Velosi Certification and Asset Integrity Services

Abu Dhabi
CURRICULUM VITAE
OF
Rahat Naseem
(Planning & Control Engineer)
Member of PMI

Nationality:

Education:
2005 2008

Pakistani

BE (Industrial & Manufacturing), NED University of


Engineering & Technology

Page 1 of 7

PROFESSIONAL EXPERIENCE
Currently working as a Planning Engineer. Major responsibilities includes,
preparation of project scheduling, planning packages, Management of interface
and coordination between different project groups and client for engineering
activities and resolution of technical issues.
VELOSI ASSET INTEGRITY LTD, ABU DHABI

July, 2013 to Date

VAIL is group of companies which provided services like Project Management


Control (PMC) for EPC projects, Risk assessment services (RBI and RCM
studies), Third Party Inspection (TPI), Health Safety and Environment (HSE)
Studies.

PROJECT: As-Built of Margham Plant (DUSUP)


POSITION : PLANNING & CONTROL ENGINEER
SCOPE
: As-Built
RESPONSIBILITIES:

Scope understanding for Margham Plant.


Resource estimation.
Development of Project Schedule and manpower histogram.
Development of Project execution methodology.
Development of cash flow histogram.

PROJECT: Provision of Asset & Operation Integrity Services for Kebabangan


Petroleum Operating Company Sdn Bhd, Malaysia
POSITION : PLANNING & CONTROL ENGINEER
SCOPE
: Asset & Operation Integrity
RESPONSIBILITIES:

Planned/developed and maintained, MS Project based implementation schedule


for 26 different projects related to asset and operation integrity.
Scope understanding and Manpower estimation.
Development of cash flow chart.
Monitoring and Periodic reporting of individual projects and as a whole on weekly
and monthly basis.
Management of interface and coordination between different project groups and
client for engineering activities and resolution of technical issues.
Performed resource allocation and monitor the resources efficiency.
Perform cost controlling and earn value analysis for the management.
Generates look-ahead plan for the client.

PROJECT: Updating of the Critical Drawings for ZIRKU Facilities (ZADCO)


POSITION : PLANNING & CONTROL ENGINEER
SCOPE
: As-Built
RESPONSIBILITIES:

Scope understanding.
Planning package understanding and review.

Page 2 of 7

Tracking of site activities and correspondence.


Daily monitoring of manpower and their efficiencies.

PROJECT: FFS and Life Extension for Static Equipment (DUSUP)


POSITION : PLANNING & CONTROL ENGINEER
SCOPE
: Fitness for Service.
RESPONSIBILITIES:

Planned/developed and maintained, MS Project based implementation schedule.


Scope understanding and Manpower estimation.
Development of Planning Package.
Monitoring and Periodic reporting on weekly and monthly basis.
Management of interface and coordination between project groups and client for
engineering activities and resolution of planning & technical issues.
Performed resource allocation and monitor the resources efficiency.

PROJECT: Operation & Maintenance Regulation Development for West Qurna


(LUKOIL)
POSITION : PLANNING & CONTROL ENGINEER
SCOPE
: Operation & Maintenance Regulation Development
RESPONSIBILITIES:

Planned/developed and maintained, MS Project based implementation schedule.


Scope understanding and Manpower estimation.
Development of Planning Package & Project Quality and Information Manual
Preparation of manpower efficiency report.
Monitoring and Periodic reporting on weekly and monthly basis.

VELOSI INTEGRITY & SAFETY PAKISTAN

Nov, 2012 to June, 2013

The VELOSI Group provides Asset Integrity, Health, Safety and Environment (HSE),
Quality Assurance, Quality Control and Engineering services to a number of leading
national and multinational oil and gas companies, including BP, Shell, ExxonMobil,
ADNOC, PETRONAS, PetroBras, ONGC, and Chevron. The Velosi Group operates
globally through five regional headquarters in the USA, the UK, Malaysia, South
Africa, and the UAE and has 63 offices in 36 countries worldwide.

PROJECT: Mechanical Integrity Assessment of OGDCL Assets in Pakistan


POSITION : PLANNING & CONTROL ENGINEER
SCOPE
: NDT & MIA
RESPONSIBILITIES:

Planned/developed and maintained, MS Project based implementation schedule.


Scope understanding and Manpower estimation.
Monitoring and Periodic reporting on weekly and monthly basis.
Management of interface and coordination between project groups and client for
engineering activities and resolution of planning & technical issues.
Performed resource allocation and monitor the resources efficiency.

Page 3 of 7

Preparation of Invoice.

PROJECT: Development Of BSRs 2nd Phase Risk Based Inspection (RBI) Plan for
Petro Veitnam
POSITION : PLANNING & CONTROL ENGINEER
SCOPE
: Risk Based Inspection
RESPONSIBILITIES:

Responsible for Cost Estimation.


Involved in Pre-bid Planning and preparation of technical & commercial dossiers.
Development of detail project schedule.
Manhour estimation and development of project manpower histogram.
Weekly and monthly reporting to the client.
Facilitate coordination between client and project execution team.
Preparation of manpower utilization reports.

Responsible for dealing with all Pre Shipment Inquiries for VELOSI-Pakistan by consulting
operational centre & branch offices.

PROJECT: Development Of Maintenance &Reliability System for MURPHY


POSITION : PLANNING & CONTROL ENGINEER
SCOPE
: Risk Based Inspection
RESPONSIBILITIES:

Responsible for Cost Estimation.


Involved in Pre-bid Planning and preparation of technical & commercial dossiers.
Development of detail project schedule.
Man hour estimation and development of project manpower histogram.
Weekly and monthly reporting to the client.
Facilitate coordination between client and project execution team.
Preparation of manpower utilization reports.

M/S DESCON ENGINEERING, ABU DHABI

June, 2011 to Oct, 2012

PROJECT: Borouge-3 Mechanical Construction of Polyolefins Unit Package P3-A,


Ruwais, UAE
POSITION : PLANNING ENGINEER
DURATION : Oct, 2011 to Oct, 2012
SCOPE
: Erection of 12,135 Tons of Steel Structure, 1,134 Nos. of Equipment and
670,000 DI of Piping
RESPONSIBILITIES:

Become thoroughly familiar with scope of work, Work Breakdown Structure


(WBS) and Organization Breakdown Structure (OBS) etc.
Maintain and update the base line Primavera plan for the project.
Generation of 3 months and 4 weeks look ahead plans based on updated Project
Plan and work front availability status.

Page 4 of 7

Involved in analyzing the cost and time impacts due to any revision of schedule by
the client or by the project team itself.
Supported Client & Stakeholder communications including, information of the
project progress measurements, work priorities and anticipated delays.
Help monitor allocation of key resources; manpower, equipment and material
based on 3-months look-ahead plan.
Monitor key parameters like labor efficiency, material wastage rate and
Equipment Utilization.
Provide support on revenue, work done, cost and cash flow through Project
Analytical studies /performance report.
Monitor subcontract awarded against budget provision.
Identify and to price of extra work.
Attend meetings which involve discussions regarding schedule, cost and scope.
Perform duties as may be assigned from time to time by the management.
Material Handling.
Cost Centre Efficiency monitoring of Execution Teams.
Help in generation of latest revenue forecast on quarterly basis in close
coordination with the Cost Engineer.
Involve in preparation of variation orders and claims in case of any change in
scope of work by studying contractual documents.

POSITION : AREA PLANNER STRUCTURE


DURATION : June, 2011 to Oct, 2011
SCOPE
: Erection of 12,135 Tons of Steel Structure
RESPONSIBILITIES:

Preparation of Work Method Statement (WMS), Lifting Plan, Risk Assessment


(RA), Job Safety Analysis (JSA) ready for client submission and approval.
Preparation and monitoring of level IV plan of Steel Structure works using P6 and
Excel.
Identification of achievable weekly work front and required resources.
Analyzed drawings to identify the potential problems and solutions for
construction.
Communication with clients for material issuance and feeding to site.
Responsible for timely release of structures to equipment and piping erection.
Communicated with clients for the acceptance of the structure works and other
technical issues.
Coordinated with lead structural designer for the updated design drawing ready for
erection at site.
Measured and estimated the material take off for the required materials and
equipments and other items.
Involved in different type of reporting.

