Base Engineering Assessment Program Checklist Template

BEAP Sewerage System Checklist

The following is a list of the general information required to assess the Condtion, Capacity and Compliance of the sewerage systems.

All physical site investigations need to be conducted in accordance with the Cardno Zero Harm HSE policies, management system and project/site specific requirem
Observation notes of physical investigations shall be recorded in both raw and final formats (eg CAD, GIS, Excel, Word, and PDF etc)

340667753.xls

Checklist summary

Page 1 of 43

Base Engineering Assessment Program Checklist Template


BEAP Sewerage System Checklist

The following is a list of the general information required to assess the Condtion, Capacity and Compliance of the sewerage systems.

All physical site investigations need to be conducted in accordance with the Cardno Zero Harm HSE policies, management system and project/site specific requirements.
Observation notes of physical investigations shall be recorded in both raw and final formats (eg CAD, GIS, Excel, Word, and PDF etc)
SEWERAGE
(Note do not enter any confined spaces)

Collection
Confirm alignments (horizontal & vertical), connectivity, and details of main distribution infrastructure.
-sizes
-materials
-age
-condition
Pumping station details
-manufacturer,
-model,
-motor size,
-impellor diameter
-curves and typical duty point),
-drive type (VSD/Fixed)
Rising Mains
-sizes
-materials
-age
-condition
-Discharge MH
Designated overflow points
Emergency storage
Demand Distribution
Fitting counts by building, and/or derivation of associated typical EP/ET by building/zone
Hydraulic model
Data input (GIS) network details, elevations, demand nodes
Modelling outputs (ADWF, PDWF, PWWF)
Colour coded site plans indicating relative capacity, surcharging
STP
Process design
Hydraulic design and capacity
PFD & PID
Influent & Effluent quality and quantity data
Component/equipment details and sizes (tanks, pumps, valve, screens, control etc )

340667753.xls

Checklist summary

Page 2 of 43

Base Engineering Assessment Program Checklist Template

project/site specific requirements.

340667753.xls

Checklist summary

Page 3 of 43

Base Engineering Assessment Program Checklist Template

BASE: xxxx
SERVICE: SEWER NETWORK

ELEMENT ID

DEFENCE / DEMS
ID

LOCATION

TYPE

STATUS

INSPECTED
(Y/N)

INSPECT
DATE

LOCATION DESCRIPTION

SURFACE LEVEL (AHD)


(m, at centre of top of lid)

LOCATION OF CENTRE OF
MANHOLE - EASTING (MGA94)

LOCATION OF CENTRE OF
MANHOLE - NORTHING (MGA94)

YEAR BUILT

YEAR BUILT CONFIRMED


OR ESTIMATED

86

TRAINING ESTABLISHMENT

MANHOLE

ACTIVE

7/29/2013

On footpath located between Building 459 and 194

7.230

341571.55

5752133.93

????

ESTIMATED

52

TRAINING ESTABLISHMENT

MANHOLE

ACTIVE

7/29/2013

On grass located NE corner of Building 459

7.240

341552.75

5752152.65

????

ESTIMATED

340667753.xls

Maintenance Holes

Page 4 of 43

Base Engineering Assessment Program Checklist Template

COVER SIZE / DIAMETER


INTERNAL MANHOLE SIZE / DIAMETER (mm)
(mm)

COVER TYPE

COVER MATERIAL

GATIC

C.I. CONCRETE FILLED COVER

700

800

GATIC

C.I. CONCRETE FILLED COVER

(810 x 653) x 2

762 x 1220

340667753.xls

MANHOLE MATERIAL

COVER CONDITION
(1 -As New to 5 - Unserviceable)

BASIS OF
COVER CONDITION

MANHOLE COVER
COMPLIANCE (Y/N)

MANHOLE COVER TIME TO


INTERVENTION PRIORITY

1.6

BRICK

2 - GOOD

Cardno's Inspection 2013

P3

1.4

CONCRETE

2 - GOOD

Cardno's Inspection 2013

INTERNAL MANHOLE HEIGHT (m)

Maintenance Holes

MANHOLE STRUCTURE CONDITION


(1 -As New to 5 - Unserviceable)

BASIS OF MANHOLE
STRUCTURE CONDITION

MANHOLE STRUCTURE
TIME TO INTERVENTION
PRIORITY

4 - POOR

Cardno's Inspection 2013

P3

2 - GOOD

Cardno's Inspection 2013

Page 5 of 43

Base Engineering Assessment Program Checklist Template

INTERVENTION
LID & STRUCTURE REPLACEMENT (P3)

340667753.xls

COMMENTS

PHOTO ID RANGE

(i) Roots intrusion sighted - cleaning required, (ii) Rising mains from SPS 1 and 6 discharge into this manhole, (iii) Loose bricks sighted, exposed aggregate, (iv) Sewer is blocking up, flow
seems to be stagnant

HMAS_Cerberus CA001 01 - 07

(i) Signs of minor roots intrusion

HMAS_Cerberus CA005 01 - 09

Maintenance Holes

Page 6 of 43

Base Engineering Assessment Program Checklist Template


BASE: xxxx
SERVICE: SEWER NETWORK

DEFENCE /
DEMS
ID

LOCATION

STATUS

UPSTREAM
PIT NO.

DOWNSTREAM PIT NO.

CCTV INSPECTION
ATTEMPTED (Y/N)

PIPE
DIAMETER
(mm)

PIPE MATERIAL

UPSTREAM DEPTH TO
INVERT (m)

DOWNSTREAM DEPTH TO
INVERT (m)

PIPES TYPE

YEAR BUILT

YEAR BUILT
CONFIRMED OR
ESTIMATED

UPSTREAM PIT SURFACE


LEVEL (AHD) (m)

UPSTREAM PIT EASTING


(MGA94)

UPSTREAM PIT NORTHING


(MGA94)

DOWNSTREAM PIT
NORTHING (MGA94)

UPSTREAM INVERT LEVEL


(AHD) (m)

CAPACITY ASSESSMENT

MINIMUM GRADE COMPLIANCE (Y/N)

CCTV DATE

LENGTH INSPECTED (m)

STRUCTURAL CONDITION GRADE


(1 -As New to 5 - Unserviceable)

BASIS OF STRUCTURAL
CONDITION GRADE

SERVICEABILITY PEAK SCORE

SERVICEABILITY CONDITION GRADE


(1 -As New to 5 - Unserviceable)

252

DSR5011: SECTION 1

TRAINING ESTABLISHMENT

ACTIVE

CA010

CA005

225

PVC

1.450

1.450

GM

1980

ESTIMATED

7.530

341519.96

5752153.15

7.240

341552.75

5752152.65

6.080

5.790

32.8

NA

7/25/2013

32.8

100%

1 - AS NEW

CCTV review

3 - FAIR

248

DSR5011: SECTION 2

TRAINING ESTABLISHMENT

ACTIVE

BA001

CA010

225

PVC

1.550

1.440

GM

1980

ESTIMATED

8.100

341472.24

5752153.89

7.530

341519.96

5752153.15

6.550

6.090

47.7

NA

7/25/2013

47.3

99%

1 - AS NEW

CCTV review

3 - FAIR

ELEMENT ID

340667753.xls

CCTV REPORT REFERENCE

Page 7 of 43

DOWNSTREAM PIT SURFACE DOWNSTREAM PIT EASTING


LEVEL (AHD) (m)
(MGA94)

Gravity Mains

DOWNSTREAM INVERT LEVEL


PIPE LENGTH (m)
(AHD) (m)

FLOW MAXIMUM
(L/s)

FLOW CAPACITY (CALCULATED


DESIGN) (L/s)

CAPACITY (%)

LENGTH INSPECTED (%) STRUCTURAL PEAK SCORE

TIME TO INTERVENTION PRIORITY


(STRUCTURAL)

Base Engineering Assessment Program Checklist Template

BASIS OF SERVICEABILITY
CONDITION SCORE

TIME TO INTERVENTION PRIORITY


(SERVICEABILITY)

INTERVENTION

CCTV review

P5

JETTING/ROOT FOAMING (P5)

1_CA010_CA005_25072013_1_121251.mpg

Deposits on the wall; Fine roots

CCTV review

P5

JETTING/ROOT FOAMING (P5)

2_BA001_CA010_25072013_2_122817.mpg

Deposits on the wall

340667753.xls

CCTV VIDEO REFERENCE NO.

