In the Last Lecture We Studied

Different Optimization Criteria


Optimization of the drilling bit hydraulics for the better cleaning of the bottom of the hole
Internal

PDB 3063

DRILLING ENGINEERING - 2

BY . ASIF ZAMIR

Semester- MAY 2016

UNIVERSITI TEKNOLOGI PETRONAS


PETROLEUM ENGINEERING DEPARTMENT

Student should be able to:

Application of different Optimization Criteria (Practical Example)


Apply the Optimization concepts of the drilling bit hydraulics for the better cleaning of the
bottom of the hole
Internal

PDB 3063

DRILLING ENGINEERING - 2

BY . ASIF ZAMIR

Semester- MAY 2016

UNIVERSITI TEKNOLOGI PETRONAS


PETROLEUM ENGINEERING DEPARTMENT

PRACTICAL EXAMPLE
Prior to changing of bit in a 12-1/4 inch hole, the standpipe pressures listed in the table below were recorded at
different flow rates with the present bit still on bottom. Present hole depth is 6528 ft and the next bit is expected to
drill down to 8000 ft. Other relevant data are:

Present Nozzle Sizes

16/32 three

Mud Weight

8.7 ppg (65 pcf)

Current flow rate

600 gpm

Maximum allowable surface pressure

2500 psi

Internal

Determine the optimum hydraulic parameters for the next bit run, using

BHHP
IF criteria
PDB 3063

DRILLING ENGINEERING - 2

BY . ASIF ZAMIR

Semester- MAY 2016

UNIVERSITI TEKNOLOGI PETRONAS


PETROLEUM ENGINEERING DEPARTMENT

PRACTICAL EXAMPLE

Internal

PDB 3063

DRILLING ENGINEERING - 2

BY . ASIF ZAMIR

Semester- MAY 2016

UNIVERSITI TEKNOLOGI PETRONAS


PETROLEUM ENGINEERING DEPARTMENT

(1) Maximum Bit Hydraulics Horsepower (BHHP)

(2) (2) Maximum Impact Force (IF)


Internal

PDB 3063

DRILLING ENGINEERING - 2

BY . ASIF ZAMIR

Semester- MAY 2016

UNIVERSITI TEKNOLOGI PETRONAS


PETROLEUM ENGINEERING DEPARTMENT

(1) Maximum Bit Hydraulics Horsepower (BHHP)

For Actual values of n


Follow the Procedure given Below
Run mud pump at Several Pumping rate (Q)
Internal

Record corresponding surface pressures


Draw a graph Log-Pc = Ps Pbit against Log-Q

The slope of this graph is taken as the index n


PDB 3063

DRILLING ENGINEERING - 2

BY . ASIF ZAMIR

Semester- MAY 2016

UNIVERSITI TEKNOLOGI PETRONAS


PETROLEUM ENGINEERING DEPARTMENT

Nozzle Selection

The nozzle size selection can be done by using the following equations

Internal

PDB 3063

DRILLING ENGINEERING - 2

BY . ASIF ZAMIR

Semester- MAY 2016

UNIVERSITI TEKNOLOGI PETRONAS


PETROLEUM ENGINEERING DEPARTMENT

Optimum Flow Rate (Qopt)

For Example using the maximum BHHP criterion, Pc is determined from

Internal

PDB 3063

DRILLING ENGINEERING - 2

BY . ASIF ZAMIR

Semester- MAY 2016

UNIVERSITI TEKNOLOGI PETRONAS


PETROLEUM ENGINEERING DEPARTMENT

Optimum Flow Rate (Qopt)

The value of n is equal to the slope of the Pc Vs Q graph.

The optimum value of flow rate, Qopt is obtained from


the intersection of the Pc value
Internal

PDB 3063

the Pc Vs Q graph.

DRILLING ENGINEERING - 2

BY . ASIF ZAMIR

Semester- MAY 2016

UNIVERSITI TEKNOLOGI PETRONAS


PETROLEUM ENGINEERING DEPARTMENT

Internal

PDB 3063

DRILLING ENGINEERING - 2

BY . ASIF ZAMIR

Semester- MAY 2016

UNIVERSITI TEKNOLOGI PETRONAS


PETROLEUM ENGINEERING DEPARTMENT

Reference

Book : Oil Well Drilling Engineering


by
Hussain RABIA

Chapter 7
Internal

PDB 3063

DRILLING ENGINEERING - 2

BY . ASIF ZAMIR

Semester- MAY 2016

UNIVERSITI TEKNOLOGI PETRONAS


PETROLEUM ENGINEERING DEPARTMENT

Internal

PDB 3063

DRILLING ENGINEERING - 2

BY . ASIF ZAMIR

Semester- MAY 2016