Sunteți pe pagina 1din 11

(DEFORMED BARS)

(DEFORMED BARS)

4.50

4.50

4.50

4.50

EXISTING
PAVEMENT

DETAIL "B"

CONCRETE PAVEMENT

3.05 m.
WIDENING

1.50 m.

CONTRACTION JOINTS WITH DOWEL BARS(PLAIN BAR)


(L=600mm, Dia. 36mm)

0.50

0.50
0.50

SPACED @ 2.0m HOR.& 1.0m VERT.,


STAGGERED

1:24

SPACED @ 2.0m HOR.& 1.0m VERT.,


STAGGERED

DETAIL " A " (GROUTED RIPRAP)

SCALE

NTS

NATURAL GROUND

NATURAL GROUND

CONCRETE PAVEMENT

EXISTING
PAVEMENT

0.50

0.60 min.

0.60 min.

NATURAL GROUND

0.60 min.
1.00 m.
min.

B=0.57H

1.00 m.
min.

B=0.57H

0.50
0.50

B=0.57H

1.00

SPACED @ 2.0m HOR.& 1.0m VERT.,


STAGGERED

1.00
0.50

1.50 m.

3.05 m.
WIDENING

EXPANSION JOINT

1.60
0.50

0.30

0.50

0.50
SPACED @ 2.0m HOR.& 1.0m VERT.,
STAGGERED

"A"

W/ FILTER CLOTH
SPACED @ 2.0m HOR.
& 1.0m VERT., STAGGERED

0.50

0.30
"A"

0.50

SEE DETAILS OF
CONCRETE LINED CANAL

0.50
1.60

0.50

0.50

0.50

TOP OF SHOULDER

DETAIL " B " (GROUTED RIPRAP)


SCALE

NTS

CONTRACTION JOINTS WITH DOWEL BARS(PLAIN BAR)


(L=600mm, Dia. 36mm)
2000
1000

4.50

4.50

4.50

FILTER CLOTH TIED AT


INNER END OF

1000

4.50

PVC WEEPHOLES
(DEFORMED BARS)
500

(DEFORMED BARS)

2.0m

1.0m
1:24

1.0m

500

1000

EXPANSION JOINTS AT 90.00m

300

500

CLOTH SPACED @ 2.00M. HOR.


& 1.00M. VERT., STAGGERED

0.57H

SECTION "A" - "A"


SCALE

NTS

Dia. 36mm DOWEL BARS (PLAIN BAR)


RED LEAD AND GREASED OR BITUMEN COATED

L = 600mm
EXISTING STONE MASONRY

300mm

3.05
PROPOSED
WIDENING

1.50
SHOULDER

3.05
PROPOSED
WIDENING

EXISTING PCCP

1.50
SHOULDER

T/2

SAWED CUT Depth = T/4

50

150

50 100 50

150

50
METAL DOWEL CAP GAUGE No. 18
TO BE PLACED ON EACH DOWEL BAR
ON ALTERNATE END
(FOR EXPANSION JOINTS ONLY)

T/2

T = SLAB DEPTH

300mm

s%

s%

1.529%

Outlet Elevation = 34.02

Invert Elevation = 34.15

ITEM 311(1)a PCCP (PLAIN), t = 0.30m.


ITEM 200 AGGREGATE SUBBASE COURSE, t = 0.35m.

Inlet Elevation = 34.28

ITEM 311(1a) PCCP (PLAIN), t = 0.15m. (SHOULDER)

SPACING OF DOWEL BAR


(Diameter 36mm / L=600mm)
SLAB DEPTH, (T)
(mm)

SPACING
(mm)

280

300

290

295

300

274

310

255

320

238

330

223

340

209

PROJECT/LOCATION :

OFFICE OF THE REGIONAL DIRECTOR


REGION 02 - CAGAYAN VALLEY REGION
TUGUEGARAO CITY

SCALE

SHEET CONTENTS :

DESIGNED:

REVIEWED:

NTS

SUBMITTED:

RECOMMENDING APPROVAL:

REVIEWED (As presented):

RECOMMENDING APPROVAL:

APPROVED:

SET NO.

