Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
No.
LIST OF CONTENTS
Qty.
Unit
Dim.
Weight
HxWxD
Net
Unit Price
Total Price
Unit Price
kg
UYU / USD
UYU / USD
UYU / USD
Page
GENERAL COMMENTS
PRICE SUMMARY
11
14
33
851 - INSTRUMENTATION
35
43
44
Erection
Equipment
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
No.
GENERAL COMMENTS
Enclosed "Bill of Quantity" covers the amount of Electrical Equipment, which
has to be handled and erected during the construction of mentioned Cement Plant
project.
The "Bill of Quantity" is preliminary and the amounts are not limited to listed.
Preamble for the erection work is described for each group of equipment.
Equipment to be erected, fitted and aligned by Mechanical Contractor is
shown grey shaded and marked by MC in Info column. This equipment is
only listed for information.
It is the same for activities, which the Civil Contractor, CC, is in charge of.
See also the document "Borderline Activities" describing interfaces to other
Contractors.
The quantities listed under Dept. 891, "Single Machines" shall be erected
on the respective machines and the amount of equipment, cables and cable
termination's are additional quantities to listed quantities in i.e. 831 Installation
Equipment.
Unit erection prices for each item shall be filled-in at the green shaded cells (see right).
Please notice that total prices and summary will be calculated automatically based on
filled-in unit price and quantity.
Unit prices for equipment and materials to be supplied by the Electrical Contractor
shall be filled-in at the yellow shaded cells (see right).
Please notice that total prices and summary will be calculated automatically based on
filled-in unit price and quantity.
Qty.
Unit
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
No.
Qty.
Unit
Dim.
Weight
HxWxD
Net
Unit Price
Total Price
Unit Price
kg
UYU / USD
UYU / USD
UYU / USD
31.5 kV
6.3 kV
400 V
230 V
24 VDC
230 V
50 Hz
Site Conditions:
- Max. ambient temperature :
40 deg.C
31 deg.C
5 deg.C
40 deg.C
0 %
120 meters
IEC
Erection
Equipment
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
No.
Qty.
Unit
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
kg
UYU / USD
UYU / USD
UYU / USD
PRICE SUMMARY
Erection
811
821
831
INSTALLATION EQUIPMENT
Cable System
27,930
98,143
Lighting System
841
CONTROL EQUIPMENT
851
INSTRUMENTATION
861
871
891
SINGLE MACHINES
Weigh Feeders
Hydraulic and Lubrication Units
Dedusting Filters
Burner Stations
Grand Total
4,430
19,557
Equipment
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
811
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
811.MV220
1 set
MV Switchgears
Cubicles
Cubicles
MV Switchgears
The requested unit price for the erection (unit price = total price)
for below listed switchgears shall comprise:
- transport from storage to relevant substation
- erect and align each panel according to lay-out and instruction
- ensure proper tightened bus bar system to next panel(s)
- re-termination of dismantled internal cables
- test and commissioning assistance
Unit
MV Main Switchgear 801MV100
0 N/A
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Dim.
Weight
HxWxD
Net
Unit Price
kg
UYU / USD
Qty.
Unit
Cubicles
pcs
2.2x0.8x1.5
500
pcs
2.2x0.8x1.5
700
pcs
2.2x0.8x1.5
700
units
1.2x1.2x0.6
No.
MV Substation Switchgear 490MV300
Erection
Equipment
Total Price
Unit Price
UYU / USD
UYU / USD
0 N/A
0 N/A
811.LV230
400
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
Distribution Transformers
units
Distribution Transformers
The requested unit price for the erection shall comprise:
- transport from storage to relevant transformer cell
- ensure correct location and alignment in the cell
- fit and re-terminate dismantled items and cables, if any
- checking of transformer oil, if required
- test and commissioning assistance
Unit
811.LV530
pcs
LV Switchgears/MCC
boards
1.8x1.1x1.8
3.090
0 N/A
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Info
LV Switchgears
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
2.2x7.0x0.5
7.600
LV-switchgear/MCC
The requested unit price for the erection shall comprise:
- transport from storage to relevant substation
- assembling of transport sections
- erect and align each panel according to lay-out and instruction
- ensure proper tightened bus bar system
- re-termination of dismantled internal cables
- test and commissioning assistance
LV-switchgear consisting of:
Unit
LV-switchgear/MCC 401LV100
installed in coal mill substation 491
pcs
0 N/A
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
units
pcs
No.
