobHor

T Amb

GlobInc

GlobEff

EArray

E_Grid

EffArrR

EffSysR

kWh/m

kWh/m

kWh/m

MWh

MWh

January

160.0

24.20

222.1

213.9

408.4

402.0

12.99

12.79

February

162.1

26.70

198.2

190.3

358.1

352.6

12.76

12.57

March

197.8

30.20

213.6

204.4

378.0

372.4

12.50

12.32

April

193.8

31.60

195.2

186.5

346.6

341.3

12.55

12.35

May

199.6

30.20

194.4

185.3

350.5

344.9

12.74

12.54

June

152.7

26.10

147.1

139.8

277.7

273.2

13.34

13.12

July

141.4

24.70

137.3

130.5

262.7

258.3

13.51

13.29

August

138.6

24.40

136.9

130.2

262.3

258.0

13.53

13.31

September

147.3

25.30

153.0

145.8

288.6

284.1

13.33

13.12

October

156.9

26.60

179.8

172.0

332.3

327.0

13.06

12.85

November

149.4

25.40

197.7

190.0

364.0

358.3

13.01

12.81

December

149.4

23.59

214.1

206.4

394.9

388.6

13.03

12.82

Year

1949.0

26.58

2189.3

2095.0

4024.3

3960.9

12.98

12.78

Legends:

PVsyst Evaluation mode

GlobHor

Horizontal global irradiation

EArray

T Amb

Ambient Temperature

E_Grid

Effective energy at the output of the array


Energy injected into grid

GlobInc

Global incident in coll. plane

EffArrR

Effic. Eout array / rough area

GlobEff

Effective Global, corr. for IAM and shadings

EffSysR

Effic. Eout system / rough area

Dec

PVSYST V6.40

13/07/16 Page 3/3

Grid-Connected System: Loss diagram


Project :

Navalakha Transline, Osmanabad

Simulation variant :

New simulation variant

System type
Main system parameters
PV Field
Tracking,
Orientation
horizontal axis E-W, Normal azimut to axis
PV modules
Model
PV Array
Nb. of modules
Inverter
Model
Inverter pack
Nb. of units
User's needs
Unlimited load (grid)

Grid-Connected
Normal azimut to axis
RSM72-6-315P
Pnom
7296
Pnom total
Solar Ware 1000 - PVL-L1000E
2.0
Pnom total

0
315 Wp
2298 kWp
1000 kW ac
2000 kW ac

Loss diagram over the whole year

T
t
s
y
s
V
P
1949 kWh/m

Horizontal global irradiation


+12.3% Global incident in coll. plane
-2.4%

-2.0%

2095 kWh/m * 14157 m coll.

IAM factor on global

Soiling loss factor


Effective irradiance on collectors

efficiency at STC = 16.26%

PV conversion

4822386 kWh

-0.2%

Array nominal energy (at STC effic.)


PV loss due to irradiance level

-12.7% PV loss due to temperature


+0.8%

Module quality loss

-2.0%

LID - Light induced degradation

-1.0%

Module array mismatch loss

-1.3%

Ohmic wiring loss

4052742 kWh

PVsyst Evaluation mode

Array virtual energy at MPP


-1.6%

Inverter Loss during operation (efficiency)

0.0%
0.0%
0.0%
-0.7%
3960877 kWh

Inverter Loss over nominal inv. power


Inverter Loss due to power threshold
Inverter Loss over nominal inv. voltage
Inverter Loss due to voltage threshold
Available Energy at Inverter Output

3960877 kWh

Energy injected into grid