L. B. BANATAO K. V. YADAO D. M. BALISI

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

TYPICAL ROADWAY SECTION ( WITH EXISTING RCCP)

ENGINEER II

NETWORK DEVELOPMENT: WIDENING OF NATIONAL ROAD 1 (N1) /


DAANG MAHARLIKA / ASIAN HIGHWAY 26
Ilagan, Isabela
K0398+691- K0400+012; K0401+853-K0405+155; K0407+000-408+797
(w/ exceptions)
Net Length = 5,788.89 m.

ENGINEER II

ENGINEER II

(NOTE: SEE COVER SHEET FOR SIGNATURE)

ADRIANO M. DOROY

DRAWN:

TYPICAL PLAN OF ADDITIONAL LANE PAVEMENT


B. CONAG C.C. MALLILLIN
TYPICAL PLAN & DETAILS OF EXTENDED RCCP K. R. LASQUERO D.E-ASSISTANT
E-ASSISTANT
E-ASSISTANT
DETAILS OF STONE MASONRY & SLOPE
CHECKED:
PROTECTION, PARAPET AND APRON
EPIFANIO M. DE GUZMAN
ENGINEER III

CECIL M. SANTOS

ZOISIMO L. BALISI

ENGINEER III

CHIEF, PLANNING AND DESIGN DIVISION

DATE :

DATE :

NERIE D. BUENO, CESO IV


OIC-REGIONAL DIRECTOR
DATE :

DANILO L. BALISI
CHIEF, HIGHWAY DIVISION, BOD
DATE :

DIRECTOR III
OFFICER-IN-CHARGE
DATE :
(NOTE: SEE COVER SHEET FOR SIGNATURE)

WALTER R. OCAMPO
DIRECTOR IV
OFFICER-IN-CHARGE FOR TECHNICAL SERVICES
DATE :

(NOTE: SEE COVER SHEET FOR SIGNATURE)

PDD
ROGELIO L. SINGSON
SECRETARY
DATE :

ISABELA

HDS

SHT NO.

20m

width = 0.10 m.

WIDENING

width = 0.10 m.

WIDENING

3.05

EDGE OF PAVEMENT ( WHITE )

spaced @ 6.0 m.

6.0 m

3.05
3.05

3.500

EXISTING
ROADWAY

EXISTING
ROADWAY

width = 0.15 m.
Length = 3.0m.

A'

3.000

A'

3.000

width = 0.15 m.
6.70

6.70

SEPARATION LINE ( WHITE )


EXISTING
ROADWAY

EXISTING
ROADWAY

spaced @ 6.0 m.

6.0 m

75
5

width = 0.15 m.
5

WIDENING

WIDENING

3.05

Length = 3.0m.

100

300

3.05

width = 0.10 m.
width = 0.10 m.

EDGE OF PAVEMENT ( WHITE )

Stop line for vehicles


w= 0.15m

Edge of Pavement

2.00m

width = 0.10 m.

2.00m

1.50m

Edge of Pavement

30.0m

Rumble strips

(white)

0.10

0.10

0.10 m.

width = 0.15 m.
0.30m

width = 0.15 m.

width = 0.15 m.

(white)

0.15

0.15

0.150

Rumble strips

width = 0.15 m.
width = 0.10 m.

Edge of Pavement

0.10
(white)

30.0m

1.50m

2.00m

2.00m
Edge of Pavement

Stop line for vehicles


w= 0.15m

PROJECT/LOCATION :

SHEET CONTENTS :

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE REGIONAL DIRECTOR
REGION 02 - CAGAYAN VALLEY REGION
TUGUEGARAO CITY

DESIGNED:

REVIEWED:

SUBMITTED:

RECOMMENDING APPROVAL:

REVIEWED (As presented):

RECOMMENDING APPROVAL:

APPROVED:

SET NO.

L. B. BANATAO K. V. YADAO D. M. BALISI

REPUBLIC OF THE PHILIPPINES

ENGINEER II

NETWORK DEVELOPMENT: WIDENING OF NATIONAL ROAD 1 (N1) /


DAANG MAHARLIKA / ASIAN HIGHWAY 26
Ilagan, Isabela
K0398+691- K0400+012; K0401+853-K0405+155; K0407+000-408+797
(w/ exceptions)
Net Length = 5,788.89 m.

ENGINEER II

ENGINEER II

(NOTE: SEE COVER SHEET FOR SIGNATURE)

ADRIANO M. DOROY

DRAWN:

DETAILS OF PAVEMENT MARKING


AND RUMBLE STRIPS

K. R. LASQUERO D. B. CONAG
E-ASSISTANT

C.C. MALLILLIN

E-ASSISTANT

CHECKED:
EPIFANIO M. DE GUZMAN
ENGINEER III

E-ASSISTANT

CECIL M. SANTOS

ZOISIMO L. BALISI

ENGINEER III

CHIEF, PLANNING AND DESIGN DIVISION

DATE :

DATE :

NERIE D. BUENO, CESO IV


OIC-REGIONAL DIRECTOR
DATE :

DANILO L. BALISI
CHIEF, HIGHWAY DIVISION, BOD
DATE :

DIRECTOR III
OFFICER-IN-CHARGE
DATE :
(NOTE: SEE COVER SHEET FOR SIGNATURE)

WALTER R. OCAMPO
DIRECTOR IV
OFFICER-IN-CHARGE FOR TECHNICAL SERVICES
DATE :

(NOTE: SEE COVER SHEET FOR SIGNATURE)

PDD
ROGELIO L. SINGSON
SECRETARY
DATE :

ISABELA

HDS

SHT NO.

WHEEL GUARD
PAVED SHOULDER

SEE DETAILS OF
WHEEL GUARD WINDOW

BAR BENDING DIAGRAM OF CONCRETE U-DITCH

600

EDGE OF SHOULDER

150

TOP OF SHOULDER

600

150

TOP OF SHOULDER

150

SUBGRADE LEVEL

150

200

100mm

200mm

50

100

800

WHEEL GUARD
3

650

100

1000

1000

800
600

600mm

INVERT ELEVATION

FOUNDATION FILL, 0.10 m THICK

50

150
100

100

100

100

900

100

100

100

100

DETAIL OF REINFORCED CONCRETE


LINED CANAL ( OPEN )

DETAIL OF REINFORCED CONCRETE


LINED CANAL ( OPEN )
SCALE

150

SCALE

NTS

NTS

TOP OF WHEELGUARD
TOP OF SHOULDER
200mm
80

3.00m

200mm

SCHEDULE OF REINFORCEMENT PER ONE METER STRIP (H=600mm. )


(FOR WITHOUT COVER)

80
200mm

5mm
GROUT

150

BAR TYPE

730

120

490

600

30

50

TOTAL LENGTH
(m.)

UNIT
WEIGHT
(kg/m)

4.00

2300

9.200

0.617

5.676

2.00

1000

2.000

0.617

1.234

6.00

1000

6.000

0.617

3.702
10.612

TOTAL

500

TOTAL
WEIGHT
(kg)

150

LENGTH
(mm.)

2
3

25
50

NO. OF PIECES

120

400

BAR SIZE

100
FOUNDATION FILL, 0.10 m THICK
150

600

ESTIMATE OF QUANTITIES PER METER (H=600mm.)

150

GROUT
5mm

900

ITEM

DETAIL OF REINFORCED CONCRETE


LINED CANAL WITH CONCRETE COVER
SCALE

UNIT

QUANTITY

kg

10.612

DETAIL OF REINFORCED CONCRETE COVER


SCALE

NTS

NTS

CLASS "A" CONCRETE

0.345

REINFORCING STEEL
GRANULAR GRAVEL BASE

BAR BENDING DIAGRAM OF CONCRETE U-DITCH

BAR BENDING DIAGRAM OF CONCRETE L.C (w/ cover)

0.055

100

152

152

152

152

650
1000

SCHEDULE OF REINFORCEMENT PER ONE METER STRIP (H=600mm.)


