Documente Academic
Documente Profesional
Documente Cultură
Prestart Checklist
Verify Check
CAB
Plant Owner:
Address:
City/Suburb:
Phone:
Plant Make:
Plant Model:
HSE-INSP-0001
Issue No.: 1
Date:
Verify Check
Cleanliness
Seat Condition OK
Operator Restraint Provided
Instruments Operational & Labelled
Levers / Controls Operational
Pedals in Good Condition
ROPS AS2294
Windows / Wipers / Washers
Rear View Mirrors
Operator Instruction
(available on plant)
Form:
WARNING DEVICES
Horn
Reversing Alarm
Verify Check
Exhaust
Serial No.:
Signature:
Date:
Verify Check
Tyres
Wheels
Brakes
Park Brake
Hydraulics
Verify Check
KEEP CLEAR
Handrails
Steps
Position:
Date:
Verify Check
Verify Check
Rams
Hoses
Connections
(check for excessive wear,
leaks and creep)
Instructions:
Verify Box to be ticked by Owner / Supplier / Operator prior to arrival on site.
Check Box to be ticked after visual inspection by HSE Department
This is to certify that the plant being supplied conforms to the relevant HSE Legislation, and the requirements as detailed above. HSE Department will assess this Pre-start Checklist to ensure the supplier has verified compliance to HSE Legislative requirements and, to
register the plant onto the site. The operator will be required to participate in ongoing training and perform work in accordance with the relevant Work Method Statement. Should the plant be found to not conform to the above, then it will be prevented from
commencing work on the site until the non-compliance is rectified. HSE Management will not reimburse the Owner / Supplier / Contractor for any down / lost time so caused from the non-conformance.
This form does not remove any liability for the plant supplier to conform with the relevant HSE Legislation