How Enterprise Asset Management (eAM) works with Oracle Process Manufacturing (OPM) (Doc ID 947243.1)
In this Document

To Bottom

Was this document helpful?

Purpose

Yes

Scope

No

Details
Asset and Resource Instance Association

Document Details

Assigning Equipment Items to Plant Resources


Assigning Equipment Serial Number to Resource Instance
Defining Assets
Defining Organizations
Defining OPM Plant Resources

Type:
Status:
Last Major
Update:
Last Update:

BULLETIN
PUBLISHED
Apr 18, 2014
Apr 18, 2014

Associating OPM Plant Resources


EAM Resource Unavailability

Related Products

EAM Resource Unavailability - How to Set Up this Feature

Oracle Process Manufacturing


Process Planning

EAM Resource Unavailability - How to Use this Feature


EAM with OPM

APPLIES TO:
Oracle Process Manufacturing Process Planning - Version 11.5.10 and later
Information in this document applies to any platform.
***Checked for relevance on 25-Apr-2011***
***Checked for relevance on 19-Oct-2012***
***Checked for relevance on 18-APR-2014 ***

Information Centers
Information Center: Oracle
Process Manufacturing
[1393312.2]

Document References
No References available for
this document.
Recently Viewed

PURPOSE
This note provides an overview of the setup necessary to use eAM with OPM. It is based on a presentation by Russ Bayles,
Principal Product Strategy Manager.

SCOPE
This note applies to both 11i and Release 12. For further details, you should consult the OPM Process Planning User's Guide and
the Oracle Enterprise Asset Management Implementation Guide and User's Guide for the appropriate release.

DETAILS
Asset and Resource Instance Association

Resource Availability
incorrect in an
OPM/EAM/ASCP integrated
environment [1377753.1]
BOM Calendar FAQ: How To
Setup Different Start Time
And End Time In One Shift
Just For A Specific Day?
[1530291.1]
Bottleneck Resource Set up
In OPM Resources for ASCP
[1345477.1]
Does The Plant Resource
Utilization Field Impact Ascp
Resource Availability
[463368.1]
OPM Resource Categories
Not Available In LOV After
Upgrade to R12.1.3
[1428415.1]
Show More

Assigning Equipment Items to Plant Resources

Assigning Equipment Serial Number to Resource Instance

Defining Assets

Defining Organizations

Defining OPM Plant Resources

Associating OPM Plant Resources

EAM Resource Unavailability


EAM maintenance work order downtime updates the resource calendar for planning and scheduling.
The maintenance workorder resource downtimes from EAM are brought into OPM and update the OPM Resource Calendar with
unavailable time. This unavailable time is picked up by ASCP and also Manufacturing Scheduling or Production Scheduling so that
production batches are not planned or scheduled during this unavailable time.

EAM Resource Unavailability - How to Set Up this Feature


There is a profile option "GMP:Exception Code for EAM downtime" that the user must use for maintenance downtimes to be
automatically taken into the resource calendar. The user creates a code in this profile that is used as an exception code in the
resource calendar. This code is then used in the resource calendar and associated to any downtimes that are brought in from

EAM.

EAM Resource Unavailability - How to Use this Feature


11i OPM Process Planning > MRP > Reports > Standard > Run > Extract eAM downtimes
R12 OPM Material Planner > Material Planning > Reports > Standard > Run > Extract eAM downtimes
The user must run the Extract EAM Downtimes program. They can run this for one plant by entering the plant code or leave this
field blank to run for all plants. They also have the option to include Unreleased maintenance orders. They can also include
Unfirmed maintenance orders. The last option available is to run this for one resource or leave this field blank and it will be run
for all resources. When this process is complete the user will be able to run ASCP or Manufacturing Scheduling and production
batches will not be planned or scheduled during these resource downtimes.

EAM with OPM

Didn't find what you are looking for?

Ask in Community...

Attachments
slide10 (72.67 KB)
slide11 (54.36 KB)
slide12 (59.32 KB)
slide13 (40.03 KB)
slide14 (40.97 KB)
slide4 (19.09 KB)
slide5 (11.56 KB)
slide6 (16.15 KB)
slide7 (21.93 KB)
slide8 (62.11 KB)
slide9 (58.24 KB)

Related
Products
Oracle E-Business Suite > Manufacturing > Process Manufacturing > Oracle Process Manufacturing Process Planning > Enterprise Asset Management

Keywords
EAM; MAINTENANCE ORDER; OPM; ORACLE PROCESS; PRODUCTION BATCHES; PRODUCTION SCHEDULE