PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)

BRANCH BUILDING-ABU DHABI


MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION PAGE NO.

PACKAGE 4

MAIN SUMMARY

BILL NO. 2 DAR AL SHIFA HOSPITAL (B+G+2)

SECTION P ELEVATOR PageB2/P/3

SECTION Q MECHANICAL ENGINEERING INSTALLATION Page B2/Q/1

SECTION R ELECTRICAL ENGINEERING INSTALLATION Page B2/R/1

Bill of Quantities Summary MS/1 August 2014 - Tender Documents


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

TOTAL AED

Bill of Quantities Summary MS/1 August 2014 - Tender Documents


DAR AL SHIFA HOSPITAL (B+G+2)
NCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AMOUNT

Bill of Quantities Summary MS/1 August 2014 - Tender Documents


DAR AL SHIFA HOSPITAL (B+G+2)
NCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

Bill of Quantities Summary MS/1 August 2014 - Tender Documents


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEMS LIST OF CONTENTS

INDEX
PACKAGE -4

BILL No. 2 DAR AL SHIFA HOSPITAL (B+G+2)

SECTION P ELEVATOR
SECTION Q MECHANICAL ENGINEERING INSTALLATION

SECTION Q/1 AIR CONDITIONING & VENTILATION SYSTEM


SECTION Q/2 COLD AND HOT WATER SUPPLY
SECTION Q/3 SANITARY FITTINGS, FIXTURES & ACCESSORIES

SECTION Q/4 DRAINAGE SYSTEM


SECTION Q/5 FIRE PROTECTION

SECTION R ELECTRICAL ENGINEERING INSTALLATION


SECTION R/1 MAIN AND SUB-MAIN DISTRIBUTION
SECTION R/2 LIGHTING INSTALLATION

SECTION R/3 POWER INSTALLATION


SECTION R/4 TELECOMMUNICATION SYSTEM

SECTION R/5 FIRE ALARM AND DETECTION SYSTEM


SECTION R/6 LIGHTNING PROTECTION AND EARTHING SYSTEM
SECTION R/7 PUBLIC ADDRESS & AUDIO VISUAL SYSTEM

SECTION R/8 CCTV SYSTEM


SECTION R/9 CENTRAL BATTERY SYSTEM

SECTION R/10 ACCESS CONTROL SYSTEM


SECTION R/11 UPS SYSTEM
SECTION R/12 BMS SYSTEM

SECTION R/13 NURSES CALL SYSTEM


SECTION R/14 CENTRAL CLOCK SYSTEM

Bill of Quantities Index IND/1 August 2014 -Tender Dpcuments


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEMS LIST OF CONTENTS

Bill of Quantities Index IND/2 August 2014 -Tender Dpcuments


T: DAR AL SHIFA HOSPITAL (B+G+2)
ANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

PAGE NO.

B2/P/1-B2/P/3

B2/Q/1/1 - B2/Q/1/80
B2/Q/2/1 - B2/Q/2/13
B2/Q/3/1 - B2/Q/3/4

B2/Q/4/1 - B2/Q/4/12
B2/Q/5/1 - B2/Q/5/7

B2/R/1/1 - B2/R/1/22
B2/R/2/1 - B2/R/2/5

B2/R/3/1 - B2/R/3/4
B2/R/4/1 - B2/R/4/5

B2/R/5/1 - B2/R/5/5
B2/R/6/1 - B2/R/6/4
B2/R/7/1 - B2/R/7/6

B2/R/8/1 - B2/R/8/3
B2/R/9/1 - B2/R/9/4

B2/R/10/1 - B2/R/10/3
B2/R/11/1 - B2/R/11/3
B2/R/12/1 - B2/R/12/5

B2/R/13/1 - B2/R/13/3
B2/R/14/1 - B2/R/14/3

Bill of Quantities Index IND/3 August 2014 -Tender Dpcuments


T: DAR AL SHIFA HOSPITAL (B+G+2)
ANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

PAGE NO.

Bill of Quantities Index IND/4 August 2014 -Tender Dpcuments


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION P - ELEVATORS

ELECTRIC TRACTION ELEVATORS

Supply and install Elevator including car,landing doors,


landing door frames, controls, hall buttons and lanterns, car
lighting, safety equipment, elevator machinery,
counterweights, ropes, door sill angles, hoist beams,
buffers, guide rails, holding down and anchor bolts and
builder's work in connection with lift, testing and
commissioning, warranty and maintenance period, as per
drawing & specification.

A Elevator 14 No.

Supply, install,testing and commissioning of Escalator , as


per drawing & specification.

B Escalator 1 No

Bill of Quantities - Section P Conveying system Installation B2/P/1 August 2014-Tender Documents
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION P - ELEVATORS

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

L.S.

Bill of Quantities - Section P Conveying system Installation B2/P/2 August 2014-Tender Documents
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

DESCRIPTION

SECTION P - ELEVATORS

COLLECTION

Total of Page No. B2/P/1

Total of Page No. B2/P/2

Bill of Quantities - Section P Conveying system Installation B2/P/3 August 2014-Tender Documents
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION P - CARRIED TO SUMMARY

Bill of Quantities - Section P Conveying system Installation B2/P/4 August 2014-Tender Documents
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

Bill of Quantities - Section P Conveying system Installation B2/P/5 August 2014-Tender Documents
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00

Bill of Quantities - Section P Conveying system Installation B2/P/6 August 2014-Tender Documents
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

AMOUNT

0.00

0.00

Bill of Quantities - Section P Conveying system Installation B2/P/7 August 2014-Tender Documents
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities - Section P Conveying system Installation B2/P/8 August 2014-Tender Documents
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

SHEET METAL DUCTWORK AND ACCESSORIES

HVAC Ductwork complete with duct hangers/supports,


voids, fittings, flanges, flexible, duct connectors, wire mesh
end covers, access doors, test, points for air/water and
identification (insulation measured separately)

A Supply Air Duct (SAD) 75,108 kg

B Return Air Duct (RAD) 70,060 kg

C Fresh Air Duct (FAD) 13,541 kg

D Extrat Air Duct (EAD) 38,688 kg

E Kitchen extract air duct 2 hr. rated(KED) 5,331 kg

F Pressurization Duct 2 hr. rated 3,277 kg

G Smoke Extract Duct 2 hr. rated 699 kg

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 1 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

HVAC INSULATION

Supply,Installation of Insulation complete with adhesive


fasteners, anchors, joint tapes, tie wires and finish all as
specified

13mm thick closed cell elastromeric rubber foam insulation


sheet for Indoor concealed ducts

A Supply Air Duct 12,043 m2

B Fresh Air Duct 1,001 m2

C Return Air Duct 10,750 m2

D Exhaust Air Duct 3,280 m2

32mm thick closed cell elastromeric rubber foam insulation,


clad with 0.9 mm thick aluminium sheet for exposed ducts

E Supply Air Duct 1,324 m2

F Fresh Air Duct 798 m2

G Return Air Duct 1,193 m2

H Exhaust Air Duct 680 m2

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 2 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

HVAC INSULATION (Cont'd.)

Duct Accoustic Lining

25 mm thick melmine foam or polyurethane foam for


ccoustic Lining complete with adhesive fasteners, anchors,
joint tapes, tie wires and finish all as specified

A Duct Lining 183 m2

AIR FILTRATION

Supply,Installation of Diffusers, Registers and Grilles as per


Specification & Drawings

B 4-Way Supply Air Diffuser, 150x150mm 146 No

C 4-Way Supply Air Diffuser, 225x225mm 519 No

D 4-Way Supply Air Diffuser, 250x250mm 5 No

E 4-Way Supply Air Diffuser, 300x300mm 322 No

E 4-Way Supply Air Diffuser, 375x375mm 42 No

D 4-Way Supply Air Diffuser, 450x450mm 48 No

F 4-Way Supply Air Diffuser, 500x500mm 16 No

G 4-Way Supply Air Diffuser, 600x600mm 58 No

H 4-Way Return Air Diffuser, 150x150mm 116 No

I 4-Way Return Air Diffuser, 225x225mm 452 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 3 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR FILTRATION (Cont'd.)

A 4-Way Return Air Diffuser, 300x300mm 289 No

B 4-Way Return Air Diffuser, 375x375mm 38 No

C 4-Way Return Air Diffuser, 450x450mm 38 No

D 4-Way Return Air Diffuser, 500x500mm 8 No

E 4-Way Return Air Diffuser, 600x600mm 34 No

E 4-Way Exhaust Air Diffuser, 150x150mm 68 No

D 4-Way Exhaust Air Diffuser, 225x225mm 31 No

F 4-Way Exhaust Air Diffuser, 300x300mm 28 No

G 4-Way Exhaust Air Diffuser, 375x375mm 6 No

H 4-Way Exhaust Air Diffuser, 450x450mm 5 No

I 4-Way Exhaust Air Diffuser, 500x500mm 8 No

J SAG, Supply Air Grille, 150x150mm 8 No

K SAG, Supply Air Grille, 450x250mm 3 No

L RAG, Return Air Grille, 150x150mm 1 No

M RAG, Return Air Grille, 450x250mm 3 No

N EAG, Exhaust Air Grille, 550x250mm 80 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 4 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

O SLSD-2000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 7 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR FILTRATION (Cont'd.)

A SLSD-3000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 6 No

B SLSD-3300, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

C SLSD-4100, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

D SLSD-5000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

E SLSD-5600, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

E SLSD-6000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

D SLSD-7100, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

F SLSD-8300, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

G SLSD-8900, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

H SLSD-11500, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 5 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

I SLSD-12000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

CARRIED TO COLLECTION

DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR FILTRATION (Cont'd.)

A SLSD-12500, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

B SLSD-12800, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

C SLSD-14000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 2 No

D SLSD-17700, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

E SLSD-1900, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 1 No

E SLSD-2200, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 1 No

D SLSD-3000, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

F SLSD-3500, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 1 No

G SLSD-4000, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 4 No

H SLSD-4200, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 6 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

I SLSD-4500, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR FILTRATION (Cont'd.)

A SLSD-6000, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 3 No

B SLSD-7000, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

C SLSD-7900, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

D SLSD-8000, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

E SLSD-8100, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 1 No

E SLSD-10900, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

D SLSD-12400, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

F SLSD-12500, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

G SLSD-12900, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 7 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

H SLSD-16500, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

I SLSD-3000, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

J SLSD-2000, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR FILTRATION (Cont'd.)

A SLSD-6800, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

B SLSD-8000, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

C SLSD-12000, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

D SLSD-13600, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

E SLSD-15100, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

E RLSD-1000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 2 No

D RLSD-2000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 8 No

F RLSD-3000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 5 No

G RLSD-6000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 8 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR FILTRATION (Cont'd.)

A RLSD-6430, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

B RLSD-7000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

C RLSD-9000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

D RLSD-9200, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

E RLSD-12000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

F RLSD-12460, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 2 No

G RLSD-12760, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

H RLSD-14000, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 9 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

I RLSD-15330, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

J RLSD-15500, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

K RLSD-15630, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

L RLSD-17680, Supply Linear Slot Diffuser, 1-Slot & 16mm


width 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR FILTRATION (Cont'd.)

M RLSD-2000, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 5 No

A RLSD-3000, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 3 No

B RLSD-3300, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

C RLSD-4500, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 5 No

D RLSD-5000, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

E RLSD-6000, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

F RLSD-6220, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 10 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

G RLSD-7000, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

H RLSD-7900, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

I RLSD-8000, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

J RLSD-9500, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 1 No

K RLSD-9650, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR FILTRATION (Cont'd.)

A RLSD-10500, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

B RLSD-10980, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

C RLSD-12460, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

D RLSD-12930, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

E RLSD-13240, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

F RLSD-16460, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 2 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 11 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

G RLSD-18090, Supply Linear Slot Diffuser, 2-Slot & 16mm


width 1 No

H RLSD-3000, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

I RLSD-4500, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

J RLSD-6000, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

K RLSD-7000, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

L RLSD-7500, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 4 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR FILTRATION (Cont'd.)

A RLSD-12960, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

B RLSD-12970, Supply Linear Slot Diffuser, 3-Slot & 16mm


width 2 No

C SAR, Supply Air Register, 150x150 11 No

D SAR, Supply Air Register, 300x300 1 No

E SAR, Supply Air Register, 400x250 7 No

F SAR, Supply Air Register, 600x250 2 No

G SAR, Supply Air Register, 600x300 4 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 12 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

H SAR, Supply Air Register, 750x300 3 No

I SAR, Supply Air Register, 850x300 2 No

J RAR, Return Air Register, 150x150 16 No

K RAR, Return Air Register, 300x300 2 No

L RAR, Return Air Register, 400x250 6 No

M RAR, Return Air Register, 600x250 2 No

N RAR, Return Air Register, 600x300 4 No

O RAR, Return Air Register, 750x300 3 No

P RAR, Return Air Register, 850x300 2 No

Q DV, Disc Valve, 150 dia 226 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

CHILLED WATER PUMPS,DX UNIT & HEAT


EXCHANGER.

Chilled water pumps, closed coupled horizontal split case


type complete with electric motor, VFD, electric wires and
controls, mounting base, vibration isolators, etc. as
specified and as shown on drawings

A Chilled Water Primary Pump(4W+1S) 5 No

B Chilled Water Secondary Pump(3W+1S) 4 No

C Chillers

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 13 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

Supply and installation of Chillers as per Schedule,Drawings


& specificaion

D Chiller-1 1 No

E Chiller-2 1 No

F Chiller-3 1 No

G Chiller-4 1 No

Chemical Dosing Unit

Supply and installation of Chemical dosing unit as per


Schedule,Drawings & specificaion

J Chemical Dosing Unit 1 No

Pressurization Unit

K Pressurization Unit 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR-CONDITIONING PIPING & ACCESSORIES

Isolating Valve with insulation

A Isolating Valve (20mm) 58 No

B Isolating Valve (25mm) 4 No

C Isolating Valve (32mm) 15 No

D Isolating Valve (40mm) 2 No

E Isolating Valve (50mm) 15 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 14 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

F Isolating Valve (65mm) 9 No

G Isolating Valve (80mm) 4 No

H Isolating Valve (100mm) 9 No

I Isolating Valve (150mm) 5 No

J Isolating Valve (20mm) 4 No

Double Regulating valve with insulation

K DRV (20mm) 58 No

L DRV (25mm) 4 No

M DRV (32mm) 15 No

N DRV (40mm) 2 No

O DRV (50mm) 7 No

P DRV (65mm) 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR-CONDITIONING PIPING & ACCESSORIES


(Cont'd.)

A DRV (80mm) 4 No

B DRV (100mm) 5 No

C DRV (150mm) 5 No

D DRV (200mm) 4 No

2-Way Modulating Valve with insulation

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 15 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

E 2-Way Valve (20mm) 58 No

F 2-Way Valve (25mm) 4 No

G 2-Way Valve (32mm) 15 No

H 2-Way Valve (40mm) 2 No

I 2-Way Valve (50mm) 15 No

J 2-Way Valve (65mm) 9 No

K 2-Way Valve (80mm) 4 No

L 2-Way Valve (100mm) 1 No

Motorised Balancing valve with insulation

M MBV (100mm) 4 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR-CONDITIONING PIPING & ACCESSORIES


(Cont'd.)

Non Returning valve with insulation

A NRV (150mm) 5 No

B NRV (200mm) 4 No

Flow Switch with insulation

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 16 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

C FS (100mm) 4 No

Flexible Coupling

D 25mm 2 No

E 32mm 30 No

F 40mm 4 No

G 50mm 28 No

H 65mm 18 No

I 80mm 8 No

J 100mm 10 No

K 150mm 10 No

L 200mm 8 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR-CONDITIONING PIPING & ACCESSORIES


(Cont'd.)

Union with insulation

A 20mm 116 No

B 25mm 8 No

C 32mm 30 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 17 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

D 40mm 4 No

E 50mm 30 No

F 65mm 18 No

G 80mm 8 No

H 100mm 2 No

Strainer with insulation

I Strainer (20mm) 58 No

J Strainer (25mm) 4 No

K Strainer (32mm) 15 No

L Strainer (40mm) 2 No

M Strainer (50mm) 15 No

N Strainer (65mm) 9 No

O Strainer (80mm) 4 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR-CONDITIONING PIPING & ACCESSORIES


(Cont'd.)

A Strainer (100mm) 5 No

B Strainer (150mm) 5 No

C Strainer (200mm) 4 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 18 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

Other accessories

D Test Point 321 No

E Pressure Gauge 26 No

F Temperature Gauge 8 No

G Thermostat 64 No

H Aoutomatic Air Valve 54 No

I Manual Air Valve 59 No

J Drain Cock 61 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR-CONDITIONING PIPING & ACCESSORIES


(Cont'd.)

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 19 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

Supply and installation of black steel seamless chilled water


pipes, complete with insulations, fittings, joints,
hangers/supports, expansion joints, anchors, guides, etc.
as specified

Chilled water pipe supply & return

A CHWS/R (20mm) 854 m

B CHWS/R (25mm) 673 m

C CHWS/R (32mm) 270 m

D CHWS/R (40mm) 94 m

E CHWS/R (50mm) 243 m

F CHWS/R (65mm) 199 m

G CHWS/R (80mm) 384 m

H CHWS/R (100mm) 219 m

I CHWS/R (125mm) 206 m

J CHWS/R (150mm) 260 m

K CHWS/R (200mm) 167 m

L CHWS/R (250mm) 3 m

M CHWS/R (300mm) 139 m

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 20 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AIR-CONDITIONING PIPING & ACCESSORIES


(Cont'd.)

Condensate Drain Piping with insulation

A CDP (15mm) 330 m

B CDP (20mm) 120 m

AIR HANDLING UNIT

Supply , Installation of Air handling units with coils for all


accessories as per schedule and specified

C AHU-B1 1 No

D AHU-B2 1 No

E AHU-B3 1 No

F AHU-B4 1 No

G AHU-B5 1 No

H AHU-K1 1 No

I AHU-G6 1 No

J AHU-G7 1 No

K AHU-G8 1 No

L AHU-F1 1 No

M AHU-F2 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 21 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR HANDLING UNIT (Cont'd.)

A AHU-F3 1 No

B AHU-F4 1 No

C AHU-F5 1 No

D AHU-F6 1 No

E AHU-F7 1 No

F AHU-F8 1 No

G AHU-F9 1 No

H AHU-F10 1 No

I AHU-F11 1 No

J AHU-F12 1 No

K AHU-F13 1 No

L AHU-F14 1 No

M AHU-F15 1 No

N AHU-S1 1 No

O AHU-S2 1 No

P AHU-S2A 1 No

Q AHU-S3 1 No

R AHU-S4 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 22 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR HANDLING UNITS (Cont'd.)

A AHU-S5 1 No

B AHU-S6 1 No

C AHU-S7 1 No

D AHU-S8 1 No

E AHU-S9 1 No

F AHU-S10 1 No

G AHU-S11 1 No

H AHU-S12 1 No

I AHU-S13 1 No

J AHU-S14 1 No

K AHU-S15 1 No

L AHU-S16 1 No

M AHU-S17 1 No

FRESH AIR HANDLING UNIT

N FAHU-1 1 No

O FAHU-2 1 No

P FAHU-3 1 No

Q FAHU-4 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 23 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

FAN COIL UNITS

Supply ,Installation Fan coil units complete with direct drive


fan, motor, filters, and all accessories including hangers,
vibration isolators, drain pan, controls and electrical wiring
and as specified

A FCU-B1 3 No

B FCU-B2 2 No

C FCU-B3 1 No

D FCU-B3A 1 No

F FCU-B4 1 No

G FCU-B5 1 No

H FCU-B6 2 No

I FCU-B7 1 No

J FCU-B8 1 No

K FCU-B9 1 No

L FCU-B10 1 No

M FCU-B11 2 No

N CCU-B11 1 No

O FCU-G1 1 No

P FCU-G2 1 No

CARRIED TO COLLECTION

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 24 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

FAN COIL UNITS (Cont'd.)

