KHAZZAN GAS PROJECT - GWES

Part I - REQUEST FOR INSPECTION


RFI NO:

CV-WMA-001 Rev. 0

Project Title :

KHAZZAN GAS PROJECT - GWES

Contract/Job No:

REP-BPXO-14-0727

Plant/Package Name:

WMA Phase 2

CTR Pack No.:

NA

Client Name:

British Petroleum

Client Representative:Jacobs Engineering Group Inc (CES LLC

To: Company/Clients Inspection Team/Mr. :


Civil/Structural

Architectural

Mechanicall

Inspection is required on (date) :

Pipeline

Piping

at time:

Location and/or Equipment :

E&I

Others:

____________

item to be inspected:

Witness

WMA Phase 2

Work Permit Required:

Hold

Surveillance

Yes

No

Inspection Activity and Test Plan Checklist:

Sub-con /
Vendor Name: BAUER Nimr LLC, Oman

Contractor has verified that the work is complete and


inspected in compliance with the following specification

QA/QC Name :
Specs/Standards:

Signature :

Drawing(s) :

Date :

Joel M. Alcantara

Phone No.

Part II - Contractor Inspection Response


This RFI was inspected by the undersigned QA/QC person
Attended :
Inspection Notice:

Yes

No
Accepted

Rejected

Joel M. Alcantara

Signature:

Cancelled

Not

Ready - _ _ _ _ _ _ _ _ _ _ _ _ _ _

Comments:

Name (Print):

Date:

Time:

Part III - Company/Client Representative


Client Inspector 's Comment

Date of Inspection:

Distribution:

Company

Inspector's Name:

Contractor

Badge No:

KHAZZAN GAS PROJECT - GWES


Part I - REQUEST FOR INSPECTION
RFI NO:

CV-WMA-001 Rev. 0

Project Title :

KHAZZAN GAS PROJECT - GWES

Contract/Job No:

REP-BPXO-14-0727

Plant/Package Name:

WMA Phase 2

CTR Pack No.:

NA

Client Name:

British Petroleum

Client Representative:Jacobs Engineering Group Inc (CES LLC

To: Company/Clients Inspection Team/Mr. :

Architectural

Civil/Structural

Mechanicall

Pipeline

Piping

E&I

Others:

____________

Inspection is required on (date) :


4-Aug-16
at time: 9:00 AM
item to be inspected:
Material Receiving Inspection of bottom closed cement block and OPC cement as per attached deliry receipts.
Enclosed: ITP, Test Certificates
Location and/or Equipment :

Witness

WMA Phase 2

Work Permit Required:


Inspection Activity and Test Plan Checklist:

Hold

Surveillance

Yes

No

KZ01-QA-PLN-S4-5101A01

Sub-con /
Vendor Name: BAUER Nimr LLC, Oman

Contractor has verified that the work is complete and


inspected in compliance with the following specification

QA/QC Name :
Specs/Standards:

KZ01-CM-MET-S4-5014 A01

Signature :

Drawing(s) :

KZ01-CV-GAS-S4-5013 A01

Date :

Joel M. Alcantara

8/3/2016

Phone No.

95295920

Part II - Contractor Inspection Response


This RFI was inspected by the undersigned QA/QC person
Attended :
Inspection Notice:

Yes

No
Accepted

Rejected

Joel M. Alcantara

Signature:

Cancelled

Not

Ready - _ _ _ _ _ _ _ _ _ _ _ _ _ _

Comments:

Name (Print):

Date:

Time:

Part III - Company/Client Representative


Client Inspector 's Comment

Date of Inspection:

Distribution:

Company

Inspector's Name:

Contractor

Badge No: