Documente Academic
Documente Profesional
Documente Cultură
Version:
Issue Date:
Review By Date:
Owned By:
Authorised By:
1.1
August 2006
June 2008
Engineering Manager D & P
Executive Manager D & P
Date of Revision
1.0
June 2006
1.1
August 2006
Details of Amendment
Initial Release
Numbering changed to represent previous system used
The above table lists in summary the amendments which have been made with most recent issues of this standard.
The table is updated with each re-issue. The latest amendments within the documents are marked with a change
indicator (|) in the outer margin.
CONTACT
This standard is the responsibility of the
Development and Projects Division, ElectraNet.
Please contact the indicated owner of the standard
with any inquiries.
ElectraNet
52-55 East Terrace, Adelaide, South Australia 5000
PO Box 7096, Hutt Street Post Office,
Adelaide, South Australia 5000
Ph (08) 8404 7966, Fx (08) 8404 7104
L I M I TATI O N O F L I A B I L I T Y AN D
D I S C L A I M E R O F W AR R A N T Y
ElectraNet makes no representation or warranty as
to the accuracy, reliability, completeness or
suitability for particular purposes of the information
in this document. ElectraNet and its employees,
agents and consultants shall have no liability
(including liability to any person by reason of
negligence or negligent misstatement) for any
statements, opinions, information or matter
(expressed or implied) arising out of, contained in
or derived from or for any omissions from the
information in this document, except in so far as
liability under any statute cannot be excluded.
2006 ElectraNet Pty Limited trading as ElectraNet. No part of this document may be reproduced
or copied in any form or by any means (graphic, electronic, mechanical, including photocopying,
recording, taping or information retrieval systems) without the prior written permission of ElectraNet.
LCM05
ElectraNet
TABLE OF CONTENTS
5.1.
SCOPE......................................................................................................................................................3
5.2.
DRAWINGS- FORMAT.........................................................................................................................3
5.3.
DRAWINGS-GENERAL........................................................................................................................4
5.4.
CONSTRUCTION DRAWINGS...........................................................................................................4
5.5.
5.6.
DRAFTING STANDARDS....................................................................................................................5
5.7.
TRANSFER OF OWNERSHIP.............................................................................................................5
5.8.
APPENDIX.............................................................................................................................................................7
Version: 1.1
Page 2 of 7
ElectraNet
LCM05
5.1. SCOPE
Version: 1.1
drawing
phasing
5.3. DRAWINGS-GENERAL
The Designer shall use Line Design software
PLS-CADD and provide ElectraNet with the
following :
Page 3 of 7
LCM05
ElectraNet
Line schedule/s;
Construction drawings;
Engineering calculations;
Materials list;
Version: 1.1
5.4. CONSTRUCTION
DRAWINGS
For tower lines : Construction drawingsincluding, but not limited to : electrical
clearance diagrams, tower footing and pegging
drawings, tower outline drawings, single
member detail drawings, leg extension
drawings, anticlimb drawings, fall arrest
drawings, insulator assembly drawings, tower
earthing drawing
For pole lines : Construction drawingsincluding, but not limited to : pole top
arrangements, crossarms & extension pieces,
footing/footing
reinforcement,
electrical
clearance diagrams, insulator assembliesphase
and
earthwire,
pole
plating/modification, step bolts, earth bonding,
ground level earthing, pole orientation, pole
rake and pole identification requirements
Page 4 of 7
ElectraNet
LCM05
Certifier and a third copy shall be forwarded to
the Superintendent.
5.8. DRAWING
MANAGEMENT AIM
5.6. DRAFTING
STANDARDS
All drawings shall comply with Australian
Standards 1046, 1100(set), 1101 & 1102 and
AS ISO 1000.
All measurements shall be in millimetres.
All fonts shall comply with ISO 3098/1 Type
B Upright characters.
5.7. TRANSFER OF
OWNERSHIP
The Contractor shall transfer ownership of all
contract-specific drawings to the Principal
upon completion of the work. The Principal
will be permitted full use of the drawings for
Version: 1.1
Page 5 of 7
LCM05
ElectraNet
Appendix
T000
2
0000 3
T210
T220
T225
T230
T240
T250
T260
Paper Size
T300
Letter T for our business -- Transmission T310
T320
Three Digit Number for Drawing Type
T330
T340
Feeder Identifier eg 1901, 1902, 1801, 1802
etc
Sheet Number
Revision
Type
Identifier
T400
T410
T420
T430
T440
T450
T724
T730
T760
24m
Pole
Pole
T800
T810
T820
T830
T840
T850
T860
T870
T875
T880
T890
Sub
Sub
Sub
Sub
Sub
Sub
Rad
Rad
Rad
Rad
Rad
T900
T910
T935
Und
Tem
Con
Drawing Type
Identifier
T000
T010
T020
T030
T040
T050
T060
T070
T080
T090
Standards
Conductor
Insulators
Line Hardware
Crossarms / Earth Peaks
Earthing
Miscellaneous Arrangements
Miscellaneous Hardware
T100
T110
T120
T125
T130
T140
T150
T160
132kV Arrangements
132kV Towers
132kV Tower Member Details
132kV Tower Material Lists
132kV Tower Footings
132kV Tower Pegging Details
132kV Insulator Assemblies
132 kV Structure Maintenance
T200
275kV Arrangements
Version: 1.1
275kV Towers
275kV Tower Member Details
275kV Tower Material Lists
275kV Tower Footings
275kV Tower Pegging Details
275kV Insulator Assemblies
275kV Structure Maintenance
Earthwire Assemblies
Phasing Abbrev
H1
H2
H3
H4
H5
H6
U V W
U W V
V W U
V U W
W U V
W V U
V1
U
V
W
V2
U
W
V
H7
H8
H9
H10
H11
H12
Page 6 of 7
R
T
T
S
R
Z
S
R
S
R
T
Y
V7
T
S
R
V8
S
R
T
ElectraNet
LCM05
V
W
U
V3
V10
T28
V11
W
V
U
T4
T7
V
U
U
T10
W
T13
T16
V
W
T37
T22
Version: 1.1
S
T
T
S
T26
S
T
T29
S
R
T32
R
T
T35
T38
U
W
W
V
T40
T2
T43
V
W
T5
T46
U
V
T8
U
V
T11
T41
U
V
T44
T20
T23
T17
R
S
W
V
V
U
T47
T14
W
U
S
R
U
V
T19
V12
V13
T1
R
S
T31
T34
V6
S
R
T25
W
U
V
V5
V9
V
U
W
V4
Page 7 of 7