Proposal for Alternative Batching Plant for Temperature Controlled

concrete.
Project: Proposed Negombo Grand Beach Hotel Project.
1. Description
Herewith we are submitting document to get approval for Tokyo Super Mix
Batching Plant- Negombo for temperature control concrete.

2. Mix design data sheet


Proposed mix design data sheet for G35 with thermal control concrete is
attached herewith. Below is important points of proposed mix design.
a.
b.
c.
d.
e.
f.
g.

Concrete Grade
Slump
OPC Cement content/m3
Fly ash Cement Content /m3
Total Cement Content/m3
Chilled Water/m3
Crushed Ice/m3

: 35 N/mm2
: 150mm + 25mm
: 323kg
: 107kg
: 430kg
: 109kg
: 50kg

3. Trial Mix
Trial mix was done on 10th Sep 2016 in Super mix bathing plant and cube test also done
to check three days strength. Following are observation and results from trial mix.
a. Temperature at fresh concrete just after batching
18.90C
b. Temperature at fresh concrete after 4 hrs
- 250C
c. Average strength of test cube for 3 days test
- 20 N/mm2
Above results are witnessed by Consultant representative also.

4. Test Reports
Following cement test reports are attached herewith for your reference.
a. Test Report for fly ash
b. Test report for OPC Cement

5. Past Records
Past records for temperature control concrete with Tokyo super OPC cement with
Fly Ash.
a. Herewith attached past record for following project using same cement
1. Altair Project
2. Orient Tower Project
b. As per above mentioned project details summary is as follows regarding
temperature rise in core.

Conc. Grade
G.40
G.55

Cement
Content
282kg
300kg

Fly ash
Content
94kg
160kg

At site Temp.
in Fresh Conc.
28 C
28 C

Max. Temp. in
Core
69.2 C
71.2 C

6. Letter from Batching Plant


Find attached letter from batching plant regarding their commitment to supply
concrete as per the project details.

Please provide your approval as alternative batching plant for supplying


concrete for this project for temperature control concrete.

3.2

CEr~ENT COf'~:ff~

PROJECT CE f

B5
Sanke:1 Lank8 Pv: Ltd

Orion City

MONITORING OF TEMPERATURE RISE IN CONCRETE TEST BLOCKS

Concrete supplier : Tokyo supermix ready mixed concrete plant / Peliyagoda

Projects :

Altair Residential Twin Towers

Mix design details

Quantities per 1 m3
Altair
55

Mix design
Grade (N/mm2)

300
160
65
50
838
1025
5500
Optima 183
1000
SL 216

Cement (kg)
Fly Ash (kg)
Chilled Water (kg)
Crushed Ice (kg)
River Sand (kg)
Coarse Agg: 20mm (kg)
Super plasticizer (ml)
Brand name
Retarder (ml)
Brand name

Temperature and Slump of fresh concrete at mock-up done for Altair Residential Towers
Concrete Grade : 55 N/mm2
Date : 11-10-2015
Batching Plant

On Site

Truck No

Time

Temperature

Slump

Time

Temperature

Slump

227-4527

10.52 pm

25.8 0C

200 mm

11.42 pm

28.00C

225 mm

LK-0475

11.35 pm

25.1 0C

185 mm

12.24 am

27.00C

200 mm

Volume of the test block : 8.00m3

(1.5m x 1.8m x 2.8m)

Temperature readings obtained from the mock-up


Maximum temperature recorded
Ellapsed time

: 71.2 0C
: 63 hrs

Fresh Concrete temperature / Batching Plant


Fresh Concrete temperature / At Site
Fresh Concrete temperature / Mock-up

: 25.5 0C
: 27.5 0C
: 31.1 0C