Documente Academic
Documente Profesional
Documente Cultură
: EHSMSM/446/4013
Effective date: 01.04.2009
SOP No.
SOP DESC
DEPARTMENT
Step
No.
01
LD3TSCR /RLZ-MNT/MEC/01/664
PBU Unit Painting
Activity
(WHAT)
Associated
Requirements/Hazards/Impacts
Effective Date
10.06.2014
Section
Page
CASTER MECHANICAL
Responsibilit
y (WHO)
01
REVISION No
00
Of 02
Remarks /
Reference
clearance
signed by
working agency
supervisor &
dept. mgr.
Before
application
checked surface
area thoroughly.
Follow safe
procedure of
working at
height
Associates/
starting the job. Six direction forms fill up Maint.
at site.
assistant
Person should enter in safe dress, safety
shoes, safety helmet, and safety goggle.
ENVIRONMENT: Oily and greasy.
QUALITY: To Ensure that the surface is
totally clean & dry.
03.
Surface cleaning.
PREPARED BY:
APPROVED BY :
LD3TSCR /RLZ-MNT/MEC/01/664
PBU Unit Painting
Activity
(WHAT)
Application of
primer, Paint.
Associated
Requirements/Hazards/Impacts
Effective Date
10.06.2014
Section
Page
CASTER MECHANICAL
Responsibilit
y (WHO)
02
REVISION No
00
Of 02
Remarks /
Reference
Returning of
clearance
Remove all materials, tools & tackles and Ensure that the
workers from site. To inform dept.
total working
foremen & returning the Clearance dully area cleaned.
Singed by the working Agency.
06
Rescue
arrangement
Associates/
Maint.
assistant
ENVIRONMENT:
QUALITY:
PREPARED BY:
APPROVED BY :