Documente Academic
Documente Profesional
Documente Cultură
INSPECTION/VA
IN THE IMPLEMENTATION OF DEPAR
DEFECTS/DEFICIENCIES
Region: CAR
District: ABRA DEO
Length (km)
b.
a.
20.03
K0430+000 - K0460+000
b.
L = 95.484 km
c.
75.45
a.
0.98
2. ABRA-CERVANTES ROAD
Pothole
Alligator
Cracks
(sq.m.)
(sq.m.)
04
05
Shoving &
Major
Pumping &
Corrugati
Scaling
Depression
on
(sq.m.)
(sq.m.)
(sq.m.)
a.
###
b.
###
a.
K0431+(-527) - K0457+562
b.
L = 14.197 km
c.
13.22
a.
36.17
a.
K0411+234 - K0412+081
b.
1.79
b.
Page 1 of 12
03
b. As
Verified
Gravel
1. ABRA-KALINGA ROAD
02
a. As
Inspected
a. Concrete
Asphalt
01
b.
1.26
-
0.27
-
SUM
INSPECTION/VA
IN THE IMPLEMENTATION OF DEPAR
DEFECTS/DEFICIENCIES
Region: CAR
District: ABRA DEO
Length (km)
b.
c.
0.87
a.
11.89
K0387+(-987) - K0408+190
b.
L = 28.468 km
c.
16.58
a.
11.88
b.
L = 24.950 km
c.
13.07
Page 2 of 12
03
Pothole
Alligator
Cracks
(sq.m.)
(sq.m.)
b. As
Verified
Gravel
L = 38.824 km
02
a. As
Inspected
a. Concrete
Asphalt
01
04
05
Shoving &
Major
Pumping &
Corrugati
Scaling
Depression
on
(sq.m.)
(sq.m.)
(sq.m.)
a.
b.
a.
b.
SUM
INSPECTION/VA
IN THE IMPLEMENTATION OF DEPAR
DEFECTS/DEFICIENCIES
Region: CAR
District: ABRA DEO
Length (km)
b.
03
Pothole
Alligator
Cracks
(sq.m.)
(sq.m.)
b. As
Verified
Gravel
6. BANGUED-CADRE ROAD
02
a. As
Inspected
a. Concrete
Asphalt
01
04
05
Shoving &
Major
Pumping &
Corrugati
Scaling
Depression
on
(sq.m.)
(sq.m.)
(sq.m.)
a.
a.
b.
b.
L = 0.628 km
c.
0.63
a.
80.95
b.
1.79
c.
119.82
Total
Accomplishment (%)
a.
1.52
b.
Page 3 of 12
#DIV/0!
SUM
INSPECTION/VA
IN THE IMPLEMENTATION OF DEPAR
DEFECTS/DEFICIENCIES
Region: CAR
District: ABRA DEO
Length (km)
b.
Gravel
\
Prepared by:
0.00
Err:509
Page 4 of 12
02
Pothole
Alligator
Cracks
(sq.m.)
(sq.m.)
a. As
Inspected
a. Concrete
Asphalt
01
b. As
Verified
03
04
05
Shoving &
Major
Pumping &
Corrugati
Scaling
Depression
on
(sq.m.)
(sq.m.)
(sq.m.)
SUMMARY
CTION/VALIDATION REPORT
OF DEPARTMENT ORDER NO. 41 SERIES OF 2016
ICIENCIES ALONG NATIONAL ROAD
0
0
BOM-MPP
Code/Defects/Deficiencies & Estimated Quantity
06
07
08
09
10
11
12
13
14
06-C
06-Y
06-P
Edge Line
Center Line
Yellow Line
Pedestrian
Crossing
(l.m.)
(l.m.)
(l.m.)
(l.m.)
Low/
inverted
shoulder
Lush
vegetation
Clogged
Drains
Open
Manhole
No /
Inadequate
Sealant in
Joints
Unmaint
ained
Ravelling
Road
Signages
Cracks
(l.m.)
(l.m.)
(l.m.)
(no./s)
(l.m.)
(l.m.)
(sq.m)
(no./s)
###
###
###
###
###
###
###
###
###
###
44.00
2,300.00
Page 5 of 12
200.00
-
83.50
-
104.50
-
SUMMARY
CTION/VALIDATION REPORT
OF DEPARTMENT ORDER NO. 41 SERIES OF 2016
ICIENCIES ALONG NATIONAL ROAD
0
0
BOM-MPP
Code/Defects/Deficiencies & Estimated Quantity
06
07
08
09
10
11
12
13
14
06-C
06-Y
06-P
Edge Line
Center Line
Yellow Line
Pedestrian
Crossing
(l.m.)
(l.m.)
(l.m.)
(l.m.)
2,450.00
-
408.33
-
70.00
Low/
inverted
shoulder
Lush
vegetation
Clogged
Drains
Open
Manhole
No /
Inadequate
Sealant in
Joints
Cracks
(l.m.)
(l.m.)
(l.m.)
(no./s)
(l.m.)
(l.m.)
100.00
(sq.m)
329.40
(no./s)
Page 6 of 12
80.00
Unmaint
ained
Ravelling
Road
Signages
2.00
SUMMARY
CTION/VALIDATION REPORT
OF DEPARTMENT ORDER NO. 41 SERIES OF 2016
ICIENCIES ALONG NATIONAL ROAD
0
0
BOM-MPP
Code/Defects/Deficiencies & Estimated Quantity
06
07
08
09
10
11
12
13
14
06-C
06-Y
06-P
Edge Line
Center Line
Yellow Line
Pedestrian
Crossing
(l.m.)
(l.m.)
(l.m.)
(l.m.)
1,530.00
-
3,980.00
255.00
-
663.33
Low/
inverted
shoulder
Lush
vegetation
Clogged
Drains
Open
Manhole
No /
Inadequate
Sealant in
Joints
Unmaint
ained
Ravelling
Road
Signages
Cracks
(l.m.)
(l.m.)
(l.m.)
(no./s)
(l.m.)
(l.m.)
(sq.m)
(no./s)
#DIV/0!
70.00
#DIV/0!
44.00
-
2,400.00
280.00
Page 7 of 12
188.00
329.40
2.00
SUMMARY
CTION/VALIDATION REPORT
OF DEPARTMENT ORDER NO. 41 SERIES OF 2016
ICIENCIES ALONG NATIONAL ROAD
0
0
BOM-MPP
Code/Defects/Deficiencies & Estimated Quantity
06
07
08
09
10
11
12
13
14
06-C
06-Y
06-P
Edge Line
Center Line
Yellow Line
Pedestrian
Crossing
(l.m.)
(l.m.)
(l.m.)
(l.m.)
Low/
inverted
shoulder
Lush
vegetation
Clogged
Drains
Open
Manhole
No /
Inadequate
Sealant in
Joints
Cracks
(l.m.)
(l.m.)
(l.m.)
(no./s)
(l.m.)
(l.m.)
Page 8 of 12
Unmaint
ained
Ravelling
Road
Signages
(sq.m)
(no./s)
BOM-MPP-SUM
15
Unmaint
ained
Bridges
(no./s)
-
Page 9 of 12
BOM-MPP-SUM
15
Unmaint
ained
Bridges
(no./s)
Page 10 of 12
BOM-MPP-SUM
15
Unmaint
ained
Bridges
(no./s)
-
Page 11 of 12
BOM-MPP-SUM
15
Unmaint
ained
Bridges
(no./s)
Page 12 of 12