REKAPITULASI ESTIMASI KONTRAK

PEKERJAAN

: PARTIAL RETUBING RADIANT REFORMER DAN CHANGED


H2 PLANT, PLANT STOP 2017

ORDER NO.

: 8301019476

PAKET ID NO.

: HCC0417014

A MATERIAL

Rp

B UPAH

Rp

C ALAT

Rp

Rp

E KEUNTUNGAN DAN RESIKO

Rp

F SUB TOTAL II (D + E)

Rp

Rp

D SUB TOTAL

(A + B + C)

DIBULATKAN

TERBILANG : TIGA MILYAR DUA RATUS ENAM PULUH DELAPAN JUTA EM


RUPIAH.

NOTE :
- RINCIAN NILAI ESTIMASI TRANSPORTASI, MATERIAL, UPAH & PERALATAN TERLAMPIR.
- BELUM TERMASUK PPN 10%.

Dumai, 15
PT. KAMI

NUZLA

Direktur

ESTIMASI KONTRAK

T REFORMER DAN CHANGED OUT CATALYST 702-H-1,

592,738,650.00
1,182,940,500.00
1,195,643,400.00
+
2,971,322,550.00
297,132,255.00
+
3,268,454,805.00
3,268,450,000.00

M PULUH DELAPAN JUTA EMPAT RATUS LIMA PULUH RIBU

Dumai, 15 Desember 2016


PT. KAMI SATOYO

NUZLAN

Direktur

PERINCIAN PENAWARAN
PEKERJAAN

PARTIAL RETUBING RADIANT REFORMER DAN CHANGE


H2 PLANT, PLANT STOP 2017

ORDER NO.
NO

DESCRIPTION

8301019476

VOL

UOM

MATERIAL

HARGA SATUAN (RP)


UPAH

PREPARATION & ADMINISTRATION

LOT

*****

15,487,500.00

INDIRECT COST

LOT

*****

68,512,500.00

HEAVY EQUIPMENT SUPPLY

LOT

*****

86,625,000.00

PARTIAL RETUBING RADIANT REFORMER & COC 702-H-1


A. PARTIAL RETUBING REFORMER 702-H-1
B. CHANGED OUT CATALYST 702-H-1

LOT

589,719,900.00

1,004,335,500.00

FINISHING & CLEANING AREA

LOT

3,018,750.00

7,980,000.00

TOTAL

N PENAWARAN

ADIANT REFORMER DAN CHANGED OUT CATALYST 702-H-1,

HARGA SATUAN (RP)


ALAT

MATERIAL

TOTAL (RP)
UPAH

12,075,000.00

*****

15,487,500.00

12,075,000.00

33,705,000.00

*****

68,512,500.00

33,705,000.00

855,750,000.00

*****

86,625,000.00

855,750,000.00

276,263,400.00

589,719,900.00

1,004,335,500.00

276,263,400.00

17,850,000.00

3,018,750.00

7,980,000.00

17,850,000.00

592,738,650.00

1,182,940,500.00

1,195,643,400.00

ALAT

ANALISA HARGA SATUAN


PEKERJAAN

ORDER NO.

PARTIAL RETUBING RADIANT REFORMER DAN CHANGED O


H2 PLANT, PLANT STOP 2017
8301019476

URAIAN PEKERJAAN

PREPARATION & ADMINISTRATION

JUMLAH

1 LOT

1. MATERIAL
NO

DESCRIPTION

SUB TOTAL

2. UPAH
NO
A SITE SURVEY
1 SUPERVISOR
2 FITTER
3 DRAFTER
DLL

DESCRIPTION

PEMBUATAN PROPOSAL, ENGINEERING DESIGN, GAMBAR


KERJA, ETC
SUB TOTAL
*) HARGA UPAH SUDAH TERMASUK ALAT SAFETY STANDARD
3. ALAT
NO
DESCRIPTION
KOMPENASSI PENGURUSAN ADM, PERMIT, MCU, BADGE MPWR, TOOLS & MAT'L
1
PREPATION
2 MOB-DEMOB EQUIPMENT, TOOLS & MATERIALS
3 DLL

SUB TOTAL

Lampiran 1
DAN CHANGED OUT CATALYST 702-H-1,

VOL

UOM

HARGA SATUAN

SUB TOTAL
0.00

0.00

VOL

UOM

HARGA SATUAN

SUB TOTAL

5
5
5

MDS
MDS
MDS

420,000.00
315,000.00
262,500.00

2,100,000.00
1,575,000.00
1,312,500.00

LOT

10,500,000.00

10,500,000.00
15,487,500.00

VOL

UOM
1

LOT

1 TRIP/PP

HARGA SATUAN

SUB TOTAL

3,675,000.00

3,675,000.00

8,400,000.00

8,400,000.00

12,075,000.00

ANALISA HARGA SATUAN


PEKERJAAN

ORDER NO.

PARTIAL RETUBING RADIANT REFORMER DAN CHANGED


H2 PLANT, PLANT STOP 2017
8301019476

URAIAN PEKERJAAN

INDIRECT COST

JUMLAH

1 LOT

1. MATERIAL
NO
1

DESCRIPTION

SUB TOTAL

2. UPAH
NO
A INDIRECT COST
A.1 PROJECT MANGEMENT
1 SITE MANAGER
2 WELDING INSPECTOR
3 QC ENGINEERING
4 MECHANICAL SUPERVISOR
5 SAFETY OFFICER
6 SCHEDULLER
7 DLL

DESCRIPTION

A.2 SUPPORTING
1 RIGGING SUPERVISOR
2 RIGGER
DLL
SUB TOTAL
*) HARGA UPAH SUDAH TERMASUK ALAT SAFETY STANDARD
3. ALAT
NO
DESCRIPTION
TRANSPORTATION & ACCOMODATION
A TRANSPORTATION
1 AIR TICKET (JKT - PKU - JKT)
2 LAND TRANSPORT (PKU - DMI - PKU)
3 SITE TRANSPORT
4 MOBILITATION IN REFINERY
B
1
2
3
4

AKOMODASI
HOTELS (INCL. BREAKFAST)
MEAL ALLOWANCE (DAY & NIGHT) + EXTRA KALORI
LOUNDRY
PORTACAMP/CONTAINER & OFFICE/DIREKSI KEET

DLL
SUB TOTAL

Lampiran 2
DAN CHANGED OUT CATALYST 702-H-1,

VOL

UOM

HARGA SATUAN

SUB TOTAL
0.00

0.00

VOL

UOM

HARGA SATUAN

SUB TOTAL

30
30
30
30
30
30

MDS
MDS
MDS
MDS
MDS
MDS
MDS

525,000.00
420,000.00
420,000.00
262,500.00
210,000.00
210,000.00
0.00

15,750,000.00
12,600,000.00
12,600,000.00
7,875,000.00
6,300,000.00
6,300,000.00
0.00

15
15

MDS
MDS

262,500.00
210,000.00

3,937,500.00
3,150,000.00

68,512,500.00

VOL

UOM

HARGA SATUAN

SUB TOTAL

5 TRIP/PP
6 TRIP/PP
90 EQDS
90 EQDS

2,100,000.00
315,000.00
15,750.00
15,750.00

10,500,000.00
1,890,000.00
1,417,500.00
1,417,500.00

25
90
42
2

262,500.00
8,400.00
15,750.00
5,250,000.00

6,562,500.00
756,000.00
661,500.00
10,500,000.00

RMDS
UNIT
UNIT
UNIT

33,705,000.00

ANALISA HARGA SATUAN


PEKERJAAN

ORDER NO.