A FCU-G3 1 No

B FCU-G4 1 No

C FCU-G5 1 No

D FCU-G6 1 No

F FCU-G7 1 No

G FCU-G8 1 No

H FCU-F1 1 No

I FCU-F2 1 No

J FCU-F3 1 No

K FCU-F4 1 No

L FCU-F5 1 No

M FCU-F6 1 No

N FCU-S1 1 No

O FCU-S2 1 No

P FCU-S3 1 No

Q FCU-S4 1 No

R FCU-S5 1 No

S FCU-S6 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 25 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

FAN COIL UNITS (Cont'd.)

A FCU-S7 1 No

B FCU-S8 1 No

C FCU-S9 1 No

D FCU-S10 1 No

F FCU-S11 2 No

G FCU-R1 1 No

H FCU-R2 1 No

I FCU-R3 1 No

J FCU-R4 1 No

K FCU-R5 2 No

L FCU-R6 1 No

M FCU-R7 2 No

N FCU-R8 2 No

O FCU-R9 2 No

P FCU-R10 1 No

Q FCU-R11 1 No

R FCU-R12 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 26 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME

A VAV-B1 1 No

B VAV-B2 1 No

C VAV-B3 1 No

D VAV-B4 1 No

F VAV-B5 1 No

G VAV-B6 1 No

H VAV-B7 1 No

I VAV-B8 1 No

J VAV-B9 1 No

K VAV-B10 2 No

L VAV-B15 1 No

M VAV-B16 1 No

N VAV-B17 1 No

O VAV-B19 1 No

P VAV-B20 1 No

Q VAV-B22 1 No

R VAV-B23 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 27 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

S VAV-B26 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-B27 1 No

B VAV-B28 1 No

C VAV-B29 1 No

D VAV-B31 1 No

F VAV-B32 1 No

G VAV-B34 1 No

H VAV-B35 1 No

I VAV-B36 1 No

J VAV-B37 1 No

K VAV-B43 1 No

L VAV-B44 1 No

M VAV-B45 1 No

N VAV-B46 1 No

O VAV-B48 1 No

P VAV-B49 1 No

Q VAV-B51 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 28 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

R VAV-B52 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-B53 1 No

B VAV-B54 1 No

C VAV-B55 1 No

D VAV-B56 1 No

F VAV-B57 1 No

G VAV-G-1 1 No

H VAV-G-2 1 No

I VAV-G-3 1 No

J VAV-G-4 1 No

K VAV-G-5 1 No

L VAV-G-6 1 No

M VAV-G-9 1 No

N VAV-G-10 1 No

O VAV-G-11 1 No

P VAV-G-12 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 29 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

Q VAV-G-13 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-G-14 1 No

B VAV-G-15 1 No

C VAV-G-16 1 No

D VAV-G-17 2 No

F VAV-G-18 2 No

G VAV-G-19 1 No

H VAV-G-20 1 No

I VAV-G-22 2 No

J VAV-G-24 2 No

K VAV-G-25 2 No

L VAV-G-26 2 No

M VAV-G-28 1 No

N VAV-G-30 1 No

O VAV-G-33 2 No

P VAV-G-34 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 30 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

Q VAV-G-35 1 No

R VAV-G-36 1 No

S VAV-G-37 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-G-38 1 No

B VAV-G-39 1 No

C VAV-G-40 1 No

D VAV-G-41 1 No

F VAV-G-42 1 No

G VAV-G-43 2 No

H VAV-G-44 1 No

I VAV-G-45 1 No

J VAV-G-46 1 No

K VAV-G2-1 1 No

L VAV-G2-2 1 No

M VAV-G2-3 1 No

N VAV-G2-4 1 No

O VAV-G2-5 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 31 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

P VAV-G2-7 1 No

Q VAV-G2-8 1 No

R VAV-G2-9 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-G2-10 1 No

B VAV-G2-11 1 No

C VAV-G2-12 1 No

D VAV-G2-13 1 No

F VAV-G2-14 1 No

G VAV-G2-15 1 No

H VAV-G2-16 1 No

I VAV-G2-17 1 No

J VAV-G2-18 1 No

K VAV-G2-19 1 No

L VAV-G2-21 1 No

M VAV-G2-22 1 No

N VAV-G2-23 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 32 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

O VAV-G2-24 1 No

P VAV-G2-25 1 No

Q VAV-G2-26 1 No

R VAV-G2-27 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-G2-28 1 No

B VAV-G2-29 1 No

C VAV-G2-30 2 No

D VAV-G2-31 2 No

F VAV-G2-33 2 No

G VAV-G2-34 1 No

H VAV-G2-35 1 No

I VAV-G2-36 1 No

J VAV-G2-37 1 No

K VAV-G2-38 1 No

L VAV-G2-39 1 No

M VAV-G2-40 1 No

N VAV-G2-41 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 33 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

O VAV-G2-42 1 No

P VAV-G2-43 1 No

Q VAV-G2-44 1 No

R VAV-G2-45 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-G2-46 1 No

B VAV-G2-47 1 No

C VAV-G2-48 1 No

D VAV-G2-49 1 No

F VAV-G2-50 1 No

G VAV-G2-51 1 No

H VAV-G2-52 1 No

I VAV-G3-1 1 No

J VAV-G3-2 1 No

K VAV-G3-4 1 No

L VAV-G3-6 1 No

M VAV-G3-7 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 34 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

N VAV-G3-8 1 No

O VAV-G3-9 1 No

P VAV-G3-10 1 No

Q VAV-G3-11 1 No

R VAV-G3-12 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-G3-13 1 No

B VAV-G3-14 1 No

C VAV-G3-15 1 No

D VAV-G3-16 1 No

F VAV-G3-17 1 No

G VAV-G3-18 1 No

H VAV-G3-19 1 No

I VAV-G3-20 1 No

J VAV-G3-21 1 No

K VAV-G3-22 1 No

L VAV-G3-23 1 No

M VAV-G3-24 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 35 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

N VAV-G3-25 1 No

O VAV-G3-26 1 No

P VAV-G3-27 1 No

Q VAV-G3-28 1 No

R VAV-G3-29 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-G3-30 1 No

B VAV-G3-31 1 No

C VAV-G3-32 1 No

D VAV-G3-33 1 No

F VAV-G3-35 1 No

G VAV-G3-36 1 No

H VAV-G6-1 1 No

I VAV-G6-2 1 No

J VAV-G6-4 3 No

K VAV-G6-6 1 No

L VAV-G6-7 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 36 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

M VAV-G6-8 1 No

N VAV-G6-9 1 No

O VAV-G6-10 1 No

P VAV-G6-11 1 No

Q VAV-G6-12 1 No

R VAV-G6-13 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-G6-14 1 No

B VAV-G6-15 1 No

C VAV-G6-16 1 No

D VAV-G6-17 1 No

F VAV-G6-18 1 No

G VAV-G6-19 1 No

H VAV-G6-20 1 No

I VAV-G6-21 1 No

J VAV-G6-22 1 No

K VAV-G6-23 1 No

L VAV-G6-24 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 37 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

M VAV-G6-25 1 No

N VAV-G7-1 2 No

O VAV-G7-3 1 No

P VAV-G7-4 1 No

Q VAV-G7-5 1 No

R VAV-G7-6 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-G7-7 1 No

B VAV-G7-8 1 No

C VAV-G7-9 1 No

D VAV-G7-10 1 No

F VAV-G7-11 1 No

G VAV-G7-12 1 No

H VAV-G7-14 1 No

I VAV-G7-15 1 No

J VAV-G7-16 1 No

K VAV-G7-17 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 38 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

L VAV-G7-18 1 No

M VAV-G7-19 1 No

N VAV-G7-20 1 No

O VAV-G7-21 2 No

P VAV-G7-22 1 No

Q VAV-G7-23 1 No

R VAV-G7-25 1 No

S VAV-G7-27 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-G7-28 1 No

B VAV-G7-29 1 No

C VAV-G7-30 1 No

D VAV-G7-31 1 No

F VAV-G7-32 1 No

G VAV-G7-33 1 No

H VAV-G7-43 1 No

I VAV-G8-2 1 No

J VAV-G8-3 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 39 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

K VAV-G8-4 1 No

L VAV-G8-5 1 No

M VAV-G8-6 1 No

N VAV-G8-7 1 No

O VAV-G8-8 1 No

P VAV-G8-9 1 No

Q VAV-G8-10 1 No

R VAV-G8-11 2 No

S VAV-G8-12 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-G8-13 1 No

B VAV-G8-14 1 No

C VAV-G8-15 1 No

D VAV-G8-16 1 No

F VAV-G8-17 1 No

G VAV-G8-18 1 No

H VAV-G8-19 1 No

I VAV-G8-20 1 No

J VAV-G8-22 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 40 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

K VAV-G8-23 1 No

L VAV-G8-24 1 No

M VAV-G8-27 1 No

N VAV-G8-28 1 No

O VAV-G8-29 1 No

P VAV-G8-30 1 No

Q VAV-G8-31 1 No

R VAV-G8-32 1 No

S VAV-F1-1 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F1-2 1 No

B VAV-F1-3 1 No

C VAV-F1-4 1 No

D VAV-F1-5 1 No

F VAV-F1-6 1 No

G VAV-F1-7 1 No

H VAV-F1-8 1 No

I VAV-F1-9 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 41 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

J VAV-F1-10 1 No

K VAV-F1-11 1 No

L VAV-F1-12 1 No

M VAV-F1-13 1 No

N VAV-F1-14 1 No

O VAV-F1-15 1 No

P VAV-F1-16 1 No

Q VAV-F1-17 1 No

R VAV-F1-18 1 No

S VAV-F1-19 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F1-21 1 No

B VAV-F1-22 1 No

C VAV-F10-1 1 No

D VAV-F10-2 1 No

F VAV-F10-3 1 No

G VAV-F11-1 1 No

H VAV-F11-2 1 No

I VAV-F11-3 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 42 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

J VAV-F11-4 1 No

K VAV-F11-5 1 No

L VAV-F11-6 1 No

M VAV-F11-7 1 No

N VAV-F12-1 1 No

O VAV-F12-2 1 No

P VAV-F12-3 1 No

Q VAV-F12-4 1 No

R VAV-F12-5 1 No

S VAV-F2-1 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F2-2 1 No

B VAV-F2-3 1 No

C VAV-F2-4 1 No

D VAV-F2-5 1 No

F VAV-F2-6 1 No

G VAV-F2-7 1 No

H VAV-F2-8 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 43 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

I VAV-F2-9 1 No

J VAV-F2-10 1 No

K VAV-F2-11 1 No

L VAV-F2-13 1 No

M VAV-F2-14 1 No

N VAV-F2-15 1 No

O VAV-F2-16 1 No

P VAV-F2-17 1 No

Q VAV-F2-18 1 No

R VAV-F2-19 1 No

S VAV-F2-20 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F2-21 1 No

B VAV-F2-22 1 No

C VAV-F2-23 1 No

D VAV-F3-1 1 No

F VAV-F3-2 1 No

G VAV-F3-3 1 No

H VAV-F3-5 2 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 44 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

I VAV-F3-6 2 No

J VAV-F3-7 1 No

K VAV-F3-8 1 No

L VAV-F3-9 1 No

M VAV-F3-10 1 No

N VAV-F3-11 1 No

O VAV-F3-12 1 No

P VAV-F3-13 1 No

Q VAV-F3-14 1 No

R VAV-F3-15 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F3-16 1 No

B VAV-F4-1 1 No

C VAV-F4-2 1 No

D VAV-F4-3 1 No

F VAV-F4-4 1 No

G VAV-F4-5 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 45 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

H VAV-F4-6 1 No

I VAV-F4-7 1 No

J VAV-F4-8 1 No

K VAV-F4-9 1 No

L VAV-F4-10 1 No

M VAV-F4-12 1 No

N VAV-F4-13 1 No

O VAV-F4-14 1 No

P VAV-F4-15 1 No

Q VAV-F4-16 1 No

R VAV-F4-17 1 No

S VAV-F4-18 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F4-19 1 No

B VAV-F4-21 1 No

C VAV-F4-22 1 No

D VAV-F4-23 1 No

F VAV-F4-24 1 No

G VAV-F4-25 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 46 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

H VAV-F4-26 1 No

I VAV-F4-27 2 No

J VAV-F4-28 2 No

K VAV-F4-29 1 No

L VAV-F4-30 1 No

M VAV-F4-31 1 No

N VAV-F4-32 1 No

O VAV-F4-33 1 No

P VAV-F4-34 1 No

Q VAV-F4-35 1 No

R VAV-F4-36 1 No

S VAV-F4-37 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F4-38 1 No

B VAV-F4-39 2 No

C VAV-F4-40 1 No

D VAV-F4-41 1 No

F VAV-F4-43 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 47 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

G VAV-F4-44 1 No

H VAV-F4-45 1 No

I VAV-F4-46 1 No

J VAV-F4-47 1 No

K VAV-F4-48 1 No

L VAV-F4-49 1 No

M VAV-F4-50 1 No

N VAV-F4-51 1 No

O VAV-F4-52 1 No

P VAV-F4-53 1 No

Q VAV-F4-54 1 No

R VAV-F4-55 1 No

S VAV-F5-1 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F5-2 1 No

B VAV-F5-3 1 No

C VAV-F5-4 1 No

D VAV-F5-5 1 No

F VAV-F5-6 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 48 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

G VAV-F5-7 1 No

H VAV-F5-8 1 No

I VAV-F5-9 1 No

J VAV-F5-10 1 No

K VAV-F5-11 1 No

L VAV-F5-12 1 No

M VAV-F5-13 1 No

N VAV-F5-14 1 No

O VAV-F5-15 1 No

P VAV-F5-16 1 No

Q VAV-F6-1 1 No

R VAV-F6-2 1 No

S VAV-F6-3 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F6-4 1 No

B VAV-F6-5 1 No

C VAV-F6-6 1 No

D VAV-F6-7 2 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 49 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

F VAV-F6-8 1 No

G VAV-F6-9 1 No

H VAV-F6-10 1 No

I VAV-F6-11 1 No

J VAV-F6-12 1 No

K VAV-F6-13 1 No

L VAV-F6-14 1 No

M VAV-F6-15 1 No

N VAV-F7-1 2 No

O VAV-F7-2 1 No

P VAV-F7-3 2 No

Q VAV-F7-4 2 No

R VAV-F7-5 2 No

S VAV-F7-8 2 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F7-10 1 No

B VAV-F7-11 1 No

C VAV-F7-12 1 No

D VAV-F7-13 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 50 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

F VAV-F7-14 1 No

G VAV-F7-15 1 No

H VAV-F7-16 1 No

I VAV-F7-17 1 No

J VAV-F7-18 1 No

K VAV-F7-19 1 No

L VAV-F7-20 1 No

M VAV-F7-21 1 No

N VAV-F7-22 1 No

O VAV-F7-23 1 No

P VAV-F7-24 1 No

Q VAV-F7-25 1 No

R VAV-F7-26 1 No

S VAV-F7-27 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F7-28 1 No

B VAV-F7-29 1 No

C VAV-F7-30 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 51 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

D VAV-F7-31 2 No

F VAV-F7-32 2 No

G VAV-F7-33 2 No

H VAV-F7-34 2 No

I VAV-F7-35 1 No

J VAV-F7-36 1 No

K VAV-F7-38 1 No

L VAV-F7-39 1 No

M VAV-F7-40 1 No

N VAV-F7-41 1 No

O VAV-F7-50 1 No

P VAV-F8-1 1 No

Q VAV-F8-2 1 No

R VAV-F8-3 1 No

S VAV-F8-4 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F8-5 1 No

B VAV-F8-6 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 52 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

C VAV-F8-7 1 No

D VAV-F8-8 1 No

F VAV-F8-9 1 No

G VAV-F8-10 1 No

H VAV-F8-11 1 No

I VAV-F8-13 2 No

J VAV-F8-14 1 No

K VAV-F8-15 1 No

L VAV-F8-16 1 No

M VAV-F8-17 1 No

N VAV-F8-18 1 No

O VAV-F8-19 1 No

P VAV-F8-20 1 No

Q VAV-F8-21 1 No

R VAV-F8-22 1 No

S VAV-F8-23 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-F8-24 1 No

B VAV-F8-25 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 53 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

C VAV-F8-26 1 No

D VAV-F8-27 2 No

F VAV-F8-28 1 No

G VAV-F9-2 1 No

H VAV-F9-6 1 No

I VAV-F9-7 1 No

J VAV-S1-2 1 No

K VAV-S1-3 1 No

L VAV-S1-4 2 No

M VAV-S1-5 1 No

N VAV-S1-6 1 No

O VAV-S1-7 1 No

P VAV-S1-8 1 No

Q VAV-S1-9 1 No

R VAV-S1-10 1 No

S VAV-S1-11 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-S1-12 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 54 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

B VAV-S1-13 1 No

C VAV-S1-14 1 No

D VAV-S1-15 1 No

F VAV-S1-16 1 No

G VAV-S1-17 1 No

H VAV-S1-18 1 No

I VAV-S1-19 1 No

J VAV-S1-20 2 No

K VAV-S1-21 1 No

L VAV-S1-22 1 No

M VAV-S1-23 1 No

N VAV-S1-24 1 No

O VAV-S1-25 1 No

P VAV-S1-26 1 No

Q VAV-S1-27 1 No

R VAV-S1-28 1 No

S VAV-S1-30 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 55 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

A VAV-S1-31 1 No

B VAV-S11-2 1 No

C VAV-S11-4 1 No

D VAV-S13-1 1 No

F VAV-S13-2 1 No

G VAV-S13-3 1 No

H VAV-S13-4 1 No

I VAV-S13-5 1 No

J VAV-S13-6 1 No

K VAV-S13-7 1 No

L VAV-S13-8 1 No

M VAV-S13-9 1 No

N VAV-S13-10 1 No

O VAV-S13-11 1 No

P VAV-S13-12 1 No

Q VAV-S13-13 1 No

R VAV-S13-14 1 No

S VAV-S13-15 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 56 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

A VAV-S13-16 1 No

B VAV-S14-1 1 No

C VAV-S14-2 1 No

D VAV-S14-3 1 No

F VAV-S14-4 1 No

G VAV-S14-5 1 No

H VAV-S14-6 1 No

I VAV-S14-7 1 No

J VAV-S14-8 1 No

K VAV-S14-9 1 No

L VAV-S14-10 1 No

M VAV-S14-11 1 No

N VAV-S14-12 1 No

O VAV-S14-13 1 No

P VAV-S14-15 2 No

Q VAV-S14-17 1 No

R VAV-S14-18 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 57 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

VARIABLE AIR VOLUME (Cont'd)

A VAV-S14-19 1 No

B VAV-S14-20 1 No

C VAV-S14-21 1 No

D VAV-S14-22 1 No

F VAV-S14-23 2 No

G VAV-S14-25 1 No

H VAV-S14-26 1 No

I VAV-S14-27 1 No

J VAV-S2-1 1 No

K VAV-S2-2 1 No

L VAV-S2-3 1 No

M VAV-S2-4 1 No

N VAV-S2-5 1 No

O VAV-S2-6 1 No

P VAV-S2-7 1 No

Q VAV-S2-8 1 No

R VAV-S2-9 1 No

S VAV-S2-10 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 58 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

VARIABLE AIR VOLUME (Cont'd)


A VAV-S2-11 1 No

B VAV-S2-12 1 No

C VAV-S2-13 1 No

D VAV-S2-14 1 No

F VAV-S2-15 1 No

G VAV-S2-16 1 No

H VAV-S2-17 1 No

I VAV-S2-18 1 No

J VAV-S2-19 1 No

K VAV-S2-20 1 No

L VAV-S2-21 2 No

M VAV-S2-22 1 No

N VAV-S2-24 1 No

O VAV-S2-25 1 No

P VAV-S2-26 1 No

Q VAV-S2-28 1 No

R VAV-S2-29 2 No

S VAV-S2-30 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 59 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-S2-31 1 No

B VAV-S2-32 1 No

C VAV-S2-33 1 No

D VAV-S3-1 2 No

F VAV-S3-2 2 No

G VAV-S3-3 1 No

H VAV-S3-4 2 No

I VAV-S3-5 2 No

J VAV-S3-6 2 No

K VAV-S3-7 1 No

L VAV-S3-8 3 No

M VAV-S3-9 2 No

N VAV-S3-10 2 No

O VAV-S3-11 2 No

P VAV-S3-12 2 No

Q VAV-S3-13 2 No

R VAV-S3-14 2 No

S VAV-S3-15 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 60 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-S3-16 2 No

B VAV-S3-17 2 No

C VAV-S3-18 1 No

D VAV-S3-19 1 No

F VAV-S3-20 1 No

G VAV-S3-21 1 No

H VAV-S3-22 1 No

I VAV-S3-23 1 No

J VAV-S3-24 1 No

K VAV-S3-25 1 No

L VAV-S3-26 1 No

M VAV-S3-27 1 No

N VAV-S3-28 1 No

O VAV-S3-29 1 No

P VAV-S3-30 1 No

Q VAV-S3-31 1 No

R VAV-S4-1 1 No

S VAV-S4-2 1 No

CARRIED TO COLLECTION

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 61 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-S4-3 1 No

B VAV-S4-4 1 No

C VAV-S4-5 1 No

D VAV-S4-6 1 No

F VAV-S4-7 1 No

G VAV-S4-8 1 No

H VAV-S4-9 1 No

I VAV-S4-10 1 No

J VAV-S4-11 1 No

K VAV-S4-12 1 No

L VAV-S4-13 1 No

M VAV-S4-14 1 No

N VAV-S4-15 1 No

O VAV-S4-16 1 No

P VAV-S4-17 1 No

Q VAV-S4-18 1 No

R VAV-S4-19 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 62 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VARIABLE AIR VOLUME (Cont'd)

A VAV-S4-20 1 No

B VAV-S4-21 1 No

C VAV-S4-22 1 No

D VAV-S4-23 1 No

F VAV-S4-24 1 No

G VAV-S4-25 1 No

H VAV-S4-26 1 No

I VAV-S4-27 1 No

J VAV-S4-28 1 No

K VAV-S4-29 1 No

L VAV-S4-30 1 No

M VAV-S4-31 1 No

N VAV-S4-32 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 63 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

CONSTANT AIR VOLUME

A CAV-B11 1 No

B CAV-B12 2 No

C CAV-B13 1 No

D CAV-B14 1 No

F CAV-B18 1 No

G CAV-B21 1 No

H CAV-B24 1 No

I CAV-B25 1 No

J CAV-B30 1 No

K CAV-B33 1 No

L CAV-B38 1 No

M CAV-B39 1 No

N CAV-B40 1 No

O CAV-B41 1 No

P CAV-B42 1 No

Q CAV-B47 1 No

R CAV-G3-3 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 64 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

S CAV-S11 2 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VOLUME DAMPER

Fresh Air Duct

A Volume Damper 300X200mm 1 No

B Volume Damper 300X250mm 1 No

C Volume Damper 350x200mm 1 No

D Volume Damper 400x250mm 8 No

F Volume Damper 500x300mm 3 No

G Volume Damper 500x400mm 1 No

H Volume Damper 600x400mm 1 No

I Volume Damper 600X500mm 3 No

Supply Air Duct

J Volume Damper 150X100mm 6 No

K Volume Damper 150X150mm 78 No

L Volume Damper 200X100mm 25 No

M Volume Damper 200X150mm 31 No

N Volume Damper 250X100mm 210 No

O Volume Damper 250X150mm 70 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 65 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

P Volume Damper 250X200mm 164 No

Q Volume Damper 250X250mm 6 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VOLUME DAMPER(Cont'd...)

A Volume Damper 300X100mm 6 No

B Volume Damper 300X150mm 196 No

C Volume Damper 300X200mm 70 No

D Volume Damper 300X250mm 111 No

E Volume Damper 350X150mm 16 No

F Volume Damper 350X200mm 24 No

G Volume Damper 350X250mm 4 No

H Volume Damper 350X300mm 4 No

I Volume Damper 400X150mm 14 No

J Volume Damper 400X200mm 25 No

K Volume Damper 400X250mm 3 No

L Volume Damper 400X300mm 2 No

M Volume Damper 450X200mm 1 No

N Volume Damper 450X250mm 8 No

O Volume Damper 450X400mm 4 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 66 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

P Volume Damper 500X200mm 17 No

Q Volume Damper 500X250mm 5 No

R Volume Damper 500X300mm 5 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

VOLUME DAMPER(Cont'd...)

A Volume Damper 550X300mm 2 No

B Volume Damper 600X300mm 1 No

C Volume Damper 650X250mm 1 No

D Volume Damper 750X400mm 1 No

E Volume Damper 1150X750mm 1 No

F Volume Damper 1150X1000mm 1 No

FIRE DAMPER

Fresh Air Duct

G Fire Damper 150X150mm 6 No

H Fire Damper 250x250mm 2 No

Return Air Duct

I Fire Damper 200x100mm 5 No

J Fire Damper 250x100mm 3 No

K Fire Damper 300x250mm 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 67 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

L Fire Damper 500X250mm 1 No

Supply Air Duct

M Fire Damper 150x150mm 8 No

N Fire Damper 200x150mm 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

FIRE DAMPER(Cont'd...)

A Fire Damper 200x100mm 4 No

B Fire Damper 250x100mm 1 No

C Fire Damper 300x200mm 2 No

D Fire Damper 300x250mm 1 No

E Fire Damper 350X200mm 2 No

MOTORISED DAMPER

F Motorised Damper 700x350mm 3 No

G Motorised Damper 700x700mm 4 No

H Motorised Damper 850x500mm 7 No

I Motorised Damper 850x750mm 2 No

J Motorised Damper 1050x500mm 1 No

NON RETURNING DAMPER

K Non Return Damper 1000x600 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 68 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

L Non Return Damper 1050x650 8 No

M Non Return Damper 1050x700 1 No

N Non Return Damper 1150x650 2 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR FILTRATION (Cont'd.)

FLEXIBLE DUCT

A Flexible Duct 150mm dia 393 No

B Flexible Duct 200mm dia 253 No

C Flexible Duct 250mm dia 191 No

AIR FILTRATION

Exhaust & Sand Trap Louver

D Exhaust Air Louver 250x150 1 No

E Exhaust Air Louver 250x200 1 No

F Exhaust Air Louver 300x250 1 No

G Exhaust Air Louver 350x250 6 No

H Exhaust Air Louver 400x250 4 No

I Exhaust Air Louver 450x250 5 No

J Exhaust Air Louver 500x200 2 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 69 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

K Exhaust Air Louver 500x250 2 No

L Exhaust Air Louver 550x250 3 No

M Exhaust Air Louver 600x250 3 No

N Exhaust Air Louver 650x250 4 No

O Exhaust Air Louver 700x250 2 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

AIR FILTRATION (Cont'd..)

A Exhaust Air Louver 1500x500 4 No

B Sand Trap Louver 550x250 2 No

C Sand Trap Louver 600x250 1 No

D Sand Trap Louver 650x250 1 No

E Sand Trap Louver 650x300 3 No

F Sand Trap Louver 700x300 3 No

G Sand Trap Louver 900x350 1 No

H Sand Trap Louver 5450x750 1 No

I Sand Trap Louver 1500x750 9 No

J Sand Trap Louver 3050x500 2 No

K Sand Trap Louver 3000x500 3 No

SOUND ATTENUATOR

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 70 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

L SA, 350x200 3 No

M SA, 500x300 2 No

N SA, 650x350 3 No

O SA, 650x400 2 No

P SA, 650x450 2 No

Q SA, 700x350 4 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

SOUND ATTENUATOR (Cont'd..)

A SA, 750x400 1 No

B SA, 800x400 1 No

C SA, 800x700 1 No

D SA, 800x800 1 No

E SA, 850x600 1 No

F SA, 850x750 3 No

G SA, 950x300 1 No

H SA, 900x750 1 No

I SA, 950x750 6 No

J SA, 1000x300 9 No

K SA, 1000x500 2 No

L SA, 1000x600 2 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 71 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

M SA, 1000x650 3 No

N SA, 1000x800 1 No

O SA, 1050x300 2 No

P SA, 1050x500 1 No

Q SA, 1050x650 12 No

R SA, 1050x700 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

SOUND ATTENUATOR (Cont'd)

A SA, 1050x750 1 No

B SA, 1100x300 2 No

C SA, 1100x500 1 No

D SA, 1150x500 1 No

E SA, 1150x650 10 No

F SA, 1150x700 1 No

G SA, 1150x750 2 No

H SA, 1200x300 2 No

I SA, 1250x850 3 No

J SA, 1300x750 1 No

K SA, 1350x750 2 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 72 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

L SA, 1350x950 4 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

EXHUST/FRESH AIR FAN

Supply and install of fans, connect to ductwork including all


controls, electrical connections, accessories, fixing in
position, complete all in accordance with the drawings and
specification

A BEF-1 7 No

B BEF-2 4 No

C BEF-3 1 No

D KMFA-B1 2 No

E KEF-1 1 No

F KEF-G 1 No

G SPF-1 1 No

H SPF-2 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 73 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

I SPF-3 1 No

J SPF-4 1 No

K SPF-5 1 No

L SEF-1 1 No

M SEF-2 1 No

N SEF-3 1 No

O SEF-4 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

EXHUST/FRESH AIR FAN (Cont'd)

A LPF-1 1 No

B LPF-2 1 No

C LPF-3 1 No

D LPF-4 1 No

E LPF-5 1 No

F LPF-6 1 No

G LPF-7 1 No

H LPF-8 1 No

I EAF-G1 1 No

J EAF-G2 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 74 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

K EAF-G3 1 No

L EAF-G4 1 No

M EAF-G5 1 No

N EAF-G6 1 No

O EAF-G7 1 No

P EAF-F1 1 No

Q EAF-F2 1 No

R EAF-F3 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

EXHUST/FRESH AIR FAN (Cont'd)

A EAF-F4 1 No

B EAF-F5 1 No

C EAF-F13 1 No

D EAF-F14 1 No

E EAF-F15 1 No

F EAF-S1 1 No

G EAF-S2 1 No

H EAF-S3 1 No

I EAF-S4 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 75 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

J EAF-S5 1 No

K EAF-S6 1 No

L EAF-S7 1 No

M EAF-S8 1 No

N EAF-S9 1 No

O EAF-AHU-S5 1 No

P EAF-AHU-S6 1 No

Q EAF-AHU-S7 1 No

R EAF-AHU-S 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

EXHUST/FRESH AIR FAN (Cont'd)

A EAF-AHU-S10 1 No

B EAF-AHU-S11 1 No

C EAF-AHU-S15 1 No

D EAF-AHU-S16 1 No

E EAF-AHU-S17 1 No

F EAF-S10(Ecological Unit) 1 No

HEPA FILTER FOR(EXHUST/FRESH AIR)

G 200x150 1 No

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 76 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

H 250x150 3 No

I 300x200 3 No

J 300x250 2 No

K 350x200 6 No

L 350x250 1 No

M 400x250 2 No

N 450x250 1 No

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

1 L.S.

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 77 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO TOTAL COLLECTION

ITEM DESCRIPTION

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION
SECTION Q/1 - AIRCONDITIONING & VENTILATION
SYSTEM

COLLECTION

Total of page No. B2/Q/1/1

Total of page No. B2/Q/1/2

Total of page No. B2/Q/1/3

Total of page No. B2/Q/1/4

Total of page No. B2/Q/1/5

Total of page No. B2/Q/1/6

Total of page No. B2/Q/1/7

Total of page No. B2/Q/1/8

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 78 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

Total of page No. B2/Q/1/9

Total of page No. B2/Q/1/10

Total of page No. B2/Q/1/11

Total of page No. B2/Q/1/12

Total of page No. B2/Q/1/13

Total of page No. B2/Q/1/14

Total of page No. B2/Q/1/15

Total of page No. B2/Q/1/16

Total of page No. B2/Q/1/17

Total of page No. B2/Q/1/18

Total of page No. B2/Q/1/19

CARRIED TO TOTAL COLLECTION

ITEM DESCRIPTION

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION
SECTION Q/1 - AIRCONDITIONING & VENTILATION
SYSTEM

COLLECTION

Total of page No. B2/Q/1/20

Total of page No. B2/Q/1/21


0
Total of page No. B2/Q/1/22

Total of page No. B2/Q/1/23

Total of page No. B2/Q/1/24

Total of page No. B2/Q/1/25

Total of page No. B2/Q/1/26

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 79 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

Total of page No. B2/Q/1/27

Total of page No. B2/Q/1/28

Total of page No. B2/Q/1/29

Total of page No. B2/Q/1/30

Total of page No. B2/Q/1/31

Total of page No. B2/Q/1/32

Total of page No. B2/Q/1/33

Total of page No. B2/Q/1/34

Total of page No. B2/Q/1/35

Total of page No. B2/Q/1/36

Total of page No. B2/Q/1/37

Total of page No. B2/Q/1/38

CARRIED TO TOTAL COLLECTION

ITEM DESCRIPTION

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION
SECTION Q/1 - AIRCONDITIONING & VENTILATION
SYSTEM

COLLECTION

Total of page No. B2/Q/1/39

Total of page No. B2/Q/1/40

Total of page No. B2/Q/1/41

Total of page No. B2/Q/1/42

Total of page No. B2/Q/1/43

Total of page No. B2/Q/1/44

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 80 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

Total of page No. B2/Q/1/45

Total of page No. B2/Q/1/46

Total of page No. B2/Q/1/47

Total of page No. B2/Q/1/48

Total of page No. B2/Q/1/49

Total of page No. B2/Q/1/50

Total of page No. B2/Q/1/51

Total of page No. B2/Q/1/52

Total of page No. B2/Q/1/53

Total of page No. B2/Q/1/54

Total of page No. B2/Q/1/55

Total of page No. B2/Q/1/56

Total of page No. B2/Q/1/57

CARRIED TO TOTAL COLLECTION

ITEM DESCRIPTION

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION
SECTION Q/1 - AIRCONDITIONING & VENTILATION
SYSTEM

COLLECTION

Total of page No. B2/Q/1/58

Total of page No. B2/Q/1/59

Total of page No. B2/Q/1/60

Total of page No. B2/Q/1/61

Total of page No. B2/Q/1/62

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 81 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

Total of page No. B2/Q/1/63

Total of page No. B2/Q/1/64

Total of page No. B2/Q/1/65

Total of page No. B2/Q/1/66

Total of page No. B2/Q/1/67

Total of page No. B2/Q/1/68

Total of page No. B2/Q/1/69

Total of page No. B2/Q/1/70

Total of page No. B2/Q/1/71

Total of page No. B2/Q/1/72

Total of page No. B2/Q/1/73

Total of page No. B2/Q/1/74

Total of page No. B2/Q/1/75

CARRIED TO TOTAL COLLECTION

ITEM DESCRIPTION

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION
SECTION Q/1 - AIRCONDITIONING & VENTILATION
SYSTEM

TOTAL COLLECTION

Total of page No. B2/Q/1/76

Total of page No. B2/Q/1/77

Total of page No. B2/Q/1/78

Total of page No. B2/Q/1/79

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 82 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION Q/1 - AIR CON. AND VENTILATION SYSTEM


CARRIED TO MECH'L ENG'G INST. SUMMARY

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 83 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 84 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 85 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 86 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 87 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

AED 0.00

RATE AMOUNT

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 88 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00

AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 89 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

0.00
0.00

AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 90 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00

0.00
0.00

0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 91 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 92 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 93 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 94 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00
AED 0.00

RATE AMOUNT

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 95 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 96 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 97 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 98 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 99 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 100 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 101 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
AED 0.00

RATE AMOUNT

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 102 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 103 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 104 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 105 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

AED 0.00

RATE AMOUNT

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 106 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
AED 0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 107 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 108 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 109 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 110 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 111 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 112 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

0.00
0.00

AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 113 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00

AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 114 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 115 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 116 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 117 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 118 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 119 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 120 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 121 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 122 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 123 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
AED 0.00

RATE AMOUNT

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 124 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
AED 0.00

RATE AMOUNT

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 125 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 126 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 127 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 128 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 129 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 130 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 131 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 132 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 133 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 134 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 135 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 136 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 137 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 138 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 139 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 140 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 141 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 142 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 143 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 144 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 145 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 146 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 147 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 148 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 149 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 150 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 151 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 152 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 153 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 154 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 155 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0

0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 156 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 157 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 158 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 159 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 160 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

AMOUNT

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 161 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AED

AMOUNT

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 162 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AED 0.00

AMOUNT

0.00

0.00

0.00

0.00

0.00

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 163 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AED 0.00

AMOUNT

0.00

0.00

0.00

0.00

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 164 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AED 0.00

AMOUNT

0.00

0.00

0.00

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 165 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation


B2/Q/1/ 166 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/2 - COLD AND HOT WATER SUPPLY


SYSTEM

PLUMBING EQUIPMENT

PUMPS

Supply,Installation of Domestic Pumps as per specification


& Drawings.

A Cooled Water Booster Pump 1 set

B Hot Water Booster Pump 1 set

C Cooled Water Circulation Pump 1 set

D Hot Water Circulation Pump 1 set

E Filtered Booster Pump 1 set

HEAT EXCHANGER

Supply,Installation of Heat Exchanger as per specification &


Drawings.

F HEX-01 1 No.

ULTRA VIOLET STERILIZER

Supply,Installation of Ultra Violet Sterilizer as per


specification & Drawings.

G UV-1 1 No.

H UV-2 1 No.

I Main Water Meter Assembly 1 set

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 1 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/2 - COLD AND HOT WATER SUPPLY


SYSTEM

PLUMBING EQUIPMENT
HOT WATER CALORIFIER

Supply,Installation of Hot Water Calorifier as per


specification & Drawings.

A HWC-1 1 set

B HWC-2 1 set

C HWC-3 1 set

D HWC-4 1 set

FILTERATION UNIT

Supply,Installation of Filteration Unit as per specification &


Drawings.

E F-1 1 set

F F-2 1 set

WATER SOFTNER UNIT

Supply,Installation of Water Softner Unit as per specification


& Drawings.

G SF 2 set

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 2 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/2 - COLD AND HOT WATER SUPPLY


SYSTEM

DOMESTIC WATER PIPING

PP-R pipe work including all fittings, supports, hangers,


coding, insulation, protection and wrappings warning grid,
etc. all in accordance with the Drawings and Specification.

Cold Water Supply Pipe

A 150mm diameter 159 m

B 200mm diameter 20 m

Boosted Cold Water Supply Pipe

C 20mm diameter 2,382 m

D 25mm diameter 1,158 m

E 32mm diameter 649

F 40mm diameter 420 m

G 50mm diameter 172 m

H 65mm diameter 119 m

I 75mm diameter 45 m

J 100mm diameter 52 m

K 150mm diameter 92 m

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 3 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/2 - COLD AND HOT WATER SUPPLY


SYSTEM

DOMESTIC WATER PIPING (Cont,d.)

Hot Water Supply Pipe

A 15mm diameter 1,694 m

B 20mm diameter 1,027 m

C 25mm diameter 578 m

D 32mm diameter 502 m

E 40mm diameter 267 m

F 50mm diameter 155 m

G 65mm diameter 57 m

H 75mm diameter 45 m

I 100mm diameter 51 m

J 150mm diameter 104 m

Hot water Return Pipe

K 15mm diameter 2,217 m

L 20mm diameter 1,037 m

M 25mm diameter 418 m

N 32mm diameter 146 m

O 40mm diameter 156 m

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 4 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/2 - COLD AND HOT WATER SUPPLY


SYSTEM

DOMESTIC WATER PIPING (Cont,d.)

A 65mm diameter 35 m

Soft water Pipe

B 15mm diameter 43 m

C 20mm diameter 22 m

D 25mm diameter 115 m

E 32mm diameter 189 m

PEX pipe work including all fittings, supports, hangers,


coding, insulation, protection and wrappings warning grid,
etc. all in accordance with the Drawings and Specification.

Boosted Cold water Supply Pipe

F 15 mm diameter 3,900 m

Hot water Supply Pipe

G 15mm diameter 2,113 m

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 5 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/2 - COLD AND HOT WATER SUPPLY


SYSTEM

DOMESTIC WATER PIPE INSULATION

19mm closed cell elastomeric rubber foam insulation all in


accordance with Drawings and Specification

Boosted Cold Water Supply Pipe Insulation 0


0
A 20mm diameter 2,382 m
0
B 25mm diameter 1,158 m
0
C 32mm diameter 649
0
D 40mm diameter 420 m
0
E 50mm diameter 172 m
0
F 65mm diameter 119 m
0
G 75mm diameter 45 m
0
Hot Water Supply Pipe Insulation 0
0
H 15mm diameter 1,694 m
0
I 20mm diameter 1,027 m
0
J 25mm diameter 578 m
0
K 32mm diameter 502 m
0
L 40mm diameter 267 m

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 6 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0
M 50mm diameter 155 m

0
CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/2 - COLD AND HOT WATER SUPPLY


SYSTEM

DOMESTIC WATER PIPE INSULATION

A 65mm diameter 57 m
0
B 75mm diameter 45 m
0
Hot water Return Pipe Insulation 0
0
C 15mm diameter 2,217 m
0
D 20mm diameter 1,037 m
0
E 25mm diameter 418 m
0
F 32mm diameter 146 m
0
G 40mm diameter 156 m
0
H 65mm diameter 35 m

25mm closed cell elastomeric rubber foam insulation all in


accordance with Drawings and Specification

Boosted Cold Water Supply Pipe Insulation

I 100mm diameter 52 m
0
J 150mm diameter 92 m
0
Hot Water Supply Pipe Insulation 0

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 7 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0
K 100mm diameter 51 m
0
L 150mm diameter 104 m

0
CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/2 - COLD AND HOT WATER SUPPLY


SYSTEM

DOMESTIC WATER PIPE INSULATION (Cont'd...)

32mm closed cell elastomeric rubber foam insulation all in


accordance with Drawings and Specification

Boosted Cold Water Supply Pipe Insulation 0

A 100mm diameter 5 m

B 150mm diameter 4 m

Hot Water Supply Pipe Insulation

C 100mm diameter 5 m

D 150mm diameter 4 m

Hot Water Return Pipe Insulation

E 25mm diameter 5 m

F 40mm diameter 4 m

PIPE SPECIALTIES

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 8 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

Supply and installation of hot and cold water pipe


specialties; including all related fixing materials, complete;
all in accordance with the Drawings and Specification

Isolation valve (IV)

G 15mm diameter 1,694 No.

H 20mm diameter 576 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/2 - COLD AND HOT WATER SUPPLY


SYSTEM

DOMESTIC WATER PIPE INSULATION (Cont'd...)

PIPE SPECIALTIES (Cont'd)

A 25mm diameter 299 No.

B 32mm diameter 103 No.

C 40mm diameter 18 No.

D 50mm diameter 10 No.

E 65mm diameter 7 No.

F 75mm diameter 5 No.

G 100mm diameter 8 No.

H 150mm diameter 5 No.

Double Regulating Valve (DRV)

I 15mm diameter 6 No.

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 9 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

J 20mm diameter 4 No.

K 25mm diameter 8 No.

L 40mm diameter 3 No.

Relief Valve (RV) 3 No.

M 40mm diameter 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

DOMESTIC WATER PIPING (Cont'd..)

PIPE SPECIALTIES (Cont'd)

Pressure Reducing Valve (PRV) Assembly

A 25mm diameter 1 No.

B 32mm diameter 1 No.

C 40mm diameter 2 No.

D 50mm diameter 1 No.

E 65mm diameter 6 No.

F 75mm diameter 6 No.

G 150mm diameter 1 No.

Solenoid Valve

H 40mm diameter 1 No.

I 150mm diameter 1 No.

Automatic Air Vent

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 10 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

J 25mm diameter 5 No.

Drain Valve

K 100mm diameter 3 No.

Drain Valve

L 75mm diameter 1 No.

M 150mm diameter 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

DOMESTIC WATER PIPING (Cont'd..)

PIPE SPECIALTIES (Cont'd)

A 200mm diameter 1 No.

B Water Hammer Arrester 198 No.

C Tank Vent With Insect Screen 3 No.

D Bib Tap 15 No.

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 11 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 12 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/2 - COLD AND HOT WATER SUPPLY


SYSTEM

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

L.S.

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 13 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 14 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

DESCRIPTION

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/2 - COLD AND HOT WATER SUPPLY


SYSTEM

COLLECTION

Total of page No. B2/Q/2/1

Total of page No. B2/Q/2/2

Total of page No. B2/Q/2/3

Total of page No. B2/Q/2/4

Total of page No. B2/Q/2/5

Total of page No. B2/Q/2/6

Total of page No. B2/Q/2/7

Total of page No. B2/Q/2/8

Total of page No. B2/Q/2/9

Total of page No. B2/Q/2/10

Total of page No. B2/Q/2/11

Total of page No. B2/Q/2/12

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 15 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION Q/2 - COLD AND HOT WATER S/SYSTEM


CARRIED TO MECH'L ENG'G INST. SUMMARY

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 16 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 17 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED
0.00

RATE AMOUNT

0.00
0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 18 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED
0.00

RATE AMOUNT

0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 19 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
AED
0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 20 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED
0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 21 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED
0.00

RATE AMOUNT

0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 22 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00

0.00
AED
0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 23 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00

0.00
AED
0.00

RATE AMOUNT

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 24 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00

AED
0.00

RATE AMOUNT

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 25 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
AED
0.00

RATE AMOUNT

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 26 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

AED
0.00

RATE AMOUNT

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 27 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
AED
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 28 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 29 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED
0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 30 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AMOUNT

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 31 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section Q, Mech'l Eng'g Installation B2/Q/2/ 32 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/3 - SANITARY FITTINGS, FIXTURES &


ACCESSORIES

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

SANITARY FITTINGS & ACCESSORIES

Supply and install complete toilet accessories indicated in


drawing ,Specification and Sanitary ware schedule

A European type Water closet, 228 No.

B Flushing Cistern 228 No.

C Wall plate for dual flush 228 No.

D Toilet Paper Holder 228 No.

E Sink 244 No.

F Sink Mixer 244 No.

G Sink with Board 13 No.

H Sink with Board Mixer 13 No.

I Wash basin(Flat Edge) 126 No.

J Wash basin Mixer 126 No.

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/3/ 1 August 2014-Tender Documents


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/3 - SANITARY FITTINGS, FIXTURES &


ACCESSORIES (Cont'd..)

A Wash basin (Round Edge) 131 No.

B Wash basin circular type Mixer 131 No.

C Shower 101 No.

D Shower Mixer and accessories 101 No.

E Urinal 6 No.

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/3/ 2 August 2014-Tender Documents


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/3 - SANITARY FITTINGS, FIXTURES &


ACCESSORIES

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

L.S.

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/3/ 3 August 2014-Tender Documents


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

DESCRIPTION

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/3 - SANITARY FITTINGS, FIXTURES &


ACCESSORIES

COLLECTION

Total of Page No. B2/Q/3/1

Total of Page No. B2/Q/3/2

Total of Page No. B2/Q/3/3

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/3/ 4 August 2014-Tender Documents


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION Q/3 - SANITARY FIT.-FIXTURES & ACCESSORIES


CARRIED TO MECH'L ENG'G INST. SUMMARY

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/3/ 5 August 2014-Tender Documents


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/3/ 6 August 2014-Tender Documents


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/3/ 7 August 2014-Tender Documents


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
AED 0.00

RATE AMOUNT

0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/3/ 8 August 2014-Tender Documents


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

AMOUNT

0.00

0.00

0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/3/ 9 August 2014-Tender Documents


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/3/ 10 August 2014-Tender Documents


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/4 - DRAINAGE SYSTEM

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

SANITARY WASTE AND VENT PIPING & STORM WATER


PIPING

Supply and install the uPVC Pipe as per specification and


drawings.

A 32 mm diameter 579 m

B 40 mm diameter 648 m

C 50 mm diameter 256 m

D 75 mm diameter 1917 m

E 100 mm diameter 3347 m

F 150 mm diameter 1109 m

G 200 mm diameter 1835 m

Under Ground Pipe

H 75 mm diameter 11 m

I 100 mm diameter 15 m

J 200 mm diameter 235 m

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 1 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/4 - DRAINAGE SYSTEM

SANITARY WASTE AND VENT PIPING & STORM WATER


PIPING (Cont'd)

Supply and install the HDPE Pipe as per specification and


drawings.

A 32 mm diameter 176 m

B 40 mm diameter 38 m

C 50 mm diameter 64 m

D 75 mm diameter 30 m

E 100 mm diameter 284 m

F 150 mm diameter 100 m

G 200 mm diameter 326 m

Pressurised Pipe

H 75 mm diameter 101 m

I 100 mm diameter 296 m

Supply and install Bend/ Reduce/ Tee as per Drawing and


Specification

45 Degree Bend

J 75 mm 339 No.

K 100 mm 280 No.

L 150 mm 100 No.

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 2 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/4 - DRAINAGE SYSTEM

SANITARY WASTE AND VENT PIPING & STORM WATER


PIPING (Cont'd)

A 200 mm 45 No.

90 Degree Bend

B 75 mm 295 No.

C 100 mm 481 No.

D 150 mm 35 No.

E 200 mm 2 No.

Reducer

F 75x32 mm 60 No.

G 75x40 mm 50 No.

H 75x50 mm 4 No.

I 100x32 mm 56 No.

J 100x40 mm 71 No.

K 100x50 mm 23 No.

L 150x32 mm 5 No.

M 150x50 mm 15 No.

N 200x32 mm 5 No.

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 3 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

O 200x50 mm 9 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/4 - DRAINAGE SYSTEM

SANITARY WASTE AND VENT PIPING & STORM WATER


PIPING (Cont'd)

Plain Tee

A 75x75x75 mm 14 No.

Double Y-Tee

B 75x75x75x75mm 1 No.

C 100x100x50x50mm 2 No.

D 100x100x75x75mm 2 No.

E 100x100x100x100mm 11 No.

F 150x150x75x75 mm 3 No.

G 150x150x150x150 mm 2 No.

H 200x200x150x50 mm 1 No.

I 200x200x200x100 mm 2 No.

J 200x200x200x150 mm 1 No.

K 200x200x150x150 mm 1 No.

L 200x200x200x200 mm 1 No.

Y-Tee

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 4 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

M 75x75x32 mm 60 No.

N 75x75x40 mm 50 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/4 - DRAINAGE SYSTEM

SANITARY WASTE AND VENT PIPING & STORM WATER


PIPING (Cont'd)

A 75x75x50 mm 2 No.

B 75x75x75 mm 103 No.

C 100x100x32 mm 56 No.

D 100x100x40 mm 71 No.

E 100x100x50 mm 21 No.

F 100x100x75 mm 181 No.

G 100x100x100 mm 319 No.

H 150x150x32 mm 5 No.

I 150x150x50 mm 15 No.

J 150x150x75 mm 24 No.

K 150x150x100 mm 24 No.

L 150x150x150 mm 46 No.

M 200x200x32 mm 5 No.

N 200x200x50 mm 8 No.

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 5 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

O 200x200x75 mm 51 No.

P 200x200x100 mm 133 No.

Q 200x200x150 mm 40 No.

R 200x200x200 mm 39 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/4 - DRAINAGE SYSTEM

SANITARY STORM AND WASTE PIPING SPECIALTIES

Supply and install Clean out/ Floor Clean out/ End cap/ Area
drain/ Roof vent/ Flow Drain/ Flow Trap as per Drawings
and Specification

A Floor Cleanout 110mm 21 No.

B Floor Cleanout 160mm 56 No.

C Floor Drain 110mm 4 No.

D Balcony Drain 110 mm 35 No.

E Vent Cowl 32 No.

F Access Cap 14 No.

Trench Drain

G 150mm 6 m

H 300mm 24 m

Clean out

I 40 mm 37 No.

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 6 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

J 50 mm 83 No.

K 75 mm 134 No.

L 100 mm 559 No.

M 150 mm 55 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/4 - DRAINAGE SYSTEM

SANITARY STORM AND WASTE PIPING SPECIALTIES


(Cont'd..)

A 200 mm 45 No.

Floor Cleanout

B 75 mm 3 No.

C 100 mm 21 No.

D 150 mm 56 No.

E 200 mm 45 No.

Floor Drain

F 75mm 373 No.

G 100mm 4 No.

Floor Trap

H 100mm 1 No.

Fish Scale Trap

I 450x450 mm 1 No.

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 7 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

MANHOLE, GULLY TRAP

Supply and install including excavation, backfilling,


concrete, waterproofing cover and frame, complete all in
accordance with the drawings and specification

Pit

A 400x400x350 mm 2 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/4 - DRAINAGE SYSTEM

SANITARY STORM AND WASTE PIPING SPECIALTIES


(Cont'd..)

Grease Trap Pit

B 3000x2000x1500 mm 1 No.

Gully Trap

C 800x800xmm 3 No.

D 600x600 mm 2 No.

E 300x300 mm 5 No.

F Manhole 19 No.

G Chemical Treatment Plant 1 No.

Sand Trap

H 600x600x600 mm 1 No.

I 1000x1000x1000 mm 2 No.

Collection Tank

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 8 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

J 2000x1500x1500 mm 1 No.

Sump pit

K 1500x1500x2400 mm 1 No.

L 3000x2000x3000 mm 5 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/4 - DRAINAGE SYSTEM

SANITARY STORM AND WASTE PIPING SPECIALTIES


(Cont'd..)

A Pressure Break Manhole 3 No.

B Catch Basin (600x600mm) 33 No.

C Final inspection (600x600mm) 3 No.

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 9 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/4 - DRAINAGE SYSTEM

DRAINAGE PUMPS

Supply and install Drainage pumps as per specification &


drawings.

A Submersible Pump SP-1 (1W+1S) 1 set

B Submersible Pump SP-2 (1W+1S) 1 set

C Submersible Pump SP-3 (1W+1S) 1 set

D Submersible Pump SP-4 (1W+1S) 1 set

E Submersible Pump SP-5 (1W+1S) 1 set

F Submersible Pump SP-6 (1W+1S) 1 set

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 10 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/4 - DRAINAGE SYSTEM

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

L.S.

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 11 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

DESCRIPTION

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/4 - DRAINAGE SYSTEM

COLLECTION

Total of page No. B2/Q/4/1

Total of page No. B2/Q/4/2

Total of page No. B2/Q/4/3

Total of page No. B2/Q/4/4

Total of page No. B2/Q/4/5

Total of page No. B2/Q/4/6

Total of page No. B2/Q/4/7

Total of page No. B2/Q/4/8

Total of page No. B2/Q/4/9

Total of page No. B2/Q/4/10

Total of page No. B2/Q/4/11

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 12 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION Q/4 - DRAINAGE SYSTEM


CARRIED TO MECH'L ENG'G INSTALLATION SUMMARY

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 13 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 14 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 15 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 16 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 17 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 18 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00

AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 19 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 20 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 21 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00

0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 22 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 23 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 24 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

N AMOUNT

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 25 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section Q.Mech'l Eng'g Installation B2/Q/4/ 26 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/5 - FIRE PROTECTION

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

FIRE HOSE REEL CABINET

Supply, install, test, commission and hand over the following


Fire hose reel Cabinets, in accordance with relevant NFPA
latest edition and conforming to Civil Defense regulations &
as shown in drawing , Specification and schedule.

A FHRC 43 No.

FIRE EXTINGUISHER

Supply, install, test, commission and hand over the following


Fire Extinguisher with the following as shown in drawing ,
Specification and schedule.

B Fire Extingusher 5kg co2 46 No.

C Foam portable extinguisher (5.5 kg) 12 No.

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 1 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/5 - FIRE PROTECTION

WATER BASED FIRE SUPPRESSION SYSTEMS

Supply and install the following Galvanized Steel, Grade B


pipework including all fittings, supports, hangers, painting
and coding for fire suppression system; Piping works as per
Specification and Drawings.

A 25mm diameter 7225 m

B 32mm diameter 1223 m

C 40mm diameter 870 m

D 50mm diameter 849 m

E 65mm diameter 1240 m

F 80mm diameter 552 m

G 100mm diameter 1358 m

H 125mm diameter 72 m

I 150mm diameter 663 m

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 2 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/5 - FIRE PROTECTION

SPRINKLER & VALVES

Supply, install, test, commission and hand over Sprinkler


and Valves from an approved manufacturer fixed to pipe
work with all required accessories and complete as per
drawings and specification

A Concealed & upright Sprinkler 2963 No.

B Side wall Sprinkler 31 No.

C Ionization detector 2 No.

D W/P Sounder + Flasher 1 No.

E Isolation Valve 150mm dia. 14 No.

F Issolation Valve 65mm dia. 104 No.

G Automatic Air Vent with Valve 12 No.

H ACV 4 No.

I
4-WAY Breaching Inlet Connection 150mm dia. 4 No.

J Foam bladder 1 No.

K No.V 150mm dia. 4 No.

L Preaction Valve 100mm 5 No.

M Preaction Valve 65mm 2 No.

N Preaction Valve 40mm 1 No.

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 3 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

O Preaction Valve 32mm 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/5 - FIRE PROTECTION

SPRINKLER & VALVES (Cont'd)

A Preaction Valve 25mm 3 No.

B Pressure Gauge 30 No.

C Pressure reduce valve 65mm dia. 5 No.

D Pressure reduce valve 25mm dia. 30 No.

E Zone Control valve 11 No.

F Foam Nozzle 32 No.

G Deluge Valve 80mm 1 No.

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 4 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/5 - FIRE PROTECTION

FIRE PUMPS

Supply, install, test and commission the following fire pumps


complete with piping, control panel, builder's work and
accessories, etc. as per specification drawings and
schedule.

A Electric Motor Driven Fire Pump , 2 No.

B Diesel Driven Fire Pump 2 No.

C Jockey Pump 2 No.

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 5 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/5 - FIRE PROTECTION

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

L.S.

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 6 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

DESCRIPTION

SECTION Q - MECHANICAL ENGINEERING


INSTALLATION

SECTION Q/5 - FIRE PROTECTION

COLLECTION

Total of Page No. B2/Q/5/1

Total of Page No. B2/Q/5/2

Total of Page No. B2/Q/5/3

Total of Page No. B2/Q/5/4

Total of Page No. B2/Q/5/5

Total of Page No. B2/Q/5/6

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 7 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION Q/5 - FIRE PROTECTION


CARRIED TO MECH'L ENG'G INST. SUMMARY

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 8 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 9 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 10 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 11 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 12 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 13 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
AED 0.00

AMOUNT

0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 14 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

AMOUNT

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 15 August 2014-Tender Document


OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section Q,Mech'l Eng'g Installation B2/Q/5/ 16 August 2014-Tender Document


PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

DESCRIPTION

SECTION Q - MECHANICAL ENGINEERING INSTALLATION

SUMMARY

SECTION Q/1 - AIRCONDITIONING & VENTILATION


SYSTEM
Page B2/Q/1/46

SECTION Q/2 - COLD AND HOT WATER SUPPLY


Page B2/Q/2/13

SECTION Q/3 - SANITARY FITTINGS, FIXTURES &


ACCESSORIES
Page B2/Q/3/4

SECTION Q/4 - DRAINAGE SYSTEM


Page B2/Q/4/12

SECTION Q/5 - FIRE PROTECTION


Page B2/Q/5/7

Page 1 of 1020
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION Q - CARRIED TO SUMMARY

Page 2 of 1020
ECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AMOUNT

G INSTALLATION

0.00

0.00

0.00

0.00

0.00

Page 3 of 1020
ECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Page 4 of 1020
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

COMMON REQUIREMENTS FOR ELECTRICAL


INSTALLATIONS

LV CABLE

Supply, install and connect Cables complete with cable


glands, ducts, cable straps and terminations to all
equipment as indicated on the drawing for proper
installation and operation compete including related civil
works

A 160
1C 50mm2 XLPE/SWA/LSF+ 1C 25mm2 ECC m

B 2,164
2C 2.5mm2 XLPE/SWA/PVC + 1C 2.5mm2 PVC/ECC m

C 643
3C 10mm2 XLPE/SWA/PVC + 1C 10mm2 PVC/ECC m

D 182
3C 16mm2 XLPE/SWA/PVC + 1C 10mm2 PVC/ECC m

E 4C 6mm2 XLPE/SWA/LSF+ 1C 6mm2 ECC 179 m

F 1,808
4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 PVC/ECC m

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 1 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

LV CABLE (Cont'd..)

A 2,952
4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 PVC/ECC m

B 614
4C 25mm2 XLPE/SWA/LSF+ 1C 16mm2 ECC m

C 372
4C 35mm2 XLPE/SWA/LSF+ 1C 16mm2 ECC m

D 331
4C 50mm2 XLPE/SWA/LSF + 1C 25mm2 ECC m

E 376
4C 70mm2 XLPE/SWA/LSF + 1C 35mm2 ECC m

F 326
4C 95mm2 XLPE/SWA/LSF + 1C 50mm2 ECC m

G 177
4C 120mm2 XLPE/SWA/LSF + 1C 70mm2 ECC m

H 169
4C 150mm2 XLPE/SWA/LSF + 1C 95mm2 ECC m

I 2,221
4C 185mm2 XLPE/SWA/LSF + 1C 95mm2 ECC m

J 785
4C 240mm2 XLPE/SWA/LSF + 1C 120mm2 ECC m

K 422
4x4C 240mm2 XLPE/SWA/LSF + 2x1C 240mm2 ECC m

L 4x1C 16mm2 LSF/SC + 1C 16mm2 ECC 202 m

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 2 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

LV CABLE (Cont'd..)

A 29
4C 6mm2 FIRE RATED CABLE + 1C 6mm2 PVC/ECC m

B 451
4C 10mm2 FIRE RATED CABLE + 1C 10mm2 ECC m

C 1,114
4C 16mm2 FIRE RATED CABLE + 1C 16mm2 PVC/ECC m

D 1,080
4C 25mm2 FIRE RATED CABLE + 1C 16mm2 ECC m

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 3 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

CABLE TRAYS FOR ELECTRICAL SYSTEMS

Supply, install and connect the following complete with all


support and accessories for proper installation and
operation as per drawings and Specification.

A 900mm HDGI Cable Tray 474 m

B 750mm HDGI Cable Tray 230 m

C 600mm HDGI Cable Tray 126 m

D 400mm HDGI Cable Tray 39 m

E 300mm HDGI Cable Tray 525 m

F 200mm HDGI Cable Tray 66 m

G 150mm HDGI Cable Tray 122 m

H HDGI Cable Tray at Terrace 251 m

CABLE TRUNCH FOR ELECTRICAL SYSTEMS

I 1250X1000MM Concrete Encased Cable Trench With


Removable Concrete Covers 142 m

J 1000MM Deep Cable Trench With GI Grating Cover


48 m

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 4 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

SWITCHBOARDS

Supply, install and connect the following Main, Sub


Distribution boards complete with all accessories
interconnections etc. (cable and conduit measured
separately), all as shown on the drawings, as specified and
as required for proper installation and operation

MAIN DISTRIBUTION BOARDS

A MDB-G 1 No.
0
B MDB-1 1 No.
0
C MDB-2 1 No.
0
D MDB-3 1 No.
0
E MDB-4 1 No.
0
F MDB-5 1 No.
0
G MDB-6 1 No.
0
H MDB-7 1 No.

SUB-MAIN DISTRIBUTION BOARDS

I SMDB-S21N 1 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 5 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

J SMDB - L2E 1 No.

K SMDB - L3E 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

SWITCHBOARDS

SUB-MAIN DISTRIBUTION BOARDS (Cont'd..)

A SMDB - R1E 1 No.

B SMDB-G31N 1 No.

C SMDB-F11N 1 No.

D SMDB-B11N 1 No.

E SMDB-R2N 1 No.

F SMDB-G11N 1 No.

G SMDB-F21N 1 No.

H SMDB-S31N 1 No.

I SMDB-G22N 1 No.

J SMDB-G21N 1 No.

K SMDB-F31N 1 No.

L SMDB-S11N 1 No.

M SMDB-BCAL 1 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 6 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

N SMDB-K 1 No.

O SMDB-L1E 1 No.

P SMDB-S21E 1 No.

Q SMDB-F21E 1 No.
CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

SWITCHBOARDS

SUB-MAIN DISTRIBUTION BOARDS (Cont'd..)

A SMDB-R2E 1 No.

B SMDB-G11E 1 No.

C SMDB-G21E 1 No.

D SMDB-G31E 1 No.

E SMDB-B11E 1 No.

F SMDB-S11E 1 No.

G SMDB-F31E 1 No.

H SMDB-S31E 1 No.

I SMDB-F31U 1 No.

J SMDB-S31U 1 No.

K SMDB-KIT 1 No.

L SMDB-G11U 1 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 7 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

M SMDB-G21U 1 No.

N SMDB-G31U 1 No.

O SMDB-U 1 No.

P SMDB-S21U 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

DISTRIBUTION BOARDS

Supply, install and connect the following complete with all


accessories, interconnections, etc., all as shown on the
drawings, as specified and as required for proper operation

A DB-R21N 1 No.

B DB-R21E 1 No.

C DB-R11E 1 No.

D DB-L.F31E 1 No.

E DB-M.F31E 1 No.

F DB-L.F21E 1 No.

G DB-L.F22E 1 No.

H DB-L.F21N 1 No.

I DB-L.F22N 1 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 8 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

J DB-P.F21N 1 No.

K DB-P.F22N 1 No.

L DB-P.F23N 1 No.

M DB-P.F24N 1 No.

N DB-M.F21N 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

DISTRIBUTION BOARDS (Cont'd.)

A DB-M.F22N 1 No.

B DB-L.F31N 1 No.

C DB-P.F31N 1 No.

D DB-P.F32N 1 No.

E DB-M.F31N 1 No.

F DB-P.F31U 1 No.

G DB-L.F11N 1 No.

H DB-L.F12N 1 No.

I DB-P.F11N 1 No.

J DB-P.F12N 1 No.

K DB-P.F13N 1 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 9 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

L DB-M.F11N 1 No.

M DB-M.F12N 1 No.

N DB-M.F13N 1 No.

O DB-L.G11E 1 No.

P DB-L.F11E 1 No.

Q DB-L.F12E 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

DISTRIBUTION BOARDS (Cont'd.)

A DB-L.G31E 1 No.

B DB-L.G32E 1 No.

C DB-P.G31U 1 No.

D DB-P.G11U 1 No.

E DB-P.F11U 1 No.

F DB-P.F12U 1 No.

G DB-P.G21U 1 No.

H DB-P.F12U 1 No.

I DB-KIT2 1 No.

J DB-KIT3 1 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 10 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

K DB-L.G21N 1 No.

L DB-L.G22N 1 No.

M DB-P.G21N 1 No.

N DB-P.G22N 1 No.

O DB-P.G23N 1 No.

P DB-P.G24N 1 No.

Q DB-P.G25N 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

DISTRIBUTION BOARDS (Cont'd.)

A DB-M.G21N 1 No.

B DB-M.G22N 1 No.

C DB-L.G11N 1 No.

D DB-P.G11N 1 No.

E DB-P.G12N 1 No.

F DB-M.G11N 1 No.

G DB-M.G12N 1 No.

H DB-G.CAF 1 No.

I DB-L.G31N 1 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 11 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

J DB-L.G32N 1 No.

K DB-P.G31N 1 No.

L DB-M.G31N 1 No.

M DB-P.S21U 1 No.

N DB-P.S22U 1 No.

O DB-P.S23U 1 No.

P DB-P.SOT1 1 No.

Q DB-P.SOT2 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

DISTRIBUTION BOARDS (Cont'd.)

A DB-P.SOT3 1 No.

B DB-L.S21E 1 No.

C DB-L.S22E 1 No.

D DB-P.S21E 1 No.

E DB-M.S21E 1 No.

F DB-M.S22E 1 No.

G DB-L.S31E 1 No.

H DB-P.S31E 1 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 12 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

I DB-M.S31E 1 No.

J DB-L.S11E 1 No.

K DB-SRS1 1 No.

L DB-SRS2 1 No.

M DB-P.S31U 1 No.

N DB-L.S31N 1 No.

O DB-L.S32N 1 No.

P DB-P.S31N 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

DISTRIBUTION BOARDS (Cont'd.)

A DB-P.S32N 1 No.

B DB-P.S33N 1 No.

C DB-L.S21N 1 No.

D DB-L.S22N 1 No.

E DB-P.S21N 1 No.

F DB-P.S23N 1 No.

G DB-L.B11N 1 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 13 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

H DB-L.B12N 1 No.

I DB-L.B13N 1 No.

J DB-L.B14N 1 No.

K DB-P.B11N 1 No.

L DB-P.B12N 1 No.

M DB-P.B13N 1 No.

N DB-P.B14N 1 No.

O DB-M.B11N 1 No.

P DB-KITE 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

DISTRIBUTION BOARDS (Cont'd.)

A DB-L.B11E 1 No.

B DB-L.B12E 1 No.

C DB-L.B13E 1 No.

D DB-P.B11U 1 No.

E DB-SER 1 No.

F CU 3 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 14 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

G DB-KIT1 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

MOTOR CONTROL CENTER

Supply, install and connect the following Motor Control


Center complete with all accessories interconnections etc.
all as shown on the drawings, as specified and as required
for proper installation and operation

A MCC - R2E 1 No.

B MCC - R3E 1 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 15 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

C MCC - R4E 1 No.

D MCC - R5E 1 No.

E MCC-R3N 1 No.

F MCC-R2N 1 No.

G MCC-B1N 1 No.

H MCC-B1E 1 No.

I MCC-B2E 1 No.

J MCC-B4E 1 No.

K MCC-R4N 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

CAPACITOR BANK

Supply, install and connect the following Capacitor Bank


complete with all accessories interconnections etc. all as
shown on the drawings, as specified and as required for
proper installation and operation

A Capacitor Bank for MDB-1 1 No.

B Capacitor Bank for MDB-2 1 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 16 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

C Capacitor Bank for MDB-3 1 No.

D Capacitor Bank for MDB-4 1 No.

E Capacitor Bank for MDB-5 1 No.

F Capacitor Bank for MDB-6 1 No.

G Capacitor Bank for MDB-7 1 No.

HV SWITCHGEAR

Supply,Installation,craneage , connection, testing &


commissioning of HV Switchgear. as per specification and
drawings

H HV Switchgear 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

COMMON REQUIREMENTS FOR ELECTRICAL


INSTALLATIONS

TRANSFORMER

Supply,Installation,craneage , connection, testing &


commissioning of Transformer. as per specification and
drawings

A 1500KVA Dry type Trasformer Tr.-1 1 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 17 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

B 1500KVA Dry type Trasformer Tr.-2 1 No.

C 1500KVA Dry type Trasformer Tr.-3 1 No.

D 1500KVA Dry type Trasformer Tr.-4 1 No.

E 1500KVA Dry type Trasformer Tr.-5 1 No.

F 1500KVA Dry type Trasformer Tr.-6 1 No.

G 1500KVA Dry type Trasformer Tr.-7 1 No.

DG SETS

Supply,Installation,craneage , connection, testing &


commissioning of DG set. as per specification and
drawings

H 1500KVA DG Sets -1 1 No.

I 1500KVA DG Sets -2 1 No.

J 1500KVA DG Sets -3 1 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

COMMON REQUIREMENTS FOR ELECTRICAL


INSTALLATIONS (Cont'd)

BUS BAR TRUNKING

Supply,Installation,testing & commissioning of Bus bar


Trunking set. as per specification and drawings

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 18 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

A 2500 A Busbar Trunking 150 m

PANEL BOARDS

Supply, install and connect the following Panel boards


complete with all accessories interconnections etc. all as
shown on the drawings, as specified and as required for
proper installation and operation

A Control Panel 26 No.

B Lighting Control panel 6 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

Contractor's Adjustment:

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 19 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

L.S.

CARRIED TO COLLECTION

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

COLLECTION

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 20 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

Total of page No. B2/R/1/1

Total of page No. B2/R/1/2

Total of page No. B2/R/1/3

Total of page No. B2/R/1/4

Total of page No. B2/R/1/5

Total of page No. B2/R/1/6

Total of page No. B2/R/1/7

Total of page No. B2/R/1/8

Total of page No. B2/R/1/9

Total of page No. B2/R/1/10

Total of page No. B2/R/1/11

Total of page No. B2/R/1/12

Total of page No. B2/R/1/13

Total of page No. B2/R/1/14

Total of page No. B2/R/1/15

Total of page No. B2/R/1/16

Total of page No. B2/R/1/17

Total of page No. B2/R/1/18

CARRIED TO COLLECTION

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 21 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

COLLECTION

Total of page No. B2/R/1/19

CARRIED TO COLLECTION

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 22 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

TOTAL COLLECTION

Total of page No. B2/R/1/20

Total of page No. B2/R/1/21

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION


CARRIED TO ELECT'L ENG'G INST. SUMMARY

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 23 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 24 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 25 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 26 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 27 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 28 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 29 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00

0.00
AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 30 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 31 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 32 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 33 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 34 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 35 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 36 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 37 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

0.00

0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 38 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 39 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
AED 0.00

RATE AMOUNT

0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 40 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 41 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 42 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

AED 0.00

AMOUNT

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 43 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AED 0.00

AMOUNT

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 44 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

AED 0.00

AMOUNT

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 45 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AED
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/1/ 46 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/2 - LIGHTING INSTALLATION

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

INTERIOR LIGHTING

A Light Points complete with all required fixings accessories,


etc., including flexible cabling, wiring and conduit and
connected the distribution boards &, all as shown on the
drawings, as specified and as required for proper operation

8,508 No.

Supply,Installation of Light fittings complete with lamps,


tubes, reflectors, control gears, transformers, power supply
units and all required fixings accessories, etc., including
ceiling roses and lighting control system, all as shown on
the drawings, as specified and as required for proper
operation

B B1 2,436 No.

C B2 35 No.

D B3 553 No.

E B4 13 No.

F B5 16 No.

G B6 128 No.

H B8 117 No.

I BHU-L 106 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/2/ 1 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/2 - LIGHTING INSTALLATION

INTERIOR LIGHTING (Cont'd.)

A C1 357 No.

B C2 63 No.

C CL1 226 No.

D D1 58 No.

E F1 709 No.

F F2 601 No.

G F3 225 No.

H F4 476 No.

I F5 467 No.

J F6 97 No.

K F7 196 No.

L FL-1 37 No.

M M1 20 No.

N S1 1,144 No.

O S2 111 No.

P W1 17 No.

Q W2 53 No.

R W3 102 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/2/ 2 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

S PIR 145 No.

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/2 - LIGHTING INSTALLATION

SWITCHES

Supply,Installation of Fittings complete with all required


fixings accessories, etc., including wiring and conduit and
connected the distribution boards all as shown on the
drawings, as specified and as required for proper operation

A 1 Gang,1 Way Switch 450 No.

B 2 Gang,1 Way Switch 61 No.

C 2 Way Switch 400 No.

D Push Bottom Timer switch 20 No.

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/2/ 3 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/2 - LIGHTING INSTALLATION

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

L.S

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/2/ 4 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/2 - LIGHTING INSTALLATION

COLLECTION

Total of page No. B2/R2/1

Total of page No. B2/R2/2

Total of page No. B2/R2/3

Total of page No. B2/R2/4

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/2/ 5 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION R/2 - LIGHTING INSTALLATION


CARRIED TO ELECT'L ENG'G INST. SUMMARY

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/2/ 6 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/2/ 7 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/2/ 8 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/2/ 9 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/2/ 10 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
0.00
AED 0.00

AMOUNT

0.00

0.00

0.00

0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/2/ 11 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section Q, Elect'l Eng'g Installation


B2/R/2/ 12 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/3 -POWER INSTALLATION

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

WIRING DEVICES

Supply, installation of following incluiding cabling,conduiting


as per drawings and specification.

A 20A, SPN Isolator 62 No.

B 32A, SPN Isolator 58 No.

C 20A, TPN Isolator 42 No.

D 32A, TPN Isolator 1 No.

E 40A, TPN Isolator 9 No.

F 63A, TPN Isolator 5 No.

G 80A, TPN Isolator 18 No.

H 100 A, TPN Isolator 1 No.

I 160A, TPN Isolator 2 No.

J 200A, TPN Isolator 3 No.

K Fire Rated 3 phase Isolator (Roof) 38 No.

L 3 phase Isolator (Basement) 28 No.

Bill of Quantities-Section -Q Elect. Eng'g Installation


B2/R/3/1 August 2014-Tender document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/3 -POWER INSTALLATION

WIRING DEVICES (Cont'd)

A 13A, Switched Socket Outlet 2,174 No.

B 13A, Switched Socket Outlet Redrockers 5 No.

C 13A, Switched Single Socket Outlet (W/P) 89 No.

D 15A, Switched Socket Outlet 4 No.

E 16A, 3 Phase Industrial type Switch socket 8 No.

F 13A, 2 gang Switched Socket Outlet 1,107 No.

G 13A, 2 gang Switched Socket Outlet Red rockers


160 No.

H 13A, 2 gang Switched Socket Outlet (W/P) 18 No.

I 13A, 2 gang Switched Socket Outlet (Floor Mounted)


4 No.

J 32A, 3 Phase Industrial type Switch socket 1 No.

Bill of Quantities-Section -Q Elect. Eng'g Installation


B2/R/3/2 August 2014-Tender document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/3 -POWER INSTALLATION

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

L.S.

Bill of Quantities-Section -Q Elect. Eng'g Installation


B2/R/3/3 August 2014-Tender document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/3 -POWER INSTALLATION

COLLECTION

Total of page No. B2/R3/1

Total of page No. B2/R3/2

Total of page No. B2/R3/3

Bill of Quantities-Section -Q Elect. Eng'g Installation


B2/R/3/4 August 2014-Tender document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION R/3 - POWER INSTALLATION


CARRIED TO ELECT'L ENG'G INST. SUMMARY

Bill of Quantities-Section -Q Elect. Eng'g Installation


B2/R/3/5 August 2014-Tender document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section -Q Elect. Eng'g Installation


B2/R/3/6 August 2014-Tender document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Bill of Quantities-Section -Q Elect. Eng'g Installation


B2/R/3/7 August 2014-Tender document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
AED 0.00

RATE AMOUNT

0.00

Bill of Quantities-Section -Q Elect. Eng'g Installation


B2/R/3/8 August 2014-Tender document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

AMOUNT

0.00

0.00

0.00

0.00

0.00

Bill of Quantities-Section -Q Elect. Eng'g Installation


B2/R/3/9 August 2014-Tender document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section -Q Elect. Eng'g Installation


B2/R/3/10 August 2014-Tender document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/4 -TELECOMMUNICATION INSTALLATION

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

COMMUNICATION EQUIPMENT, CABLING AND


COMMON WORKS

Supply, install and connect the following Communication


Equipment,Cabling and Common works as per specification
and Drawings.

A Quadrable RJ45 outlet (2 voice & 2 data) 243 No.

B Single RJ45 data outlet (for wireless access point) 92 No.

C Single RJ45 data outlet 34 No.

D Single RJ45 voice outlet 122 No.

E Twin RJ45 data outlet 17 No.

F Twin RJ45 outlet (1 voice & 1 data) 417 No.

G 2x6 Core multimode fiber optic cable 1,383 m

H Intermediate distribution terminal 14 No.

I Main distribution terminal 1 No.

J Optical distribution frame 1 No.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/4/1 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/4 -TELECOMMUNICATION INSTALLATION

COMMUNICATION EQUIPMENT, CABLING AND


COMMON WORKS (Cont'd)

A Private automatic branch exchange 1 No.

CABLE TRAYS / TRUNKING /CONDUIT FOR


TELECOMMUNICATION SYSTEMS

Supply, install and connect the following complete with all


support and accessories for proper installation and
operation as per drawings and Specification.

B 600mm HDGI Cable Tray 230 m

C 450mm HDGI Cable Tray 152 m

D 300mm HDGI Cable Tray 102 m

E 3 Compartment 100 x 150mm GI trunking 2,198 m

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/4/2 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

EARTHING SYSTEM

Supply and installation of lightning protection and earthing


system, complete; all in accordance with the Drawings and
Specification

A 1C 70 Sqmm Cu/ PVC Earthing Cable item

B Earth Pit item

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/4/3 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/4 -TELECOMMUNICATION INSTALLATION

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

L.S.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/4/4 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/4 -TELECOMMUNICATION INSTALLATION

COLLECTION

Total of page No. B2/R/4/1

Total of page No. B2/R/4/2

Total of page No. B2/R/4/3

Total of page No. B2/R/4/4

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/4/5 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION R/4 - TELECOM. INSTALLATION


CARRIED TO ELECT'L ENG'G INST. SUMMARY

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/4/6 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/4/7 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/4/8 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/4/9 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/4/10 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00

0.00
0.00
AED 0.00

AMOUNT

0.00

0.00

0.00

0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/4/11 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/4/12 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/5 -FIRE ALARM AND DETECTION SYSTEM

EQUIPMENT, CABLING AND COMMON WORKS

Supply, install and connect, fire detection and alarm system


to the latest rules and regulations complete with cabling and
accessories as required for proper installation and operation
As per Drawings and specification.

A Addressable Ionisation Smoke Detector 1,182 No.

B Addressable Heat Detector 15 No.

C Addressable Break Glass unit 78 No.

D Fire Alarm Telephone Jack 15 No.

E Fire Alarm Sounder with Flasher 103 No.

F Fire Alarm Speaker 563 No.

G FARP - 1 1 No.

H FARP - 2 1 No.

I FACP - 1 1 No.

J FACP - 2 1 No.

Bill of Quantities-Section R. Elect'l Eng'g installation


B2/R/5/ 1 August 2014-Tender documents
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

CABLE TRAYS / TRUNKING /CONDUIT FOR FIRE


ALRAM SYSTEMS

Supply, install and connect the following complete with all


support and accessories for proper installation and
operation as per drawings and Specification.

A 50mm x 50mm GI Trunking for Fire Alarm System item

Bill of Quantities-Section R. Elect'l Eng'g installation


B2/R/5/ 2 August 2014-Tender documents
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/5 -FIRE ALARM AND DETECTION SYSTEM

A
Interface to HVAC System. complete with all accessories 1 L.S.

B Interface to Fire Fighting system complete with all


accessories 1 L.S.

C Interface to PA & Music System complete with all


accessories 1 L.S.

D Interface to Programmable Lighting Control system


complete with all accessories 1 L.S.

E
Interface to Elevator complete with all accessories 1 L.S.

F
Interface to Security System complete with all accessories 1 L.S.

G Interface to Kitchen fire Suppression System complete with


all accessories 1 L.S.
Interface to Kitchen fire Suppression System complete with
H all accessories 1 L.S.
Interface to incipient Fire alram complete with all
I accessories 1 L.S.

Installing all working modules and interface for connection


J
to Civil Defense 1 L.S.

K Central Monitoring system 1 L.S.

L Interface to BMS system 1 L.S.

Bill of Quantities-Section R. Elect'l Eng'g installation


B2/R/5/ 3 August 2014-Tender documents
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/5 -FIRE ALARM AND DETECTION SYSTEM

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

1 L.S.

Bill of Quantities-Section R. Elect'l Eng'g installation


B2/R/5/ 4 August 2014-Tender documents
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/5 -FIRE ALARM AND DETECTION SYSTEM

FIRE ALARM AND DETECTION SYSTEM

COLLECTION

Total of page No. B2/R/5/1

Total of page No. B2/R/5/2

Total of page No. B2/R/5/3

Total of page No. B2/R/5/4

Bill of Quantities-Section R. Elect'l Eng'g installation


B2/R/5/ 5 August 2014-Tender documents
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION R/5 -FIRE ALARM AND DETECTION SYSTEM


CARRIED TO ELECT'L ENG'G INSTALLATION SUMMARY

Bill of Quantities-Section R. Elect'l Eng'g installation


B2/R/5/ 6 August 2014-Tender documents
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R. Elect'l Eng'g installation


B2/R/5/ 7 August 2014-Tender documents
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R. Elect'l Eng'g installation


B2/R/5/ 8 August 2014-Tender documents
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
AED 0.00

RATE AMOUNT
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R. Elect'l Eng'g installation


B2/R/5/ 9 August 2014-Tender documents
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

Bill of Quantities-Section R. Elect'l Eng'g installation


B2/R/5/ 10 August 2014-Tender documents
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

AMOUNT

0.00

0.00

0.00

0.00

0.00

Bill of Quantities-Section R. Elect'l Eng'g installation


B2/R/5/ 11 August 2014-Tender documents
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED
0.00

Bill of Quantities-Section R. Elect'l Eng'g installation


B2/R/5/ 12 August 2014-Tender documents
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/6 -LIGHTNING PROTECTION AND


EARTHING SYSTEM

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

EARTHING SYSTEM FOR ELECTRICAL SYSTEM

Supply, install and connect Earthing & lightning protection


system complete with Air Networks, Air.Terminals, Copper
Tape, Down Conductors, Clamps, Clips, Earthing with
Earthing Pit, Bonding and all accessories required for a
complete earthing & lightning protection installation as per
Drawings and specification.

A Earth Pit item

B Earth Bar item

C Down Conductor item

D Air Termination item

E
240 Sqmm Earth Conductor - From Earth Pit to Earth Pit item

F 1C 150 Sqmm Cu/ PVC Earthing Cable item

G 70 Sqmm Cu/ PVC Cable item

Bill of quantities-Section R, Elect'l Eng'g Installation


B2/R/6/ 1 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/6 -LIGHTNING PROTECTION AND


EARTHING SYSTEM

EARTHING SYSTEM FOR ELECTRICAL SYSTEM


(Cont'd..)

A 600mm HDGI Cable Tray item

B 450mm HDGI Cable Tray item

C 300mm HDGI Cable Tray item

D 225mm HDGI Cable Tray item

E 150mm HDGI Cable Tray item

F 100mm HDGI Cable Tray item

G 50mm HDGI Cable Tray item

Bill of quantities-Section R, Elect'l Eng'g Installation


B2/R/6/ 2 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/6 -LIGHTNING PROTECTION AND


EARTHING SYSTEM

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

1 L.S.

Bill of quantities-Section R, Elect'l Eng'g Installation


B2/R/6/ 3 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/6 -LIGHTNING PROTECTION AND


EARTHING SYSTEM

COLLECTION

Total of page No. B2/R6/1

Total of page No. B2/R6/2

Total of page No. B2/R6/3

Bill of quantities-Section R, Elect'l Eng'g Installation


B2/R/6/ 4 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION R/6 -LIGHTNING PROTECTION AND EARTHING


CARRIED TO ELECT'L ENG'G INST. SUMMARY

Bill of quantities-Section R, Elect'l Eng'g Installation


B2/R/6/ 5 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of quantities-Section R, Elect'l Eng'g Installation


B2/R/6/ 6 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of quantities-Section R, Elect'l Eng'g Installation


B2/R/6/ 7 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
AED 0.00

RATE AMOUNT

0.00

Bill of quantities-Section R, Elect'l Eng'g Installation


B2/R/6/ 8 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

AMOUNT

0.00

0.00

0.00

Bill of quantities-Section R, Elect'l Eng'g Installation


B2/R/6/ 9 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED
0.00

Bill of quantities-Section R, Elect'l Eng'g Installation


B2/R/6/ 10 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/7 -PUBLIC ADDRESS & AUDIO VISUAL


SYSTEM

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

Public Address & Audio visual system and equipment's


cabling with accessories required to complete the
installation, all in accordance with the drawings and
specification

A CS-1 (Decorative wall mounted colum speaker) 9


No.

B CS - 1 (Decorative wall mounted sound projector weather 40


proof) No.

C S-1 (Recessed ceiling speaker) 542 No.

D Auxiliary Paging Microphone 3 No.

E FM/AM Radio 1 No.

F Double Tape Deck 1 No.

G CD Player 1 No.

H Matrix Switcher (Amplifiers) 1 No.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/7/ 1 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/7 -PUBLIC ADDRESS & AUDIO VISUAL


SYSTEM (Cont'd..)

A Zone Amplifier 17 No.

B Sub PA Junction Box with Terminal Block Amplifier


13 No.

C Volume Control with Built in Emergency Relay


82 No.

D MATV 1 No.

E SAT/TV/FM outlet 5 No.

F SAT/TV/FM outlet installed above false ceiling


168 No.

G TV splitter box located in the ward corridor above false


ceiling 8 No.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/7/ 2 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/7 -PUBLIC ADDRESS & AUDIO VISUAL


SYSTEM

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

1 L.S.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/7/ 3 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/7 -PUBLIC ADDRESS & AUDIO VISUAL


SYSTEM

COLLECTION

Total of page No. B2/R/7/1

Total of page No. B2/R/7/2

Total of page No. B2/R/7/3

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/7/ 4 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION R/7 -PUBLIC ADDRESS & AV SYSTEM


CARRIED TO ELECT'L ENG'G INST. SUMMARY

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/7/ 5 August 2014-Tender Document
RATE AMOUNT

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/7/ 6 August 2014-Tender Document
AED 0.00

RATE AMOUNT

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/7/ 7 August 2014-Tender Document
0.00
AED 0.00

RATE AMOUNT

0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/7/ 8 August 2014-Tender Document
AED 0.00

AMOUNT

0.00

0.00

0.00

0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/7/ 9 August 2014-Tender Document
AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/7/ 10 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/8 -CCTV SYSTEM

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

Supply, install and connect, video surveillance system to the


latest rules and regulations complete with cabling, conduits
and accessories as required for proper installation and
operation

A IP Based digital color fixed dome camera 83 No.

B
IP based digital color fixed dome camera (weather proof) 32 No.

C
12 port gigabit ethernet core switch with fiber modules 1 No.

D 24 port gigabit ethernet switch (layer-3) 14 No.

E 12 port gigabit ethernet switch 1 No.

F 42" lcd screen 4 No.

Bill of Quantities-Section R, Elect'l Eng,g Installation


B2/R/8/1 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

Bill of Quantities-Section R, Elect'l Eng,g Installation


B2/R/8/2 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/8 -CCTV SYSTEM

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

1 L.S.

Bill of Quantities-Section R, Elect'l Eng,g Installation


B2/R/8/3 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

Bill of Quantities-Section R, Elect'l Eng,g Installation


B2/R/8/4 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/8 -CCTV SYSTEM

COLLECTION

Total of page No. B2/R/8/1

Total of page No. B2/R/8/2

SECTION R/8 -CCTV SYSTEM

Bill of Quantities-Section R, Elect'l Eng,g Installation


B2/R/8/5 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO ELECT'L ENG'G INST. SUMMARY

Bill of Quantities-Section R, Elect'l Eng,g Installation


B2/R/8/6 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng,g Installation


B2/R/8/7 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section R, Elect'l Eng,g Installation


B2/R/8/8 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00

Bill of Quantities-Section R, Elect'l Eng,g Installation


B2/R/8/9 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section R, Elect'l Eng,g Installation


B2/R/8/10 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AMOUNT

0.00

0.00

AED 0.00

Bill of Quantities-Section R, Elect'l Eng,g Installation


B2/R/8/11 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section R, Elect'l Eng,g Installation


B2/R/8/12 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/9 -CENTRAL BATTERY SYSTEM

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

CENTRAL BATTERY BASED EMERGENCY LIGHTING


SYSTEM

Supply and installation of complete Central Battery System


including control modules, Charger modules, Battery and all
required equipment, components and auxiliary work
between the Central Battery and the building's electrical
system

Central Battery System

A CEBP - B1 1 No.

B CEBP - B2 1 No.

C CEBP - G1 1 No.

D CEBP - G2 1 No.

E CEBP - G3 1 No.

F CEBP - F1 1 No.

G CEBP - F2 1 No.

H CEBP - F3 1 No.

I CEBP - S1 1 No.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 1 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/9 -CENTRAL BATTERY SYSTEM (Cont'd..)

A CEBP - S2 1 No.

B CEBP - S3 1 No.

Light fittings complete with lamps, tubes, reflectors, control


gears, transformers, power supply units and all required
fixings accessories, etc., including ceiling roses and flexible
cabling, wiring and conduit and connected the distribution
boards & light.

A 1 X 8W Emergency Exit Light (Single Side) 164 No.

B 1 X 8W Emergency Exit Light (Double Side) 50 No.

C 1 X 8W Emergency Light 1,031 No.

D 2 X 8W Emergency Light 97 No.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 2 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 3 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/9 -CENTRAL BATTERY SYSTEM

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

1 L.S

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 4 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 5 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/9 -CENTRAL BATTERY SYSTEM

COLLECTION

Total of page No. B2/R/9/1

Total of page No. B2/R/9/2

Total of page No. B2/R/9/3

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 6 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION R/9 -CENTRAL BATTERY SYSTEM


CARRIED TO ELECT'L ENG'G INST. SUMMARY

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 7 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 8 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 9 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

0.00
0.00
AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 10 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00

0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 11 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 12 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AMOUNT

0.00

0.00

0.00

0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 13 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/9/ 14 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/10 - ACCESS CONTROL SYSTEM

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

EQUIPMENTS

Supply, install testing & commissioning of central station,


workstation, operating system and application software, and
controllers connected by a high-speed electronic data
transmission network data as per Specification & Drawings.

A Door Contact 58 No.

B Exit Buttom 28 No.

C Door Contact 149 No.

D Door Contact Panel 11 No.

E Access control card reader 90 No.

Bill of quantities - Section R, Elect'l Emg'g Installation


B2/R/10/ 1 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/10 - ACCESS CONTROL SYSTEM

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

1 L.S.

Bill of quantities - Section R, Elect'l Emg'g Installation


B2/R/10/ 2 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/10 - ACCESS CONTROL SYSTEM

COLLECTION

Total of page No. B2/R/10/1

Total of page No. B2/R/10/2

Bill of quantities - Section R, Elect'l Emg'g Installation


B2/R/10/ 3 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION R/10 -ACCESS CONTROL SYSTEM


CARRIED TO ELECT'L ENG'G INST. SUMMARY

Bill of quantities - Section R, Elect'l Emg'g Installation


B2/R/10/ 4 August 2014-Tender Document
RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of quantities - Section R, Elect'l Emg'g Installation


B2/R/10/ 5 August 2014-Tender Document
AED 0.00

RATE AMOUNT

0.00

Bill of quantities - Section R, Elect'l Emg'g Installation


B2/R/10/ 6 August 2014-Tender Document
AED 0.00

AMOUNT

0.00

0.00

0.00

0.00

Bill of quantities - Section R, Elect'l Emg'g Installation


B2/R/10/ 7 August 2014-Tender Document
AED 0.00

Bill of quantities - Section R, Elect'l Emg'g Installation


B2/R/10/ 8 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/11 -UPS SYSTEM

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

UNINTERRUPTIBLE POWER SUPPLY

Supply, installation complete UPS system in accordance


with the drawings and specification

A 400 v ,50 Hz, 400 KVA UPS -1 1 No.

B 400 v ,50 Hz, 400 KVA UPS -2 1 No.

C 400 v ,50 Hz, 250 KVA UPS -3 1 No.

D 400 v ,50 Hz, 250 KVA UPS -4 1 No.

Bill of Quantities Section R - Elec'l Eng'g. Installaltion B2/R/11/1 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/11 -UPS SYSTEM

Contractor's Adjustment:

Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

1 L.S.

Bill of Quantities Section R - Elec'l Eng'g. Installaltion B2/R/11/2 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

Bill of Quantities Section R - Elec'l Eng'g. Installaltion B2/R/11/3 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/11 -UPS SYSTEM

COLLECTION

Total of page No. B2/R/11/1

Total of page No. B2/R/11/2

Bill of Quantities Section R - Elec'l Eng'g. Installaltion B2/R/11/4 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION R/11 -UPS SYSTEM


CARRIED TO ELECT'L ENG'G INSTALLATION SUMMARY

Bill of Quantities Section R - Elec'l Eng'g. Installaltion B2/R/11/5 August 2014-Tender Document
RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

Bill of Quantities Section R - Elec'l Eng'g. Installaltion B2/R/11/6 August 2014-Tender Document
AED 0.00

RATE AMOUNT

0.00

Bill of Quantities Section R - Elec'l Eng'g. Installaltion B2/R/11/7 August 2014-Tender Document
AED 0.00

Bill of Quantities Section R - Elec'l Eng'g. Installaltion B2/R/11/8 August 2014-Tender Document
AMOUNT

0.00

0.00

Bill of Quantities Section R - Elec'l Eng'g. Installaltion B2/R/11/9 August 2014-Tender Document
AED 0.00

Bill of Quantities Section R - Elec'l Eng'g. Installaltion B2/R/11/10 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/12 -BUILDING MANAGEMENT SYSTEM

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

BUILDING MANAGEMENT SYSTEM

Supply, install test and commissioning of Building


Management System equipment and accessories including
wiring and interfacing with all control equipment, complete
all in accordance with the drawings and specifications

A
Combined control stations for BAS system, Access control,
Lighting control, Central Battery system, Energy monitoring,
UPS, Fire alarm, Lift monitoring, AV system, PV generation
as shown in drawing consist of minimum hardware
requirements: 1 L.S.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/12/1 August 2014-tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/12 -BUILDING MANAGEMENT SYSTEM


(Cont'd..)

Supply, install and connect BMS Point of Location


Accessories complete with cabling and accessories for
proper installation and operation

A DDC controller 1 L.S.

B Analogue Input of DDC controller 1 L.S.

C 2 Way valve actuator 1 L.S.

D Differential pressure switch 1 L.S.

E Air flow sensor 1 L.S.

F Temperature air humidity sensor 1 L.S.

G Pressure sensor 1 L.S.

H Temperature sensor 1 L.S.

I Digital Input of DDC controller 1 L.S.

J Digital Output of DDC controller 1 L.S.

K Air quality sensor 1 L.S.

L Pressure damper sensor 1 L.S.

M Carbon dioxide sensor 1 L.S.

N Chlorine level sensor 1 L.S.

O PH level sensor 1 L.S.

P 22AWG / 2 Core MS/TP LAN cable 1 L.S.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/12/2 August 2014-tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/12 -BUILDING MANAGEMENT SYSTEM


(Cont'd..)

Supply, install and connect BMS system capable of


integration with other building services as required complete
with cabling and accessories for proper installation and
operation

A Energy metering & Electrical system 1 L.S.

B Central Battery system 1 L.S.

C CCTV system 1 L.S.

D Access control panel 1 L.S.

E AV equipment 1 L.S.

F BAS server 1 L.S.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/12/3 August 2014-tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/12 -BUILDING MANAGEMENT SYSTEM


(Cont'd..)

