NAME OF THE WORK: Construction of CC road from Ele.Pole No.SS 55/B1 for Formation of Bhima
Bypass road in Tadepalligudem Municipality.
DETAILED CUM ABSTRACT ESTIMATE
S.No
Description of Item
No
Qty
Rate
Per
C.C.Road
Earthwork in excavation for removal of road loose soil as
per drawing and echnical specifications Clause 305.1
including setting out, construction of shoring and bracing,
removal of stumps and other deleterious aterial and
disposal upto a lead of 50 m, dressing of sides and ottom
1 and backfilling in trenches with excavated suitable material
as per Technical Specification 305 MORD / 304 MORTH
etc., complete as per S.S and as directed by the
departmental officer in charge of the work.
105.00
5.90
0.30
185.85
1x2
105.00
0.30
0.20
say
12.60
199.00
158.81
1 cum
59.70
31.00
1 cum
3.15
97.00 1330.70
1 cum
Page 1
92.93
342696555.xlsx
S.No
Description of Item
No
Qty
Rate
Per
1x1
105.00
5.90
0.15
92.925
1x2
3.50
4.50
0.10
3.15
Page 2
342696555.xlsx
S.No
Description of Item
No
D
say
Qty
Rate
Per
97.00 4341.98
1 cum
Construction of
un-reinforced, plain cement concrete
pavement, thickness as per design, over a prepared sub
base, with 43 grade cement or any other type as per Clause
1501.2.2 M35 (Grade) Design Mix, coarse and fine
aggregates conforming to IS : 383, maximum in a concrete
mixer of not less than 0.2 cum capacity and appropeiate
weigh batcher using approved mix design, laid in approved
fixed side formwork (steel channel, laying and fixing of 125
mictron thick polythene film, wedges, steel plates including
levelling the formwork as per drawing), spreading the
concrete with sholvels, rakes, compacted using needle,
5 scareed and plate vibrators and finished in continuous
operation including provision of ntraction and expansion,
construction joints, applying debonding strips, primer,
sealant, dowel bars, near approaches to bridge / culvert
and construction joints, admixtures as approved, curing of
concrete slabs for 14- days, curing compound (where
specified) and water finishing to lines and grade as per
drawing and Technical Specification Clause 1501 MORD.
and other incidental charges complete as per S.S and as
directed by the departmental officer in charge of the
work.But excluding cost of seigniorage charges.
For road
1x1
105.00
5.90
0.28
173.46
1x2
3.50
4.50
0.17
5.36
say
Supply and delivery of M.S dowel bars of S 240 grade and
tie bars including cost and conveyance to site and placing
in position insite as per drawing, all labour charges othes
incidental charges complete as per S.S and as directed by
the departmental officer in charge of the work.
6 A) Cross 100/20=5.00 joints 25 mm dia @ 27 cm C/C
5.90/0.27 22 x5x0.50x3.858 Kg=212.19 Kg
B) Tie bars-10 mm dia @ 30 cm C/C 45 cm length
(10000/30=333.33) 333.333x0.45*0.617 Kg=92.549Kg
Total= 212.90+92.55=305.45
Page 3
179.00 6646.32
306
50.41
1 cum
1 Kg
342696555.xlsx
S.No
Description of Item
No
Qty
Rate
Per
Page 4
342696555.xlsx
S.No
Description of Item
No
Qty
Rate
Per
1561.00
50.89
1 Kg
402.32
1 Cum
1x2
105.00
0.30
0.20
12.60
0.00
13.00
TOTAL ECV
8 Provision for VAT @ 5%
10 Provision for seigniorage charges.
Provision for MPLADSsign Board carrying the description
11 "MPLADS WORK" with the name of honourable MP,
including funds details.
12 Provision For Inaguration
13 Provision For Unforceen items
SSR 2015-16, Cement Rate - 5,840.00/MT, Steel Rate - 33,000.00/MT
(October 2015)
TOTAL =
say
Assistant Engineer(PH)
Tadepalligudem Section.
Dy Executive Engineer(PH)
Eluru Sub-Division.
Page 5
Executrive Engineer(PH)
Eluru Division.
342696555.xlsx
GUDEM MUNICIPALITY
31603.19
1850.70
129077.90
Page 6
342696555.xlsx
Amount
Page 7
342696555.xlsx
Amount
421172.06
1189691.28
15425.46
Page 8
342696555.xlsx
Amount
Page 9
342696555.xlsx
Amount
79439.29
5230.16
1873491.00
93675.00
22100.00
3000.00
3000.00
4734.00
2000000.00
2000000.00
Executrive Engineer(PH)
Eluru Division.
Page 10
342696555.xlsx
31603.19
1850.7
129077.9
421172.06
1163106
15425.46
79439.29
5230.16
1846904.76