ETAP

Project:

12.6.0H

Location:
Contract:

Date:

22-04-2016

SN:

Engineer:
Filename:

Page:

Study Case: LF
final test

Revision:

Base

Config.:

Normal

Bus Loading Summary Report


Directly Connected Load
Constant kVA

Bus
ID

kV

Rated Amp

MW
0

Constant Z

Mvar

Bus1

150.000

Bus2

20.000

Bus3

20.000

0.002

0.200

Bus4

20.000

Bus5

0.380

Bus6

20.000

MW
0

Total Bus Load

Constant I

Mvar

MW

Generic

Mvar

MW

Mvar

MVA

% PF

Amp

2.710

3.8

10.4

2.696

3.8

78.2

0.005

0.584

2.674

2.3

78.2

1.879

1.7

55.3

0.008

0.876

0.876

0.9

1421.8

0.009

0.959

0.959

1.0

28.3

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).

Percent
Loading

ETAP

Project:

12.6.0H

Location:
Contract:

Date:

22-04-2016

SN:

Engineer:
Filename:

Page:

Study Case: LF
final test

Revision:

Base

Config.:

Normal

Branch Loading Summary Report

Transformer
CKT / Branch
ID

Cable & Reactor


Type

Ampacity
(Amp)

Loading
Amp

Capability
(MVA)

Loading (input)
MVA

Loading (output)
MVA

Cable1

Cable

271.68

78.23

28.79

Cable2

Cable

271.68

55.29

20.35

Cable3

Cable

271.68

28.27

10.41

T1

Transformer

5.000

2.710

54.2

2.696

53.9

T2

Transformer

1.000

0.918

91.8

0.876

87.6

* Indicates a branch with operating load exceeding the branch capability.

ETAP

Project:

12.6.0H

Location:
Contract:

Date:

22-04-2016

SN:

Engineer:
Filename:

Page:

Study Case: LF
final test

Revision:

Base

Config.:

Normal

Branch Losses Summary Report

CKT / Branch
ID

From-To Bus Flow

To-From Bus Flow

MW

Mvar

% Bus Voltage

Losses
kW

kvar

Vd
% Drop
in Vmag

MW

Mvar

From

To

T1

0.104

2.708

-0.104

-2.694

0.3

13.9

100.0

99.5

0.51

Cable1

0.104

2.694

-0.061

-2.673

42.9

20.6

99.5

98.7

0.81

Cable2

0.054

1.889

-0.033

-1.879

21.9

10.5

98.7

98.1

0.58

Cable3

0.012

0.961

-0.009

-0.959

3.1

1.5

98.1

97.9

0.16

T2

0.020

0.918

-0.008

-0.876

12.0

42.1

98.1

93.6

4.52

80.3

88.7

ETAP

Project:

12.6.0H

Location:
Contract:

Date:

22-04-2016

SN:

Engineer:
Filename:

Page:

Study Case: LF
final test

Revision:

Base

Config.:

Normal

Alert Summary Report


% Alert Settings
Critical

Marginal

Loading
Bus

100.0

95.0

Cable

100.0

95.0

Reactor

100.0

95.0

Line

100.0

95.0

Transformer

100.0

95.0

Panel

100.0

95.0

Protective Device

100.0

95.0

Generator

100.0

95.0

Inverter/Charger

100.0

95.0

OverVoltage

105.0

102.0

UnderVoltage

95.0

98.0

OverExcited (Q Max.)

100.0

95.0

UnderExcited (Q Min.)

100.0

Bus Voltage

Generator Excitation

Critical Report
Device ID
Bus5

Type
Bus

Condition
Under Voltage

Rating/Limit
0.380

Unit
kV

Operating
0.356

% Operating
93.6

Phase Type
3-Phase

Marginal Report
Device ID
Bus6

Type
Bus

Condition
Under Voltage

Rating/Limit
20.000

Unit
kV

Operating
19.588

% Operating
97.9

Phase Type
3-Phase

ETAP

Project:

12.6.0H

Location:
Contract:

Date:

22-04-2016

SN:

Engineer:
Filename:

Page:

Study Case: LF
final test

Revision:

Base

Config.:

Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW

Mvar

MVA

% PF

Source (Swing Buses):

0.104

2.708

2.710

Source (Non-Swing Buses):

0.000

0.000

0.000

Total Demand:

0.104

2.708

2.710

3.84 Lagging

Total Motor Load:

0.002

0.200

0.200

0.80 Lagging

Total Static Load:

0.022

2.419

2.419

0.91 Lagging

Total Constant I Load:

0.000

0.000

0.000

Total Generic Load:

0.000

0.000

0.000

Apparent Losses:

0.080

0.089

System Mismatch:

0.000

0.000

Number of Iterations: 2

3.84 Lagging