MAINTENANCE OF MAIN/SUB-51f.l!

TCH BOARD
LOW VOLTAGE SYSTEM

***********************************

SWITCH BOARD> NO/LOCATION:


SUPPLY ICOMING FROM :
DATE:
TIME OF SUTDOWN/SUPPLY RESTORED:
CARRIED OUT BY:
,,..

NO .

'

CHECKED

DESCRIPTION OF WORK

Switch off main incoming supply/withdrwl ACB


Place warning 'Men At Work ' and lock operating handle
Test st.rpply at outgoing MCB to confirm supply is Off
Tight en MCCB cable terminal and spray l Ontact cleaner

1.

2.
3.
4.

Test operation of ACC MCB


Blow off MCB compartment and ensure phase barrier in

1
--

5.

I
-

...

[DO NOT REMOVE COVER AT SUPPLY INCOM1NG CABLE END]


backtightness
cover andofblow
8.
Remove
all off
outgoing cable termination
9.
Hand check
! and tighten if necessary
10.
Checl:.. earthing terminals/frame work for sign of rust
Chee position of C.T's for clearance
12.
Chec K all capacitor
covers are securely in position
13.
Fina:check for any unwanted _parts
J. 4 .
Reintall back cover to original posit on
15 .

....

1-

1
1 -

tJ

'

16.'
17.

Reintall ACB

Inspect condition of oil dash pot, relay and fuses


interna ::. compartment ..

7.

,.

posii.ion

- L
'

1
.

l'

.. ...\ .
.. " 11'1.
'.'1.

.1 .

?""!
'
..-

'jl:ti
'I. . .

. . :.,;-

,'

..

..'

. .

..

Ensure all MCB covers-'in-position


Spring
charge ACB to close
18.
RecoYd Voltage

.!-ct
"!

f.
. ;,,r

Fina :checked/En rgised by


NOTE: 1) Before supply is switched off ensure that the bus
couplex is off position and if necessary withdraw couplex
ACB
2) Ensure gen set incoming supply is at off posiion and if necesary
switch off gen set ACB incomi g

I
RE'-'!AR)(S

MAINTENANCE OF MAIN/SUB-SWCTH BOARD


LOW VOLTAGE SYSTEM

***********************************

SWITCH BOARD NO/LOCATION:


SUPPLY ICOMING FROM :
DATE:
TIME OF SUTDOWN/SUPPLY RESTORED:
CARRIED OUT BY: