Documente Academic
Documente Profesional
Documente Cultură
The graphic below shows the posting transactions for costs and revenues
form the DBM order through the CO-PA:
Warehouse
Level 1
DBM order
3 Material consumption
(goods issue)
Valuated for the moving
average price or standard
price
Sales order
Sales order
2 Activity allocation
Internal order
in
DBM Controlling
6a Internal revenues on
the basis of primary cost
repostings.
Revenues 5
5 Revenues
Billing document
Level 2
Billing document
6b Order settlement
Internal order
for each bill-to party
Internal orders
for each bill-to party
Individually or as a collective
internal order for DBM
orders
Individually or as a collective
Internal order for DBM
orders
Automatically generated
Settlement rule
Automatically generated
Settlement rule
Level 3
Profitability Analysis
Level 1: As soon as you create a DBM order, the system generates a header
internal order for DBM controlling on the first level (see number 1 in the
picture 1). With arrow 2 the costs for labor values are posted with activity
allocation. Goods issue posts the material consumption to the internal order.
You can see it with arrow 3. If work is finished, the internal order gets the
status Technically completed (number 4). All costs for labor values and parts
are parked on this internal order, till the revenues are posted. It is a necessary
assumption for analysis in controlling in general, that costs and revenues are
posted together in the relevant period. The creation of the billing documents
brings the revenues to the internal order (arrow 5). The number of billing
documents depends on the splits in the DBM order.
This enables you to examine the contribution margin on the basis of individual
orders as well as on the basis of compatible selection criteria (such as
vehicle) within Overhead Cost Controlling.
Level 3: If you want to use CO-PA, you can transfer the values to CO-PA. The
characteristics of CO-PA are provided on the basis of the settlement rule or
the standard derivation based on this (arrow 7).
This enables you to examine the contribution margin in accordance with any
information in the DBM order, that is, characteristics and their values. You can
use the full scope of functions for CO-PA reports and create your own reports
bases on drilldown reporting.
All customer, vehicle and workshop specific information known in the DBM
order, or that can be derived from the DBM order, can be transferred to the
characteristics defined in CO-PA and to a limited extent, different material
groups. To distinguish different material groups, you have to use different cost
elements for different material groups.
1 PROGRAM LOGIC
A user triggers implicit and explicit events in the DBM order, which are
converted in the Order Engine (OE) to actions, which accords to function
modules. The following chart shows the connection between user action in
DBM order and order engine action in the background (see also picture 1):
Arrow User action in
DBM order
OE-action
Button SAVE
ORD_SAVE
INT_ORD_CREAT
E
Button
CONFIRMATION
CONFIRM
CBOOK_WORK
Button GOODS
ISSUES
GDSMVT_CR
EATE
GDSMVT_CREAT
E
Button CONFIRM
COMPLETION
L/P
ORD_T_CONF TECH_CONF
L/P
ORD_T_CONF TECH_CONF_IO
L/P
SD_ORD_CR
INTORD_CREATE
_RE
L/P
SD_ORD_CR
CREATE_ORD_G
ROUP
6a/
6b
L/P
SD_ORD_CR
INT_BILL_VIA_CO
L/P
SD_ORD_CR
CRE_SETTLE_RU
LE
L/P
SD_ORD_CR
REPOST_LINE_IT
EM
4
5
Chart 3
Button BILLING
DOCUMENT
Order engine actions are nothing else, than function modules. This is
described in the following chart (see also picture 1):
Arrow OE-action
Function module
INT_ORD_CREATE
/DBM/ORD_AC_INTORD_CREATE
CBOOK_WORK
/DBM/CO_ACT_LBR_COST_BOOK
GDSMVT_CREATE
/DBM/ORD_AC_CO_MSG_BUFFER_CLEA
/DBM/ORD_AC_GOODSMVMNT_CREATE
TECH_CONF
/DBM/ORD_AC_TECHREADY_MAINTAIN
TECH_CONF_IO
/DBM/CO_ACT_INT_ORDER_SET_TABG
INTORD_CREATE_RE
/DBM/CO_ACT_CREATE_ORDER_RE
CREATE_ORD_GROUP
/DBM/CO_ACT_CREATE_ORDER_GROUP
6a/
6b
INT_BILL_VIA_CO
/DBM/CO_ACT_INT_BILL_VIA_CO
CRE_SETTLE_RULE
/DBM/CO_ACT_CREATE_SETTLE_RULE
REPOST_LINE_ITEM
/DBM/CO_ACT_REPOST_LINE_ITEM
Chart 4