(FOR COVERED TYPE)

1000

370

420

630

650

100

152

800

152

800

1000

BAR TYPE

800

SCHEDULE OF REINFORCEMENT PER ONE METER STRIP (H=600mm. )


(ATTACHED ON STONE MASONRY)
150

600

150

150

600

150
50

100

600

600mm

INVERT
ELEVATION

BAR TYPE

BAR SIZE

LENGTH
(mm.)

NO. OF PIECES

TOTAL LENGTH
(m.)

UNIT
WEIGHT
(kg/m)

TOTAL
WEIGHT
(kg)

4.00

2300

9.200

0.617

5.676

2.00

1000

2.000

0.617

1.234

5.00

1000

5.000

0.617

BAR SIZE

NO. OF PIECES

LENGTH
(mm.)

TOTAL LENGTH
(m.)

UNIT
WEIGHT
(kg/m)

TOTAL
WEIGHT
(kg)

10

934

9.34

1.578

14.739

724

2.896

1.578

4.570

674

4.044

1.578

6.381

10

1000

10.00

0.888

8.880

2600

10.40

0.888

9.235

5
TOTAL

43.805

ESTIMATE OF QUANTITIES PER METER (H=600mm.)

3.085

ITEM

UNIT

QUANTITY

kg

43.805

9.995

TOTAL

CLASS "A" CONCRETE


150

150

REINFORCING STEEL

ESTIMATE OF QUANTITIES PER METER (H=600mm.)

DETAIL OF REINFORCED CONCRETE


LINED CANAL ON STONE MASONRY
SCALE

ITEM

UNIT

QUANTITY

CLASS "A" CONCRETE


REINFORCING STEEL

kg

0.345
9.995

NTS

PROJECT/LOCATION :

SHEET CONTENTS :

OFFICE OF THE REGIONAL DIRECTOR


REGION 02 - CAGAYAN VALLEY REGION
TUGUEGARAO CITY

DESIGNED:

REVIEWED:

SUBMITTED:

RECOMMENDING APPROVAL:

REVIEWED (As presented):

RECOMMENDING APPROVAL:

APPROVED:

SET NO.

L. B. BANATAO K. V. YADAO D. M. BALISI

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

0.10

FOUNDATION FILL

50

900

0.454

ENGINEER II

NETWORK DEVELOPMENT: WIDENING OF NATIONAL ROAD 1 (N1) /


DAANG MAHARLIKA / ASIAN HIGHWAY 26
Ilagan, Isabela
K0398+691- K0400+012; K0401+853-K0405+155; K0407+000-408+797
(w/ exceptions)
Net Length = 5,788.89 m.

ENGINEER II

ENGINEER II

(NOTE: SEE COVER SHEET FOR SIGNATURE)

ADRIANO M. DOROY

DRAWN:

DETAILS OF CONCRETE LINED


CANAL

K. R. LASQUERO D. B. CONAG
E-ASSISTANT

C.C. MALLILLIN

E-ASSISTANT

CHECKED:
EPIFANIO M. DE GUZMAN
ENGINEER III

E-ASSISTANT

CECIL M. SANTOS

ZOISIMO L. BALISI

ENGINEER III

CHIEF, PLANNING AND DESIGN DIVISION

DATE :

DATE :

NERIE D. BUENO, CESO IV


OIC-REGIONAL DIRECTOR
DATE :

DANILO L. BALISI
CHIEF, HIGHWAY DIVISION, BOD
DATE :

DIRECTOR III
OFFICER-IN-CHARGE
DATE :
(NOTE: SEE COVER SHEET FOR SIGNATURE)

WALTER R. OCAMPO
DIRECTOR IV
OFFICER-IN-CHARGE FOR TECHNICAL SERVICES
DATE :

(NOTE: SEE COVER SHEET FOR SIGNATURE)

PDD
ROGELIO L. SINGSON
SECRETARY
DATE :

ISABELA

HDS

SHT NO.

200
100
51

100
51
d

131

1700

50

1470

3810

1470

3810

1700

362

131

1000

230

50

10

230

10

230

700

200

GENERAL NOTES:
MATERIALS AND WORKMANSHIP SHALL COMPLY WITH STANDARD SPECIFICATIONS FOR HIGHWAYS AND
BRIDGES REVISED 2013.

