Section/Clause/Paragraph:
Sections 4.3.11
No
System/Sub-System:
N/A
Yes
THE MAXIMUM TIME BETWEEN MIXING AND PLACING CONCRETE SHALL NOT EXCEED ONE (1) HOUR.
Proposed Deviation to Specification
THE MAXIMUM TIME BETWEEN MIXING AND PLACING CONCRETE SHALL NOT EXCEED (1.5) HOUR.
Attach additional sheets, if necessary.
Technical Justification to Deviate: (Full and detailed appraisal required and attach additional sheets if necessary)
Concrete mix design D will be used for lean concrete as described in sec.7.3 of S-B00-1320-002
Initial setting time as per the attached trail mix (D) from RMQ No. 007-012 is 225 280 minutes.
The concrete mixers will travel around 45 minutes to reach the project site gate, the setting time needs to be extended to
give the construction time for the concrete placing and other related activities.
Slump and temperature of concrete will be maintained as required in the specifications. Refer attached RMQ letter for more
details.
Issued By Responsible Personnel Name:
H.K.MANJUNATH
Title/Discipline:
Signature:
Date: 16-10-2011
Impact
(Yes/No)
No
Quality
No
Regulatory
No
Cost
No
Schedule
No
Engineering / Construction
No
Corrosion Protection
No
Operability
Yes
No
Contractor Recommendation/Comments: Provide details below i.e. Recommend Accept/Reject. Outline the positive or negative aspects if ticked
above. Estimated cost or schedule benefits if this SDR is approved. Define applicability i.e which LNG Train? If needed, Contractor should consider
prior discussion and COMPANY concurrence before completion of Section 2 Estimate of Impact and Risk & SHE Evaluation.
Contractor Comments:
Will enhance the constructability of concrete works as the batching plant is not close to the site location and construction activities
needs to be given enough time.
Sheet: Page 1 of 4
Sheet: 2 of 3
Definition
Possibility of
Repeated
Incidents
Possibility of
Isolated
Incidents
Probability Definitions
Working Definition
20 or more times per facility life: or 5 or more
times during project execution
Possibility of
Occurring
Sometimes
Not Likely To
Occur
Practically
Impossible
D
E
Cat
I
Health/Safety
Fatalities/Serious
Impact to Public. One
or more fatality
II
Serious Injury to
Personnel/ Limited
Impact to Public.
Severe but non-fatal
III
IV
Minor Impact on
Personnel. First aid
only
XY
A
C
O
N
S
E
Q
U
E
N
C
E
S
PROBABILITY
B
C
D
Risk Level(Y):
XY
II
III
LOW
IV
HIGHER RISK
MEDIUM RISK
LOW RISK
Contractor
Consequence Considerations
Public Disruption
Environmental Impact
Large Community.
Major/ Extended
Impact on a large
Duration/ Full-Scale
scale and
Response. Requires
communicated by
corporate assistance
national/ international
and picked up by
media
national/ international
media.
Small Community.
Serious/ Significant
Impact on public is
Resource Commitment.
limited, attracts
Oil spill response,
national media
communicated by
media
Minor. Isolated
Moderate/Limited
impact, no coverage
Response of Short
by national media
Duration. Oil spill
response
communicated by
media
Minimal to None
Minor/Little or No
Response Needed
Financial Impact
Corporate. More
than 50USMD
loss of assets or 4
month delay
Regional Affiliate.
Between 2 &
20USMD, or 2
month delay
Division/Site.
Between 2 USMD
and 500 USKD, or
2 week delay
Other. No
financial impact
Name
Title
Reviewed by:
RAM MOHAN D
Approved by:
H.K.MANJUNATH
Signature
Date
16-10-2011
16-10-2011
Yes
No
Deviation requests entering the Medium Risk and High Risk Areas or remaining in the High Risk Area of the Risk Matrix and all deviations to S
(Safety) designated paragraphs; require additional COMPANY SME review and endorsement.
If the proposed deviation is considered higher risk or the risk level increases (further left on matrix) compared to the baseline document, then
approval must be obtained according to the levels detailed in Tables 6.8 and 6.9 of CPQ-3 Venture Quality Management System Rev 2 Dated May
2010.
Spec Deviation Request is technically acceptable Recommend Acceptance as a one-time deviation to Project Specification
Spec Deviation Request is technically unacceptable, incomplete and/or lacking supporting evidence - Recommend rejection. (See comments)
Recommend Alternative (see comments)
PMOC Recommended?
Yes
No
Recommend that a Permanent Revision to Project Specification be considered and Applicable to All Current Project Work?
Yes
No
COMPANY SME EVALUATION OF DEVIATION REQUEST REQUIRED? (when med, high, safety risk or requested by PMT)
Yes
No
Signature:
Date:
SDR Number:
SDR-5858-GCC-001 Rev.0
Sheet: 3 of 3
Proposed alternative
Signature:
Date:
Alternative Proposed
PMOC Required
Management Comments: (i.e. is a further estimate required to verify accuracy of cost and schedule impact?)
Signature:
Date:
Signature:
Date:
Is all requested documentation attached that supports satisfactory implementation and closure?
Contractor Authorized Representative Name:
Signature:
Date:
Date:
Signature:
DOCUMENT DISTRIBUTION
Project File Ref:
Project Distribution (designate recipients):
Operations Rep
Construction
Information Management
RA/SHE
Engineering Disciplines
Quality
Other: (specify)
Sheet: 4 of 3