VELOSI INTEGRITY & SAFETY PAKISTAN

May, 2010 to May, 2011

POSITION : Mechanical Engineer


RESPONSIBILITIES:

Responsible for leading the team for the inspection of various Lifting Gears &
Equipment at M/s ENI Bhit Field. Scope includes Visual Examination, Load
testing & MPI (where applicable) for all items.
HSE based inspection of CNG Stations as per Pakistan CNG Rules. (Client M/s
OGRA)

Page 5 of 7

Dealing with all Pre Shipment Inquiries for VELOSI-Pakistan by consulting


operational centre & branch offices.
Responsible for Cost Estimation, Bid Planning and preparation of technical &
commercial dossiers for various small & large scale projects and preparation of
contracts. Major projects are as under:
o Annual Inspection of Lifting Equipment & items (Client: M/s SSGC)

Engineering, Procurement & Site Supervision for Well Head Compression


Project Client: M/s PPL
TPI of three (3) Pressure Vessels during shut down (Client: M/s PSO)

HAZOP & SIL Determination Study (Client: M/s Penspen-Thailand)

RBI Analysis for Static Equipment & Piping (Client: M/s Newfield
Malaysia.

Responsible for coordination between client and site.


Responsible for the resource allocation.
Responsible for optimum utilization of resources.
Responsible for weekly and monthly report preparation.
Responsible for invoicing.

DAWLANCE PVT LIMITED

Sep, 2009 to April, 2010

Dawlance is premier leading household electrical appliance manufacturer in Pakistan with


more than 65% market. Share. Product includes refrigerator, deep freezer, vertical freezer,
washing machine, split air conditioner etc.

POSITION : MANUFACTURING ENGINEER


SHOP
: Refrigerator Assembly Line, Factory-1
RESPONSIBILITIES:

To conduct time and study motion.


To conduct daily audits.
To coordinate contractors for manpower.
To control and reduce rejects and rework.
To preparation of rework and reject reports.
To participate in cross-functional task team from manufacturing department.
To educate supervisors and workers about daily plan and task.
To conduct workers training regularly to increase multi-task workers pool.
To educate supervisors and workers about KAIZEN, LEAN
MANUFACTURING, KANBAN etc.
To lead KAIZEN campaign.
To ensure physical material receiving according manufacturing oracle
system.
To present department in weekly OBEHYA.

Page 6 of 7

GATRON INDUSTRIES

Feb, 2009 to Sep, 2009

Gatron (Industries) Limited a petrochemical plant with more than 235,000 mt/annum
PET Resin production capacity.
POSITION : Trainee Engineer Maintenance
SHOP
: Utilities Maintenance
RESPONSIBILITIES:

To get familiar with different plant piping circuits.


To update monthly and weekly preventive maintenance plan.
To responsible for maintain parts and consumable inventory.
To perform predictive maintenance.
To main equipment maintenance history and perform different analysis.

During my tenure, I actively involved in maintenance of oil free Screw compressors, Air
Compressors, Reciprocating & Centrifugal pumps for different type of liquid transportation,
Steam fired absobtion chillers, Centrifugal chillers, Cooling towers, Refrigerant Air Dryers,
Adsobtion Air Dryers, Different types of Blowers used in AHUs.
Also involved in different type of erection projects including;
Diesel tank roof fabrication
Piping of new cooling tower and pumps for the compressor

Worked as an energy audit team member with National Productivity Organization.(12


Jan 2009 22 Jan 2009)

Worked as an Industrial Engineer with PIQC Institute of Quality Control for


implementing ISO 9001/TS 16949 for a production plant responsible for the development
of GAP Analysis, Time & Study Motion, Control Charts, Process Flow, Work
Instructions, Job descriptions, Master Control Plans, perform FMEA and contributed in
development of Quality System Manual and Quality System Procedures.(Dec 2007 July
2008)

Worked as an internee in Pakistan Machine Tool Factory on a project on improvement


of Material handling and re-designing of material handling equipments.(June 2007 - July
2007)

SKILLS

Platforms: XP/Vista and Office 2007 and VISIO.


Tools: MS Project 2007, Primavera P6, Pro E Wild Fire, SolidEdge, FMEA,
Quality Tools
Communication skills, Enthusiastic, Self learner, Conflict manager.
Considerable good knowledge about ISO, Project planning & execution,
manufacturing processes and equipments.

REFRENCE
May be provided upon request.

Page 7 of 7