Documente Academic
Documente Profesional
Documente Cultură
07
1
1
2
1
1
3
1
1
1
2
1
4
13
12
13
18
10
1
86
09
1
1
2
1
1
3
1
1
1
2
1
4
15
12
13
18
11
1
89
POWER TOOLS/TOOLS
Air Compression Machine
Hand drill
Welding Machine
Edge Grinder
Spray Gun
Laser Level
Ramset
Flat Sander
Jig Saw Machine
Circular Saw
Aviation Snip
Pneumatic Brad Nailer
Riveter
Hammer Drill
Tile Cutter
JANUARY
10
11
1
1
1
1
2
2
1
1
1
1
3
3
1
1
1
1
1
1
2
2
1
1
4
4
13
17
14
10
14
14
20
20
12
10
1
1
93
91
12
1
1
2
1
1
3
1
1
1
2
1
4
19
10
14
19
11
1
93
QUANTITY
2
10
1
10
4
1
1
1
1
2
7
4
10
4
2
13
1
1
2
1
1
3
1
1
1
2
1
4
2nd Floor
3rd Floor
4th Floor
5th Floor
Package 1 & 2
Remarks:
1. Wall Tiles are on hold at Shower area to give way to MJ Aluminum prior to glass partition installation.
2. Cannot close rooms at 4th and 5th Floor Rooms due to ongoing construction of MEPF.
3. As per managements meeting (Engr. Caloy) , all rooms will board up on 4 th Floor on January 20, 2017
and 5th Floor on Janaury 30, 2017.
4. Some rooms @ 4th floor and 5th floor cant install floor tiles due to unfinished waterproofing and concrete
topping.
5. Other Owner Supplied Materials are not yet delivered.
6. Insulation Installation @ 5th floor is on hold due to unfinished waterproofing at roof deck.
CONTRACTOR :
CLIENT:
Prepared By :
Checked By :
Aceboy Sibbaluca
Ar. Romeo C
.Reroma, Jr.
Project-In-Charge
Project Architect
Submitted By:
Approved By:
Engr. Nicholas
Magarzo
Project Manager
Project
Manager
10