LV Capacitor Banks
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
2.2x1.0x0.5
500
Total
0 N/A
0
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
sets
set
pcs
1.8x1.0x0.6
700
pcs
1.8x1.2x0.6
1.500
pcs
1.0x1.0x0.2
50
UPS System
with rack mounted batteries installed in cabinet.
The requested unit price for the erection shall comprise:
- transport from storage to relevant electrical room
- erect and align each panel according to lay-out and instruction
- re-termination of dismantled internal cables
- test and commissioning assistance
811.UP620
0 N/A
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
821
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
motors
MC
MV Capacitor Bank
pcs
motor
drives
drive
1.0x0.5x0.5
620 kg
0 N/A
0 N/A
3470 kg
MC
-
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Dim.
Weight
HxWxD
Net
Unit Price
Total Price
Unit Price
kg
UYU / USD
UYU / USD
UYU / USD
Qty.
Unit
pcs
LV Frequency Converter
pcs
1.6x0.6x0.5
1240 kg
pcs
1.4x0.8x1.2
1810 kg
drives
drive
pcs
LV Frequency Converter
pcs
50
LV Frequency Converter
pcs
135
LV Frequency Converter
pcs
540
64
motors
No.
m
MC
Preamble
Erection
Equipment
3400 kg
MC
0 N/A
LV Motors
- transport from storage to motor foundation
- erect and align motor and coupling to the related machine
The requested unit price for electrical erection shall comprise:
- electrical test and commissioning assistance
MC
11
pcs
0 N/A
MC
LV-SC Motors,
12
pcs
0 N/A
MC
LV-SC Motors, 11 - 30 kW
21
pcs
0 N/A
MC
LV-SC Motors, 37 - 90 kW
pcs
0 N/A
MC
13
pcs
0 N/A
MC
pcs
0 N/A
3 - 7.5 kW
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
10
actuator
pcs
Control box
pcs
pcs
No.
Motor-Operated Actuators
Preamble
MC
-
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
0.6x0.4x0.2
30
Actuators
- transport from storage to motor foundation
- erect and align motor and coupling to the related machine
The requested unit price for electrical erection shall comprise:
- installation of control box
- test and commissioning assistance
MC
MC
0 N/A
0 N/A
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
No.
831
Unit
Dim.
Weight
HxWxD
Net
Unit Price
Total Price
Unit Price
kg
UYU / USD
UYU / USD
UYU / USD
INSTALLATION EQUIPMENT
CABLE INSTALLATION
Preamble
Total
Cable Installation
The below listed amount of cables are foreseen to be used for
the following installation works:
- MV power distribution system, motors and drives
- LV power distribution system, motors and drives
- Field Control and Instrumentation
Cable Laying Distribution:
The average unit price (price/meter) for pulling and fixation of
cables shall be based on to the following distribution of installation
conditions:
Cable Racks
HT cables:
MV cables:
80 %
90 %
85 %
Control cables:
Signaling cables:
Imbedded Pipes
Conduit
100 %
80 %
80 %
20 %
5%
10 %
10 %
10 %
5%
5%
10 %
10 %
Cable Fixation
Cables laying on cable racks shall be proper arranged and fixed by
cable straps.
Cable Terminations:
Number of cable cuts are listed at "Info" and number of
terminations (two/cut) at "Qty" for each type of cable.
Unit price for cable termination shall be based on the
following termination method:
- MV-cables: - termination with MV termination kits and cable lugs
- LV-cables (? 6 mm2): - termination with cable lugs
- LV-cables (? 4 mm2): - termination in terminals
- Control and signal cables: - termination in terminals
Cable Numbering
Cable number labels shall be fitted at both cable-ends on all cables.
Erection
Equipment
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
831.CB020
Total
705
5,931
3 x 70 RM/16 cable
Cable terminations
3 x 95 RM/16 cable
210
Cable terminations
14
pcs
495
12
pcs
1,425
4,506
0 N/A
0 N/A
0 N/A
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Total
Qty.
Unit
14,781
No.
831.CB030
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
15,285
42
4 x 2.5 RE cable
Cable terminations
40
4 x 4 RE cable
Cable terminations
4 x 6 RM cable
Cable terminations
5 x 2,5 RE cable
Cable terminations
5 x 4 RE cable
Cable terminations
5 x 10 RM cable
Cable terminations
5 x 25 RM cable
Cable terminations
5 x 35 RM cable
Cable terminations
5 x 95 RM cable
Cable terminations
3 x 2,5 RE cable
Cable terminations
3 x 35 SM/1G16 RM cable
Cable terminations
13,680
3,800
84
pcs
3,550
80
pcs
670
12
pcs
100
pcs
100
pcs
100
pcs
120
pcs
500
16
pcs
100
pcs
200
pcs
100
pcs
889
1,087
287
28
37
78
202
1,302
584
81
160
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
3 x 50 SM/1G25 RM cable
300
pcs
No.
4
Cable terminations
9
3 x 70 SM/1G35 RM cable
Cable terminations
3 x 95 SM/1G50 RM cable
Cable terminations
11
10
1,017
18
pcs
220
pcs
200
Cable terminations
pcs
4 x 10 RM/10 cable
845
Cable terminations
22
pcs
4 x 16 RM/16 cable
990
Cable terminations
18
pcs
4 x 25 RM/25 cable
768
Cable terminations
20
pcs
110
Cable terminations
pcs
3 x 70 SM/35 cable
187
Cable terminations
10
pcs
Cable terminations
204
12
pcs
1 x 240 RM cable
Cable terminations
Weight
Net
kg
Erection
Unit Price
UYU / USD
563
2,652
783
1,074
521
901
921
Equipment
Total Price
Unit Price
UYU / USD
UYU / USD
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
501
3 x 35 RM/16 cable
Dim.
HxWxD
198
517
950
600
600
20
pcs
1,470
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
831.CB040
Total
17,877
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
3,352
220
3 x 1.5 RE cable
Cable terminations
33
4 x 1.5 RE cable
pcs
2,642
66
pcs
5 x 1.5 RE cable
70
pcs
7 x 1.5 RE cable
Cable terminations
440
Cable terminations
Cable terminations
4
14,935
14 x 1.5 RE cable
Cable terminations
100
pcs
200
10
pcs
2,615
602
17
29
89
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Total
Signaling Cables (C )
Qty.
Unit
No.
831.CB050
37,517
Dim.
Weight
HxWxD
Net
Unit Price
Total Price
Unit Price
kg
UYU / USD
UYU / USD
UYU / USD
3,362
14,640
933
286
pcs
Erection
Equipment
143
1x2x1 + 1 RM cable
Cable terminations
220
1x4x1 + 1 RM cable
Cable terminations
100
10
4x2x1 + 1 RM cable
440
pcs
2,590
Cable terminations
200
pcs
8x2x1 + 1 RM cable
889
20
pcs
Cable terminations
5
19,198
1,632
427
254
116
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
200
10
pcs
lot
28 N/A
N/A
lot
35 N/A
N/A
lot
200 N/A
N/A
Info
MV Termination Kits
for MV power cables, heat shrinking type
831.CB110
Info
Cable Lugs
for power cables ? 6 mm2, press tool erection
831.CB120
Info
Total
Cable System
27,930
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
Total
5,290
18,333
3,700
8,510
0 N/A
212
868
0 N/A
50
480
0 N/A
Brick Wall
Concrete
50 %
30 %
20 %
60 %
30 %
10 %
90 %
10 %
80 %
10 %
10 %
80 %
10 %
10 %
100 %
100 %
50 %
30 %
80 %
20 %
20 %
Erection
Vertical distance between parallel running rack system containing
cables for different voltage level shall be a least 300 mm.
The cables shall be separated according to the following voltage
levels:
- Communication cables (Y) - top level
- Signal cables (C )
- EX-zones cables (I)
- Control cables (M)
- LV power cable (W)
- MV power cable (H) - bottom level
Cable Tray, width: 100 mm
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
574
2,412
0 N/A
238
1,033
0 N/A
307
1,441
0 N/A
209
1,074
0 N/A
900
1,125
0 N/A
26
100
0 N/A
26
100
0 N/A
200
615
0 N/A
50
230
0 N/A
25
115
0 N/A
50
230
0 N/A
2,310
Cable racks installed outdoor or places with risk for cable damage
shall be protected by covers.
831.CM220
Total
Steel Conduits
492
102
173
0 N/A
Steel Conduit: 48 mm
390
2,137
0 N/A
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Total
Qty.
Unit
No.
831.CM230
7,700
Dim.
