Sunteți pe pagina 1din 10

Ref: SBE/GK-1/131/10 11

Date: 30th July 2010,


To
M/s. Harrisons Malayalam Limited.,
Bristow Road, Willigdon Island,
Post Box No.502 Kochi-682003
Ph: 0484 2666155, 26668866,
Fax: 04842666752
Kind Attn: Mr. Sunil John Tharakan
Dear Sir,
Sub: Offer for Hot Water Boiler and Accessories for May Feild Regarding.
With reference to the telephonic discussion, we are herewith enclosing our competitive offer for
our Model: SHBSP 1000, pressurized Hot Water Boiler, Wood fired, capable of generating
10,00,000 kcals/hr of heat output and its accessories.
We hope the above offer will be inline with your requirements. In case of any clarifications please
feel free to contact us.
Thanking you and assuring you of our best services at all times.
Yours truly,
For SOUTHERN BOILERS AND EQUIPMENTS PVT. LTD.,

M. GOPALAKRISHNAN

M/s. Harrisons Malayalam.,


Bristow Road, Willigdon Island
Post Box No.502 Kochi-682003
HOT WATER GENERATOR
SHBSP 1000
(Pressurised)
1. DESIGN FEATURES

Our Offer Ref


Your Ref
Date
WOOD FIRED

: SBE/GK/136/10 11
: Telephone
: 30.07.2010
QUOTATION

Three pass fully wet back design.


The boiler is designed in such way that it is easy to operate and to maintain.
Maximum efficiency is ensured while designing the boiler.
All the parts of the boiler are easily available locally.
Shell and Multi tubular design.
2. SCOPE OF SUPPLY
Pressure parts fabricated out of MS plates and tubes.
Refractory lined Front and back smoke boxes are provided.
Internal furnace with removable type flat grate will be provided.
Pre-wired control panel with relays, contactors, fuses are provided.
Pressure gauge is provided to indicate the pressure.
Temperature Indicator cum controller to control the ID fan.
Temperature Indicator cum Controller to sense the return water temperature.
Safety Valve is provided.
One No. blow down valve is provided.
One No. Isolation valve to isolate pressure gauge.
ID Fan with motor will be provided.
Pressure switch to control the pressurized pump is provided.
Pressure pump for maintaining the system pressure is provided
One: Temperature indicator control at inlet to maintain constant hot water temperature by
controlling the ID fan operation.

4.

TECHNICAL SPECIFICATION
Model
Total Heat Output
Maximum Temperature
Thermal efficiency based on NCV
Flow rate
Fuel Consumption wood 3000

:
:
:
:
:
:

ATH 800
8,00,000 Kcals/Hr
160o C
74 +/- 2%
40 m/hr
333 Kgs/Hr

:
:
:
:
:

7.5 / 5 KW
1. 8 KW
20 HP / 15 KW
21.8 KW
415 V, 3 PH, AC 50 Hz, 4 Wire

:
:
:
:

5000 mm
2300 mm
2700 mm
9000 Kgs

Price (Ex-works)
Charges Erection and Commissioning

Rs. 10,56,000/-

(guidance)

Rs. 25,000/-

Kcals/Kg
ID Fan
Pressure pump
Circulating pump
Total connected load
Electric Supply
Overall Dimensions (Approx)
Length
Width
Height
Dry weight
5.

6.

PRICE SCHEDULE

TAXES
a)

7.

As per vat 4%.

DUTIES
Excise duty will be 10% of the basic price plus 3% Educational Cess.

8.

PAYMENT TERMS
40% Advance along with purchase order.
60% against Proforma invoice prior to despatch.

9.

VALIDITY
This offer is valid for acceptance for a period of 15 days from the date of the offer.

10.

DELIVERY
8 weeks from the date of confirmed order along with advance.

11.

INSPECTION
At our works prior to despatch.

12.

THIS OFFER EXCLUDES


a) All civil and structural work for installing the unit.
b) Erection of the unit at site.
c) Water service tank and make up tank.
d) Main chimney and fuel gas ducting from unit to chimney.
e) Hot water pipeline from boiler outlet to the process and from process to the pump
suction and from pump suction to the boiler.
f) Main switch and supply cable to control panel.
g) Spares for installation operation and maintenance.
h) Transportation from our works to your site.
i) Insulation of Hot water boiler.
j) Unloading and loading the boiler to the foundation.
k) All interconnecting piping.
l) All electrical cabling from panel to internal motor and controls.
m) Any other items and services not specifically mentioned in our scope of supply.

13.

WARRANTY
The product carries a guarantee against manufacturing defects, for a period of twelve
months, from the date of commissioning at your factory or eighteen months from the date

of supply. The guarantee is restricted to mechanical items only and is limited to repair,
replacement of defective spares and accessories, The guarantee will not cover normal wear
and tear of the parts of defects due to mishandling of the equipment or negligence, As
regards bought out items like pumps, motors, instruments etc., the guarantee offered by the
manufacturers of these items would be passed on to us and it is limited to the guarantee
offered by the respective manufacturers.
14.

JURISDICATION
Subject to Chennai Jurisdiction.

For SOUTHERN BOILERS AND EQUIPMENTS PVT. LTD.,

M. GOPALAKRISHNAN

ACCESSORIES FOR HOT WATER GENERATOR


I)
a) Hot water line from Hot water generator to radiator, radiator to circulating pump then to
hot water generator.

S.No.

Particulars

Size

Qty

Unit Rate

1.

100 Mtrs.

2125/mtrs

2.

ERW C Class pipe


(inlet line & return
line)
Flange

4 nos.

1490/no.

5,960.00

3.

Seamless Bend

4 nos.

1630/no

6,520.00

Total

Total
2,12,500.00

2,24,980.00

b) Fabrication & Erection of high pressure pump line from make-up tank to main line.
S.No.

Particulars

Size

Qty

Unit Rate

1.

ERW C Class pipe

24 mtrs

800/mtrs

19,200.00

2.

Flange

16 nos.

280/no.

4,480.00

3.

Seamless Bend

10 nos.

200/no.

2,000.00

Total

Total

25,680.00

c) Fabrication & Erection of Safety valve outlet line till make up tank
S.No.

Particulars

Size

Qty

Unit Rate

1.

ERW C Class pipe

24 Mtrs

800/mtrs

19,200.00

2.

Flange

6 nos.

280/no.

1,680.00

3.

Seamless Bend

8 nos.

200/no.

1,600.00

Total

Total

22,480.00

d) Fabrication & Erection of Solenoid Valve till make up tank


S.No.

Particulars

Size

Qty

Unit Rate

Total

1.

ERWC Class pipe

24 Mtrs

800/mtrs

19,200.00

2.

Fla nge

6 nos.

280/no.

1,680.00

3.

Seamless Bend

8 nos.

200/no.

1,600.00

Total

22,480.00

e) Drain line of Hot Water Generator


S.No.

Particulars

Size

Qty

Unit Rate

1.

ERWC Class pipe

12 Mtrs

800/mtrs

9,600.00

2.

Flange

6 nos.

280/no.

1,680.00

3.

Seamless Bend

3 nos.

200/no.

600.00

Total

Total

11,880.00

f) Air vent line till make up tank


S.No.

Particulars

Size

Qty

Unit Rate

1.

ERWC Class pipe

24 Mtrs

800/mtrs

19,200.00

2.

Flange

4 nos.

600/no.

2,400.00

3.

Seamless Bend

6 nos.

425/no.

2,550.00

Total

II) Fabrication & Erection of Valves & fittings in the hot water line
4 Globe Valve for circulating pump isolation -2 nos. x Rs.12,000/

Rs.24,000/-

4 Stainer in circulation pump

Rs.10,000/-

-1 nos. x Rs.10,000/-

Total

24,150.00

4 Globe Valve at inlet & outlet of radiators - 4 nos x Rs.12,000/-

Rs.48,000/-

1 Globe Valve at pressuring pump for isolation - 2 nos.xRs.6,500/-

Rs.13,000/-

1 Stainer at make up water tank outlet

- 1 no. x Rs.7,500/-

Rs.7,500/-

1 Globe Valve for solenoid valve isolation

- 2 nos.x Rs.7,900/-

Rs.15,800/-

1 Solenoid valve

- 1 no. x Rs.35,000/- Rs. 35,000/-

1 Globe Valve to isolate make up tank

- 1no. x Rs.7,900/-

Rs.7,900/-

4 Non Return Valve

- 1no. x Rs.14,000/-

Rs.14,000/-

Bolt & nut

- 1 Set

Rs.15,000/-

Gaskets

- 1 set

Rs.10,000/-

Pressure gauge isolation valve

- 6 nos.@Rs.1500

Rs.9,000/-

Pressure gauge

- 6 nos.@Rs.1600

Rs.9,600/-

1 drain valve at radiator outlet

- 2 nos. x Rs.7,900/- Rs. 15,800/-

1 Globe valve at withering radiator

- 1 nos. x Rs. 7.900/- Rs. 7,900/-

Total

Rs. 2,42,500/-

III) Ducting
I) Flue Gas
1. Hot Water Generator to Air preheater of size 450 mm dia length of 3 mts
2. Air preheater to ID fan 6 mts
II) Air Duct
1. Air preheater to furnace 10 mts
Total ducting cost will be. Rs. 52,500/- (Approx. for 750 kg @ Rs.70/kg)

IV) Erection
Erection of Boiler fittings and radiators.

The cost of the above will beRs.20,000/V) Insulation of Hot Water Generator
1. The cost of insulation for Hot Water Generator (100 mm thk)
(For 60 m @ Rs.1200/m)....Rs. 72,000/2. The cost of insulation for Hot water pipelines (50 mm), solenoid valve pipeline, air vent
line

(For 107 m @ Rs.1000/m).......Rs.1,07,000/-

3. The cost of insulation for Air pre heater (100 mm )


(For 20 m @ Rs.1200/m)...Rs.24,000/4. The cost of insulation for Ducting ( 50 mm )
(For 30 m @ Rs.1000/m)...Rs. 30,000/VI) Make- Up Water Tank
Design, Fabrication and Erection of MS feed water tank of capacity 2000 litres made out of MS
sheets with necessary nozzles, level Indicator and top lid for cleaning and enamel painting on the
outer side.
The cost for the above will be .Rs. 50,000/VII) Structural Supports
Fabrication and Erection of supporting structurals for make up tank, Air Pre heater,
pipeline, flue gas ductings.The cost of the above will be ..Rs35,000/- (Approx.
for 500 kg @ Rs.70/kg)
VII) Transportation (for accessories)
The cost of the transportation from Chennai to your site Rs.45,000/Total cost for the above will be . Rs.10,09,650/-

Payment Terms
40% as advance
60 % against Proforma invoice prior to despatch.

Exclusions
All electrical cabling
1. All civil works
2. All duties & taxes at actuals.
3. Boiler unloading, leading to its foundation.
For SOUTHERN BOILERS AND EQUIPMENTS PVT. LTD.,
M. GOPALAKRISHNAN