Documente Academic
Documente Profesional
Documente Cultură
9"
4'-6"
16'-6"
10'-6"
R OOF I N G AS / SPECIFICATION
-12 '-7"
3'-0"
9"
ARCHITECTURE WING
-17'-3"
-22'-0"
ARCHITECTURE WING
0"
-4'-6"
2.
3.
10'-6"
3'-0"
9'-9"
32'-3"
-22'-0"
ROOM
15
9"
-12 '-7"
3'-0"
CONFORMATION OF
STRUCTURAL ADVICE
RECEIVED FROM
S.E(PROJECT) VIDE
THEIR LETTER NO.-12365
DT.27.11.96
26
3'-0"
10'-6"
8'-3"
8'-3"
10'-6"
5.
9"
+9"
0"
1.
2'-3"
+9"
5'-3"
0"
+ 7'- 6"
PUDA
30
18'-9"
+ 4'- 6"
32'-3"
5'-3"
5'-3"
3.
ROOM
-12 '-7"
NOTES
9"
S.NO.
-22'-0"
5'-3"
5'-3"
32'-3"
- 4'-10 1 2 "
10'-6"
3'-9"
32'-3"
10'-6"
- 4'-10 1 2"
2'-3"
PUDA
+9"
24'-0"
- 412"
3'-0"
5'-3"
6'-9"
6'-0"
-17'-3"
2'-3"
4'-0"
10'-6"
8'-3"
- 412"
11
S.NO.
STATION
JOB NO.
9'-9"
REAR ELEVATION
8'-3"
FRONT ELEVATION
9"
9"
4 12"
1.
BOUNDARY WALL 5'-11
1
2
SEC. 70
M-70
S.A.S. NAGAR
" HIGH
2.
DRG / DINING
1
M12 &13
T = 9"
R = 7.875"
W = 3'- 0"
SEC. 40
SAMRALA ROAD
13'-4 12"
13'-9"
LUDIHANA
REAR COURT.
21'-3"X13'-4 1 2 "
REAR COURT.
3.
4.
SIDE ELEVATION
F L OOR I N G AS / SPECIFICATION
SECTION AT 'A-A'
4" S.W.P
4" S.W.P
SCHEDULE OF JOINERY
3
4
DW1
9"
W1
3
4
WIDTH
HT.
C.L
2'-3"
6'-9"
L.L
3'-0" H IGH PAR APET WALL
VER.
1.
D1
2.
D2
" G.I.P
3.
D3
4.
D4
5.
W1
6.
DW1
1 "
2
2'-7
6'-9"
3'-0"
6'-9"
6'-9"
6'-9"
3
4
" G.I.P
KIT.
TOILET
BED RM.
9'-6" X 15'-0"
BED RM.
D1
" G.I.P
W.C
D1
3" W.S
D3
STORE
4'-10 1 2" X 5'-0"
4" V/S
DRG./ DINING
4'-6"
21'-1 12 "
D4
3" W.S
18
16
"
BED ROOM
STAIRS
T = 9"
8'-7 1 2" X R
= 7.875"
10'-6" W = 3'-0"
14.
3'-0"
2'-9"
9"
9"
D3
8'-3"
9'-9"
4'-0"
2'-9"
6'-9"
4" H.C.I.P
VER.
9'-412 "
CAR PORCH
4" R.W.P
15
4'-6"
W7
2'-9"
3'-0"
STAIRS
DN
13
11
W4
W7
3"H CIP
5'-3"
BED ROOM
11'-10" X 15'-10"
1"
4" S/S
BED ROOM
11'-10" X 15'-10"
16
19
4'-0"
2'-9" 6'-9"
T E R RA CE
Sd/-
CHIEF ADMINISTRATOR
(COMPETENT AUTHORITY)
1. PLOT AREA
1452
162
S. YDS.
968
S. FT.
S. FT.
761.75 S. FT.
382.250 S. FT.
26
DN
Sd/-
SENIOR ARCHITECT
D3
W7
W4'
4" R .W.P
4" R .W.P
BAL C ONY
9 '-0" X 4 '-1"
BAL C ONY
9 '-0" X 4 '-1"
Sd/-
ARCHITECT
SCALE
11'-10 1 2 "
9"
9'-41 2"
9'-41 2 "
9"
11'-10 1 2"
264.0 C/C
Sd/22'-0" C/C
22'-0" C/C
Sd/-
ARCHITECT
1
SCALE
9'-4 12"
11'-10 12"
9'-4 12"
9"
11'-10 12"
22'-0" C/C
4"
JOB NO.
DRG NO.
263 -A
CHECKED BY
22'-0" C/C
TERRACE PLAN
DATE 29.2.96
= 1'-0"
ANITA
DEALT BY
9"
264.0
C/C
4"
ANITA
DEALT BY
= 1'-0"
JOB NO.