Weight
HxWxD
Net
Unit Price
Total Price
Unit Price
kg
UYU / USD
UYU / USD
UYU / USD
38,500
38,500
Erection
Equipment
831.CM250
Total
Accessories
Info
Cable Binders
7,700
39
tonnes
N/A
39000
N/A
N/A
Fixation Items
N/A
98,143
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Total Price
Unit Price
kg
UYU / USD
UYU / USD
UYU / USD
Total
Preamble
Earthing System
Primary earthing system
Primary earthing system carried out as a meshed network
of clamped concrete steel bar, earth electrodes, ring conductor
around buildings and interconnection conductors between buildings.
Earthing Outlets will be fitted to the MV Clamps embedded in
concrete walls or foundation as connection points to the
meshed network.
CC
CC
lot
4,337
Erection
Equipment
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
Equalization Bonding
In general all metallic parts shall be at earth potential obtained by
bonding to earthing rails, test clamps or bonding bars, such as:
- steel structure
- doors and frames
- ducting and piping
- ladders and staircases
- transformer body and rails
- cable trays and ladders
- motor frames
- electric panels and boxes
- conveyors
- filters
831.LN310
Primary Earthing:
CC
CC
280
pcs
129
70
pcs
23
2,270
53
2,171
0 N/A
pcs
159
0 N/A
330
361
0 N/A
13
pcs
0 N/A
90
284
pcs
15
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
831.LN320
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
Secondary Earthing
Earthing Rails, 35 x 6 mm, Bare Cu
80
150
0 N/A
709
0 N/A
770
Bonding terminations
132
pcs
60
pcs
126
0 N/A
2,690
418
0 N/A
555
pcs
1,280
pcs
26
lot
50
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Total
Qty.
Unit
lot
No.
831.LN340
Preamble
Dim.
Weight
HxWxD
Net
kg
Erection
Equipment
Unit Price
Total Price
Unit Price
UYU / USD
UYU / USD
UYU / USD
93
CC
10
pcs
CC
25
pcs
296
41
0 N/A
pcs
0 N/A
lot
lot
50
Total
4,430
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
LIGHTING SYSTEM
831.LG410
Total
Lighting Equipment
for illumination in and around process buildings, substations,
Central Control Building and Plant Roads
Preamble
lot
19,557
N/A
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
875
pcs
4,375
0 N/A
16
pcs
240
0 N/A
28
pcs
56
0 N/A
pcs
0 N/A
410
pcs
82
0 N/A
15
pcs
75
0 N/A
pcs
880
0 N/A
11
pcs
310
0 N/A
pcs
25
0 N/A
831.LG450
831.LG460
0,2x0,1x0,2
Total
7,690
5,520
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
16
5 x 2.5 RE cable
2,300
Cable terminations
640
pcs
5 x 4 RE cable
300
32
pcs
Cable terminations
33
5 x 6 RM cable
Cable terminations
20
38
5 x 16 RM cable
66
pcs
390
Cable terminations
40
pcs
5 x 25 RM cable
Cable terminations
5 x 35 RM cable
Cable terminations
22
600
5 x 50 RM cable
Cable terminations
710
76
pcs
500
44
pcs
616
110
309
436
1,645
1,554
0 N/A
0 N/A
0 N/A
0 N/A
N/A
0 N/A
N/A
0
0
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
130
3 x 1 cable
750
Cable terminations
440
pcs
4 x 1 cable
160
Cable terminations
260
pcs
56
15
22
3 x 2.5 RE cable
2,500
Cable terminations
110
pcs
3 x 4 RE cable
850
44
pcs
Cable terminations
6
3 x 6 RM cable
Cable terminations
250
12
pcs
478
213
88
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Total
Cable Conduit
Qty.
Unit
1,704
No.
831.LG480
Dim.
Weight
HxWxD
Net
Unit Price
kg
UYU / USD
2,473
Erection
Equipment
Total Price
0
Unit Price
UYU / USD
UYU / USD
0 N/A
Lighting System
19,557
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
841
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
CONTROL EQUIPMENT
PROCESS CONTROL SYSTEM
841.CS010
Total
system
Operator System
system
pcs
- Engineering Station
- Printers
pcs
30
pcs
20
PLC System
system
pcs
2.0x1.2x0.5
pcs
2.0x1.2x0.5
Operator System
Total price for installation of listed hardware
PLC System
Unit price for installation of PLC and I/O cabinets at proper
locations.
Network Cables
Cables laying on cable rack or in conduit, proper arranged and fixed
according to instructions
Terminations:
Number of cable cuts are listed at "Info" and number of terminations
(two/cut) at "Qty" for each type of cable.
