LINE DISCRIPTION
LPH-3 Operating
Air vent to
Condenser
LPH-2 Operating
Air vent to
Condenser
LPH-1 Operating
Air vent to
Condenser
CEP Discharge to
SJAE inlet
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
BFP-3A,B & C
recirculation line
70
71
72
Booster pump
suction header
73
74
75
76
77
78
79
80
81
82
83
84
BFP Discharge
piping up to
Finger rack &
Block commission
valve
85
86
87
88
89
BFP Discharge
piping up to
Finger rack &
Block commission
valve
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
Dearaeator
overflow and
drain to HP Flash
tank
Carbohydrazide &
Ammonia Dosing
line
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
CFP Recirculation
line
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
CFP Discharge
line
167
168
169
170
171
172
173
CFP Discharge
line
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
HPH-6 extraction
line
HPH-5 Extraction
line
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
1-381-01-06295
CW line to
condenser inletwest side
1-381-01-06296
CW line to
condenser inletEast side
1-381-01-6297 CW
return line from
condenser outletwest side
1-381-01-6298 CW
line from
condenser outletEast side
ACW discharge
line to PHE
LPH 3 extraction
line
256
257
258
259
260
261
262
263
264
LPH 3 extraction
line
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
Deareator
pegging steam
line
294
295
296
Deareator
extraction line
297
298
299
300
301
302
303
304
305
Deareator
extraction line
Common Points
End connection to CFT flange joint short bolts to be replace, loose bolts to be tightened & missing
washer to be fitted
Line Hydro test to be done
Flushing loop to be made blind
RG(PS-HC-1-425-07) not rest.
Scaffolding to be removed from CFT area
R(PS-HC-1-425-06) shifted towards south side, clarification required
R(PS-HC-1-425-06) base plate anchor bolting balance
R(PS-HC-1-425-05) shifted towards north side, clarification required
R(PS-HC-1-425-05) base plate anchor bolts found loose
Line foul with DM water line, to be rectify
RH support (PS-HC-1-424-04) lock nut missing and support found loose.
RH support (PS-HC-1-424-01) rod foul with fire line, to be rectify
Hanger schedule required
RH support (PS-HC-1-410-04) found loose
Line foul with TG structure bolt, gap required
Hanger schedule required
BFP-3A, B & C R/C line control valve tag number not match, to be conform
BFP-3B R/C line orifice flange joint 01 bolt to be replace due to it is found with small diameter
BFP-3B R/C line rod hanger support (PS-WB-1-612-01) to be align
BFP-3A R/C line control valve handle foul with cable tray support, to be rectify
BFP-3A R/C line flow orifice flange joints short bolts to be replace
BFP-3C R/C line Rest guide support (PS-WB-1-617-02) trunnion & sliding plate to be fitted
BFP-3C R/C line rod hanger support (PS-WB-1-617-01) to be align
All spring support cold setting to be done
Rest support (PS-WB-1-601-08) civil foundation to be extend- (21 meter)
Booster pump 3B & 3C suction MIV wheel handle to be fitted
Booster pump 3C Bottom spring support (PS-WB-1-614-02 & 03) anchor bolts found loose & extra long
bolts to be cut
Booster pump 3C suction strainer flange joint missing bolts to be fitted
Booster pump-3A, 3B & 3C line vent (7meter) to be extended up to safe location
Booster pump 3B Bottom spring support (PS-WB-1-609-02 & 03) anchor bolts ti be fitted & extra long
bolts to be cut
Booster pump 3B suction strainer drain valve to be fitted
Booster pump 3B suction strainer flange joint missing bolts to be fitted
BFP-3A, 3B & 3C discharge drain line to be extend and support to be fitted
BFP-3B discharge MIV wheel found bend, to be rectify
BFP-3B discharge MIV wheel handle fit-up balance
Discharge header to HPH-5 I/L rest support not resting, packer plate required (7 meter)
End cap to be fitted at block valve for future connection
Both Block valve wheel handle to be fitted
Block valve (MIV-653) stem cover fit-up balance
Block valve (MIV-653) wheel to be locked properly
Block valve (MIV-654) wheel found bend, to be rectify
Rest support (PS-HD-1-758-03) bottom base plate to be extend, packer plate to be fitted and base pla
bottom side stiffer required
line 1" drain to be plugged
02 nos temporary support to be removed
Line foul with vacuum breaker line
MIV gland bolt found loose
Rest support (PS-AR-1-411-02) not resting
1" vent line to be made blind
Line 1" vent to be plugged at 21 meter
vent valve body bolts found loose and missing bolts to be fitted
Rest support (PS-WB-1-620-02) not rest and cement chipping work to be done
Rod hanger support (PS-WB-1-602-12) to be align
line insulation foul with other line at 7 meter, gap required
All RH support lock nut to be tightened
Extra clamp support fit up balance at 7 meter opening
Rod hanger support (PS-WB-1-602-15) found bend, to be rectify
Spring hanger support (PS-WB-1-602-17) cold setting balance
1" drain to be plugged
Ammonia dosing pump A & B Discharge flange joint to be tightened
Every clamp support SS foil to be fitted
Every clamp support to be tightened with washer
02 nos extra supports to be fitted at 0 meter EL.