159
318
200

509
100

59

50

76

262

254

200

200

GAUGE OF FLEX-BEAM GUADRAIL SHALL BE AS INDICATED IN PLAN & SPECIFICATIONS.

100

262

200

WHEN CONCRETE POST ARE USED, IT SHALL CONFORM WITH THE REQUIREMENTS OF CLASS "C"
CONCRETE, ITEM NO. 405 (3) AND REINFORCING STEEL SHALL CONFORM WITH REQUIREMENTS OF
REINFORCING STEEL, ITEM NO. 404.

59
50

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.

ALL NUTS SHALL BE WELDED TO THE BOLTS AFTER TIGHTENING.


HOLES TO BE PROVIDED FOR BOTH THE FLEX BEAM AND CONCRETE POST MUST BE FITTED FOR THE

DETAIL OF STANDARD FLEX-BEAM GUARDRAIL


SCALE

NTS

500mm
CONCRETE CURB
CONCRETE GUTTER

500mm

210mm
360mm

W4 - 1

150mm
360mm

100mm

300mm

100mm

150mm

150mm

100mm

100mm

100mm

NUTS & WASHER

170mm

CONCRETE CURB

W4 - 2

CONCRETE GUTTER
s=8%

WHITE BACKGROUND
RED CHEVRON SYMBOLS

210mm

600

600

360mm

150mm

670mm
670mm
NGL

170mm

10mm PREFORMED JOINT FILLER

25mm
s%

8%

210mm

NOTE:
1. MATERIAL AND CONSTRUCTION REQUIREMENTS SHALL CONFORM TO DPWH STANDARD
SPECIFICATION FOR HIGHWAYS AND BRIDGES (2013).
2. USE OF MONOFILAMENT POLYPROPYLENE SYNTHETIC FIBERS (D.O. 95, SERIES 2005) AS ADDITIVE TO
CONCRETE MIX.
3. CONCRETE CURB AND GUTTER SHALL BE CONSIDERED IN THE DESIGN OF PAVED ROADS IF THE
FUNCTION IS TO FACILITATE THE CHANNELING OF SURFACE WATER RUN-OFF THUS PREVENTING THE
EROSION OF SHOULDER AND SLOPE.

600
PIPE POST
PAINTED W/
REFLECTORIZED
SUNSHINE YELLOW
W/ RED LEAD
BASE PAINT

W4 - 1

NUTS & WASHER

PAINTED W/ REFLECTORIZED
SUNSHINE YELLOW W/ RED
LEAD BASE PAINT

360mm

100mm

1 12 ' x 61 ' G.I. FLAT BAR

300mm x 300mm CONC. POST

150mm

100mm

250mm

NOTE :
CONCRETE CLASS "A"

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED.


2. LATERAL OFFSET (LO).
3. TWO (2) ADJACENT CHEVRON ALIGNMENT ON ONE (1) G.I. PIPE POST.

PROPOSED CURB & GUTTER


ITEM 311(1): PCC PAVEMENT (PLAIN), 300mm THICK
ITEM 201: AGGREGATE BASE COURSE,100mm THICK

DETAIL OF INSTALLATION OF ROAD SIGN


SCALE

PROJECT/LOCATION :

SHEET CONTENTS :

OFFICE OF THE REGIONAL DIRECTOR


REGION 02 - CAGAYAN VALLEY REGION
TUGUEGARAO CITY

REVIEWED:

SUBMITTED:

RECOMMENDING APPROVAL:

REVIEWED (As presented):

RECOMMENDING APPROVAL:

APPROVED:

SET NO.

L. B. BANATAO K. V. YADAO D. M. BALISI

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

DESIGNED:

NTS

ENGINEER II

NETWORK DEVELOPMENT: WIDENING OF NATIONAL ROAD 1 (N1) /


DAANG MAHARLIKA / ASIAN HIGHWAY 26
Ilagan, Isabela
K0398+691- K0400+012; K0401+853-K0405+155; K0407+000-408+797
(w/ exceptions)
Net Length = 5,788.89 m.