Unit price for cable termination shall be based on the proper fitting
of included terminations kits
Control Desk
Total price for handling, installation and alignment of desk units
according to instruction and arrangement layout.
Unit
0 N/A
200
200
0
30
0
0
N/A
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
Communication Network
system
No.
Dim.
Weight
HxWxD
Net
kg
Erection
Unit Price
UYU / USD
0
Equipment
Total Price
0
Unit Price
UYU / USD
UYU / USD
0
0 N/A
Total
Control System
50
pcs
1,076
16
pcs
400
18
pcs
204
40
0 N/A
0 N/A
0 N/A
0
0
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
851
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
INSTRUMENTATION
GAS ANALYZER SYSTEMS
Preamble
MC
851.AM840
system
pcs
pcs
pcs
- Sampling hoses
set
system
- Measuring head
pcs
- Mounting flange
pcs
pcs
- Light trap
pcs
pcs
set
1,225
0 N/A
138
0 N/A
consisting of:
851.AM886
0.6x1.1x0.6
Total
0,6x0,3x0.2
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
Erection
Unit price for installation of support or stands and fitting of the
relevant field control equipment.
The main part of field control equipment shall be mounted on a
fabricated support and erected on the construction or structure.
Field control equipment can also partly be installed direct
on the construction or structure.
Erection on fabricated stands can also be an needed option.
Unit
851.FC910
set
29
68
pcs
0 N/A
75
pcs
0 N/A
12
pcs
63
0 N/A
49
pcs
68
0 N/A
tonnes
LOT
851.FC950
Terminal Boxes
with max. 40 terminals for transfer of digital and analog signals
1000
Bolts, nuts, washers screw and plugs required for fixation of field
instruments shall be supplied by Electrical Erection Contractor
Total
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
851.IP990
PROCESS INSTRUMENTATION
MC
78
unit
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
unit
pcs
set
unit
pcs
pcs
-Temperature transducer
pcs
10
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
2
Bearing Temperature Measurement (2)
unit
pcs
pcs
pcs
10
unit
pcs
pcs
20
Pressure Measurement
unit
pcs
2-10
set
unit
pcs
4-16
set
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
No.
Info
Qty.
Unit
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
Level
Silo level
unit
pcs
60
pcs
pcs
pcs
pcs
pcs
Vibrocontrol
pcs
pcs
pcs
pcs
pcs
pcs
pcs
20
18
pcs
pcs
pcs
16
pcs
pcs
30
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
0 N/A
Vibration
for vibration monitoring of vertical mills, main gears, main ventilators
and big motors, each consisting of:
1
Motion Detectors
normally installed at tale-end of conveyors, each consisting of:
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Dim.
Weight
HxWxD
Net
Unit Price
Erection
kg
UYU / USD
Equipment
Qty.
Unit
pcs
pcs
Position Transducers
pcs
N/A
pcs
N/A
tonnes
lot
No.
Belt Drift Switches
Total Price
0
Unit Price
UYU / USD
UYU / USD
0 N/A
installed on long belt conveyors in drive and tale end and also in
between on very long belt conveyor, each consisting of:
1
Position
MC
MC
Total
2000
Bolts, nuts, washers screw and plugs required for fixation of field
instruments shall be supplied by Electrical Erection Contractor
Total
Process Instumentation
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
861
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
861.FI010
system
- Annunciate panel
pcs
- Terminal Racks
pcs
80
0 N/A
85
0 N/A
consisting of:
- Smoke Detectors
15
pcs
- Alarm Push-buttons
pcs
- Alarm Bells
pcs
1000
unit
- 1 x 2 x 0.8 mm Cables
861.FI020
1.2x0.6x0.3
Total
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
891
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
SINGLE MACHINES
Preamble
MC
Preamble
MC
241.WF150
241.WF250
pcs
- SC-Motor, 1,1 - 11 kW
pcs
- Load Cell
pcs
- Limit Switch
pcs
- Junction Boxes
pcs
unit
200
28
pcs
420
0 N/A
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
pcs
No.
461.RL620
461.RL570
Dim.
