Documente Academic
Documente Profesional
Documente Cultură
MANNING
Donde:
R=A/P
n: Rugosidad
V: Velocidad (m/s)
R: Radio Hidraulico (m)
S: Pendiente (m/m)
A: Area Hidraulica (m2)
P: Perimetro mojado (m)
HAZZEN Y WILLIANS
Donde:
Q = K C D2.63 hf0.54
Q: Caudal (lts/seg)
D: Diametro (Pulg)
hf: Perdida de carga (m/km)
K: 0.0004265
C: Coeficiente de Hazzen y Willians
Para C = 140
Material
ga (m/km)
Hazzen y Willians
Fierro Fundido
Concreto
100
110
Acero
Asbesto cemento
PVC
120
140
140
MANNING
CANALES y TUBERIAS (no llenas)
PROBLEMA 01.- Datos
Poblacion =
Consumo =
Fuente de Agua: Q =
22,000
120
35.0
hab
lts / hab / dia
lts / seg
50.00
3.00
m3
m
Calcular:
Para el reservorio
Capacidad del Reservorio = 2,690,000.00 lts
=
2,690.00
Vol = L x L x H => L =
29.94
m
Vol = Area x H => Diam =
33.79
m
Caudal para llenar el reservorio =
31.13
lts/seg (Durante las 24 horas)
Tiempo de llenado del reservorio =
76,857
seg (Usando todo el caudal de la fuente)
Para el Canal (24 horas)
Tirante (Y) =
Area Hidraulica (A) =
Perimetro Mojado (P) =
Radio Hidraulico (R) =
Velocidad del agua en canal (V) =
0.170 m
0.0412 m2
0.5505 m
0.075 m
0.739 m/s
0.1700 m
TANTEANDO
31.13
lts/seg (Durante las 24 horas)
0.030 m3 / s
30.47 lts / s
Aumentar Tirante
R=A/P
m3
B = 0.29 m
b = 0.20 m
Talud = 0.175 m
mentar Tirante
DE CALCULO HIDRAULICO Q = V . A
=A/P
Donde:
n: Rugosidad
V: Velocidad (m/s)
R: Radio Hidraulico (m)
S: Pendiente (m/m)
A: Area Hidraulica (m2)
P: Perimetro mojado (m)
HAZZEN Y WILLIANS
TUBERIAS A PRESION
Caudal Q=
Long. De tuberia =
Cota de inicio =
Cota de salida =
Calculos:
Carga disponible =
Perdida de Carga disponible (hf') =
D' =
Asumimos D =
Calculamos el hf para el D comercial
hf =
Perdida de carga total (Hf) =
Q=V.A => Velocidad (V) =
Presion de salida
101.99
0.1545
3.833
4
lts / seg
m
msnm
msnm
m
m/m
Pulg
Pulg (Diam. Comercial)
0.1255
m/m
82.83
m
3.84
m/s
19.16 m
Agua incendio =
HAZZEN Y WILLIANS
Q = K C D2.63 hf0.54
Poblacion = 22,000.00 habitantes
Consumo =
120.00
lts / hab / dia
Agua incendio =
50,000.00 lts / dia
Caudal Q= 2,690,000.00 lts / dia
Donde:
Q: Caudal (lts/seg)
D: Diametro (Pulg)
= K C D2.63 hf0.54
Material
Fierro Fundido
Concreto
Acero
Asbesto ceme
PVC
C
100
110
120
140
140
SENCICO
CALCULOS:
Consumo unitario
TRAMO
Caudal Q=
1.172
Qmh =
1.758
lts / seg
Reserv-A
A-B
B-C
C-D
C-E
B-RP
RP-F
F-G
F-H
H-I
0
122
161
160
157
100
103
119
105
98
TOTAL
1125
0.000
0.191
0.252
0.250
0.245
0.156
0.161
0.186
0.164
0.153
1.758
1.758
0.747
0.250
0.245
0.820
0.664
0.186
0.317
0.153
2,462.00
2,443.00
2,432.00
2,430.00
2,430.00
2,432.00
2,412.00
2,392.00
2,392.00
2,385.00
2,443.00
2,432.00
2,430.00
2,424.00
2,434.00
2,412.00
2,392.00
2,369.00
2,385.00
2,372.00
LONG.
