The load C.T. is only required when there is more than one Mains Controller (DSE8660 / DSE7560 / DSE5560) on the same system. With the load C.T. fitted, the Mains Controller transfers the right amount of load to the grid before disconnecting the generators. This prevents the generators being shock loaded. Without the load C.T., the Mains Controller does not know how much load to transfer to the grid when other Controllers are still in island mode. This results in the Mains Controller transferring a pre determined amount of load before disconnecting the generators from the grid. Hence, there is either too much load, or not enough load transferred, and the generators are shock loaded as they are disconnected from the grid.
ChatGPT Side Hustles 2024 - Unlock the Digital Goldmine and Get AI Working for You Fast with More Than 85 Side Hustle Ideas to Boost Passive Income, Create New Cash Flow, and Get Ahead of the Curve
ChatGPT Money Machine 2024 - The Ultimate Chatbot Cheat Sheet to Go From Clueless Noob to Prompt Prodigy Fast! Complete AI Beginner’s Course to Catch the GPT Gold Rush Before It Leaves You Behind
ChatGPT Millionaire 2024 - Bot-Driven Side Hustles, Prompt Engineering Shortcut Secrets, and Automated Income Streams that Print Money While You Sleep. The Ultimate Beginner’s Guide for AI Business