CCTV VIDEO REVIEW COMMENTS / ADDITIONAL COMMENTS

Page 8 of 43

Gravity Mains

Base Engineering Assessment Program Checklist Template


BASE: xxxx
SERVICE: SEWERAGE PUMP STATIONS
CAPACITY
ELEMENT ID

INSPECTED

INSPECT_DATE

STATUS

LOCATION

SPS

380

YES

8/1/2013

ACTIVE

TRAINING ESTABLISHMENT

B123 SPS1

Sewerage Pump Station

YES

8/1/2013

TRAINING ESTABLISHMENT

B123 SPS1

Wet Well

YES

8/1/2013

TRAINING ESTABLISHMENT

B123 SPS1

Wet Well Cover

YES

8/1/2013

TRAINING ESTABLISHMENT

B123 SPS1

Pump 1

SV26761

YES

8/1/2013

TRAINING ESTABLISHMENT

B123 SPS1

Pump 2

SV26762

YES

8/1/2013

TRAINING ESTABLISHMENT

B123 SPS1

YES

8/1/2013

TRAINING ESTABLISHMENT

YES

8/1/2013

YES

340667753.xls

ASSET

DEFENCE ID
SPS1

ASSIGNED ID

YEAR INSTALLED

YEAR BUILT CONFIRMED


WET WELL
WET WELL
OR ESTIMATED
DIAMETER (mm) DEPTH (mm)

MATERIAL

MAKE

MODEL

SERIAL NUMBER

POWER
(kW)

IMPELLER
SIZE (mm)

MEASURED FLOW
DIAMETER
CONDITION
VALVE TYPE
(l/s)
(mm)
(1 -As New to 5 - Unserviceable)

COMMENTS

PHOTO ID RANGE

Located on a concrete platform along Cook Rd and NE of Building 1

HMAS_Cerberus B123 SPS1 01 - 24

SPS1 B123

1998

ESTIMATED

SPS1 B123 WW

1998

ESTIMATED

SPS1 B123 WWC

1998

ESTIMATED

STEEL (HINGED CHEQUER PLATE)

SPS1 B123 P1

1998

ESTIMATED

CAST IRON

4.60

3 - FAIR

Operates OK

SPS1 B123 P2

1998

ESTIMATED

CAST IRON

4.80

3 - FAIR

Operates OK

Pipework

SPS1 B123 PW

1998

ESTIMATED

PVC

B123 SPS1

Isolation Valve 1

SPS1 B123 IV1

1998

ESTIMATED

BRASS

TRAINING ESTABLISHMENT

B123 SPS1

Non-Return Valve 1

SPS1 B123 NRV1

1998

ESTIMATED

8/1/2013

TRAINING ESTABLISHMENT

B123 SPS1

Isolation Valve 2

SPS1 B123 IV2

1998

YES

8/1/2013

TRAINING ESTABLISHMENT

B123 SPS1

Non-Return Valve 2

SPS1 B123 NRV2

YES

8/1/2013

TRAINING ESTABLISHMENT

B123 SPS1

Guide Rails

YES

8/1/2013

TRAINING ESTABLISHMENT

B123 SPS1

Control Panel

SV05360

1800

5150

CONCRETE

2 - GOOD

Minor wear observed but otherwise wet well is in good condition (refer Photo 04)

2 - GOOD

Minor wear to the bottom of cover but in good condition (refer Photo 01 and 21)

150

2 - GOOD

GATE

150

3 - FAIR

External corrosion but operates OK

BRASS

CHECK

150

3 - FAIR

External corrosion but operates OK

ESTIMATED

BRASS

GATE

150

3 - FAIR

External corrosion but operates OK

1998

ESTIMATED

BRASS

CHECK

150

3 - FAIR

External corrosion but operates OK

SPS1 B123 GR

1998

ESTIMATED

GAL STEEL

SPS1 B123 CP

1998

ESTIMATED

Page 9 of 43

STATUS
EXCEEDED

CONDITION
COMMENTS

Hydraulic analysis indicates PWWF is at 9.45 L/s. This has exceeded SPS1's single pump flowrate range (measured
to be between 4.60 - 4.70 L/s).

STATUS
GOOD

COMPLIANCE
COMMENTS

Overall good condition. External corrosion evident on isolation and non-return valves.

STATUS

COMMENTS

NON-COMPLIANT

No confined space signage.

NON-COMPLIANT

RCDs required for light and GPO.

Pipeworks seem to be quite new and in good condition

2 - GOOD

Guide rails seem to be quite new and in good condition

2 - GOOD

Some general wear. Controls two pumps.

SPS

HMAS_Cerberus B123 SPS1 22 - 24

Base Engineering Assessment Program Checklist Template


BASE: xxxx
SERVICE: SEWER NETWORK

ELEMENT ID
620
159

340667753.xls

DEFENCE / DEMS
ID

STATUS

UPSTREAM
PIT NO.

TRAINING ESTABLISHMENT

ACTIVE

IH005

TRAINING ESTABLISHMENT

ACTIVE

B123 SPS1

CCTV REPORT REFERENCE


DSR5011: SECTION 29

LOCATION

Rising Mains

Page 10 of 43

Base Engineering Assessment Program Checklist Template

DOWNSTREAM PIT
NO.

CCTV INSPECTION
ATTEMPTED (Y/N)

PIPE
DIAMETER
(mm)

PIPE MATERIAL

UPSTREAM DEPTH TO
INVERT (m)

DOWNSTREAM DEPTH
TO INVERT (m)

PIPES TYPE

YEAR
BUILT

YEAR BUILT
CONFIRMED OR
ESTIMATED

LA001

225

DI

NA

1.460

RM

????

ESTIMATED

CA001

150

PVC

NA

NA

RM

????

ESTIMATED

340667753.xls

Rising Mains

Page 11 of 43

Base Engineering Assessment Program Checklist Template

UPSTREAM PIT
UPSTREAM PIT EASTING UPSTREAM PIT NORTHING
SURFACE LEVEL (AHD)
(MGA94)
(MGA94)
(m)

DOWNSTREAM PIT SURFACE


LEVEL (AHD) (m)

DOWNSTREAM PIT
EASTING (MGA94)

DOWNSTREAM PIT
NORTHING (MGA94)

UPSTREAM INVERT
LEVEL (AHD) (m)

3.570

341920.24

5751493.47

8.180

341684.61

5751600.64

NA

NA

342087.84

5752181.95

7.230

341571.55

5752133.93

NA

340667753.xls

Rising Mains

Page 12 of 43

Base Engineering Assessment Program Checklist Template

DOWNSTREAM INVERT
LEVEL (AHD) (m)

PIPE LENGTH
(m)

VELOCITY MAXIMUM (m/s)

VELOCITY CAPACITY (CALCULATED DESIGN) (m/s)

CAPACITY (%)

6.720

344.2

0.50

2.00

25%

NA

560.3

0.27

2.00

14%

340667753.xls

Rising Mains

Page 13 of 43

Base Engineering Assessment Program Checklist Template

CAPACITY ASSESSMENT

COMPLIANCE STATUS

CCTV DATE

WITHIN LIMITS

7/30/2013

WITHIN LIMITS

340667753.xls

LENGTH INSPECTED LENGTH INSPECTED


(m)
(%)
1.2

0.3%

STRUCTURAL CONDITION GRADE


(1 -As New to 5 - Unserviceable)
2 - GOOD
2 - GOOD

Rising Mains

Page 14 of 43

Base Engineering Assessment Program Checklist Template

BASIS OF STRUCTURAL
CONDITION GRADE

SERVICEABILITY CONDITION GRADE


(1 -As New to 5 - Unserviceable)

BASIS OF SERVICEABILITY
CONDITION SCORE

Performance

5 - UNSERVICEABLE

CCTV review

Performance

2 - GOOD

Performance

340667753.xls

TIME TO INTERVENTION PRIORITY


(STRUCTURAL)

Rising Mains

Page 15 of 43

Base Engineering Assessment Program Checklist Template

TIME TO INTERVENTION PRIORITY


(SERVICEABILITY)

INTERVENTION

P2

JETTING/ROOT FOAMING (P2)

340667753.xls

Rising Mains

Page 16 of 43

Base Engineering Assessment Program Checklist Template

CCTV VIDEO REFERENCE NO.


29_JUNCTION_LA001_30072013_29_085701.mpg

340667753.xls

Rising Mains

Page 17 of 43

Base Engineering Assessment Program Checklist Template

CCTV VIDEO REVIEW COMMENTS / ADDITIONAL COMMENTS

Draw down test conducted on 1/8/2013. CCTV inspection abandoned as rising main is filled with fat deposits - requires cleaning. The condition of smaller diameter pressure mains is assessed through historical pe
failures of rising mains, the structural condition of the mains is rated to be good. Rising main is found to be non-compliant as the flow velocity is below 0.9 m/s (the minimum velocity required to prevent slime bui

Draw down test conducted on 1/8/2013. The condition of smaller diameter pressure mains is assessed through historical performance in a similar manner to the assessment of water mains. As there has been no e
found to be non-compliant as the flow velocity is below 0.9 m/s (the minimum velocity required to prevent slime build-up).