(m)
60.00
125.00
97.00
67.00
105.00
109.00
98.00
86.00
100.00
120.00
HAZZEN Y WILLIANS
TUBERIAS A PRESION
H dispon.
m
hf'
m/m
D'
Pulg
DIAM. VELOCIDAD
(pulg)
(m/s)
hf
(m/m)
Hf
m
COTA PIEZOMETRICA
INICIAL
FINAL
19.00
0.3167
1.109 1.50
1.540
0.0727
4.3634
2,462.00
2,457.64
0.00
14.64
25.64
0.2051
1.212 1.50
1.542
0.0727
9.0904
2,457.64
2,448.55
14.64
16.55
18.55
0.19
0.89
1.00
1.474
0.1074
10.4159
2,448.55
2,438.13
16.55
8.13
14.13
0.21
0.57
0.75
0.877
0.0574
3.8486
2,438.13
2,434.28
8.13
10.28
4.13
0.04
0.80
1.00
0.484
0.0137
1.4345
2,438.13
2,436.70
8.13
2.70
36.55
0.34
0.82
1.00
1.619
0.1277
13.9245
2,448.55
2,434.62
16.55
22.62
20.00
0.20
0.84
1.00
1.311
0.0864
8.4652
2,412.00
2,403.53
0.00
11.53
34.53
0.40
0.45
0.50
1.468
0.2392
20.5709
2,403.53
2,382.96
11.53
13.96
18.53
0.19
0.65
0.75
1.113
0.0893
8.9261
2,403.53
2,394.61
11.53
9.61
22.61
0.19
0.49
0.50
1.209
0.1670
20.0349
2,394.61
2,374.57
9.61
2.57
HAZZEN Y WILLIANS
TUBERIAS A PRESION
1,125.00
Qmh =
Dotacion =
TRAMO
hab
1.50 x (Q)
90.00
N HAB
A-B
122
B-C
161
C-D
160
C-E
157
B-RP
100
RP-F
103
F-G
119
F-H
105
H-I
98
TOTAL
1125
CALCULOS:
Caudal Q=
1.172
Qmh =
1.758
Consumo unitario
TRAMO
q=
N HAB
0.001563
lts / seg
lts / seg
CONSUMO TRANSPORTE
lts / seg
lts / seg
Reserv-A
1.758
2,462.00
A-B
122
0.191
1.758
2,443.00
B-C
161
0.252
0.747
2,432.00
C-D
160
0.250
0.250
2,430.00
C-E
157
0.245
0.245
2,430.00
B-RP
100
0.156
0.820
2,432.00
RP-F
103
0.161
0.664
2,412.00
F-G
119
0.186
0.186
2,392.00
F-H
105
0.164
0.317
2,392.00
H-I
98
0.153
TOTAL
1125
1.758
0.153
2,385.00
CALCULOS:
Caudal Q=
lts / seg
Qmh =
Consumo unitario
TRAMO
q=
N HAB
lts / seg
CONSUMO TRANSPORTE
lts / seg
Reserv-A
A-B
122
B-C
161
C-D
160
C-E
157
B-RP
100
RP-F
103
F-G
119
F-H
105
H-I
98
TOTAL
1125
lts / seg
LONG.
H disp
hf'
D'
DIAM.
VELOCIDAD
hf
(m)
m/m
Pulg
(pulg)
(m/s)
(m/m)
2,443.00
60.00
1.50
1.542
0.07272
2,432.00
125.00
1.50
1.542
0.07272
2,430.00
97.00
1.50
0.655
0.01490
2,424.00
67.00
1.00
0.493
0.01415
2,434.00
105.00
1.00
0.484
0.01366
2,412.00
109.00
1.50
0.720
0.01773
2,392.00
98.00
1.50
0.582
0.01199
2,369.00
86.00
1.00
0.367
0.00818
2,385.00
100.00
1.00
0.626
0.02199
2,372.00
120.00
1.00
0.302
0.00571
LONG.
H disp
hf'
D'
DIAM.
