Cross Section and Borrow Pit
Methods
Volumes
Usage:
Quantities of earthwork and concrete
Capacities of some structures: tanks,..
Quantities of water discharged by streams per
unit time
Units:
1 yd3 = 27ft3
1 m3 = 35.315ft3
Acre-foot: volume of an acre of 1 foot depth
Data Recording
Plate B-5
Left page looks like Profile leveling, no
intermediate points
right page: in front of each station, a group of
fractions that describe the point location,
reading, and elevation, in the form:
99.2
7.4
52
Elevation
rod reading
distance from CL
compute individual areas and add them up. After computing the
elevation at critical points, form a table:(mistakes!)
station H L C D E R G
24+00 0 C12.5 C15.8 C18.0 C10.1 C12.2 0
15
15 33.8
20
0
33.3 15
Compute the areas and add them up.
Volume Computation
Done after computing the end areas, identify which is cut
and which is fill. Two main methods:
Average End Area: Multiply the average area of the two
sections by the distance between them. See next slide
Ve = A1+ A2 * L
2
27
yd3
Prismoidal Formula
What is a prismoid? A solid with parallel ends joined
by a plane or continuously wrapped surfaces
Fits most earthwork problems
VP = L(A1+4AM+A2)
6*27
yd3
Volume Computation
Compute end areas at stations, fill the first three
columns in table 26-3.
Compute the cut and fill volumes, one of the
formulae.
Multiply the fill volumes by an expansion factor.
Compute the amount of soil to be borrowed or
transferred out of the site, which is the difference
between the cut and the fill.
Borrow-Pit Method
Not suitable for linear features, very useful for
construction sites.
The site is divided into equal squares of sides
20,50, or a 100 ft. Elevations are then
measured at the corners of the grid, which are
given titles that correspond to the coordinates
of the corner in the grid, ex: 3-D, 4-A,..
V = (hijn)
A
yd3
4*27
The idea is to multiply each height by the
number of complete squares it is common to.
Plate B.2
Site 1
Site 3
Site 2
PROJECT 1
Instructions
36
Assumed 36
for piles
200 ft
20
C
D
B
A