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

1 L.S.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/12/4 August 2014-tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/12 -BUILDING MANAGEMENT SYSTEM

COLLECTION

Total of page No. B2/R/12/1

Total of page No. B2/R/12/2

Total of page No. B2/R/12/3

Total of page No. B2/R/12/4

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/12/5 August 2014-tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION R/12 -BMS SYSTEM


CARRIED TO ELECT'L ENG'G INST'L SUMMARY

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/12/6 August 2014-tender Document
RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/12/7 August 2014-tender Document
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/12/8 August 2014-tender Document
0.00
0.00
AED 0.00

RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/12/9 August 2014-tender Document
0.00
0.00
0.00
0.00
AED 0.00

RATE AMOUNT

0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/12/10 August 2014-tender Document
AED 0.00

RATE AMOUNT

0.00

0.00

0.00

0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/12/11 August 2014-tender Document
AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/12/12 August 2014-tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/13 -NURSES CALL SYSTEM

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

Supply and installation of Nurse call station with code blue


and reset push button with wall mounted or recessed in
sereon control staion with pull card , Bed head units , room
lights complete as specified wiring in PVC conduit as
specified in Drawings

A Nurses call station 18 No.

B Nurse prescence unit 109 No.

C Nurses call pull cord with reassurance led and call cancel
switch 108 No.

D Nurses call unit 125 No.

E
Over door light with three solid state lamps (red,yellow and
green) to be installed over the door to each patient
room/ward and with clear indication for the following 137 No.

F Staff assist call panel 34 No.

G Annunciator panel 7 No.

H
Ancillary call unit with nurses call switch reassurance led,
emergency pull switch, and call reset switch, 3 No.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/13/ 1 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/13/ 2 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/13 -NURSES CALL SYSTEM

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

1 L.S.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/13/ 3 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/13/ 4 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/13 -NURSES CALL SYSTEM

COLLECTION

Total of page No. B2/R/13/1

Total of page No. B2/R/13/2

SECTION R/8 -CCTV SYSTEM

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/13/ 5 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO ELECT'L ENG'G INST. SUMMARY

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/13/ 6 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/13/ 7 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/13/ 8 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/13/ 9 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/13/ 10 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AMOUNT

0.00

0.00

0.00

0.00

AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/13/ 11 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/13/ 12 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/14 -CENTRAL CLOCK SYSTEM

The Contractor is referred to the Drawings and


Specification for all details related to this section of the
Works and he is to include for complying with all the
requirements contained therein, whether or not they are
specifically mentioned within the item descriptions

Supply and installation of Central clock System from an


approved manufacturer including all necessary components
and equipments as per specification and Drawings.

A surface mounted with 2.5" high red led display single sided
digital clock assembly 25 No.

B
surface mounted with 4.0" high red led display double sided
digital clock assembly for corridors/common areas. 16 No.

C
calender time clock digital alaphanumeric calender clock
with 2.5" led display to indicate time and date. 8 No.

D IDT 10 No.

E MDT 1 No.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/14/ 1 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/14/ 2 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

ITEM DESCRIPTION QTY. UNIT

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/14 -CENTRAL CLOCK SYSTEM

Contractor's Adjustment:

A Contractor may price here any items which has been shown
in the Contract drawings or any other Tender/Contract
Documents but overlooked or not specifically mentioned in
the schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum
Contract/Tender Price includes all such items and no claims
for additional items will be entertained.

L.S.

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/14/ 3 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO COLLECTION

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/14/ 4 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING


INSTALLATION

SECTION R/14 - CENTRAL CLOCK SYSTEM

COLLECTION

Total of page No. B2/R/14/1

Total of page No. B2/R/14/2

SECTION R/8 -CCTV SYSTEM

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/14/ 5 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

CARRIED TO ELECT'L ENG'G INST. SUMMARY

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/14/ 6 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/14/ 7 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/14/ 8 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

RATE AMOUNT

0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/14/ 9 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/14/ 10 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AMOUNT

0.00

0.00

0.00

0.00

AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/14/ 11 August 2014-Tender Document
OJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

AED 0.00

Bill of Quantities-Section R, Elect'l Eng'g Installation


B2/R/14/ 12 August 2014-Tender Document
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

DESCRIPTION

SECTION R - ELECTRICAL ENGINEERING INSTALLATION

SUMMARY

SECTION R/1 - MAIN AND SUB-MAIN DISTRIBUTION


Page B2/R/1/23

SECTION R/2 - LIGHTING INSTALLATION


Page B2/R/2/5

SECTION R/3 - POWER INSTALLATION


Page B2/R/3/4

SECTION R/4 -TELECOMMUNICATION SYSTEM


Page B2/R/4/5

SECTION R/5 -FIRE ALARM AND DETECTION SYSTEM


Page B2/R/5/5

SECTION R/6 -LIGHTNING PROTECTION AND EARTHING SYSTEM


Page B2/R/6/4

SECTION R/7 -PUBLIC ADDRESS & AUDIO VISUAL SYSTEM


Page B2/R/7/4

SECTION R/8 -CCTV SYSTEM


Page B2/R/8/3

SECTION R/9 -CENTRAL BATTERY SYSTEM


Page B2/R/9/4

SECTION R/10 -ACCESS CONTROL SYSTEM


Page B2/R/10/3

SECTION R/11 -UPS SYSTEM


Page B2/R/11/3

SECTION R/12 -BMS SYSTEM


Page B2/R/12/5

SECTION R/13 - NURSES CALL SYSTEM


Total of page No. B2/R/13/3
SECTION R/14 - CENTRAL CLOCK SYSTEM
Total of page No. B2/R/14/3

Page 1 of 1020
PROJECT: DAR AL SHIFA HOSPITAL (B+G+2)
BRANCH BUILDING-ABU DHABI
MAIN WORKS PACKAGE
BILLS OF QUANTITIES

SECTION R - CARRIED TO SUMMARY

Page 2 of 1020
AMOUNT

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 3 of 1020
AED 0.00

Page 4 of 1020
S
Type Item Description
PPR Boosted Cold Water
PPR Boosted Cold Water
PPR Boosted Cold Water
PPR Boosted Cold Water
PPR Boosted Cold Water
PPR Boosted Cold Water
PPR Boosted Cold Water
PPR Boosted Cold Water
PPR Boosted Cold Water

Cold Water Supply


Cold Water Supply

PPR Hot Water Return


PPR Hot Water Return
PPR Hot Water Return
PPR Hot Water Return
PPR Hot Water Return
PPR Hot Water Return

PPR Hot Water Supply


PPR Hot Water Supply
PPR Hot Water Supply
PPR Hot Water Supply
PPR Hot Water Supply
PPR Hot Water Supply
PPR Hot Water Supply
PPR Hot Water Supply
PPR Hot Water Supply
PPR Hot Water Supply

PPR Soft Water


PPR Soft Water
PPR Soft Water
PPR Soft Water

PEx Boosted Cold Water Supply


PEx Hot Water Supply

Item Description
Cooled Water Tank
Filtered Water Tank
Raw Water Tank
Cooled Water Booster Pump
Hot Water Booster Pump
Cooled Water Circulation Pump
Hot Water Circulation Pump
Filtered Booster Pump
Ultra Violet Sterilizer
Ultra Violet Sterilizer
Hot Water Calorifier
Hot Water Calorifier
Hot Water Calorifier
Hot Water Calorifier
Heat Exchanger
Water Softner Unit
Filteration Unit
Filteration Unit
Main Water Meter Assembly
Level Drg. No.
Level Drg. No.

First Floor P-103

Basement P-101
Basement P-101

Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104

Basement P-101
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102

Basement P-101
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Kitchen P-101d
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102

Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Kitchen P-101d
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102

First Floor P-103


Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102

First Floor P-103


First Floor P-103
Second Floor P-104
Second Floor P-104
Ground Floor P-102

Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Ground Floor P-102
Ground Floor P-102

Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104

Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Kitchen P-101d
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102

Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Kitchen P-101d
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102

First Floor P-103


First Floor P-103
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102

Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102

Basement P-101

First Floor P-103

Basement P-101
Basement P-101
Basement P-101

Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104

Basement P-101
Basement P-101
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Basement P-101
Basement P-101
Basement P-101
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Kitchen P-101d
Kitchen P-101d
Kitchen P-101d
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102

Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Kitchen P-101d
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Kitchen P-101d
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102

First Floor P-103


First Floor P-103
First Floor P-103
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102

First Floor P-103


Second Floor P-104
Second Floor P-104
Ground Floor P-102
Ground Floor P-102

First Floor P-103


First Floor P-103
Second Floor P-104
Second Floor P-104
Ground Floor P-102

First Floor P-103


First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103

Second Floor P-104


Second Floor P-104

First Floor P-103


First Floor P-103
Second Floor P-104
Ground Floor P-102
Ground Floor P-102

Basement P-101
Basement P-101
Basement P-101
Kitchen P-101d
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102
Ground Floor P-102

Level Description
B1-GF BCWS
B1-GF HWS
B1-GF HWR
B1-GF SW
GF-L1 BCWS
GF-L1 HWS
GF-L1 HWR
GF-L1 SW

Level Drg. No.

Riser P-201
Riser P-201
Riser P-201

Riser P-201
Riser P-201
Riser P-201

Basement P-101
First Floor P-103
Second Floor P-104

GF P-102
First Floor P-103
Riser P-201

GF P-102
GF P-102
Riser P-201

Riser P-201

Riser P-201
Riser P-201
Riser P-201
Basement P-101

Basement P-101

Kitchen P-101d
Kitchen P-101d
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
Second Floor P-104
Second Floor P-104

GF P-102
GF P-102
GF P-102
Kitchen P-101d
Kitchen P-101d
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Roof P-105

GF P-102
GF P-102
GF P-102
GF P-102
GF P-102
Kitchen P-101d
Kitchen P-101d
Basement P-101
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
First Floor P-103
Second Floor P-104
Second Floor P-104
Second Floor P-104
Second Floor P-104
Riser P-201

GF P-102
GF P-102
GF P-102
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
Second Floor P-104
Second Floor P-104
Second Floor P-104

GF P-102
Basement P-101
Basement P-101
First Floor P-103
First Floor P-103
First Floor P-103
Second Floor P-104
Second Floor P-104
Second Floor P-104
Riser P-201

Basement P-101
First Floor P-103
First Floor P-103
Second Floor P-104
Second Floor P-104
Riser P-201

First Floor P-103


First Floor P-103
Second Floor P-104
Second Floor P-104

Basement P-101
First Floor P-103
First Floor P-103
Second Floor P-104
Second Floor P-104

Riser P-201

Riser P-201

Riser P-201
Riser P-201
Riser P-201

Riser P-201

Riser P-201
Riser P-201

Riser P-201
Riser P-201

Riser P-201

Riser P-201

Riser P-201

GF P-102

Riser P-201

Level Drg. No.

Basement P-101
Kitchen P-101d
Ground Floor P-102
1st Floor P-103
2nd Floor P-103
Basement P-101
Kitchen P-101d
Ground Floor P-102
1st Floor P-103
2nd Floor P-103
Kitchen P-101d
Ground Floor P-102
1st Floor P-103
2nd Floor P-104
Kitchen P-101d
Ground Floor P-102
1st Floor P-103
2nd Floor P-104
Basement P-101
Ground Floor P-102
1st Floor P-103
2nd Floor P-104
Ground Floor P-102
1st Floor P-103
2nd Floor P-104
Ground Floor P-102
1st Floor P-103
2rd Floor P-104
Basement P-101
Kitchen P-101d
Ground Floor P-102
1st Floor P-103
2nd Floor P-104

Kitchen P-101d
Ground Floor P-102
1st Floor P-103
2nd Floor P-104
Kitchen P-101d
Ground Floor P-102
1st Floor P-103
2nd Floor P-104
Basement P-101
Ground Floor P-102
1st Floor P-103
2nd Floor P-104
Ground Floor P-102
1st Floor P-103
2rd Floor P-104
Basement P-101
Kitchen P-101d
Ground Floor P-102
1st Floor P-103
2nd Floor P-104

Level Drg. No.

Basement
Kitchen Area
Ground Floor
1st Floor
2nd Floor

Kitchen Area
Ground Floor
1st Floor
2nd Floor
Basement
Ground
1st Floor
2nd Floor

Kitchen Area
Ground Floor
1st Floor
2nd Floor

Ground Floor
1st Floor
2nd Floor

Ground Floor
1st Floor
3rd Floor

Basement
Kitchen Area
Ground Floor
1st Floor
2nd Floor

Level Drg. No.

Basement D-101
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
Basement D-101
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104

Roof D-105
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
2nd D-104
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104

Ground D-100
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-100
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
Ground D-102
Ground D-102
1st D-103
1st D-103
2nd D-104
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104

Ground D-100
1st D-103
2nd D-104
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101

Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101

Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101

Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101

Ground D-102
Ground D-102
Ground D-102
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101

2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d

1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Basement D-101
Basement D-101
Basement D-101
Basement D-101

Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101

Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101

Basement D-101
Basement D-101
Ground D-102

Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102
Ground D-102
Ground D-102
Ground D-102

Ground D-102
Ground D-102
Ground D-102
Ground D-102

Ground D-102
Ground D-102
Ground D-102

Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102

Ground D-102
Basement D-101
2nd D-104
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102
1st D-103
2nd D-104
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
Ground D-102
2nd D-104
Basement D-101
Basement D-101
Basement D-101

Ground D-102
Ground D-102
Basement D-101
Basement D-101
Ground D-102
Basement D-101
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
Basement D-101
Basement D-101

Ground D-102
Ground D-102
Ground D-102
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102

Ground D-102
Basement D-101

Ground D-102
Ground D-102
Basement D-101
2nd D-104
1st D-103
Ground D-102
1st D-103
1st D-103
2nd D-104
2nd D-104

Ground D-102
Ground D-102
Ground D-102
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102
1st D-103
2nd D-104

Ground D-100
Basement D-101
1st D-103

Basement D-101

Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
2nd D-103

Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
2nd D-104

Ground D-102
2nd D-104
Ground D-102

Ground D-102
Basement D-101
1st D-103
2nd D-104

Ground D-102
1st D-103
2nd D-104

1st D-103
Ground D-102
Basement D-101
1st D-103
2nd D-104

Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101

Basement D-101

Ground D-102

Ground D-102
Ground D-102
Basement D-101

1st D-103
Ground D-102
Basement D-101
1st D-103
2nd D-104

Ground D-102

1st D-103

2nd D-104
2nd D-104

2nd D-104
1st D-103
Ground D-102

Basement D-101
Basement D-101
Basement D-101

Basement D-101
1st D-103

Ground D-102

Ground D-102

Ground D-102

Ground D-102

Ground D-102

Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
2nd D-103

Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
2nd D-104
Ground D-102

1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
Ground D-102
Basement D-101
1st D-103
2nd D-104

Ground D-102
Basement D-101
1st D-103
2nd D-104

Ground D-102
1st D-103
2nd D-104

Ground D-102
Basement D-101
1st D-103
2nd D-104

Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102
1st D-103
2nd D-104

Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
Ground D-102
Basement D-101
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104

Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101

Basement D-101

Basement D-101

Basement D-101
Ground D-102

Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102
1st D-103
Roof D-105

Ground D-102

Ground D-102
Basement D-101

Ground D-102
Basement D-101

Ground D-102
Basement D-101

Basement D-101

Ground D-102
Basement D-101

Upper Roof D-106

Ground D-102
1st D-103
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105

Roof D-105

Ground D-100

Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101

Ground D-102
Ground D-102
Ground D-102

Ground D-102
Ground D-102

Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101

Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104

1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104

Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
Ground D-102

Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
Ground D-102

Ground D-102
1st D-103
1st D-103
1st D-103
2nd D-104
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105
Roof D-105

Ground D-102

Basement D-101

Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102

Ground D-102
Basement D-101

Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
1st D-103
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104
2nd D-104

Basement D-101

Basement D-101

Basement D-101d

Basement D-101

Basement D-101

Basement D-101d
Basement D-101
Basement D-101

Ground D-102
Ground D-102

Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102

Basement D-101d
Basement D-101d
Basement D-101d
Basement D-101d
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102
Ground D-102

Basement D-101

Basement D-101

Basement D-101
Basement D-101

Basement D-101

Basement D-101

Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101

Ground D-102
Ground D-102
Ground D-102

Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Basement D-101
Summary Supply Pipe
Item Description Size
BCWS 20mm
BCWS 25mm
BCWS 32mm
BCWS 40mm
BCWS 50mm
BCWS 65mm
BCWS 75mm
BCWS 100mm
BCWS 150mm

CWS 150mm
CWS 200mm

HWR 15mm
HWR 20mm
HWR 25mm
HWR 32mm
HWR 40mm
HWR 65mm

HWS 15mm
HWS 20mm
HWS 25mm
HWS 32mm
HWS 40mm
HWS 50mm
HWS 65mm
HWS 75mm
HWS 100mm
HWS 150mm

SW 15mm
SW 20mm
SW 25mm
SW 32mm

BCWS 15mm
HWS 15mm

Summary Pumps
Item Description Size
63m3
62m3
580m3
CWBP
HWBP
CWCP
HWCP
FBP
UV-1
UV-2
HWC-1
HWC-2
HWC-3
HWC-4
HEX
SF
F-1
F-2

Summary Countables
Item Description Size
Isolation Valve 15mm
Isolation Valve 20mm
Isolation Valve 25mm
Isolation Valve 32mm
Isolation Valve 40mm
Isolation Valve 50mm
Isolation Valve 65mm
Isolation Valve 75mm
Isolation Valve 100mm
Isolation Valve 150mm
DRV 15mm
DRV 20mm
DRV 25mm
DRV 40mm
PRV 25mm
PRV 32mm
PRV 40mm
PRV 50mm
PRV 65mm
PRV 75mm
PRV 150mm
Solenoid Valve 40mm
Solenoid Valve 150mm
RV 40mm
AAV 25mm
Drain Valve 100mm
Float Valve 150mm
Float Valve 200mm
Float Valve 75mm
Water Hammer Arrester
Tank Vent With Insect Screen
Bib Tap 20mm

Summary Drainage
Dimension
Item Description Type
-

Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste

Pipe Kitchen drain HDPE


Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE

Pipe Pressurized line


Pipe Pressurized line

Pipe waste
Pipe Soil
Pipe waste

Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 90 degee
Bend 90 degree
Bend 90 degree
Bend 90 degree

Reducer
Reducer
Reducer
Reducer
Reducer
Reducer
Reducer
Reducer
Reducer
Reducer
Tee Plain Tee

Tee Double Y-Tee


Tee Double Y-Tee
Tee Double Y-Tee
Tee Double Y-Tee
Tee Double Y-Tee
Tee Double Y-Tee
Tee Double Y-Tee
Tee Double Y-Tee
Tee Double Y-Tee
Tee Double Y-Tee
Tee Double Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Rain water outlet RWO


Rain water outlet RWO
Rain water outlet RWO

Vent Cowl Vent


Access Cap Hepseal
Trench Drain Grating
Trench Drain Grating
Clean out CO
Clean out CO
Cleanout CO
Cleanout CO
Clean out CO
Clean out CO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Drain FD
Floor Drain FD
Floor Trap FT
Fish scale trap

Pit Drainage
Grease Trap Pit Drainage
Gully Trap Dry DGT-B4
Gully Trap GT-1
Gully Trap GT-6
Manhole MH-5
Plant Chemical Treatment Plant
Pit Sand Trap
Pit Sand Trap
Tank Collection Tank
Sump pit Drainage
Sump pit Drainage
Press. Break Manhole PBMH-3
Catch Basin Catch Basin
Chamber Final inspection FIC-3
Pump Sump pump 3 L/S