VELOCIDAD
hf
(m)
m/m
Pulg
(pulg)
(m/s)
(m/m)
Hf
INICIAL
FINAL
INICIAL
FINAL
4.3634
2,462.00
2,457.64
0.00
14.64
9.0904
2,457.64
2,448.55
14.64
16.55
1.4457
2,448.55
2,447.10
16.55
17.10
0.9480
2,447.10
2,446.15
17.10
22.15
1.4345
2,447.10
2,445.67
17.10
11.67
1.9326
2,448.55
2,446.61
16.55
34.61
1.1749
2,412.00
2,410.83
0.00
18.83
0.7033
2,410.83
2,410.12
18.83
41.12
2.1987
2,410.83
2,408.63
18.83
23.63
0.6850
Hf
m
2,408.63
2,407.94
23.63
35.94
FINAL
INICIAL
FINAL
SENCICO
CALCULOS:
Calculo de alt. Estatica (H) =
Carga disponible (Hf) =
19.600
mca
11.4
mca
HAZZEN Y WILLIANS
TUBERIAS A PRESION
ALTURA
(mca)
MEDIDOR
(mca)
LONG.
(m)
LONG. EQUIV
CRANE (m)
LONG. TOTAL
(m)
uH
A-B
B-C
C-D
D-E
E-G
G-H
1.00
2.80
2.80
2.80
0.00
0.00
1.50
2.43
3.30
2.80
2.80
4.90
8.00
4.90
3.90
3.90
2.40
2.40
1.70
7.33
7.20
6.70
5.20
7.30
9.70
285.00
228.00
171.00
114.00
57.00
38.00
3.11
2.64
2.23
1.79
1.20
0.88
hf'
m/m
D'
Pulg
DIAM.
(pulg)
VELOCIDAD
(m/s)
hf
(m/m)
Hf
m
Presion Salida
FINAL
30.00
4.09
0.81
2.00
1.534
0.0515
0.38
32.12
mca
26.82
3.73
0.78
1.50
2.316
0.1544
1.11
28.21
mca
22.91
3.42
0.74
1.50
1.956
0.1130
0.76
24.65
mca
19.35
3.72
0.67
1.00
3.533
0.5419
2.82
19.04
mca
16.54
2.27
0.64
1.00
2.368
0.2584
1.89
17.15
mca
14.65
1.51
0.62
1.00
1.737
0.1455
1.41
15.74
mca
LTS
28
0.46666667
SENCICO
CALCULOS:
Calculo de alt. Estatica (H) =
Carga disponible (Hf) =
5.650
mca
4.9
mca
TRAMO
ALTURA
(mca)
MEDIDOR
(mca)
LONG.
(m)
A-B
B-C
C-D
D-E
E-F
F-G
G-H
1.50
2.80
0.00
0.00
0.00
0.00
1.85
1.00
22.64
4.36
7.97
9.21
7.20
2.46
4.53
1.00
LONG. EQUIV
CRANE (m)
LONG. TOTAL
(m)
uH
22.64
4.36
7.97
9.21
7.20
2.46
4.53
38.25
15.25
15.25
10.25
5.25
4.50
1.50
HAZZEN Y WILLIANS
TUBERIAS A PRESION
0.82
0.46
0.46
0.35
0.24
0.18
0.06
hf'
m/m
D'
Pulg
DIAM.
(pulg)
VELOCIDAD
(m/s)
hf
(m/m)
Hf
m
Presion Salida
FINAL
10.00
0.44
0.77
4.00
0.101
0.0001
0.00
12.50
mca
7.20
1.65
0.47
2.00
0.227
0.0015
0.01
9.69
mca
6.19
0.78
0.55
2.00
0.227
0.0015
0.01
8.68
mca
6.18
0.67
0.51
0.75
1.228
0.1071
0.99
7.69
mca
5.19
0.72
0.44
0.50
1.895
0.3837
2.76
4.93
mca
2.43
0.99
0.37
0.50
1.421
0.2252
0.55
4.37
mca
0.02
0.01
0.71
1.50
0.053
0.0001
0.00
2.52
mca
LTS
28
0.46666667