PARTIAL RETUBING RADIANT REFORMER DAN CH


H2 PLANT, PLANT STOP 2017
8301019476

URAIAN PEKERJAAN

HEAVY EQUIPMENT SUPPLY

JUMLAH

1 LOT

1. MATERIAL
NO
1

DESCRIPTION

SUB TOTAL

2. UPAH
NO
DESCRIPTION
A
UPAH MANPOWER ALAT BERAT
1
TRUCK CRANE 100 TON
2
FOCO TRUCK MIN KAP. 8 TON
3
ROUGHTER CRANE, KAP. MIN. 35 TON
4
FORKLIFT KAP. MIN 3 TON
NOTE :
- INCLUDE OPERATOR, RIGGER, MEKANIK & HELPER (2 SHIFT)
- HARGA SEWA TERMASUK RIGGING ACCESSORIES
- UPAH TERMASUK ALAT SAFETY STANDARD
SUB TOTAL
*) HARGA UPAH SUDAH TERMASUK ALAT SAFETY STANDARD
3. ALAT
NO
A
1
2
3
4
B
1
2
3
4

DESCRIPTION
SEWA ALAT BERAT
TRUCK CRANE 100 TON
FOCO TRUCK MIN KAP. 8 TON
ROUGHTER CRANE, KAP. MIN. 35 TON
FORKLIFT KAP. MIN 3 TON
MOBILISASI & DEMOBILISASI ALAT BERAT
TRUCK CRANE 100 TON
FOCO TRUCK MIN KAP. 8 TON
ROUGHTER CRANE, KAP. MIN. 35 TON
FORKLIFT KAP. MIN 3 TON
NOTE :
- INCLUDE OPERATOR, RIGGER, MEKANIK & HELPER (2 SHIFT)
- HARGA SEWA TERMASUK RIGGING ACCESSORIES
- UPAH TERMASUK ALAT SAFETY STANDARD

SUB TOTAL

Lampiran 3

ORMER DAN CHANGED OUT CATALYST 702-H-1,

VOL

UOM

HARGA SATUAN

SUB TOTAL
0.00

TAL

0.00

VOL
1
1
1
1

UNIT
UNIT
UNIT
UNIT

UOM

300
300
300
300

EQHRS
EQHRS
EQHRS
EQHRS

HARGA SATUAN
105,000.00
52,500.00
78,750.00
52,500.00

TAL

SUB TOTAL
31,500,000.00
15,750,000.00
23,625,000.00
15,750,000.00

86,625,000.00

VOL

UOM

1
1
1
1

UNIT
UNIT
UNIT
UNIT

300
300
300
300

1
1
1
1

UNIT
UNIT
UNIT
UNIT

1
1
1
1

EQHRS
EQHRS
EQHRS
EQHRS

LOT
LOT
LOT
LOT

HARGA SATUAN

SUB TOTAL

1,365,000.00
315,000.00
446,250.00
288,750.00

409,500,000.00
94,500,000.00
133,875,000.00
86,625,000.00

84,000,000.00
5,250,000.00
31,500,000.00
10,500,000.00

84,000,000.00
5,250,000.00
31,500,000.00
10,500,000.00

TAL

855,750,000.00

ANALISA HARGA SATUAN


PEKERJAAN

ORDER NO.

URAIAN PEKERJAAN

JUMLAH

1. MATERIAL
NO
DESCRIPTION
1 SABUN HIJAU
2 MAJUN
3 BRONZE BRUSH WIRE
4 STEEL BRUSH WIRE
5 AQUA GALON
6 SCRAP 3"
7 RUST REMOVER WD-40
8 TERPAL HIJAU UK : 4 X 6 M SYNTETIC RUBBER
9 MANILA ROOP 5/8" @ 220 MTR/ROLL
10 PLASTIC BAGS, 100 CM X 150 CM X 0.5 MM
11 EMBER PLASTIK ANTI PECAH CAP : 10 LITER
12 GRINDING WHEEL 6" X 6 MM THK
13 GRINDING WHEEL 4" X 4 MM THK
14 GLOVE LEATHER GENERAL USE FOR WELDING
15 CUTTING WHELL, 180 X 1.6 X 22 MM (7IN)
16 BLADE, HAND HACKSAW, 12IN
17 GRINDING WHEEL, FOR SS, 7IN X 6 MM
18 GRINDING WHEEL, SS, 4IN X 6 MM
19 WHEEL, CUTTING, ALUMINIUM OXIDE, 180 X 3 X 22 MM F
20 ROD ELECTRODE, ER. 90S-B3, SIZE 2.4 MM
21 ROD, WELDING, ER. NiCrCoMol
22 ARGON GAS, UHP, 99.999%, 230 CUFT, 2200PSI
23 PAPER, SOLUBLE, GRADE W, LD-60
24 TAPE, ADHESIVE SOLUBLE, PPR, WHITE, 1IN
25 TAPE, ADHESIVE PAPER, 2IN
26 METAL MARKER STICK, COLOURWHITE
27 PLATE, STEEL, A285, GR.C,2400 X 1200 X 8 MM
28 PLATE:MTL, CS, A283, C, 2438 X 1219,6 MM
29 PAINT, GREY, HR-600
30 THINNER, HR600
31 BRUSH, PAINT, BLACK BRISTLE FILLING, 3IN
32 ROLLER, PAINT, ALLUM.CORE, W/HANDLE, 4IN
33 ROD ELECTRODE, ER.70-SB, SIZE 2:4 MM
34 ELECTRODE, WLD, AWS. E-6010 - B6,2.50MM
35 ELECTRODE, WLD, AWS. E-7018 - B6,2.50MM
36 ELECTRODE, WELDING, AWS-E7018 - B2,3.2 MM
37 METAL MARKER STICK, COLOURWHITE
38 BLANKET, FIRE, FIBER GLASS, WHITE
39 HOSE, HIGH PRESS, DIA. 1/2IN, C/W CONNECTOR
40 MEASURING TAPE 5M, STEEL
41 MEASURING TAPE 50M, STEEL
42 TAPE ADHESIVE PAPER, 3IN
43 SPIDOL MARKER PERMANENT, BLACK

ANALISA HARGA SATUAN


PEKERJAAN

ORDER NO.

URAIAN PEKERJAAN

JUMLAH

44
45
46
47
48
49
50
51
52

CUTTER PAPER
ANTI SEIZE MOLYCOTE 1000
GASKET NO. 2, PERMATEX FORM A
SEAL TAPE, PFTE, WHITE
LAMP, 24VOLT, 25 WATT
CABLE, ELECTRICAL, 2 X 2.5 MM, FLEXIBLE
BAR, ROUND, RUBBER DIA.5IN
BORESCOPE, MIN. 15M LENGTH PROBE, WATERPROOF C/
MULTIPLEX 8 MM

B. MATERIAL CERAMIC FIBER


1 CERAMIC FIBER SHEE, Z-BLOCK MODULE

SU

ANALISA HARGA SATUAN


PEKERJAAN

ORDER NO.

URAIAN PEKERJAAN

JUMLAH

2. UPAH
NO
DESCRIPTION
A TOTAL RETUBING HEATER 211-H-1
A.1 RADIANT SECTION
1 PARTIAL RETUBING RADIANT SECTION REFORMER 702-H2 REPAIRE ROOF SEGMEN CABIN C/W CERAMIC FIBER MOD
3 BONGKAR & PASANG AKSESORIES HEATER UNTUK PARTIA
4 ISOLIR UNIT 702
5 MECHANICAL HEATER, CHANGED OUT CATALYST 702-H-1
6 PENGGANTIAN VALVES BURNER 702-H-1
7 MECHANICAL VESSEL, CHANGED OUT CATALYST HTSC 70
8 PENGGANTIAN LINE OUTLET 702-E-5
B UPAH MANPOWER PWHT
1 PWHT 2 (DUA) UNIT TERMASUK MENYEDIAKAN :
OPERATOR
HEATER ELEMENT SIZE 1.1/2IN, 4IN
CABLE 25 METER
ISOLASI ELEMENT HEATER
- WORKING
C UPAH SCAFFOLDING
1 PASANG & BUKA SCAFFOLDING
2 MOB-DEMOB SCAFFOLDING

*)

SU
HARGA UPAH SUDAH TERMASUK ALAT SAFETY STANDARD

3. ALAT
NO
DESCRIPTION
A SEWA ALAT KERJA
1 DIESEL WELDING MACHINE 400A, C/W. ACC + OPR
2 WELDING TRAFO 400A SINGLE OUTLET C/W ACCESSORIE
3 WELDING ELECTRODE DRYER
4 TANG LAS ARGON C/W ACCESSORIES
5 CUTTING TORCH SET C/W FLASH BACK ARESTOR
6 GRINDING CUT OFF MACHINE, SIZE 14"
7 HAND GRINDING MACHINE, 4IN
8 HAND GRINDING MACHINE, 6IN
9 WELDING MASK
10 COMBINATION WRENCH PASS - RING SET 10 S/D 32 MM
11 SMALL TOOLS & ACCESSORIES FOR WELDING
12 CHAIN BLOCK/HOIST, 1 TON X 3 MTR
13 CHAIN BLOCK/HOIST, 2 TON X 3 MTR
14 CHAIN BLOCK/HOIST, 5 TON X 5 MTR

ANALISA HARGA SATUAN


PEKERJAAN

ORDER NO.

URAIAN PEKERJAAN

JUMLAH

15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

COPPER HAMMER, 3 KG
KUNCI RING PUKUL LURUS 22 MM
KUNCI RING PUKUL LURUS 24 MM
KUNCI RING PUKUL LURUS 27 MM
KUNCI RING PUKUL LURUS 32 MM
KUNCI RING PUKUL LURUS 36 MM
KUNCI RING PUKUL LURUS 41 MM
COMBINATION WRENCH PASS - RING 36 MM
COMBINATION WRENCH PASS - RING 41 MM
ERECTION WRENCH (KUNCI RUNCING), 32 MM
ERECTION WRENCH (KUNCI RUNCING), 36 MM
PIPE WRENCH, SIZE 18"
GERGAJI BESI
SAFETY NET
PORTABLE ELECTRIC DRILLING MACHINE, 12 MM
CORD REELS W/ OUT LET 20 AMP, 30 MTR
TIMBANGAN RANGE 10 KG

ANALISA HARGA SATUAN


PEKERJAAN

ORDER NO.

URAIAN PEKERJAAN

JUMLAH

B SEWA ALAT PWHT


1 PWHT 2 (DUA) UNIT TERMASUK MENYEDIAKAN :
OPERATOR
HEATER ELEMENT SIZE 1.1/2IN, 4IN
CABLE 25 METER
ISOLASI ELEMENT HEATER
- WORKING
C SEWA ALAT SCAFFOLDING
1 SCAFFOLDING (PASANG + BUKA)
2 MOB-DEMOB SCAFFOLDING

SU

PARTIAL RETUBING RADIANT REFORMER DAN CHANGED OUT CATALYST 702-H-1,


H2 PLANT, PLANT STOP 2017
8301019476
PARTIAL RETUBING RADIANT REFORMER & COC 702-H-1
1 LOT

DESCRIPTION

K : 4 X 6 M SYNTETIC RUBBER
8" @ 220 MTR/ROLL
100 CM X 150 CM X 0.5 MM
ANTI PECAH CAP : 10 LITER
EL 6" X 6 MM THK
EL 4" X 4 MM THK
GENERAL USE FOR WELDING
, 180 X 1.6 X 22 MM (7IN)
ACKSAW, 12IN
EL, FOR SS, 7IN X 6 MM
EL, SS, 4IN X 6 MM
G, ALUMINIUM OXIDE, 180 X 3 X 22 MM FOR SS
E, ER. 90S-B3, SIZE 2.4 MM
ER. NiCrCoMol
P, 99.999%, 230 CUFT, 2200PSI
, GRADE W, LD-60
SOLUBLE, PPR, WHITE, 1IN
PAPER, 2IN
STICK, COLOURWHITE
285, GR.C,2400 X 1200 X 8 MM
A283, C, 2438 X 1219,6 MM

LACK BRISTLE FILLING, 3IN


ALLUM.CORE, W/HANDLE, 4IN
E, ER.70-SB, SIZE 2:4 MM
D, AWS. E-6010 - B6,2.50MM
D, AWS. E-7018 - B6,2.50MM
LDING, AWS-E7018 - B2,3.2 MM
STICK, COLOURWHITE
FIBER GLASS, WHITE
SS, DIA. 1/2IN, C/W CONNECTOR
E 5M, STEEL
E 50M, STEEL
PAPER, 3IN
PERMANENT, BLACK

VOL
25.00
100.00
40.00
40.00
120.00
25.00
120.00
4.00
4.00
50.00
30.00
120.00
120.00
150.00
150.00
25.00
100.00
120.00
150.00
25.00
25.00
40.00
2.00
12.00
12.00
20.00
2.00
2.00
25.00
25.00
10.00
10.00
20.00
20.00
25.00
25.00
20.00
6.00
30.00
2.00
2.00
100.00
20.00

UOM
KG
KG
PCS
PCS
GLN
PCS
CAN
LBR
ROLL
PCS
PCS
PCS
PCS
PAA
PCS
PCS
PCS
PCS
PCS
KG
KG
CYL
ROLL
ROLL
ROLL
PCS
SHT
SHT
LTR
LTR
PCS
PCS
KG
KG
KG
KG
PCS
PCS
MTR
PCS
PCS
ROLL
PCS

