According to the data given in the Geotechnical Report, the project should be treated in a high
safety class. According to this the consequce class is defined according to EN1990 to CC3,
with a factor KFI correponding to realibility class RC3 having a value of 1.1. In the following
table, values for partial safety factors are presented.
KFI 1.1
Design
situation
Permanentactions
Unfavourable
Favourable
gGj,inf*Gkj,inf
KFI *gGj,sup*Gkj,sup
EQU,UPLand
1.1 gGj,inf
HYD(6.10) gGj,sup
STR,GEO
(6.10a)
KFI *gGj,sup*Gkj,sup
gGj,inf*Gkj,inf
(6.10b)
KFI *gGj,sup*Gkj,sup
gGj,inf*Gkj,inf
gGj,sup
gGj,inf
(6.10a)
(6.10b)
0.9
For
Forsoil
For
Forsoil
structural
and
structural
and
component water component water
1.2
1.0
1.0
1.0
1.0
1.0
0.9
1.0
Leading
variableaction
Accompanying
variableactions
KFI *gQ,1*Qk,1
KFI *gQ,i*0,i*Qk,i
gQ,1
gQ,1
1.5
1.5
KFI *gQ,1*Qk,1
KFI *gQ,i*0,i*Qk,i
gQ,1
gQ,1
1.50
1.50
13-week Report
DTU, Course 11080
Advanced Building design
Team 03
s151263
04.12.2016
For the serviceability limit the following combination of action should be take into account:
Combinationtype
Characteristic
Permanentactions
Unfavourable
Favourable
Gkj,sup
Gkj,inf
Variableaction
Leading
Others
Qk,1
0,i*Qk,i
Frequent
Gkj,sup
Gkj,inf
1,1*Qk,1
2,i*Qk,i
Quasipermanent
Gkj,sup
Gkj,inf
2,1*Qk,1
2,i*Qk,i
Values for partial safety factors to be considered in the combinations are presented in the
following table.
PartialsafetyfactorsforEQU,UPLandHYDcombination:
0,i
Loadtype
Symbol Value
Unfavourable gG,dst
Favourable gG,sub
1.1
0.9
Variable,leadingload
gQ,dst
1.5
Variable,otherloading
gQ,dst
Permanentloads
0,i*1.5
Symbol
Value
Angleofshearingresistance
g?'
1.25
Effectivecohesion
gc'
1.25
Undrainedshearstrength
gcu
1.4
Weightdensity
gg
1.0
PartialsafetyfactorsforSTRandGEOcombination:
Value
Loadtype
Symbol
A1 A2
1.35 1.00
Unfavourable gG,dst
Permanentloads
Favourable gG,sub
1.00 1.00
gQ,dst
Variable,leadingload
1.50 1.30
Variable,otherloading
gQ,dst
1.50
0.7
PartialfactorsforsoilparametersinEQU,UPLandHYD
Soilparameter
KFI
1.30
PartialfactorsforsoilparametersinSTRandGEO
Value
Soilparameter
Symbol
M1 M2
g?'
1.00 1.25
Angleofshearingresistance
gc'
1.00 1.25
Effectivecohesion
Undrainedshearstrength
gcu
1.00
1.40
Weightdensity
gg
1.00
1.00
Totalvalue
1.1
1.21
0.90
1.1
1.65
1.1
1.16
13-week Report
DTU, Course 11080
Advanced Building design
Team 03
s151263
04.12.2016
13-week Report
DTU, Course 11080
Advanced Building design
Team 03
s151263
04.12.2016
Accoring to EN 1997-1, three design approaches are proposed which distribute the partial
factors in different ways.
For the current project only 2 design approaches will be used, 2 and 3, which are more
relevant.
Design approach 2 will be used for the retaining structure, while design approach 3 will be used
for the pile foundation.
Combinations according to the design approaches are presented in the following.
Design Approach 2:
A1+M1+R2
Design Approach 3:
A1+M2+R3
A2+M2+R3
Note: In design approach 3, A1 is used for structural action and A2 is used for geotechnical
actions.
For the design of the mat foundation, the combination of action will be obtained accordgin to
DS EN 1997-1 DK 2013, for which the safety factors are presented in the following table.
De sign Approach
Limit state
STR/GEO
Load combination
Permanent Load
Variable
loads,
building
Unfabourable G;sup
A1 or A2
1,2K FI
1,0K FI
1,2
1,0
1,0
G;inf
1,0
0,9
1,0
0,9
1,0
Unfabourable G;sup
1,0
1,0
1,0
1,0
1,0
G;inf
1,0
1,0
1,0
1,0
1,0
Favourable
Weight of the soil
and water,
geotechnical
construction
STR
Favourable
Dominant
Unfavourable Q,1
1,5K FI
1.5
Others
Unfavourable Q,i
1,5 0 K FI 0
1,5
13-week Report
DTU, Course 11080
Advanced Building design
Team 03
s151263
04.12.2016
Designcombinationtobeused
Partialsafetyfactor
Combination
2
3
1.1
1.2
gG
1
1.32
4
1
gQ
1.65
1.5
gQ,i
0.99
0.9
Having the above safety coeeficients, the following load combinations will be used:
Design combination 1: 1.32G 0 Q 0 Qi
Design combination 2: 1.10G 1.65 Q 0.99 Qi
Design combination 3: 1.2G 0 Q 0 Qi
Design combination 4: 1.00 G 1.50 Q 0.9 Qi
Where:
- G is the dead load
- Q is the live load
- Qi other live load (ex: wind)
Total values of the loads are presented in the following tabels.
Axialforcefromthemainbuildingfordifferentcombination
Combinations
1
2
3
4
Axialforce,
N[MN]
960.954
1063.66
873.595
966.962
Axialforcefromtheonecolumnintheparkingextensionfordifferentcombination
Combinations
1
2
3
4
Axialforce,
N[kN]
1304.15
1421.57
1185.59
1327.29