In its Outlook, the IEA expects oil and gas spending to increase
sharply, increasing by almost 50% from its average of US$678b
per year over the 20002013 period.
Industry spending will continue to be dominated by spending in
the upstream segment accounting for about 77% of total
industry spending.
Midstream or transportation-related spending, in particular for
pipelines and storage, will account for about 13% of total
spending, with cumulative natural gas transportation spending of
about US$1.9t and
oil transport spending of about US$1t over the 20142035
period.
Downstream spending will account for the remaining gas (LNG)
projects of about US$0.7t.
In total, oil-related spending will account for about 61% of total
spending, with the remaining 39% made up of natural gasrelated spending
As seen in above Table, the typical oil and gas megaproject was very
expensive, and a great deal more expensive than planned.
It was also nearly a year late.
Worst of all, it was frequently quite disappointing in terms of production. The
failure to produce is by far the most economically damaging result.
Objectives:
drilling at lowest possible costs
to safely drill
useable hole
underlined the necessity for sound project management to
ensure above goals
MC
10
( )Deliverables
-
-
028
029
031
028
029
031
-7
-1-7
-2-7
-3-7
-4-7
-5-7
-6-7//
-7-7 -
-8-7
-9-7 --
-10-7
-
-
PMC
MC
( ) BuyBack
MC
MC
MC
)(TEC Total Upstream Solution
:
:
:
:
:
: !
:
MC
/
/
MC
Well
Planning
Workflow
Traditional drilling workflow. A linear workflow requires more people and incurs higher cost because of
inefficiency in the process. Iteration is time consuming and costly, particularly at the stage when drilling
target selection occurs. The lack of a shared digital database inhibits integration of data and
interpretations among team members. Integration, in this situation, depends on human interaction as
well as duplication of data entry efforts in incompatible databases.
Ideal drilling workflow. With team members using the same database and model of the earth, the drilling
process becomes less linear. At each point in the process, validation occurs earlier, saving time and
money. Inferior solutions are weed out early in the process. The use of real-time data allows
optimization of operations during drilling. After completion of drilling operations, results are readily
available in the database to improve subsequent operations.
TEC/PKD Office
MPCL/EDS Office
Mudlogging
LWD
Internet
Real-Time Collaboration:
Pressure Engineers+ Drilling
Optimization team+ Geoscience
Experts
1)Composite Real-time displays
2)WITSML feed to Techlog
Majnoon
86
Drilling programme targeting new 15-20 wells ongoing two drilling rigs in place, a third rig
on its way.
Several production shut-down programmes as part of facility maintenance and inspection.
In addition to the Majnoon Pioneer Camp, other 9 camps (contractors) are being built. 1800
workers in the field and an estimated 1300 jobs provided to local community members to
date.
Jetty construction has concluded. This will allow the transportation of Early Production System
(EPS) equipment through the ShattAl Arab water-way, thus minimizing road transportation.
New Central Production Facility
Several Social Investment projects (SI) delivered within the areas of Education,
Health and
Capacity building.
Metal contamination
Collection of ERW