PARTIAL RETUBING RADIANT REFORMER DAN CHANGED OUT CATALYST 702-H-1,


H2 PLANT, PLANT STOP 2017
8301019476
PARTIAL RETUBING RADIANT REFORMER & COC 702-H-1
1 LOT

YCOTE 1000
ERMATEX FORM A

CAL, 2 X 2.5 MM, FLEXIBLE


UBBER DIA.5IN
N. 15M LENGTH PROBE, WATERPROOF C/W MONITOR

AMIC FIBER
SHEE, Z-BLOCK MODULE

10.00 PCS
10.00 CAN
10.00 TBS
50.00 ROLL
20.00 ROLL
200.00 MTR
5.00 MTR
1.00 SET
50.00 SHT

30.00
SUB TOTAL

M2

PARTIAL RETUBING RADIANT REFORMER DAN CHANGED OUT CATALYST 702-H-1,


H2 PLANT, PLANT STOP 2017
8301019476
PARTIAL RETUBING RADIANT REFORMER & COC 702-H-1
1 LOT

DESCRIPTION
NG HEATER 211-H-1

NG RADIANT SECTION REFORMER 702-H-1


EGMEN CABIN C/W CERAMIC FIBER MODULE
ANG AKSESORIES HEATER UNTUK PARTIAL RETUBING RADIANT

ATER, CHANGED OUT CATALYST 702-H-1


ALVES BURNER 702-H-1
SSEL, CHANGED OUT CATALYST HTSC 702-V-7
INE OUTLET 702-E-5

VOL

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

UOM

LOT
LOT
LOT
LOT
LOT
LOT
LOT
LOT

WER PWHT
NIT TERMASUK MENYEDIAKAN :

T SIZE 1.1/2IN, 4IN

T HEATER
15.00 MEQDS

SCAFFOLDING
AFFOLDING

900.00
900.00

M3
M3

SUB TOTAL
DAH TERMASUK ALAT SAFETY STANDARD

DESCRIPTION

G MACHINE 400A, C/W. ACC + OPR


400A SINGLE OUTLET C/W ACCESSORIES
RODE DRYER
N C/W ACCESSORIES
SET C/W FLASH BACK ARESTOR
OFF MACHINE, SIZE 14"
MACHINE, 4IN
MACHINE, 6IN

WRENCH PASS - RING SET 10 S/D 32 MM


ACCESSORIES FOR WELDING
OIST, 1 TON X 3 MTR
OIST, 2 TON X 3 MTR
OIST, 5 TON X 5 MTR

VOL

UOM

22.00
140.00
220.00
220.00
220.00
176.00
176.00
88.00
220.00
88.00
88.00
220.00
220.00
88.00

EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS

PARTIAL RETUBING RADIANT REFORMER DAN CHANGED OUT CATALYST 702-H-1,


H2 PLANT, PLANT STOP 2017
8301019476
PARTIAL RETUBING RADIANT REFORMER & COC 702-H-1
1 LOT

UL LURUS 22 MM
UL LURUS 24 MM
UL LURUS 27 MM
UL LURUS 32 MM
UL LURUS 36 MM
UL LURUS 41 MM
WRENCH PASS - RING 36 MM
WRENCH PASS - RING 41 MM
NCH (KUNCI RUNCING), 32 MM
NCH (KUNCI RUNCING), 36 MM

TRIC DRILLING MACHINE, 12 MM


OUT LET 20 AMP, 30 MTR
NGE 10 KG

220.00
220.00
220.00
440.00
440.00
220.00
220.00
440.00
440.00
220.00
220.00
132.00
440.00
110.00
44.00
132.00
44.00

EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS
EQDS

PARTIAL RETUBING RADIANT REFORMER DAN CHANGED OUT CATALYST 702-H-1,


H2 PLANT, PLANT STOP 2017
8301019476
PARTIAL RETUBING RADIANT REFORMER & COC 702-H-1
1 LOT

NIT TERMASUK MENYEDIAKAN :

T SIZE 1.1/2IN, 4IN

T HEATER
15.00 EQDS

AFFOLDING
PASANG + BUKA)
AFFOLDING

900.00
900.00
SUB TOTAL

M3
M3

Lampiran 4

D OUT CATALYST 702-H-1,

HARGA SATUAN
30,450.00
12,075.00
26,250.00
36,750.00
26,250.00
15,750.00
68,250.00
630,000.00
1,312,500.00
126,000.00
15,750.00
36,750.00
26,250.00
47,250.00
57,750.00
131,250.00
52,500.00
27,300.00
57,750.00
294,000.00
3,150,000.00
1,102,500.00
1,575,000.00
5,250.00
7,875.00
15,750.00
4,851,000.00
4,851,000.00
252,000.00
78,750.00
36,750.00
26,250.00
89,250.00
63,000.00
50,400.00
50,400.00
26,250.00
367,500.00
131,250.00
36,750.00
787,500.00
15,750.00
26,250.00

SUB TOTAL
761,250.00
1,207,500.00
1,050,000.00
1,470,000.00
3,150,000.00
393,750.00
8,190,000.00
2,520,000.00
5,250,000.00
6,300,000.00
472,500.00
4,410,000.00
3,150,000.00
7,087,500.00
8,662,500.00
3,281,250.00
5,250,000.00
3,276,000.00
8,662,500.00
7,350,000.00
78,750,000.00
44,100,000.00
3,150,000.00
63,000.00
94,500.00
315,000.00
9,702,000.00
9,702,000.00
6,300,000.00
1,968,750.00
367,500.00
262,500.00
1,785,000.00
1,260,000.00
1,260,000.00
1,260,000.00
525,000.00
2,205,000.00
3,937,500.00
73,500.00
1,575,000.00
1,575,000.00
525,000.00

Lampiran 4

D OUT CATALYST 702-H-1,

31,500.00
157,500.00
89,250.00
5,250.00
47,250.00
47,250.00
157,500.00
36,750,000.00
183,750.00

315,000.00
1,575,000.00
892,500.00
262,500.00
945,000.00
9,450,000.00
787,500.00
36,750,000.00
9,187,500.00

9,230,130.00

276,903,900.00
589,719,900.00

Lampiran 4

D OUT CATALYST 702-H-1,

HARGA SATUAN

SUB TOTAL

358,113,000.00
249,900,000.00
36,750,000.00
10,500,000.00
68,250,000.00
98,332,500.00
78,750,000.00
8,925,000.00

358,113,000.00
249,900,000.00
36,750,000.00
10,500,000.00
68,250,000.00
98,332,500.00
78,750,000.00
8,925,000.00

2,100,000.00

31,500,000.00

52,500.00
17,850.00

47,250,000.00
16,065,000.00
1,004,335,500.00

HARGA SATUAN
262,500.00
157,500.00
15,750.00
15,750.00
21,000.00
17,850.00
8,925.00
10,500.00
5,250.00
52,500.00
18,900.00
15,750.00
27,300.00
36,750.00

SUB TOTAL
5,775,000.00
22,050,000.00
3,465,000.00
3,465,000.00
4,620,000.00
3,141,600.00
1,570,800.00
924,000.00
1,155,000.00
4,620,000.00
1,663,200.00
3,465,000.00
6,006,000.00
3,234,000.00

Lampiran 4

D OUT CATALYST 702-H-1,

15,750.00
3,675.00
5,250.00
7,875.00
10,500.00
12,600.00
15,750.00
12,600.00
15,750.00
10,500.00
12,600.00
6,300.00
6,300.00
26,250.00
17,850.00
8,400.00
36,750.00

3,465,000.00
808,500.00
1,155,000.00
3,465,000.00
4,620,000.00
2,772,000.00
3,465,000.00
5,544,000.00
6,930,000.00
2,310,000.00
2,772,000.00
831,600.00
2,772,000.00
2,887,500.00
785,400.00
1,108,800.00
1,617,000.00

Lampiran 4

D OUT CATALYST 702-H-1,

3,675,000.00

55,125,000.00

89,250.00
31,500.00

80,325,000.00
28,350,000.00
276,263,400.00

ANALISA HARGA SATUAN


PEKERJAAN
ORDER NO.