DETAILS OF GUARDRAIL
DETAIL OF ROAD SIGN
DETAIL OF CURB & GUTTER

ENGINEER II

ENGINEER II

(NOTE: SEE COVER SHEET FOR SIGNATURE)

ADRIANO M. DOROY

DRAWN:
K. R. LASQUERO D. B. CONAG
E-ASSISTANT

C.C. MALLILLIN

E-ASSISTANT

CHECKED:
EPIFANIO M. DE GUZMAN
ENGINEER III

E-ASSISTANT

CECIL M. SANTOS

ZOISIMO L. BALISI

ENGINEER III

CHIEF, PLANNING AND DESIGN DIVISION

DATE :

DATE :

NERIE D. BUENO, CESO IV


OIC-REGIONAL DIRECTOR
DATE :

DANILO L. BALISI
CHIEF, HIGHWAY DIVISION, BOD
DATE :

DIRECTOR III
OFFICER-IN-CHARGE
DATE :
(NOTE: SEE COVER SHEET FOR SIGNATURE)

WALTER R. OCAMPO
DIRECTOR IV
OFFICER-IN-CHARGE FOR TECHNICAL SERVICES
DATE :

(NOTE: SEE COVER SHEET FOR SIGNATURE)

PDD
ROGELIO L. SINGSON
SECRETARY
DATE :

ISABELA

HDS

SHT NO.

BH-1 STA 402+500


THICKNESS

BH-7 STA 408+000(R/S)


CBR

BH-2 STA 404+250


THICKNESS

THICKNESS

CBR

BH-8 STA 408+000 (L/S)


CBR

THICKNESS

CBR

BH-3 STA 404+500


THICKNESS

CBR

BH-4 STA 404+750


THICKNESS

CBR

BH-5 STA 407+750


THICKNESS

CBR

PROJECT/LOCATION :

SHEET CONTENTS :

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE REGIONAL DIRECTOR
REGION 02 - CAGAYAN VALLEY REGION
TUGUEGARAO CITY

DESIGNED:

REVIEWED:

SUBMITTED:

RECOMMENDING APPROVAL:

REVIEWED (As presented):

RECOMMENDING APPROVAL:

APPROVED:

SET NO.

L. B. BANATAO K. V. YADAO D. M. BALISI

REPUBLIC OF THE PHILIPPINES

ENGINEER II

NETWORK DEVELOPMENT: WIDENING OF NATIONAL ROAD 1 (N1) /


DAANG MAHARLIKA / ASIAN HIGHWAY 26
Ilagan, Isabela
K0398+691- K0400+012; K0401+853-K0405+155; K0407+000-408+797
(w/ exceptions)
Net Length = 5,788.89 m.

ENGINEER II

ENGINEER II

(NOTE: SEE COVER SHEET FOR SIGNATURE)

ADRIANO M. DOROY

DRAWN:

BORELOG
PAVEMENT DESIGN PARAMETERS

K. R. LASQUERO D. B. CONAG
E-ASSISTANT

C.C. MALLILLIN

E-ASSISTANT

CHECKED:
EPIFANIO M. DE GUZMAN
ENGINEER III

E-ASSISTANT

CECIL M. SANTOS

ZOISIMO L. BALISI

ENGINEER III

CHIEF, PLANNING AND DESIGN DIVISION

DATE :

DATE :

NERIE D. BUENO, CESO IV


OIC-REGIONAL DIRECTOR
DATE :

DANILO L. BALISI
CHIEF, HIGHWAY DIVISION, BOD
DATE :

DIRECTOR III
OFFICER-IN-CHARGE
DATE :
(NOTE: SEE COVER SHEET FOR SIGNATURE)

WALTER R. OCAMPO
DIRECTOR IV
OFFICER-IN-CHARGE FOR TECHNICAL SERVICES
DATE :

(NOTE: SEE COVER SHEET FOR SIGNATURE)

PDD
ROGELIO L. SINGSON
SECRETARY
DATE :

ISABELA

HDS

SHT NO.