340667753.xls

Rising Mains

Page 18 of 43

Base Engineering Assessment Program Checklist Template


BASE: xxxx
SERVICE: TRADE WASTE DEVICES

ELEMENT ID

B49 POI-7

DEFENCE / DEMS
ID
POI-7

B49 POI-7 C
B520 POI-4
B520 POI-4 C

340667753.xls

POI-4

INSPECTED INSPECT_DATE

YES

7/30/2013

YES

7/30/2013

YES

7/30/2013

YES

7/30/2013

STATUS

WASTELOG NUMBER

SITE LOCATION

NON ACTIVE

326742

TRAINING ESTABLISHMENT

Building 49 Petrol & Oil Interceptor

TRAINING ESTABLISHMENT

Building 49 Petrol & Oil Interceptor

TRAINING ESTABLISHMENT

Building 520 Petrol & Oil Interceptor

TRAINING ESTABLISHMENT

Building 520 Petrol & Oil Interceptor

ACTIVE

326711

Trade Waste Device

TRADE WASTE

Page 19 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 20 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 21 of 43

Base Engineering Assessment Program Checklist Template

ASSET

YEAR BUILT YEAR BUILT CONFIRMED OR ESTIMATED

PIT MATERIAL

LENGTH (mm) WIDTH (mm)

Petrol & Oil Interceptor

????

????

CONCRETE

1980

670

Cover

????

????

C.I. CONCRETE FILLED COVER

2040

690

Petrol & Oil Interceptor

????

????

CONCRETE

1870

600

Cover

????

????

C.I. CONCRETE FILLED COVER

2070

650

340667753.xls

Trade Waste Device

Page 22 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 23 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 24 of 43

Base Engineering Assessment Program Checklist Template

OPERATIONAL DEPTH (mm) TOTAL DEPTH (mm)

1000

1600

CALCULATED
CAPACITY (litres)

CAPACITY FROM TRADE


WASTE PLAN (litres)

1327

1500

CAPACITY STATUS (%)

NA

1010

1650

1133

1000
NA

340667753.xls

Trade Waste Device

Page 25 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 26 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 27 of 43

Base Engineering Assessment Program Checklist Template

LOCATION DESCRIPTION

CONDITION
(1 -As New to 5 - Unserviceable)

BASIS OF CONDITION RATING

2 - GOOD

Site inspections

3 - FAIR

Site inspections

3 - FAIR

Site inspections

4 - POOR

Site inspections

Located North of Building 49 opposite fuel storage tank

Located SE corner of Building 520

340667753.xls

Trade Waste Device

Page 28 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 29 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 30 of 43

Base Engineering Assessment Program Checklist Template

COMMENTS

PHOTO ID RANGE

Minor corrosion/hairline cracks but no effect on structure. Petrol and oil interceptor is non-active

HMAS_Cerberus B49 POI-7 01 - 09

Concrete covers are visually aged with loose/missing concrete on corners of the covers evident (i.e. chipped - refer Photo 02). Structural integrity
not compromised. 3 covers (i.e. (680 x 690) x 3)
Some concrete corrosion and minor tree roots evident (refer Photo 01)

HMAS_Cerberus B520 POI-4 01 - 10

Concrete covers are visually aged with significant concrete loose evident (refer Photo 05) and corrosion on the bottom side of the covers (refer
Photo 08). 3 covers (i.e. (650 x 690) x 3)

340667753.xls

Trade Waste Device

Page 31 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 32 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 33 of 43

Base Engineering Assessment Program Checklist Template

CAPACITY
STATUS

COMMENTS

CONDITION
STATUS

NA

Asset is not a grease trap - capacity assessment not undertaken.

GOOD

NA

Asset is not a grease trap - capacity assessment not undertaken.

FAIR

340667753.xls

Trade Waste Device

Page 34 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 35 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 36 of 43

Base Engineering Assessment Program Checklist Template

CONDITION

COMPLIAN

COMMENTS

STATUS

Minor corrosion/hairline cracks but no effect on structure

NA

Some concrete corrosion and minor tree roots evident (refer Photo 01)

NA

340667753.xls

Trade Waste Device

Page 37 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 38 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 39 of 43

Base Engineering Assessment Program Checklist Template

COMPLIANCE
COMMENTS

Asset is not a grease trap - compliance assessment not undertaken.

Asset is not a grease trap - compliance assessment not undertaken.