: PARTIAL RETUBING RADIANT REFORMER DAN CHANGED OUT


H2 PLANT, PLANT STOP 2017
: 8301019476

URAIAN PEKERJAAN

: FINISHING & CLEANING AREA

JUMLAH

: 1 LOT

1. MATERIAL
NO
DESCRIPTION
1 SABUN HIJAU
2 MAJUN
3 PLASTIC BAGS, 100 CM X 150 CM X 0.5 MM
4 EMBER PLASTIK ANTI PECAH CAP : 10 LITER
5 SAPU LIDI
6 DLL

VOL
25.00
40.00
20.00
35.00
10.00

SUB TOTAL
2. UPAH
NO
A MANPOWER
1 PEMUKA
2 SAFETYMAN
3 HELPER
4 DLL

*)

DESCRIPTION

VOL
8.00
8.00
40.00

SUB TOTAL
HARGA UPAH SUDAH TERMASUK ALAT SAFETY STANDARD

3. ALAT
NO
DESCRIPTION
1 GEROBAK SORONG
2 CANGKUL
3 SKOP, STD
4 TRUCK COLD DIESEL, KAPASITAS : 4 TON + DRIVER & BBM
5 DLL
SUB TOTAL

VOL
40.00
40.00
40.00
10.00

Lampiran 5

MER DAN CHANGED OUT CATALYST 702-H-1,

UOM
KG
KG
PCS
PCS
PCS

HARGA SATUAN
15,750.00
26,250.00
15,750.00
31,500.00
15,750.00

SUB TOTAL
393,750.00
1,050,000.00
315,000.00
1,102,500.00
157,500.00

3,018,750.00

UOM
MDS
MDS
MDS

HARGA SATUAN
262,500.00
210,000.00
105,000.00

SUB TOTAL
2,100,000.00
1,680,000.00
4,200,000.00

7,980,000.00

UOM
EQDS
EQDS
EQDS
EQDS

HARGA SATUAN
42,000.00
5,250.00
5,250.00
1,575,000.00

SUB TOTAL
1,680,000.00
210,000.00
210,000.00
15,750,000.00

17,850,000.00

SHIFT PAGI
NO

JABATAN

NAMA

HELPER

A.FAUZI
B. SHARIYZAN
C.
D.
H.
F.
G
H.
I.
J.
K.
L.
M.
N.
O.

WELDER

HERMAN FAIZAL
AJIS MUKTAR
M. DENI
EKA SUMARNO
SAIFULLAH
BADRA LISMAN
ABDUL SALIM
ROMI INDRA
YOYON

PIPE FITER

RUSMADI
SUDARMADI
JUNAIDI
ERI YONAL
BUDI HARTONO
AMRIZAL
SURYA DARMA
YUNNEIDI
ABDULLAH
ONFARMON
DEDY SUMARNA
SASMITA
HERYONO
SYAFRIDONI

KATALIS

RIGER

DRIVER

A.
B.
C. AAA (TIME KEEPER)

SEFTIMEN

A. HERI PURNAMA
B.ALDO

QWC/WI

A. ZULMAN

10

MANDOR

A. MAULUDIN

11

TAKER

A. REFLI HARIADI

SHIFT MALAM
NO
1

HELPER

I. GAEK MADI
J.
K.
L.
M.
N.
O.
A.
B.

JABATAN

NAMA
A. DAUS
B. ADI GAPUK
C.
D.
H.
F.
G
H.

I.
J.
K.
L.
M.
N.
O.
2

WELDER

A.HARIADI (FORMEN)
B.
C.
D.
E.
F.
G.
H.

PIPE FITER

IWANTED(FORMEN)
BAHARI
HIZAM
EDI
ANDI SALASKA
F.
G.
H.

KATALIS

A.GAEK MADI(FORMEN)
B.
C.
D.
E.
F.
G
H.
I.
J.
K.
L.
M.
N.
O.

RIGER

A.
B.

DRIVER

A.
B.
C. (TIME KEEPER)

SEFTIMEN

A.
B.

QWC/WI

A.SAHADAT

10

MANDOR

A. SUPRIANTO

11

TAKER

A. AKBAR

DATA PEKERJA TA

PT. KAMISATOYO
Jl. Sultansarif kasim No 121
DUMAI _RIAU
Phone: 085374281298

INVOICE #

2034
CUSTOMER ID

564

BILL TO

SHIP TO

DORI
PT EMIRA
JL. Sukajadi no 22
DUMAI
Phone : 08136333363

ADRIANSA
PT EMIRA
JL. Sukajadi no 22
DUMAI
Phone : 08136333363

EMIRA@YAHOO.COM

EMIRA@YAHOO.COM

DESCRIPTION

RADIOGRAFI JT 1
PEMBAYARAN MENPOWER

Thank you for your business!


PENERIMA

M. OPERASI
DORI

QTY

40
20

TOTAL

UNIT PRICE

900,000.00
200,000.00

INVOICE
DATE

3/1/2017
TERMS
SETELAH PEKERJAAN SELESAI

AMOUNT

36,000,000.00
4,000,000.00
-

40,000,000.00
PEMBERI

M.KEUNGAN
HUTRI RAMAH

LAPORAN PEKERJAAN PERGANTIA


NO

LAPORAN PEKERJAAN PERGANTIAN SHIFE


PAKERJAAN YANG TELAH DILAKUKAN

PEKERJAAN YANG HARUS DI LANJUTKN

YANG MEMBUAT

PEMUKA MALAM

YANG MENERIMA

PEMUKA PAGI

PERGANTIAN SHIFE
KET / %

HARI/ TGL

DI SETUJUI

SUFERFESOR
CANDRA SAFUDIN

PEKERJAAN : PARTIAL RETUB


NO

DESCRIPTION

BOBOT
(%)

PREPARATION & ADMINISTRATION

0.93

HEAVY EQUIPMENT SUPPLY

31.72

PARTIAL RETUBING RADIANT REFORMER & COC 702-H-1

66.39

A. PARTIAL RETUBING REFORMER 702-H-1


B. CHANGED OUT CATALYST 702-H-1
4

FINISHING & CLEANING AREA

0.97
100.00

PROGRESS INCREMENTAL PLAN (%)


PROGRESS ACCUMULATIVE PLAN (%)
PROGRESS INCREMENTAL ACTUAL (%)
PROGRESS ACCUMULATIVE ACTUAL (%)
DEVIATION (%)

Dibuat Oleh :
PT. KAMI SATOYO

NUZLAN
Direktur

TIME

SCHEDULE

PARTIAL RETUBING RADIANT REFORMER DAN CHANGED OUT CATAL

OBOT
(%)

2
0.31

0.31

0.31

10.57

10.57

10.57

3.69

33.19

3.69

33.19

1
0

0.31
0.31
0.00
0.00
(0.31)

2
10.88
11.19
0.00
0.00
(11.19)

3
10.88
22.07
0.00
0.00
(22.07)

4
10.57
32.64
0.00
0.00
(32.64)

3.69
36.33
0.00
0.00
(36.33)

3.69
40.02
0.00
0.00
(40.02)

