Sunteți pe pagina 1din 3

CSEC (U) LTD.

Project

PLOT 692, BLOCK 214, KISASI_RESIDENTIAL

Client

BUKENYA JONATHAN, P.O BOX 7131, KAMPALA.

Location FIRST FLOOR SLAB.

Made by

from 7 to 10

ak
Checked

RIBBED SLABS to EN 1992-1: 2004


Originated from TCC32.xls v 4.0 on CD

LOCATION

Supports from grid

MATERIALS
fck
fyk
fywk

25
500
500

Steel class
Density

A
25

mm

mm btm

N/mm

dg
s
c

N/mm

Wk

20
1.15
1.50
0.40

(t-t0)

0.30
2

N/mm

(Normal weight)
kN/m

L (m)

H (mm)

Left

Right

6.300

275

500

500

Revision

Job No

STR-003-17

Top cover
Btm cover
Side cover
c,dev

26
26
26
10

mm

slab depth, hf

50

mm

Rib width
Centres
1 in

150
450
10

mm

steel
concrete
mm top

mm
mm
mm

RIBS

mm

taper

SUPPORTS
Support No

Type

1
K
2
K
K(nife), C(anti(antilever) or E(ncastre)
Usage: Dwelling

LOADING UDLs (kN/m)


Span 1
UDL
PL 1
PL 2
Span 2
UDL
PL 1
PL 2
Span 3
UDL
PL 1
PL 2

COVERS (to links, or if no links, to reinf)

Solid (mm)

SPANS
SPAN 1
SPAN 2
SPAN 3
SPAN 4
SPAN 5
SPAN 6

10

Page

23-Jan-17

2003-2017 TCC

to grid

Date

PLs (kN/m)

With brittle partitions

Position (m)

Self

Add Dead

Imposed

Position

Weight

Load

Load

from left

3.96
~~~~
~~~~

2.93

1.50

~~~~

~~~~
~~~~
~~~~
~~~~
~~~~
~~~~

Self

Span 4
Weight
UDL
PL 1 ~~~
PL 2 ~~~
Span 5
UDL
PL 1 ~~~
PL 2 ~~~
Span 6
UDL
PL 1 ~~~~
PL 2 ~~~~

LOADING PATTERN
DEAD
IMPOSED

min
1.35

Add Dead

Imposed

Position

Load

Load

from left

~~~~

~~~~

max
1.35
1.50

BS EN 1990: (6.10)

LOADING DIAGRAM

10

REACTIONS (kN/m)
SUPPORT
Characteristic Dead
Max Imposed
Min Imposed
MAX ULTIMATE

21.7
4.7

21.7
4.7

36.4

36.4

~
~
~
~

~
~
~
~

~
~
~
~

~
~
~
~

~
~
~
~

CSEC (U) LTD.

PLOT 692, BLOCK 214, KISASI_RESIDENTIAL

Project
Client

BUKENYA JONATHAN, P.O BOX 7131, KAMPALA.

Location

Made by

FIRST FLOOR SLAB., from 7 to 10

Date

ak
Checked

RIBBED SLABS to EN 1992-1: 2004

Originated from TCC32.xls v 4.0 on CD

Page

23-Jan-17
Revision

Job No

2003-2017 TCC

STR-003-17

BENDING MOMENT DIAGRAMS (kNm/m)


10

10

-10

-10

-20

-20

-30

-30

-40

-40

-50

-50

-60

-60
-70

-70
0

10

Elastic Moments

SUPPORT No

Elastic M
Redistributed M

Redistribution

Redistributed Envelope

0.0
0.0
1.000

0.0
0.0
1.000
0.0%

~
~
~
0.0%

~
~
~

~
~
~

~
~
~

~
~
#VALUE!

~
~
#VALUE!

~
~
#VALUE!

~
~
#VALUE!

~
~
#VALUE!

SPAN No

10

kNm/m
kNm/m
~

Elastic M
Redistributed M

57.29
57.29
1.000

SHEAR FORCE DIAGRAMS (kN/m)


50

50

40

40

30

30

20

20

10

10

-10

-10

-20

-20

-30

-30

-40

-40

-50
0

Elastic V
Redistributed V

10

Elastic Shears
SPAN No

-50

Redistributed Shears

36.4
36.4

36.4
36.4

~
~

~
~

~
~

~
~

~
~

~
~

~
~

~
~

~
~

~
~

SPAN No

Elastic V
Redistributed V

10

Project

PLOT 692, BLOCK 214, KISASI_RESIDENTIAL

Client

BUKENYA JONATHAN, P.O BOX 7131, KAMPALA.

Location

CSEC (U) LTD.


Made by

FIRST FLOOR SLAB., from 7 to 10

ak
Checked

RIBBED SLABS to EN 1992-1: 2004

Originated from TCC32.xls v 4.0 on CD

Date

Page

Revision

2003-2017 TCC

23-Jan-17

Job No

STR-003-17

SPAN 1
ACTIONS
DESIGN

d
As
As2

kNm/m
mm
mm
mm

TOP STEEL

As prov

mm

As2 prov
SHEAR
VEd
VEd per rib
VRd,c

mm

BTM STEEL
kN
kN
kN

LINKS
DEFLECTION
& CHECKS

LEFT
0.0
1.00
241.0
0
0
2H
16
/rib
+ 2H8 between
503
2H
16
/rib
402
36.37
13.77
27.87
.
L/d 26.14

CENTRE
57.3
1.00
241.0 (x=30.1<hf/)
259 (448 for defln)
As2
0
2H
16
/rib
As2 prov
3H
As prov

402
16
603

Link
2H0 @ 0
Allowed 27.32

/rib

ok

RIGHT
0.0
1.00
241.0
0
As2
0
2H
16
/rib
+ 2H8 between
As prov
503
2H
16
/rib
As2 prov
402
VEd
36.37
VEd per rib
13.77
VRd,c
27.87
.
(As increased by 72.9%)

% As
Bar & cover
Bar spacing

ok

ok

ok

ok

ok

ok

ok

ok

ok

Max Asw/s

ok