Documente Academic
Documente Profesional
Documente Cultură
M. GOPALAKRISHNAN
: SBE/GK/136/10 11
: Telephone
: 30.07.2010
QUOTATION
4.
TECHNICAL SPECIFICATION
Model
Total Heat Output
Maximum Temperature
Thermal efficiency based on NCV
Flow rate
Fuel Consumption wood 3000
:
:
:
:
:
:
ATH 800
8,00,000 Kcals/Hr
160o C
74 +/- 2%
40 m/hr
333 Kgs/Hr
:
:
:
:
:
7.5 / 5 KW
1. 8 KW
20 HP / 15 KW
21.8 KW
415 V, 3 PH, AC 50 Hz, 4 Wire
:
:
:
:
5000 mm
2300 mm
2700 mm
9000 Kgs
Price (Ex-works)
Charges Erection and Commissioning
Rs. 10,56,000/-
(guidance)
Rs. 25,000/-
Kcals/Kg
ID Fan
Pressure pump
Circulating pump
Total connected load
Electric Supply
Overall Dimensions (Approx)
Length
Width
Height
Dry weight
5.
6.
PRICE SCHEDULE
TAXES
a)
7.
DUTIES
Excise duty will be 10% of the basic price plus 3% Educational Cess.
8.
PAYMENT TERMS
40% Advance along with purchase order.
60% against Proforma invoice prior to despatch.
9.
VALIDITY
This offer is valid for acceptance for a period of 15 days from the date of the offer.
10.
DELIVERY
8 weeks from the date of confirmed order along with advance.
11.
INSPECTION
At our works prior to despatch.
12.
13.
WARRANTY
The product carries a guarantee against manufacturing defects, for a period of twelve
months, from the date of commissioning at your factory or eighteen months from the date
of supply. The guarantee is restricted to mechanical items only and is limited to repair,
replacement of defective spares and accessories, The guarantee will not cover normal wear
and tear of the parts of defects due to mishandling of the equipment or negligence, As
regards bought out items like pumps, motors, instruments etc., the guarantee offered by the
manufacturers of these items would be passed on to us and it is limited to the guarantee
offered by the respective manufacturers.
14.
JURISDICATION
Subject to Chennai Jurisdiction.
M. GOPALAKRISHNAN
S.No.
Particulars
Size
Qty
Unit Rate
1.
100 Mtrs.
2125/mtrs
2.
4 nos.
1490/no.
5,960.00
3.
Seamless Bend
4 nos.
1630/no
6,520.00
Total
Total
2,12,500.00
2,24,980.00
b) Fabrication & Erection of high pressure pump line from make-up tank to main line.
S.No.
Particulars
Size
Qty
Unit Rate
1.
24 mtrs
800/mtrs
19,200.00
2.
Flange
16 nos.
280/no.
4,480.00
3.
Seamless Bend
10 nos.
200/no.
2,000.00
Total
Total
25,680.00
c) Fabrication & Erection of Safety valve outlet line till make up tank
S.No.
Particulars
Size
Qty
Unit Rate
1.
24 Mtrs
800/mtrs
19,200.00
2.
Flange
6 nos.
280/no.
1,680.00
3.
Seamless Bend
8 nos.
200/no.
1,600.00
Total
Total
22,480.00
Particulars
Size
Qty
Unit Rate
Total
1.
24 Mtrs
800/mtrs
19,200.00
2.
Fla nge
6 nos.
280/no.
1,680.00
3.
Seamless Bend
8 nos.
200/no.
1,600.00
Total
22,480.00
Particulars
Size
Qty
Unit Rate
1.
12 Mtrs
800/mtrs
9,600.00
2.
Flange
6 nos.
280/no.
1,680.00
3.
Seamless Bend
3 nos.
200/no.
600.00
Total
Total
11,880.00
Particulars
Size
Qty
Unit Rate
1.
24 Mtrs
800/mtrs
19,200.00
2.
Flange
4 nos.
600/no.
2,400.00
3.
Seamless Bend
6 nos.
425/no.
2,550.00
Total
II) Fabrication & Erection of Valves & fittings in the hot water line
4 Globe Valve for circulating pump isolation -2 nos. x Rs.12,000/
Rs.24,000/-
Rs.10,000/-
-1 nos. x Rs.10,000/-
Total
24,150.00
Rs.48,000/-
Rs.13,000/-
- 1 no. x Rs.7,500/-
Rs.7,500/-
- 2 nos.x Rs.7,900/-
Rs.15,800/-
1 Solenoid valve
- 1no. x Rs.7,900/-
Rs.7,900/-
- 1no. x Rs.14,000/-
Rs.14,000/-
- 1 Set
Rs.15,000/-
Gaskets
- 1 set
Rs.10,000/-
- 6 nos.@Rs.1500
Rs.9,000/-
Pressure gauge
- 6 nos.@Rs.1600
Rs.9,600/-
Total
Rs. 2,42,500/-
III) Ducting
I) Flue Gas
1. Hot Water Generator to Air preheater of size 450 mm dia length of 3 mts
2. Air preheater to ID fan 6 mts
II) Air Duct
1. Air preheater to furnace 10 mts
Total ducting cost will be. Rs. 52,500/- (Approx. for 750 kg @ Rs.70/kg)
IV) Erection
Erection of Boiler fittings and radiators.
The cost of the above will beRs.20,000/V) Insulation of Hot Water Generator
1. The cost of insulation for Hot Water Generator (100 mm thk)
(For 60 m @ Rs.1200/m)....Rs. 72,000/2. The cost of insulation for Hot water pipelines (50 mm), solenoid valve pipeline, air vent
line
Payment Terms
40% as advance
60 % against Proforma invoice prior to despatch.
Exclusions
All electrical cabling
1. All civil works
2. All duties & taxes at actuals.
3. Boiler unloading, leading to its foundation.
For SOUTHERN BOILERS AND EQUIPMENTS PVT. LTD.,
M. GOPALAKRISHNAN