Free clamp support required due to two lines touch with each other
line foul with cable tray support, to be rectify (above BFP-3A discharge line)
NRV fit up balance in Ammonia dosing line
CFP-A, B, C R/C line end connection to CFT flange joint stud and bolts both are applied, to be rectify an
short bolts to be replace
CFP-B R/C line 1" vent line to be plugged
CFP-C R/C line rest support (507-05) packer plate welding balance
CFP-A R/C line rest support (505-05) packer plate to be replaced
CFP-A R/C line rod hanger support (505-01)rod found bend, rod foul with cable tray and lock nut found
loose
CFP-A R/C line MIV gland bolts found loose
CFP-B R/C line Hanger support (506-01/02 & 03) to be align & locknut to be tightened
CFP-3C R/C MIV gland bolts found loose
CFP-A,B & C discharge drain foul with floor, to be rectify
CFP-C discharge PG tapping handle missing
ALL MOV stem cover to be fitted
All Discharge flange joints bolts to be tightened
CFP-C discharge rest support 510-02 sliding plate foul with cable tray support, to be rectify
CFP-B discharge rest support 509-02 sliding plate foul with Extra clit, to be rectify & its packer plate
welding balance
CFP-A discharge vent handle locking key to be fitted
RH(511-03) to be align & Lock nut to be tightened
Temporary wooden support to be removed near drain cooler
Drain cooler inlet rest support stiffener required
LPH-2 Bypass MOV Wheel missing
RH-512-05 rod found bend
Rest support (419-05/04, 417-02/03, 421-03/04, 420-04/05, 418-03/04) trunnion to be extended due t
support are not resting and too much packer plate found
Both syphon drain to be plugged
RH(420-07) support found loose
R(421-05) support not resting properly
Extra support to be removed (near support R-417-07)
TOP-SJAE after cooler drain line root valve handle missing near surge pipe
support (418-09) rod hanger fitted instead of rest clarification required.
support (420-06) rest fitted instead of rod hanger clarification required.
support (421-06) rest fitted instead of rod hanger clarification required.
support (421-05) rest fitted instead of rod hanger clarification required.
support (417-08) rod hanger fitted instead of rest clarification required.
support (419-08) rest fitted instead of rod hanger clarification required.
hanger schedule required
Line modification as build drawing required
End cap to be fitted at block valve for future connection
vent between between future block valve to be extended
All direct drain to be plugged
hydro arrangement line to be removed
Rest support erection balance at 13 meter (261-02)
vent valve to be replace near block valve at 13 meter
civil foundation to be rectify of RGL support at 21 meter
initial heating & continuous heating line end connection balance
continuous heating line 02 rest support not resting properly at 21 meter, packer plate to be fitted
DSH support at 13 meter TAG number not matching, to be rectify or clarification to be given. (263-23)
Drain line at 21 meter operating approach not available, to be modify
STATUS
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
REMARKS
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed