Sunteți pe pagina 1din 5
bragaZ Ee Erasmus+ Title Content - FLETRONIC Content = GRAPHIC DESIGN __] (05/03/2017 | Arrival Transfer to Braga Transfer to Braga to Braga, Bom Jesus and Sameiro. Cultural visit to Braga, Bom Jesus and Sameiro (06/03/2047 | introduction mn of the company and mentoring company —| Presentation of the company and mentoring company — to information about the daily work schedules, organization | information about the daily work schedules, organization of the companies | of the company, etc; Introduction of the standards of | company, etc; Introduction of the standards of Health and Safety Internship: Health and Safety at work; Meeting the staff and getting | at work; Meeting the staff and getting acquainted with the DAY1 acquainted with the workplace. Test Notion of first tasks workplace. Notion of first tasks. 1071032017 | internship _| - Integration in the day-to-day routine of the company; __| Integration in the day-to-day routine of the company; Daily work DAY2 Daily work activities following the standards of Health and | acti following the standards of Health and Safety at work; Safety at work; Assemble, install, test, and maintain Specific tasks and responsi ies for book/magazine/newspaper, electrical wiring, equipment, appliances, apparatus, and brochure and catalogue conception and editing aspects. ing hand tools and power tools; Prepare low blueprints to determine the location of wiring and equipment and to ensure conformance to building and safety codes. _ _ 08/03/2017 | Internship ‘Assemble, install, test, and maintain electrical wiring, | Developing concepts, graphics and layouts for product DAY3 equipment, appliances, apparatus, and fixtures, using hand } il ny logos, and websites; Determining size and tools and power tools; Inspect electrical systems, | arrangement of illustrative material and copy, and font style and ‘equipment, and components to identify hazards, defects, | size; Using the proper technology used in this area of expertise. and the need for adjustment or repair, and to ensure compliance with codes; Prepare sketches or follow blueprints to determine the location of wiring and equipment and to ensure conformance to building and safety codes. 09/03/2017 | Internship Diagnose malfunctioning systems, apparatus, and | Determining size and arrangement of illustrative material and DAY4 ‘components, using test equipment and hand tools, to | copy, and font style and size; Preparing rough drafts of material locate the cause of a breakdown and correct the probler based on an agreed brief; Reviewing final layouts and suggesting. 2 Assemble, install, test, and maintain electrical_wiring, | improvements if required; Project management and promotion. bragaZ | Erasmus+ ‘equipment, appliances, apparatus, and fixtures, using hand tools and power tools; Prepare sketches or follow blueprints to determine the location of wiring and equipment and to ensure conformance to building and safety codes. 40/03/2017 | internship | inspect electrical systems, equipment, and components to | Liaising with external printers on a regular basis to ensure DAYS identify hazards, defects, and the need for adjustment or | deadlines are met and mz printed to the highest quality; repair, and to ensure compliance with codes; Repair or for book/magazine/newspaper, replace wiring, equipment, and fixtures, using hand tools _| brochure and catalogue conception and editing aspects. and power tools; Perform other tasks as assigned by the supervisor. : 11/03/2017 | First Cultural Visit to Porto 7 Cultural Visit to Porto Weekend Saturday Z 4210312017 | First Free — Free Weekend ‘Sunday 43/03/2017 | internship | Assemble, install, test, and maintain electrical wiring, DAY6: equipment, appliances, apparatus, and fixtures, using hand ‘tools and power tools; Diagnose malfunctioning systems, | Determining size and arrangement of illustrative material and apparatus, and components, using test equipment and | copy, and font style and size; Project management and hand tools, to locate the cause of a breakdown and correct | promotion; Perform other tasks as assigned by the ‘the problem; Perform other tasks as assigned by the | mentor/supervisor. supervisor. 4410312017 | internship | inspect electrical systems, equipment, and components to | Using the proper technology used in this area of expertise; DAY7 identify hazards, defects, and the need for adjustment or | Developing concepts, graphics and layouts for product repair, and to ensure compliance with iny logos, and wet 2s; Determining size and electrical systems and continuity of circuits in electrical and copy, and font style and wiring, equipment, and fixtures, using testing devices such braga”, ce Erasmus+ ‘as ohmmeters, voltmeters, and oscilloscopes, to ensure compatibility and safety of system; Perform other tasks as assigned by the supervisor. 15/03/2017 Internship DAY8 Test electrical systems and continuity of circuits in equipment, appliances, apparatus, and fixtures, using hand tools and power tools; Perform other tasks as assigned by the supervisor. Preparing rough drafts of material based on an agreed bri Reviewing final layouts and suggesting improvements if req Using the proper technology used in this area of expertise; Project management and promotion; Perform other tasks as assigned by the mentor/supervisor. 16/03/2017 Internship DAYS Collaborate with electrical engineers and other personnel to identify, define, and solve developmental problems; Use a variety of tools and equipment such as power construction equipment, measuring devices, power tools, and testing equipment including oscilloscopes, ammeters, and test lamps; Perform other tasks as assigned by the supervisor. ‘Managing client proposals from typesetting through to design, print and production; Specific tasks and responsibilities for book/magazine/newspaper, brochure and catalogue conception and editing aspects; Perform other tasks as assigned by the mentor/supervisor. 1710312017 Internship DAY 10 Prepare sketches or follow blueprints to determine the location of wiring and equipment and to ensure conformance to building and safety codes; Inspect electrical systems, equipment, and components to identify hazards, defects, and the need for adjustment or repair, and to ensure compliance with codes; Perform other tasks as assigned by the supervisor. 1g with external printers on a regular basis to ensure deadlines are met and material is printed to the highest quality; Developing concepts, graphics and layouts for product illustrations, company logos, and websites; Determining size and arrangement of illustrative material and copy, and font style and size; Perform other tasks as assigned by the mentor/supervisor. 18/03/2017 Second weekend Saturday Cultural Visit to Viana do Castelo and Vigo Cultural Visit to Viana do Castelo and Vigo 19/03/2017 ‘Second Free braga” Ea Erasmus+ ‘weekend Sunday 20/03/2017 Internship DAY 11 Prepare sketches or follow blueprints to determine the location of wiring and equipment and to ensure conformance to building and safety codes; Inspect electrical systems, equipment, and components to hazards, defects, and the need for adjustment or repair, and to ensure compliance with codes; Perform other tasks as assigned by the supervisor. Liaising with clients to determine their requirements and budget; Determining size and arrangement of illustrative material and copy, and font style and size; Preparing rough drafts of material based on an agreed brief; Reviewing final layouts and suggesting improvements if required; Project management and promotion; Perform other tasks as assigned by the mentor/supervisor. 21/03/2017 Internship DAY 12 ‘Assemble, install, test, and m: ‘equipment, appliances, apparatus, and fixtures, using hand tools and power tools; Test electrical systems and continuity of circuits in electrical wiring, equipment, and fixtures, using testing devices such as ohmmeters, voltmeters, and oscilloscopes, to ensure compatibility and safety of system; Perform other tasks as assigned by the supervisor. Managing client proposals from typesetti print and production; Liaising with external basis to ensure deadlines are met and mate highest quality; Specific tasks and _respor book/magazine/newspaper, brochure and catalogue conception and editing aspects; Perform other tasks as assigned by the mentor/supervisor. through to design, 22/03/2017 Internship DAY 13 Inspect electrical systems, equipment, and components to identify hazards, defects, and the need for adjustment or repair, and to ensure compliance with codes; Test electrical systems and continuity of circuits in electrical wiring, equipment, and fixtures, using testing devices such as ohmmeters, voltmeters, and oscilloscopes, to ensure ‘compatibility and safety of system; Perform other tasks as assigned by the supervisor. Working with clients, briefing and advising them with regard to design style, format, print production and timescales; Developing concepts, graphics and layouts for product illustrations, company 10s, and websites; Determining size and arrangement of trative material and copy, and font style and size; Using the proper technology used in this area of expertise; Perform other tasks as assigned by the mentor/supervisor. 23/03/2017 Internship DAY 14 Collaborate with electrical engineers and other personnel +o identify, define, and solve developmental problems; Use a variety of tools and equipment such as power construction equipment, measuring devices, power tools, and testing equipment including oscilloscopes, ammeters, Preparing rough drafts of material based on an agreed brief; Reviewing final layouts and suggesting improvements if required; Using the proper technology used in this area of experti Project management and promotion; Perform other tasks as assigned by the mentor/supervisor. braga braga mob ia Erasmus+ and test lamps; Perform other tasks as assigned by the supervisor. 24/03/2017 | internship | Perform tasks as assigned by the supervisor; Programme | Perform tasks as assigned by the supervisor; Programme DAY 15 evaluation; Sharing of experiences and ions regarding | evaluation; Sharing of experiences and opinions regarding the ‘the stay in Portugal, concerning the tre g and cultural | stay in Portugal, concerning the tr: 1g and cultural programmes; Handing of the documents pertaining to the | programmes; Handing of the documents pertaining to ‘the project. project. 25/03/2017 | Third Free Free Weekend Saturday _ a 26/03/2017 | Third Free Free Weekend Sunday _ 27/03/2017 | Departure Transfer to Porto and departure to Greece. Transfer to Porto and departure to Greece. ‘The programme has been approved by Braga mob which is the intermediate organization between the companies and the trainees and has arranged their work placements. The work placements have been prepared for a group of 15 students from 1st Vocational Senior High School of Egaleo studying in Graphic Design and Eletrician. as part of the KA1 Erasmus+ Programme and with project title (#WorkBaL@EU). Braga, Portugal, 12 December 2016 FA Tiago Costa - Manager

S-ar putea să vă placă și