DULE

ED OUT CATALYS 702-H-1, H2 PLANT, PLANT STOP 2017


7

HARI KERJA KE8

3.69

3.69

10

11

12

13

3.69

3.69

3.69

3.69

3.69

5.53

5.53

5.53

5.53

5.53
0.32

3.69
43.71
0.00
0.00
(43.71)

3.69
47.40
0.00
0.00
(47.40)

9.22
56.62
0.00
0.00
(56.62)

10
9.22
65.84
0.00
0.00
(65.84)

11
9.22
75.06
0.00
0.00
(75.06)

12
9.22
84.28
0.00
0.00
(84.28)

13
9.54
93.82
0.00
0.00
(93.82)

14

GRAFIK
PROGRESS
100%

15

50%
5.53
0.32

0.32
0%

14
5.86
99.68
0.00
0.00
(99.68)

15
0.32
100.00
0.00
0.00
(100.00)

PARTIAL RETUBING R

GENERAL AFFAIR
ANTON
SAFETY OFFICER
WAREHOUSE
ANGGI
SAFETYMAN PAGI
ALDO RAASID

FOREMAN WELDER

FORE

BEJO
SAFETYMAN MALAM
RIKIZET / RAMAN

WELDER

HELPER

STRUKTUR ORGANISASI

IAL RETUBING RADIANT REFORMER DAN CHANGED OUT CATALYST 702-H-1, H2 PLANT, PLA

SITE MANAGER
CANDRA SAFUDIN

ERAL AFFAIR
ANTON
PEMUKA PAGI

AREHOUSE

PEMUKA MALAM

MAULUDIN

FOREMAN FITTER

SUPRIANTO

WI / QC

WANTED

ZULMAN

FITTER

SCHEDULLER

DRAFTER

TAKER PAGI

TAKER MALAM

ARI
HELPER

AKBAR
ADM

ADE /DILA

-1, H2 PLANT, PLANT STOP 2017

EMUKA MALAM

TIM KEEPER

SUPRIANTO

DRAFTER

FOREMAN WELDER

FOREMAN FITTER

WELDER

FITTER

HELPER

HELPER

AKER MALAM

:
:

DAFTAR HARGA UPAH KARIAWAN TA 2017


UNTUK SHIFT PAGI
JABATAN

JAM NORMAL

HELPER

Rp

10,000.00

WELDER

Rp

41,500.00

PIPE FITER

Rp

25,000.00

KATALIS

Rp

10,800.00

SEFTIMEN

Rp

12,500.00

RIGER

Rp

20,800.00

MANDOR

Rp

25,000.00

QWC

Rp

50,000.00

DRIVER

Rp

11,600.00

MB UPAH WELDER UNTUK SABTU & MINGGU LANGSUNG X2


JABATAN
MEN
WELDER
8
FITER
8

UNTUK SHIFT MALAM


JABATAN

JAM NORMAL

HELPER

Rp

10,000.00

WELDER

Rp

41,500.00

PIPE FITER

Rp

25,000.00

KATALIS

Rp

10,800.00

SEFTIMEN

Rp

12,500.00

RIGER

Rp

20,800.00

MANDOR

Rp

25,000.00

QWC

Rp

50,000.00

DRIVER

Rp

11,600.00

MB UPAH WELDER UNTUK SABTU & MINGGU LANGSUNG X2


JABATAN
WELDER
FITER

MEN
8
8

TOTAL UPAH HARI BIASA (ALL)


