NO:
of the
Assistant
Engineer Elec.
66/11KV
MUSS KPTCL
Iggaluru.
__________________________________________________________________________________
_________
To,
Executive Engineer(Elec)
220KV Receiving Station
T.K.Halli.
Sir,
Sub: Regarding routine maintenance works carried out at Iggaluru MUSS-reg
**********
With respect to above subject I am herewith sending the report of routine
maintenance works carried out at 66/11KV MUSS Iggaluru under T.K.Halli Division from
July-2015 to January-2016.
Details of work carried out with respect to date wise are mentioned below:
July-2015
Sl no
Date
1
3.7.2015
2
3
4
5
4.7.2015
10.7.2015
17.7.2015
25.7.2015
August-2015
Sl no
Date
1
6.8.2015
2
10.8.2015
3
4
5
6
15.8.2015
21.8.2015
23.8.2015
31.8.2016
Description of works
Cleaned the Battery charger and battery sets is cleaned and applied
petroleum jelly to battery terminals and tightened the bolts and nuts for
proper connections
Control room and 66KV C&R panels cleaned
F1-feeder R-phase CT bolts and nuts replaced.
F8 feeder y-phase GOS maintenance work carried out.
F7-Maregowdanadoddi feeder GOS maintainance work carried out from
BESCOM authorities.
Description of works
Control room and 66KV C&R panels cleaned
Cleaned the Battery charger and battery sets is cleaned and applied
petroleum jelly to battery terminals and tightened the bolts and nuts for
proper connections
Bank-1 R-phase Bus bar jump replaced with suitable clamps.
F9-Nidagodi and F8-C.B.Doddi feeders 11KV GOS maintenance
F3 and F6 Switchgear serviced during Load shedding period
F2 feeder Y-phase GOS jump replaced.
September-2015
Sl no
Date
1
1.9.2015
2
7.9.2015
3
4
5
6
7
8
10.9.2015
16.9.2015
19.9.2015
20.9.2015
27.9.2015
30.9.2015
October-2015
Sl no
Date
1
2
3
4
5
3.10.2015
5.10.2015
10.10.2015
16.10.2015
18.10.2015
6
24.10.2015
November-2015
Sl no
Date
1
3.11.2015
2
3.11.2015
3
1111.2015
4
21.11.2015
December-2015
Sl no
Date
1
2.12.2015
2
5.12.2015
3
4
5.12.2015
6.12.2015
Description of works
. Cleaned the Battery charger and battery sets is cleaned and applied
petroleum jelly to battery terminals and tightened the bolts and nuts for
proper connections
F1 feeder R-phase and Y-phase GOS jump replaced with suitable bolts an
nuts.
Control room and 66KV C&R panels cleaned
F4 and F8 feeder R-phase jump replaced with PG clamps
F2 feeder R-phase pothead PG clamp replaced.
F6 B-phase GOS jump replaced.
11KV bank 1 B-phase CT bolts and nuts replaced.
F6, F2, F8 and F9 feeders GOS maintenance works carried out.
Description of works
Cleaned the Battery charger and battery sets is cleaned and applied
petroleum jelly to battery terminals and tightened the bolts and nuts for
proper connections
F1 feeder Y-phase Jumps replaced with bolts and nuts
F7 feeder Y-phase GOS PG clamps replaced
Tr-1 painting work carried out from firm M/s.Sri.Ranganatha Electricals.
66KV side Marshelling boxes, Isolators operating box and CT bodys
painting works carried out.
F7 feeder R-phase GOS PG clamps replaced
Description of works
Cleaned the Battery charger and battery sets is cleaned and applied
petroleum jelly to battery terminals and tightened the bolts and nuts for
proper connections
F3 feeder R-phase GOS jump replaced.
F6 feeders 11KV jump replaced with P.G.Clapms
F8 feeder Y-phase jump replaced with P.G.Clapms
Description of works
Control room and 66KV C&R panels cleaned
Cleaned the Battery charger and battery sets is cleaned and applied
petroleum jelly to battery terminals and tightened the bolts and nuts for
proper connections
F9 feeder R-phase GOS jump replaced with PG clamps
F7 feeder 11KV GOS maintenance works carried out.
5
6
18.12.2015
26.12.2015
January-2016
Sl no
Date
1
4.1.2016
2
5.1.2016
3
24.1.2016
4
5
25.1.2016
28.1.2016
FEB-2016
Sl no
DATE
1
2
2
3
4
5
MARCH-2016
Sl no
1
2
2
3
4
5
DATE
Description of works