263-A
NOTE:-
22'-0" C/C
(ULTIMATE
PLANS)
3'-9"
9'-9"
ARCHITECTURE WING
8'-3"
0"
8'-3"
9'-9"
12'-0"
18"
4 '-10 "
12'-0"
-12'-7 1 2 "
12"
2'-3"
3"
2'-3"
6"
9"
CAR PORCH
DRG./ DINING
" V.D.P.C
1 2 " H.D.P.C
SIDE ELEVATION
S.NO.
SECTION A - A
1'-6"
3'-9"
+ 7'- 6"
0"
5.
12'-0"
10'-6"
+ 4'- 6"
+ 4'- 6"
+ 5'- 3"
1'-6"
+9"
0"
8'-3"
12'-0"
10'-6"
3'-9"
4.
+ 4'- 6"
PUDA
+9"
NOTES
1.
2.
CONFORMATION OF
STRUCTURAL ADVICE
RECEIVED FROM
S.E(PROJECT) VIDE
THEIR LETTER NO.-12365
DT.27.11.96
3.
-4'-6"
REAR ELEVATION
9"
4 12"
FRONT ELEVATION
STATION
13'-9"
13'-4 12"
2.
DR-1
D2
3.
DR-2
D1
4.
SEC - 40 SAMRALA
ROAD , LUDHIANA
9"
S.NO. TYPE
G.T 12"X12"
4" V/S
3" W.S
4" V/S
BELL
4'-6"
3
4
D4
" G.I.P
3" H.C.I.P
4" H.C.I.P
3
4
P/C
3
4"
G.I.P
9"
BED RM.
3
4
D1
1
2"
3
4
44'-0"
D1
FUTURE
STAIRS
T E R RA CE
4" V/S
T E R RA CE
W.C
3" W.S
4" V/S
SLOPE
3'-4
2"
6'-9"
6'-9"
2"
6'-9"
6'-9"
6'-9"
6'-9"
W1
DW2
2'-3"
2'-7
2'-9"
W3
2"
5'-6"
8'-3"
1 "
2
8'-3"
4'-6"
3'-9"
6'-0"
4'-0"
2'-9"
8'-3"
8'-3"
6'-9"
8.
W4
6'-0"
6'-6"
0'-3"
6'-9"
9.
3'-0"
1'-6"
8'-3"
9'-9"
1. PLOT AREA
1452
162
S. YDS.
968
S. FT.
S. FT.
"
D/C
I/C
18"X
24"
T.P
CAR PORCH
8'-7 1 2 " X 15'-9"
CAR PORCH
P.P
12'-4 12 "
1" G.I.P
4" R.W.P
P/C
9"
CHIEF ADMINISTRATOR
(COMPETENT AUTHORITY)
Sd/-
9"
D/C
W/M
Sd/-
P/C
T.V
A
A
CORRUGA TED
A .C.C. SHEET
ROOF
9"
21'-1 12"
412"
3'-0"
DRG./ DINING
23'-3"
D4
4'-6"
L.L
6'-9"
W4
VER.
11'-10 12 "
9'-4 12 "
22'-0" C/C
9"
9'-4 12"
11'-10 12"
SENIOR ARCHITECT
9"
Sd/-
22'-0" C/C
ARCHITECT
SCALE
4" H.C.I.P
3'-0"
FRONT COURT.
21'-3" X 7'-6"
ANITA
DEALT BY
FRONT COURT.
SLAB D EPRESSED
BY 3"
CHECKED BY
I/C
24"X36"
5'-3"
7'-6"
4"
= 1'-0"
JOB NO.
263 -A
DATE 29.2.96
DRG. NO.
4
4" S.W.P
9"
8'-3"
CORRUGATED
A.C.C SHEET ROOF
SLOPE
G.T.
12"X12"
UP
P/C P.P
D4
DRG./ DINING
11'-10 1 2 " X 21'-1
C.L
6'-9"
AREA STATEMENT
F.T
D4
2'-7
1'-10
" G.I.P
C.B
W.C
4'-10 1 2 " X
5'-0"
4.
7.
P/C
P.P
1" G.I.P
UP
A
A
HT.
P/C
T.P
1'-10 12 "
1'-6"
9"
66'-0"
D3
D3
6.
" G.I.P(DN)
F.T
D2
D2
3.
" G.I.P
(DN)
TOILET
T.V
SLAB DEPRESSED
AT 8'-3 HT.
2.
2'-3"
" G.I.P
" G.I.P
KIT.
" G.I.P
D1
5.
F.T
3
4
1.
WINDOW OPENINGS
F.T
BED RM.
9'-6" X 15'-0"
12'-0"
VER.
VER.
" G.I.P
W1
TOILET
5'-0" X 10'-1
WIDTH
DOOR OPENINGS
I/C
24"X36"
W3
KIT.
6'-0" X 12'-0"
M12 &13
4" S.W.P
I/C
24"X36"
DW2
DRG. NO.
M-70
3" W.S
4" S.W.P
4" R.W.P
2'-7 12"
JOB NO.
SEC. 70
S.A.S. NAGAR
SCHEDULE OF JOINERY
REAR COURT.
21'-3"X13'-4 1 2"
1.
9"
BOUNDARY WALL
AS/ ESTIMATE
44'-0"
9"
9"
412"
11'-10 12 "
9"
8'-7 12"
8'-7 12 "
9"
22'-0" C/C
9"
22'-0" C/C
FROM MAIN
11'-10 12"
9"
3'-0"
11'-10 12 "
DRG NO.
PROJECT :--
(ULTIMATE PLANS)
9"
DATE 29.2.96
DUPLEX HOUSES
3'-9"
8'-7 12"
T E R RA CE
22
4" S.W.P
9"
3" W/S
D3
ST AIRS
8'-7" X 10'-6"
4" H.C.I.P
22'-0" C/C
8'-7 12"
4" HCIP
5'-6" 8'-3"
9"
412"
9"
GIP
1" GIP
FT
1" G.I.P
11'-10 12"
4"
GIP
CHECKED BY
9"
GATE
9"
D1
SENIOR ARCHITECT
3'-0"
3'-0"
7'-6"
FT
T OILET
(COMPETENT AUTHORITY)
I/C
24"X36"
" GIP
Sd/-
TERRACE
4"
CHIEF ADMINISTRATOR
TERRACE
WATER
METER
SLAB DEPRESSED
BY 3"
9"
8'-3"
FRONT COURT.
21'-3" X 7'-6"
T OILET
8'-7" X 5'-0"
30
4'-6"
4" H.C.I.P
W6
W5
6'-9"
1'-6"
4'-6"
3
2
AREA STATEMENT
22
9
3'-0" HIGH
RAILING
12'-4 12"
4 12"
4'-6"
15'-9"
CAR PORCH
8'-7 1 2 " X 15'-9"
W5
4'-0"
" GIP
20
11
I/C
18"X
24"
D4
12.
13.
UP
UP
DN
W4
11.
6'-0"
8'-3"
" GIP
6'-9"
6'-9"
4" V/S
UP
BED ROOM
11'-10 1 2 " X 15'-10
13
0'-3"
W6
D3
9"
T = 9"
7
R = 7.875"
W = 3'-0"
2'-9"
6'-6"
W4'
8'-3"
3'-9"
4'-0"
6'-0"
10.
1" G.I.P
UP TO TANK
4'-6"
6'-0"
W4
9"
UP
UP
"
STORE
2"
W3
8'-3"
8'-3"
G.T
15'-10 12"
8.
9.
8'-3"
8'-3"
5'-6"
W5
3'-0"
UP
8'-3"
2'-9"
TERR ACE
2 1' -3 " X 16 '- 6"
6'-9"
5'-6"
8'-3"
2"
1 "
2
2'-7
1'-10
D1
WINDOW TO DETAIL
DRG./ DINING
11'-10 1 2 " X 21'-1
DW2
DRESSING
C.B
C.B
1" G.I.P
UP TO TANK
7.
3
4 " G.I.P DN FROM
SECOND FLOOR
DRESSING
D3
4'-0"
W.C
4'-10 1 2 " X
5'-0"
44'-0"
C.B
2
34'-7 12"
" G.I.P
(DN)
DRESSING
5'-0"X 4'-1 1 2"
2'-9"
1 "
2
1
4'-6"
2'-3"
2'-7
1'-10
D1
DRESSING
6'-0"X 4'-1 1 2 "
4'-112 "
F.T
TOILET
TOILET
KIT.
3"
H.C.I.P
C.B
D3
D2
9"
TOILET
5'-0" X 7'-6"
2'-3"
66'-0"
TOILET
6'-0" X 7'-6"
4 12"
TOILET
5'-0" X 10'-10 1 2 "
" G.I.P
6'-9"
9"
4" H.C.I.P
3
4
1 "
2
3'-4
17'-41 2 "
3"
H.C.I.P
3" H.C.I.P
D1
9"
12'-0"
BED RM.
9'-6" X 15'-0"
7'-6"
BED RM.
9'-6" X 15'-0"
KIT.
6'-0" X 12'-0"
4" H.C.I.P
TERR ACE
2 1' -3 " X 16 '- 6"
9"
"
G.I.P
6'-9"
" G.I.P
W1
D1
3
4"
G.I.P
4" S/S
9"
2""
D4
17'-3"
D4
16'-6"
VER.
VER.
15'-10 1 2"
9"
3" H.C.I.P
4" H.C.I.P
4'-6"
4'-6"
" G.I.P
9"
DW2
S.NO. TYPE
W3
3
4
4'-6"
G.T 12"X12"
W3
D4
9"
I/C
24"X36"
9"
I/C
24"X36"
4" R.W.P