TOTAL PAGI
TOTAL MALAM
TOTAL UPAH

ANGGARAN MAKAN PEKERJA TA


SHIFT PAGI
PEKERJA

TOTAL HARIKERJA

HELPER

20

WELDER

15

PIPE FITER

15

KATALIS

10

SEFTIMEN

20

RIGER

15

MANDOR

20

QWC

15

DRIVER

20

MB : UNTUK TOTAL MAKAN WELDER , FITER & QWC 3X SEHARI


SHIFT MALAM

PEKERJA

TOTAL HARI KERJA

HELPER

20

WELDER

15

PIPE FITER

15

KATALIS

10

SEFTIMEN

20

RIGER

15

MANDOR

20

QWC

15

DRIVER

20

MB : UNTUK TOTAL MAKAN WELDER , FITER & QWC 3X SEHARI

PAGI

Rp

17,640,000.00

MALAM

Rp

17,640,000.00

TOTAL

Rp

35,280,000.00

BIAYA JALAN / ONGKOS /TRANSPORTASI


UPAH PERAWANG DUMAI PP
PEKERJA
TOTAL ORG
WELDER
16
FITER

TOTAL ONGKOS PP Rp

UANG MINYAK
MOBIL
HILUK
HILUK
DYNA

16

6,400,000.00

NO POLISI
BM
BM
BM

JAM LEMBUR

TOTAL JAM NORMAL

Rp

10,000.00

8 JAM (07.00. 16.00)

Rp

41,500.00

8 JAM (07.00. 16.00)

Rp

25,000.00

8 JAM (07.00. 16.00)

Rp

10,800.00

8 JAM (07.00. 16.00)

Rp

12,500.00

8 JAM (07.00. 16.00)

Rp

20,800.00

8 JAM (07.00. 16.00)

Rp

25,000.00

8 JAM (07.00. 16.00)

Rp

50,000.00

8 JAM (07.00. 16.00)

Rp

11,600.00

8 JAM (07.00. 16.00)

41,000.00
25,000.00

TOTAL JAM
80
80

GU LANGSUNG X2
UPAH
Rp
Rp

JAM LEMBUR

TOTAL JAM NORMAL

Rp

10,000.00

8 JAM (19.00. 04.00)

Rp

41,500.00

8 JAM (19.00. 04.00)

Rp

25,000.00

8 JAM (19.00. 04.00)

Rp

10,800.00

8 JAM (19.00. 04.00)

Rp

12,500.00

8 JAM (19.00. 04.00)

Rp

20,800.00

8 JAM (19.00. 04.00)

Rp

25,000.00

8 JAM (19.00. 04.00)

Rp

50,000.00

8 JAM (19.00. 04.00)

Rp

11,600.00

8 JAM (19.00. 04.00)

41,000.00
25,000.00

TOTAL JAM
80
80

GU LANGSUNG X2
UPAH
Rp
Rp

SA (ALL)
Rp

MINGU & SABTU UNTUK WELDER &FITE


165,504,000.00 PAGI
MALAM

Rp

162,504,000.00 TOTAL

Rp

328,008,000.00

HRGA

TOTAL HARGA

Rp

12,000.00

Rp

3,600,000.00

Rp

12,000.00

Rp

4,320,000.00

Rp

12,000.00

Rp

4,320,000.00

Rp

12,000.00

Rp

1,800,000.00

Rp

12,000.00

Rp

480,000.00

Rp

12,000.00

Rp

360,000.00

Rp

12,000.00

Rp

240,000.00

Rp

12,000.00

Rp

540,000.00

Rp

12,000.00

Rp

720,000.00

Rp

17,640,000.00

TOTAL
ER & QWC 3X SEHARI

HRGA

TOTAL HARGA

Rp

12,000.00

Rp

3,600,000.00

Rp

12,000.00

Rp

4,320,000.00

Rp

12,000.00

Rp

4,320,000.00

Rp

12,000.00

Rp

1,800,000.00

Rp

12,000.00

Rp

480,000.00

Rp

12,000.00

Rp

360,000.00

Rp

12,000.00

Rp

240,000.00

Rp

12,000.00

Rp

540,000.00

Rp

12,000.00

Rp

720,000.00

TOTAL
ER & QWC 3X SEHARI

Rp

17,640,000.00

UPAH BORONGAN
PWHT
RADIO GRAFI
TOTAL

Rp

ONGKOS
200,000.00

Rp

TOTAL
3,200,000.00

Rp

200,000.00

Rp

3,200,000.00

Rp

6,400,000.00

TOTAL HARI
20
15
10

MON/HARI
Rp
Rp
Rp

100,000.00
100,000.00
150,000.00
TOTAL

ANGGARAN PENGELUARAN TA 2017

TOTAL JAM LEMBUR


2 JAM (`16.00. 18.00)
2 JAM (`16.00. 18.00)
2 JAM (`16.00. 18.00)
2 JAM (`16.00. 18.00)
2 JAM (`16.00. 18.00)
2 JAM (`16.00. 18.00)
2 JAM (`16.00. 18.00)
2 JAM (`16.00. 18.00)
2 JAM (`16.00. 18.00)

JAM KERJA
07.00 S/D 18.00
07.00 S/D 18.00

TOTAL JAM LEMBUR


2 JAM (`04.00. 05.00)
2 JAM (`04.00. 05.00)
2 JAM (`04.00. 05.00)

2 JAM (`04.00. 05.00)


2 JAM (`04.00. 05.00)
2 JAM (`04.00. 05.00)
2 JAM (`04.00. 05.00)
2 JAM (`04.00. 05.00)
2 JAM (`04.00. 05.00)

JAM KERJA
18.00 S/D 07.00
18.00 S/D 07.00

TUK WELDER &FITER


Rp
Rp

42,240,000.00
42,240,000.00

Rp

84,480,000.00

TOTAL MAN
15
8

8
15
2
2
1
1
3

TOTAL MAN
15
8
8
15
2
2
1
1
3

Rp

65,000,000.00

Rp

20,000,000.00

Rp

85,000,000.00

KET
HARUS ADA TIKET
UNTUK PENGAMBILAN UANG

TOTAL MON
Rp
Rp
Rp
Rp

2,000,000.00
1,500,000.00
1,500,000.00
5,000,000.00

GARAN PENGELUARAN TA 2017

KET JAM
JAM LEMBUR X 2
JAM LEMBUR X 2
JAM LEMBUR X 2
JAM LEMBUR X 2
JAM LEMBUR X 2
JAM LEMBUR X 2
JAM LEMBUR X 2
JAM LEMBUR X 2
JAM LEMBUR X 2
TOTALUPAH / HARI

Rp
Rp
Rp

TOTAL MON
26,240,000.00
16,000,000.00
42,240,000.00

KET JAM
JAM LEMBUR X 2
JAM LEMBUR X 2
JAM LEMBUR X 2

JAM LEMBUR X 2
JAM LEMBUR X 2
JAM LEMBUR X 2
JAM LEMBUR X 2
JAM LEMBUR X 2
JAM LEMBUR X 2
TOTALUPAH / HARI

Rp
Rp
Rp

TOTAL MON
26,240,000.00
16,000,000.00
42,240,000.00

TOTAL MON UPAH KESELURUHAN


TOTAL UPAH HARI BIASA
MINGU & SABTU UNTUK WELDER &FITER

2017

UPAH PERHARI
Rp

120,000.00

Rp

498,000.00

Rp

300,000.00

Rp

129,600.00

Rp

150,000.00

Rp

249,600.00

Rp

300,000.00

Rp

600,000.00

Rp

139,200.00

Rp

2,347,200.00

UPAH PERHARI
Rp

120,000.00

Rp

498,000.00

Rp

300,000.00

Rp

129,600.00

Rp

150,000.00

Rp

249,600.00

Rp

300,000.00

Rp

600,000.00

Rp

139,200.00

Rp

SELURUHAN

UK WELDER &FITER
GRAND TOTAL

2,347,200.00

GRENTOTAL ANGGARAN TA 2017


UANG EXTRA PUDING
UANG INTERTEN
UANG MINYAK
PWHT
RADIO GRAFI
UANG UPAH
UANG JALAN PP DUMAI PERAWANG
UANG MAKAN
MATERIAL
TOTAL

TOTAL HARI

TOTAL MEN

20

15

11

11

10

15

20

15

20

20

20

3
GRAND TOTAL

TOTAL HARI

TOTAL MEN

20

15

11

11

10

15

20

15

20

15

20

3
GRAND TOTAL

Rp

328,008,000.00

Rp

84,480,000.00

Rp

412,488,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,000,000.00
60,000,000.00
5,000,000.00
65,000,000.00
20,000,000.00
412,488,000.00
6,400,000.00
35,280,000.00
350,000,000.00
619,168,000.00
769,288,000

TOTAL
Rp

36,000,000.00

Rp

43,824,000.00

Rp

26,400,000.00

Rp

19,440,000.00

Rp

6,000,000.00

Rp

7,488,000.00

Rp

6,000,000.00

Rp

12,000,000.00

Rp

8,352,000.00

Rp

165,504,000.00

TOTAL
Rp

36,000,000.00

Rp

43,824,000.00

Rp

26,400,000.00

Rp

19,440,000.00

Rp

6,000,000.00

Rp

7,488,000.00

Rp

6,000,000.00

Rp

9,000,000.00

Rp

8,352,000.00

Rp

162,504,000.00

BERITA ACARA SERAH TERIMA ALAT KERJA


NO :
.

PADA HARI INI : ./././ ,BERTEMPAT DI ..YANG BERTANDATANG


DI BAWAH INI :
NAMA
:
JABATAN
:
ALAMAT
:

DENGAN INI MENYATAKAN BAHWA PIHAK PERTAMA DI ATAS TELAH MENYERAHKAN KEPADA GUDAN
BERUPA ALAT DAN MATERIAL KERJA SEBAGAI BERIKUT :
NAMA
KEADAN BARANG
NO
BARANG
QTY
SATUAN
NO SPM
BAIK

DAN SELANJUTNYA ALAT KERJA TERSEBUT MENJADI TANGGUNG JAWAB GUDANG PT KAMI SATOYO
DEMIKIAN BERITA ACARA SERAH TERIMA INI KAMI BUAT DENGAN SEBENARNYA

PIHAK PERTAMA

NAMA
JABATAN

:
:

..YANG BERTANDATANGAN

NYERAHKAN KEPADA GUDANG PT KAMISATOYO

ADAN BARANG
TIDAK BAIK

KET

GUDANG PT KAMI SATOYO

N SEBENARNYA

GUDANG

NAMA
JABATAN

:
:

LAMPIR
" PARTIAL RETUBING RADIANT REF
NO

NAMA

NO. KTP

CHANDRA
SYAHBUDIN

1472022108700022

IWANTED

1408042105790004

MAJID

AJIS MUKTAR

1408041007750017

M. DENI

1408041108720013

EKA SUMARNO

21711110088191013

SAIFULLAH

1306090606780004

BADRA LISMAN

1408041603770000

ABDUL SALIM

1219050808700006

ROMI INDRA

1408041910820001

10

YOYON

1205041701830001

11

HERMAN FAIZAL

1472020605790025

RUSMADI

1209191407830000

SUDARMADI

1472010810650001

13

14

JUNAIDI

1472021301710001

15

ERI YONAL

1472020702620021

16

BUDI HARTONO

1472040608700001

15

AMRIZAL

1408041011790002

16

SURYA DARMA

1408042712860003

17

YUNNEIDI

1304022407740004

18

ABDULLAH

1408040204790001

19

ONFARMON

1408041703790001

20

DEDY SUMARNA

1205140202780004

21

SASMITA

1307091004680001

22

HERYONO

1801040509820007

23

SYAFRIDONI

1305152009840000

24

HARYADI

1210201907730001

25

MAULUDDIN

1472020405720001

26

REFLI ARIYADI

1472011204940002

27

RICKY. Z

1472022403720001

28

ALDO NOFANDI

1472021111940003

29

DEDO SALASKA

1306080609920003

30

IBNU TAKBIRATUL
AKBAR

1374011605940000

31

DODI HARTONO

1306080904740000

32

ADHY MARTHA
AGUS

1472011503750040

33

NUR FADILLAH

1472014511940020

34

ADE SURYANI

1472014301940000

35

AGUS MERI ACHMAD

1472030708670000

36

MARHAN SUTAFLI

1472022505720020

37

RIVO HARIANTO

1373022601850000

38

HENDI SALASKA

1306082106940000

39

MAHADIR
MUHAMMAD

1472023108940060

40

DEDIK HERIYANTO

1472010512700000

41

MULYADI

1472022506790002

42

M. FIRDAUS

1403012503960005

43

NUZLAN

1472012301730000

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74

75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90

LAMPIRAN NAMA KARYAWAN


" PARTIAL RETUBING RADIANT REFORMER 702-H-1, H2 PLANT, PLANT STOP 2017 "
ALAMAT

JL. SIBAYAK KELURAHAN JAYA MUKTI


KECAMATAN DUMAI TIMUR KOTA DUMAI

JL. HANG JEBAT GG. JATI KELURAHAN


PERAWANG KECAMATAN TUALANG
KABUPATEN SIAK

JABATAN

SITE MANAGER

PEMUKA

FOREMAN WELDER

JL. LINGKUNGAN DAMAI NO. 195


KELURAHAN PERAWANG KECAMATAN
TUALANG KABUPATEN SIAK

WELDER

GG. HIDAYAH KELURAHAN PERAWANG


KECAMATAN TUALANG KABUPATEN SIAK

WELDER

SAGULUNG SUMBER SERAYA KELURAHAN


SUNGAI LANGKAI KECAMATAN SAGULUNG
KOTA BATAM

WELDER

JL. AR HAKIM KELURAHAN PERAWANG


KECAMATAN TUALANG KABUPATEN SIAK

WELDER

JL. AR HAKIM

WELDER

DUSUN IV SIDUABELAS KELURAHAN


PERKEBUNAN PETATAL KECAMATAN TALAW
KABUPATEN BATU BARA

WELDER

JL. SUKARAMAI GG. DURIAN KELURAHAN


PERAWANG KECAMATAN TUALANG
KABUPATEN SIAK

WELDER

JL. SUKARAMAI KELURAHAN PERAWANG


KECAMATAN TUALANG KABUPATEN SIAK

WELDER

JL. TAKARI NO. 16 KELURAHAN SUKAJADI


KECAMATAN DUMAI KOTA KOTA DUMAI

WELDER

JL. ASRAMA TRIBATA JATI 5

FITTER

JL.SIAK KELURAHAN SIMPANG TETAP DARUL


ICHSAN KECAMATAN DUMAI BARAT

FITTER

JL. GAJAH MADA GG. PENGHULU NO. 305,


KELURAHAN BULUH KASAP, KECAMATAN
DUMAI TIMUR

FITTER

JL. KAMBOJA GG. SEROJA KELURAHAN DUMAI


KOTA KECAMATAN DUMAI TIMUR

FITTER

JL. RAYA PU BANGSAL ACEH KELURAHAN


BANGSAL ACEH KECAMATAN SUNGAI
SEMBILAN KOTA DUMAI

FITTER

JL. AR HAKIM GG. RAHMAT NO. 110


KELURAHAN PERAWANG KECAMATAN
TUALANG KABUPATEN SIAK

FITTER

BTN PURI PERAWANG KM 09 KELURAHAN


PERAWANG BARAT KECAMATAN TUALANG
KABUPATEN SIAK

FITTER

JL. AR HAKIM KELURAHAN PERAWANG


KECAMATAN TUALANG KABUPATEN SIAK

FITTER

JL. HANG JEBAT GG. JATI KELURAHAN


PERAWANG KECAMATAN TUALANG
KABUPATEN SIAK

FITTER

JL. MAHARAJA SRI WANGSA KELURAHAN


TULANAG KECAMATAN TUALANG
KABUPATEN SIAK

FITTER

JL. PERJUANGAN SUKAMULIA KELURAHAN


PELAWI SELATAN KECAMATAN BABALAN
KABUPATEN LANGKAT

FITTER

JL. GAJAH TUNGGAL KELURAHAN PERAWANG


KECAMATAN TUALANG KABUPATEN SIAK

FITTER

DSN MARGOMULYO RULUNG HELOK


KELURAHAN RULUNG HELOK KECAMATAN
NATAR KABUPATEN LAMPUNG SELATAN

FITTER

JL. RAJA KECIK

FITTER

DUSUN II SEI NAHUDARIS KELURAHAN SEI


NAHODARIS KECAMATAN PANAI TENGAH

WELDER

JL. GAJAH MADA GG. RIMIJA KELURAHAN


BULUH KASAP KECAMATAN DUMAI TIMUR

JL. SEMANGKA KELURAHAN RIMBA


SEKAMPUNG KECAMATAN DUMAI BARAT

SUPERVISOR

TEKER

JL. HANG TUAH GG. KARYA IV KELURAHAN


BULUH KASAP KECAMATAN DUMAI TIMUR

SAFETYMAN

GG. BAKTI KELURAHAN BINTAN KECAMATAN


DUMAI TIMUR KOTA DUMAI

SAFETYMAN

JORONG BARUAH KELURAHAN PADANG


TAROK KECAMATAN BASO

JL. SYECH M JAMIL NO. 67

JL. JANUR KUNING GG. HIDAYAH

OPERATOR FOCO

PROJECT MANAGER

PEMUKA

JL. P. DIPONEGORO

SAFETYMAN

JL. UTAMA KM. 7.5

STAFF ADMINISTRASI

JL. PANGKALAN SENA

STAFF ADMINISTRASI

JL. PANTI ASUHAN

OPERATOR CRANE

JL. SULTAN HASANUDDIN NO. 55

DRIVER

JL. PELITA

DRIVER

JORONG BARUAH

FITTER

JL. PERJUANGAN

FITTER

JL. UTAMA

MEKANIK

JL. SULTAN SYARIF KASIM NO. 121


KELURAHAN TELUKBINJAI KECAMATAN
DUMAI TIMUR

HELPER

JL TUNAS MUDA

HELPER

JL. PELITA RAWASARI

PEMUKA

2017 "
KETERANGAN