Sunteți pe pagina 1din 4

PLaNILLa

total
1
2
3
4
5
6

S/.
S/.
S/.
S/.
S/.
S/.

###

4,000.00
2,000.00
5,500.00
200.00
3,500.00
1,300.00

CONCRETOS
L

NCH

LTO

# VECES

z1
Z2
Z3
Z4

0.6
0.7
1.3
1.5

0.6
0.7
1.3
1.5

0.5
0.5
0.5
0.5

4
1
10
13

z1-z4

1.5

1.5

0.5

28

vigas

144.8

0.5

0.3

119.17

0.25

0.12

COLUMNS

2.9
2.9

0.3
0.25

0.25
0.25

23
5

PLCS

2.6

0.12

1.5

144.8

0.3

119.17

0.25

COLUMN

1.1
1

2.9
2.9

23
5

PLCS

3
1.5

2.6
2.6

4
4

sobrecimiento

ENCOFRaDOS
VIGaS
SOBRECIMIENTO

fierro bases columnas placas


ladrillo 9 millares
1 millar

S/.

300.00

techo 210 m2
210 x
180 x
30 x

S/.
S/.
S/.

45.00
45.00
45.00

aVaNCE

S/.26,149.74

adeuda

S/. 9,649.74

M3

S/.xM3

S/.

0.72
0.245
8.45
14.625
24.04

70 S/. 1,682.80

31.5

70 S/.2,205.00

21.72

70 S/.1,520.40

3.5751

70 S/.

250.26

5.0025
0.90625

140 S/.
140 S/.
S/.

700.35
126.88
827.23

3.744

140 S/.

524.16

86.88

20 S/.1,737.60

59.585

20 S/.1,191.70

73.37
14.5

20 S/.1,467.40
20 S/. 290.00
S/.1,757.40
20 S/. 624.00
20 S/. 312.00
S/. 936.00

31.2
15.6

S/.4,000.00
S/.2,700.00

S/.8,500.00
S/.8,100.00
S/.1,350.00

S-ar putea să vă placă și