Documente Academic
Documente Profesional
Documente Cultură
eMail Data...
NONMATERIAL REQUIREMENTS
Save Data...
REV. ______________________
DATE: ______________________
DEVELOPMENT NO.
ITEM/TAG NUMBERS:_________________________________________________________________
HARD COPIES
NOTE:
DESCRIPTION
601 PRELIMINARY DRAWINGS AND DATA FOR REVIEW AND APPROVAL BY BUYER
1. DETAILED DRAWINGS, INCLUDING FIELD TESTING/INSPECTION
2. MECHANICAL, STRUCTURAL, AND BUOYANCY CALCULATIONS, INCLUDING: EXPECTED
IMMERSION DURING OPERATION, BLEEDER VENT SIZING, WEIGHT OF FLOATING
ROOF, AND DESIGN OF SUPPORTING LEGS.
3. WELDING PROCEDURES, PROCEDURE QUALIFICATIONS (IF APPLICABLE)
4. MATERIALS OF CONSTRUCTION
5. INSTALLATION INSTRUCTIONS
6. COMPOSITE ENGINEERING/SUB-VENDOR MATERIAL/PROCUREMENT/FABRICATION/
TESTING SCHEDULE
NO. OF
CALENDAR
WEEKS
DUE
DATES
1
1
1
1
1
1
2
2
2
3
3
3
NOTES: (A) PURCHASE ORDER NUMBER AND ITEM/TAG NUMBER MUST BE NOTED ON ALL DATA
SUBMITTED.
(B) IDENTICAL ITEMS MAY BE REPRESENTED ON A COMMON DRAWING PROVIDED ITEM/TAG
IDENTIFICATION OF THOSE ITEMS ARE CLEARLY SHOWN.
(C) WHEN DRAWINGS ARE RETURNED "APPROVED" OR "APPROVED EXCEPT AS NOTED,"
THE VENDOR MAY START FABRICATION. WHEN DRAWINGS ARE RETURNED "DISAPPROVED,"
THE VENDOR SHOULD NOT START FABRICATION. THE VENDOR MUST RESUBMIT
CORRECTED DRAWINGS FOR APPROVAL WITHIN TWO (2) WEEKS.
(D) THE NOTES ON THE ATTACHMENT TO THIS SHEET ARE A PART OF NONMATERIAL
REQUIREMENTS AND CONSEQUENTLY OF THE PURCHASE ORDER.
(E) NORMALLY ONLY THREE HARD COPIES AND ONE SOFT COPY ARE REQUIRED.
SUBMITTAL OF
REQUIRED DRAWINGS,
MANUALS, ETC.
SOFT COPY
COPIES REQUIRED
BIDDER'S SIGNATURE:
COMPANY:_______________________________________
BIDDER'S REF. NO.:__________________________________
DATE:_____________________________________________
602
603