340667753.xls

Trade Waste Device

Page 40 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 41 of 43

Base Engineering Assessment Program Checklist Template

340667753.xls

Trade Waste Device

Page 42 of 43

Base Engineering Assessment Program Checklist Template


BASE: xxxx
SERVICE: SEWERAGE TREATMENT PLANTS
CAPACITY
ELEMENT ID

DEFENCE / DEMS
ID

227

PROCESS AREA

ASSET

YEAR
YEAR BUILT CONFIRMED
INSTALLED
OR ESTIMATED

MATERIAL

MAKE

MODEL

SERIAL
NUMBER

ATTRIBUTES

CONDITION
(1 -As New to 5 - Unserviceable)

YES

8/2/2013

Rifle Range STP

Sewage Treatment Plant

YES

8/1/2013

Balance Tank 1

Civil

????

????

CONCRETE

Tank dimension: 975 mm x 1500 mm

2 - GOOD

YES

8/1/2013

Balance Tank 2

Civil

????

????

CONCRETE

Tank dimension: 975 mm x 1500 mm

2 - GOOD

YES

8/1/2013

Balance Tank 3

Civil

????

????

CONCRETE

Tank diameter: 1620 mm

2 - GOOD

SV65305

YES

8/1/2013

Balance Tank 3

Submersible Pump 1

????

????

CONCRETE

SV65304

YES

8/1/2013

Balance Tank 3

Submersible Pump 2

????

????

CONCRETE

YES

8/1/2013

Rotating Biological Contactor 1

Civil

????

????

Diston Sewage Purification

YES

8/1/2013

Rotating Biological Contactor 1

Feed Pump

????

????

Nov Mono

YES

8/1/2013

Rotating Biological Contactor 1

Rotating Discs

????

????

Diston Sewage Purification

SV26799 & SV26800

YES

8/1/2013

Rotating Biological Contactor 1

Motor and gearbox

????

????

WEG Motores LTDA

SV05319

YES

8/1/2013

Rotating Biological Contactor 1

Electrical

????

????

YES

8/1/2013

Secondary Tank 1

Civil

????

????

YES

8/1/2013

Rotating Biological Contactor 2

Civil

????

????

YES

8/1/2013

Rotating Biological Contactor 2

Rotating Discs

????

????

YES

8/1/2013

Rotating Biological Contactor 2

Motor and gearbox

????

????

YES

8/1/2013

Secondary Tank 2

Civil

????

????

YES

8/1/2013

Pipework

Pipework

????

????

3 - FAIR

YES

8/1/2013

Pump Out

Civil

????

????

2 - GOOD

YES

8/1/2013

Pump Out

Motor and gearbox

????

????

2 - GOOD

YES

8/1/2013

Pump Out

Electrical

????

????

2 - GOOD

YES

8/1/2013

Sludge Treatment

Sludge Pump

????

????

2 - GOOD

YES

8/1/2013

Irrigation Area

Irrigation Area

????

????

SV97076

SV97075

SV05318

340667753.xls

INSPECTED INSPECT_DATE

COMMENTS

PHOTO ID RANGE

STATUS

Rifle Range STP 01 - 68

WITHIN LIMITS

COMMENTS
Based on hydraulic analysis, STP's capacity is within limits during PWWF.

CONDITION
STATUS
FAIR

COMMENTS
STP overall condition is fair. Effluent leaving STP is relatively clear with no significant
defects/issues identified.

COMPLIANCE
STATUS

COMMENTS

NON-COMPLIANT

Effluent testing is not undertaken as part of maintenance practices. Non-compliant.

3 - FAIR
3 - FAIR
2 - GOOD
CP08003C1R8C

08B 0691

Nominal Flow: 60 L/min, Max Pressure: 28 metres

3 - FAIR
3 - FAIR

Nominal output power: 0.25 kW @ 1410 rpm

Moeller

3 - FAIR
2 - GOOD

CONCRETE

Tank diameter: 2400 mm


Diston Sewage Purification

General wear and insects sighted in control panel. In good condition.

Rifle Range STP 29 - 33

NON-COMPLIANT

Some hand written labels. Not lockable.

General wear and some loose wiring in control panel. In good condition.

Rifle Range STP 63 -66

NON-COMPLIANT

Some hand written labels. Not lockable.

2 - GOOD
3 - FAIR

Diston Sewage Purification

3 - FAIR

WEG Motores LTDA

3 - FAIR

CONCRETE

Tank diameter: 2400 mm

EARTH

3 - FAIR

3 - FAIR

Page 43 of 43

STP