Weight
HxWxD
Net
Unit Price
Erection
kg
UYU / USD
Equipment
Total Price
0
Unit Price
UYU / USD
UYU / USD
0 N/A
pcs
pcs
- VFD-Drive-motor, 5,5 - 11 kW
pcs
pcs
pcs
- Solenoid valves
16
pcs
pcs
- Emergency stop
pcs
pcs
pcs
pcs
100
30
pcs
Weigh Feeders
2.0x1.8x0.7
250
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
pc
0 N/A
0 N/A
pc
- Heating element
pc
pc
pc
pc
- Pressure switch
pc
- Emergency stop
pc
pc
- Cable terminations
50
pc
pc
461.LQ120
1.2x1.0x0.3
250
pc
- Heating element
pc
pc
- Emergency stop
pc
pc
- Cable terminations
80
pc
1.2x1.0x0.3
250
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
pc
No.
461.LQ145
Dim.
Weight
HxWxD
Net
Unit Price
Erection
kg
UYU / USD
Equipment
Total Price
Unit Price
UYU / USD
UYU / USD
0 N/A
0 N/A
pc
pc
- Temperature transmitters
pc
- Thermostats
pc
- Flow sensors
pc
- Pressure switches
12
pc
- Emergency stop
pc
pc
- Cable terminations
80
pc
pc
pc
- Proximity switches
pc
pc
- Cable terminations
pc
461.GS155
1.2x1.0x0.3
300
Total
0.7x0.7x0.3
20
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
231BF410
231BF420
231BF460
MC
10
units
- Diaphragm Valves
pcs
231BF530
pcs
231BF540
20
231BF610
- Cable terminations
12
pcs
units
0.6x0.6x0.3
0 N/A
0 N/A
0 N/A
20
231BF620
211BF070
461BF300
- Diaphragm Valves
4-12
pcs
pcs
pcs
30
- Cable terminations
24
pcs
units
0.6x0.6x0.3
20
- Diaphragm Valves
10-55
pcs
pcs
pcs
10
100
20
- Cable terminations
60
pcs
0.6x0.6x0.3
20
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
No.
Total
Dedusting Filters
Qty.
Unit
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
0
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
No.
BURNER STATIONS
Preamble
MC
Qty.
Unit
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
Equipment
kg
UYU / USD
UYU / USD
UYU / USD
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
units
pcs
pcs
pcs
pcs
- Cable terminations
32
pcs
431.BU510
units
432.BU510
pcs
pcs
pcs
pcs
No.
461.HG700
Dim.
Weight
HxWxD
Net
Unit Price
Erection
kg
UYU / USD
Total Price
UYU / USD
Equipment
Unit Price
UYU / USD
0 N/A
0 N/A
. solenoid valves
. oil pressure
. oil valves
. valve positions
. pressure stat
. ignition unit
. oil valves
. valve positions
. UV sensor
. emergency stop
MC
. oil temperature
. oil pressure
. oil valves
. valve positions
. pressure stat
2.0x1.0x0.4
150
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Dim.
Weight
Qty.
Unit
HxWxD
Net
Unit Price
Total Price
Unit Price
kg
UYU / USD
UYU / USD
UYU / USD
pcs
1.2x1.0x0.3
100
- Cable terminations
20
pcs
No.
Erection
Equipment
PAYSANDU; Uruguay
Print Date:
Cement Plant
Paysandu_
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
No.
431.BU520
432.BU520
units
pcs
pcs
pcs
pcs
- Cable terminations
26
pcs
. solenoid valves
. emergency stop
. oil pressure
. oil valves
. valve positions
. pressure stat
. ignition unit
. oil valves
. valve positions
. UV sensor
Dim.
Weight
HxWxD
Net
Unit Price
Erection
Total Price
Unit Price
kg
UYU / USD
UYU / USD
UYU / USD
2.0x1.0x0.4
Equipment
0 N/A
PAYSANDU; Uruguay
Paysandu_
Print Date:
Cement Plant
Basic Date:
Electrical Erection.
Dept.
Equip.
Info
Qty.
Unit
units
pcs
pcs
pcs
- UV sensor
pcs
- Emergency stop
pcs
pcs
- Cable terminations
32
pcs
No.
431.BU530
432.BU530
Dim.
Weight
HxWxD
Net
Unit Price
Erection
kg
UYU / USD
Equipment
Total Price
0
Unit Price
UYU / USD
UYU / USD
0 N/A
. solenoid valves
. valve position
. valve positions
. gas pressure
. air pressure
. gas valve
. air valve
. igniter coil
Total
Burner Stations
2.0x1.2x0.4
150
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Equipment
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
0
0
0
0
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
0
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
0
0
0
0
0
0
0
0
0
0
0
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
0
0
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
0
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0
Paysandu_