Hospital Supply
Dimensions
Item Description
Size Length mm

BCWS 100mm 46637.36


BCWS 100mm

BCWS 150mm 80705.19


BCWS 150mm 6745.39
BCWS 150mm

BCWS 20mm 26031.76


BCWS 20mm 72517.67
BCWS 20mm 6675.72
BCWS 20mm 21150.58
BCWS 20mm 49992.47
BCWS 20mm 16184.49
BCWS 20mm 1565.03
BCWS 20mm 38966.15
BCWS 20mm 36926.06
BCWS 20mm 19267.29
BCWS 20mm 9104.78
BCWS 20mm 7682.17
BCWS 20mm 2824.52
BCWS 20mm 2948.26
BCWS 20mm 2891.2
BCWS 20mm 2729.52
BCWS 20mm 6371.07
BCWS 20mm 2187.83
BCWS 20mm 13610.53
BCWS 20mm 7873.61
BCWS 20mm 2321.39
BCWS 20mm 2180.24
BCWS 20mm 4352.27
BCWS 20mm 21954.65
BCWS 20mm 5910.74
BCWS 20mm 3005.71
BCWS 20mm 4155.38
BCWS 20mm 15636.01
BCWS 20mm 2028.91
BCWS 20mm 6963.2
BCWS 20mm 895.15
BCWS 20mm 2762.97
BCWS 20mm 11577.08
BCWS 20mm 2766.42
BCWS 20mm 889.7
BCWS 20mm 6714.72
BCWS 20mm 2457.14
BCWS 20mm 2909.74
BCWS 20mm 3480.59
BCWS 20mm 27035.17
BCWS 20mm 1992.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6078.3
BCWS 20mm 2214.74
BCWS 20mm 2465.57
BCWS 20mm 5680.77
BCWS 20mm 5657.14
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 6044.83
BCWS 20mm 1816.14
BCWS 20mm 2660.64
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 2489.85
BCWS 20mm 4319.59
BCWS 20mm 1830.43
BCWS 20mm 16410.15
BCWS 20mm 5894.76
BCWS 20mm 1936.92
BCWS 20mm 4749.03
BCWS 20mm 3228.56
BCWS 20mm 4707.74
BCWS 20mm 4446.31
BCWS 20mm 4725.95
BCWS 20mm 7536.93
BCWS 20mm 2870.66
BCWS 20mm 3045.6
BCWS 20mm 7054.41
BCWS 20mm 5752.34
BCWS 20mm 6513.47
BCWS 20mm 3231.84
BCWS 20mm 7049.78
BCWS 20mm 5662.46
BCWS 20mm 1647.33
BCWS 20mm 10019.79
BCWS 20mm 8516.71
BCWS 20mm 8835.84
BCWS 20mm 3378.35
BCWS 20mm 2585.69
BCWS 20mm 1891.66
BCWS 20mm 2014.49
BCWS 20mm 1962.67
BCWS 20mm 9223.56
BCWS 20mm 1629.75
BCWS 20mm 440.18
BCWS 20mm 1680.15
BCWS 20mm 10243.47
BCWS 20mm 1408.77
BCWS 20mm 3972.03
BCWS 20mm 1072.46
BCWS 20mm 5732.23
BCWS 20mm 3076.72
BCWS 20mm 3219.78
BCWS 20mm 463.57
BCWS 20mm 2669.66
BCWS 20mm 3053.31
BCWS 20mm 3064.42
BCWS 20mm 3131.71
BCWS 20mm 3419
BCWS 20mm 2569.69
BCWS 20mm 1264.36
BCWS 20mm 6699.48
BCWS 20mm 6152.59
BCWS 20mm 4638.57
BCWS 20mm 4423.33
BCWS 20mm 12220.25
BCWS 20mm 2735.81
BCWS 20mm 6431.84
BCWS 20mm 5738.67
BCWS 20mm 2452.1
BCWS 20mm 953.42
BCWS 20mm 1171.76
BCWS 20mm 953.42
BCWS 20mm 1164.48
BCWS 20mm 946.15
BCWS 20mm 3779.47
BCWS 20mm 541.42
BCWS 20mm 3237.77
BCWS 20mm 2979.36
BCWS 20mm 3146.18
BCWS 20mm 22220.73
BCWS 20mm 6668.89
BCWS 20mm 1887.45
BCWS 20mm 6898.61
BCWS 20mm 803.65
BCWS 20mm 3882.64
BCWS 20mm 582.95
BCWS 20mm 3675.47
BCWS 20mm 7247.68
BCWS 20mm 311.16
BCWS 20mm 10420.71
BCWS 20mm 7378.1
BCWS 20mm 3573.53
BCWS 20mm 3809.49
BCWS 20mm 5697.84
BCWS 20mm 3611.35
BCWS 20mm 2880.25
BCWS 20mm 3164.65
BCWS 20mm 1642.1
BCWS 20mm 3130.01
BCWS 20mm 7758.87
BCWS 20mm 2387.47
BCWS 20mm 4790
BCWS 20mm 3048.41
BCWS 20mm 4043.55
BCWS 20mm 1409.33
BCWS 20mm 10811.48
BCWS 20mm 3783.65
BCWS 20mm 1407.68
BCWS 20mm 1396.22
BCWS 20mm 1398.52
BCWS 20mm 3376.61
BCWS 20mm 6375.5
BCWS 20mm 2159.18
BCWS 20mm 5673.1
BCWS 20mm 9908.68
BCWS 20mm 4159.54
BCWS 20mm 5647.22
BCWS 20mm 6447.45
BCWS 20mm 3273.85
BCWS 20mm 2973.79
BCWS 20mm 3772.5
BCWS 20mm 3758.63
BCWS 20mm 6695.01
BCWS 20mm 7881.81
BCWS 20mm 5910.86
BCWS 20mm 389.43
BCWS 20mm 400.76
BCWS 20mm 1890.15
BCWS 20mm 3901.46
BCWS 20mm 945.86
BCWS 20mm 3915.09
BCWS 20mm 1474.82
BCWS 20mm 1371.08
BCWS 20mm 682.4
BCWS 20mm 670.62
BCWS 20mm 695.03
BCWS 20mm 2553.36
BCWS 20mm 3635.5
BCWS 20mm 1009.27
BCWS 20mm 4417.52
BCWS 20mm 3839.33
BCWS 20mm 9863.42
BCWS 20mm 885.02
BCWS 20mm 982.24
BCWS 20mm 2087.67
BCWS 20mm 1247.94
BCWS 20mm 4553.29
BCWS 20mm 1540.28
BCWS 20mm 2041.7
BCWS 20mm 673.77
BCWS 20mm 5656.31
BCWS 20mm 9284.7
BCWS 20mm 4455.06
BCWS 20mm 3366.19
BCWS 20mm 10670.76
BCWS 20mm 7900.92
BCWS 20mm 4880.56
BCWS 20mm 4613.9
BCWS 20mm 2200.42
BCWS 20mm 14238.89
BCWS 20mm 6230.52
BCWS 20mm 3269.07
BCWS 20mm 2321.36
BCWS 20mm 13024.8
BCWS 20mm 638.57
BCWS 20mm 9279.76
BCWS 20mm 2986.31
BCWS 20mm 10545.02
BCWS 20mm 5313.02
BCWS 20mm 1572.96
BCWS 20mm 2107.45
BCWS 20mm 1238.27
BCWS 20mm 3168.3
BCWS 20mm 6392.2
BCWS 20mm 1191.87
BCWS 20mm 4599.03
BCWS 20mm 4454.25
BCWS 20mm 4444.88
BCWS 20mm 2396.54
BCWS 20mm 1890.52
BCWS 20mm 5524.8
BCWS 20mm 5530.95
BCWS 20mm 8930.79
BCWS 20mm 8215.08
BCWS 20mm 5055.7
BCWS 20mm 5052.79
BCWS 20mm 2636.32
BCWS 20mm 850.84
BCWS 20mm 650.07
BCWS 20mm 15253.78
BCWS 20mm 2692.54
BCWS 20mm 3951.55
BCWS 20mm 6390.3
BCWS 20mm 2093.84
BCWS 20mm 1026.5
BCWS 20mm 2056.79
BCWS 20mm 2269.05
BCWS 20mm 1673.69
BCWS 20mm 2698.46
BCWS 20mm 2063.97
BCWS 20mm 1316.2
BCWS 20mm 2528.21
BCWS 20mm 3934.46
BCWS 20mm 15503.15
BCWS 20mm 1255.01
BCWS 20mm 4433.34
BCWS 20mm 3357.38
BCWS 20mm 7598.58
BCWS 20mm 14036.53
BCWS 20mm 4045
BCWS 20mm 1761.81
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 6135.65
BCWS 20mm 6078.3
BCWS 20mm 4916.51
BCWS 20mm 4923.13
BCWS 20mm 7049.78
BCWS 20mm 5662.46
BCWS 20mm 1647.33
BCWS 20mm 3231.84
BCWS 20mm 3045.6
BCWS 20mm 7033.43
BCWS 20mm 5355.41
BCWS 20mm 6513.47
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 6044.83
BCWS 20mm 6051.75
BCWS 20mm 5669.56
BCWS 20mm 1816.14
BCWS 20mm 2660.64
BCWS 20mm 2870.66
BCWS 20mm 4707.74
BCWS 20mm 4446.31
BCWS 20mm 4725.95
BCWS 20mm 7536.93
BCWS 20mm 3064.56
BCWS 20mm 3282.85
BCWS 20mm 4047.29
BCWS 20mm 8639.27
BCWS 20mm 10432.3
BCWS 20mm 2869.09
BCWS 20mm 1584.16
BCWS 20mm 3287.87
BCWS 20mm 5218.48
BCWS 20mm 7165.44
BCWS 20mm 4297.89
BCWS 20mm 5298.35
BCWS 20mm 2944.16
BCWS 20mm 12215.61
BCWS 20mm 15651.11
BCWS 20mm 3247.21
BCWS 20mm 6633.63
BCWS 20mm 5620.49
BCWS 20mm 6468.14
BCWS 20mm 6461.81
BCWS 20mm 12043.54
BCWS 20mm 5864.36
BCWS 20mm 7208.98
BCWS 20mm 4500.19
BCWS 20mm 4431.82
BCWS 20mm 2705.22
BCWS 20mm 1787.79
BCWS 20mm 6379.84
BCWS 20mm 7811.22
BCWS 20mm 5387.24
BCWS 20mm 4559.06
BCWS 20mm 8982.49
BCWS 20mm 3562.85
BCWS 20mm 4037.65
BCWS 20mm 3873.02
BCWS 20mm 4699.43
BCWS 20mm 3741.89
BCWS 20mm 7778.91
BCWS 20mm 7456.49
BCWS 20mm 4399.76
BCWS 20mm 4153.76
BCWS 20mm 14771.65
BCWS 20mm 6437.7
BCWS 20mm 4525.76
BCWS 20mm 7857
BCWS 20mm 2257.58
BCWS 20mm 8792.74
BCWS 20mm 1477.03
BCWS 20mm 2125.65
BCWS 20mm 1021.09
BCWS 20mm 7894.94
BCWS 20mm 5014.04
BCWS 20mm 8517.12
BCWS 20mm 2189.83
BCWS 20mm 11673.72
BCWS 20mm 9550.62
BCWS 20mm 1146.38
BCWS 20mm 706.87
BCWS 20mm 2154.7
BCWS 20mm 1287.93
BCWS 20mm 340.39
BCWS 20mm 5091.22
BCWS 20mm 5814.47
BCWS 20mm 8721.57
BCWS 20mm 849.52
BCWS 20mm 3259.06
BCWS 20mm 8272.94
BCWS 20mm 5303.06
BCWS 20mm 3276.36
BCWS 20mm 1361.09
BCWS 20mm 4376.78
BCWS 20mm 2520.17
BCWS 20mm 1010.25
BCWS 20mm 1156.09
BCWS 20mm 2705.67
BCWS 20mm 7183.76
BCWS 20mm 5330.25
BCWS 20mm 3617.24
BCWS 20mm 1569.47
BCWS 20mm 4728.28
BCWS 20mm 2240.77
BCWS 20mm 4224.43
BCWS 20mm 1963.47
BCWS 20mm 1986.82
BCWS 20mm 1724.63
BCWS 20mm 2758.73
BCWS 20mm 1399.86
BCWS 20mm 7563.84
BCWS 20mm 4774.76
BCWS 20mm 6228.34
BCWS 20mm 6767.04
BCWS 20mm 3285.82
BCWS 20mm 4293.27
BCWS 20mm 2208.89
BCWS 20mm 12164.47
BCWS 20mm 2106.63
BCWS 20mm 3539.45
BCWS 20mm 4642.55
BCWS 20mm 2805.85
BCWS 20mm 3272.44
BCWS 20mm 2536.47
BCWS 20mm 4442.8
BCWS 20mm 1999.62
BCWS 20mm 7711.17
BCWS 20mm 1104.07
BCWS 20mm 2636.68
BCWS 20mm 8057.59
BCWS 20mm 2944.69
BCWS 20mm 3918.27
BCWS 20mm 7785.17
BCWS 20mm 6344.14
BCWS 20mm 3663.62
BCWS 20mm 9077.3
BCWS 20mm 2397.97
BCWS 20mm 10936.33
BCWS 20mm 3186.74
BCWS 20mm 5927.08
BCWS 20mm 10202.39
BCWS 20mm 532.52
BCWS 20mm 577.68
BCWS 20mm 4557.68
BCWS 20mm 218.96
BCWS 20mm 3166.7
BCWS 20mm 6582.97
BCWS 20mm 2377.96
BCWS 20mm 3332.62
BCWS 20mm 598.77
BCWS 20mm 3923.82
BCWS 20mm

BCWS 25mm 32795.32


BCWS 25mm 6488.35
BCWS 25mm 6152.18
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 592.17
BCWS 25mm 577.37
BCWS 25mm 595.05
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 571.22
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 588.24
BCWS 25mm 2326.35
BCWS 25mm 3364.53
BCWS 25mm 4701.96
BCWS 25mm 4344.05
BCWS 25mm 5950.07
BCWS 25mm 10537.43
BCWS 25mm 8893.17
BCWS 25mm 9607.86
BCWS 25mm 7304.99
BCWS 25mm 14840.25
BCWS 25mm 6454.43
BCWS 25mm 11035.92
BCWS 25mm 9155.42
BCWS 25mm 3433.56
BCWS 25mm 9283.91
BCWS 25mm 5496.18
BCWS 25mm 6748.58
BCWS 25mm 12177.64
BCWS 25mm 7956.27
BCWS 25mm 6625.62
BCWS 25mm 3548.27
BCWS 25mm 8380.31
BCWS 25mm 10073.36
BCWS 25mm 1068.62
BCWS 25mm 7960
BCWS 25mm 9641.05
BCWS 25mm 9475.38
BCWS 25mm 392.69
BCWS 25mm 396.29
BCWS 25mm 7447.85
BCWS 25mm 3151.19
BCWS 25mm 8968.56
BCWS 25mm 3899.31
BCWS 25mm 1077.59
BCWS 25mm 2466.23
BCWS 25mm 3309.38
BCWS 25mm 2343
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 566.54
BCWS 25mm 592.17
BCWS 25mm 592.17
BCWS 25mm 771.7
BCWS 25mm 3364.53
BCWS 25mm 4701.96
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 579.6
BCWS 25mm 571.22
BCWS 25mm 9559.05
BCWS 25mm 3935.31
BCWS 25mm 4866.27
BCWS 25mm 4813.48
BCWS 25mm 6568.75
BCWS 25mm 2564.93
BCWS 25mm 10417.6
BCWS 25mm 4176.42
BCWS 25mm 398.91
BCWS 25mm 5365.3
BCWS 25mm 9273.12
BCWS 25mm 3458.03
BCWS 25mm 11534.32
BCWS 25mm 17217.7
BCWS 25mm 8200.25
BCWS 25mm 16473.84
BCWS 25mm 9366.01
BCWS 25mm 4985.65
BCWS 25mm 8165.56
BCWS 25mm 3521.81
BCWS 25mm 4624.92
BCWS 25mm 5258.82
BCWS 25mm 5118.19
BCWS 25mm 3383.53
BCWS 25mm 3348.5
BCWS 25mm 10209.14
BCWS 25mm 2620
BCWS 25mm 12874.49
BCWS 25mm 5,407.09
BCWS 25mm 2,472.14
BCWS 25mm 1,814.17
BCWS 25mm 1,679.30
BCWS 25mm 2,114.40
BCWS 25mm 2,175.83
BCWS 25mm 1,831.82
BCWS 25mm 1,675.19
BCWS 25mm 2,122.12
BCWS 25mm 2,173.50
BCWS 25mm 1,814.33
BCWS 25mm 1,692.44
BCWS 25mm 445.78
BCWS 25mm 2,187.67
BCWS 25mm 1,688.55
BCWS 25mm 1,814.27
BCWS 25mm 1,688.60
BCWS 25mm 1,836.20
BCWS 25mm 1,654.82
BCWS 25mm 1,467.23
BCWS 25mm 1,677.26
BCWS 25mm 2,090.48
BCWS 25mm 2,217.49
BCWS 25mm 1,827.64
BCWS 25mm 1,680.66
BCWS 25mm 1,826.11
BCWS 25mm 2,108.44
BCWS 25mm 2,175.66
BCWS 25mm 1,672.98
BCWS 25mm 1,815.02
BCWS 25mm 2,103.75
BCWS 25mm 2,154.07
BCWS 25mm 10,056.67
BCWS 25mm 3,500.81
BCWS 25mm 4,722.77
BCWS 25mm 3,311.17
BCWS 25mm 7,589.68
BCWS 25mm 2,888.72
BCWS 25mm 5,657.01
BCWS 25mm 1,592.44
BCWS 25mm 7,122.08
BCWS 25mm 3,248.35
BCWS 25mm 10,675.75
BCWS 25mm 3,147.03
BCWS 25mm 6,537.39
BCWS 25mm 4,512.57
BCWS 25mm 2,168.12
BCWS 25mm 1,777.30
BCWS 25mm 2,043.43
BCWS 25mm 2,206.67
BCWS 25mm 1,820.54
BCWS 25mm 1,658.50
BCWS 25mm 2,043.43
BCWS 25mm 2,206.67
BCWS 25mm 1,820.54
BCWS 25mm 1,658.50
BCWS 25mm 2,043.43
BCWS 25mm 2,206.67
BCWS 25mm 1,820.54
BCWS 25mm 1,658.50
BCWS 25mm 2,043.43
BCWS 25mm 2,206.67
BCWS 25mm 1,820.54
BCWS 25mm 1,658.50
BCWS 25mm 2,043.43
BCWS 25mm 2,206.67
BCWS 25mm 1,820.54
BCWS 25mm 1,658.50
BCWS 25mm 2,043.43
BCWS 25mm 2,206.67
BCWS 25mm 1,820.54
BCWS 25mm 1,658.50
BCWS 25mm 2,084.58
BCWS 25mm 740.27
BCWS 25mm 397.76
BCWS 25mm 1,083.28
BCWS 25mm 822.03
BCWS 25mm 7,858.61
BCWS 25mm 5,561.56
BCWS 25mm 4,442.54
BCWS 25mm 8,638.96
BCWS 25mm 2,652.75
BCWS 25mm 3,136.66
BCWS 25mm 4,140.42
BCWS 25mm 4,963.58
BCWS 25mm 5,011.61
BCWS 25mm 8,187.70
BCWS 25mm 4,130.18
BCWS 25mm 1,276.00
BCWS 25mm 5,842.07
BCWS 25mm 2,201.21
BCWS 25mm 2,400.80
BCWS 25mm 5,474.89
BCWS 25mm 11,506.81
BCWS 25mm 12,476.86
BCWS 25mm 5,072.74
BCWS 25mm 5,095.08
BCWS 25mm 4,272.15
BCWS 25mm 4,474.34
BCWS 25mm 5,304.77
BCWS 25mm 5,501.24
BCWS 25mm 5,804.34
BCWS 25mm 11,643.92
BCWS 25mm 6,701.66
BCWS 25mm 7,725.84
BCWS 25mm 4,819.17
BCWS 25mm 2,491.28
BCWS 25mm 5,069.78
BCWS 25mm 29,624.52
BCWS 25mm 1,111.38
BCWS 25mm 3,496.42
BCWS 25mm 3,517.75
BCWS 25mm 6,625.41
BCWS 25mm 6,160.69
BCWS 25mm 3,637.11
BCWS 25mm 3,402.45
BCWS 25mm 1,328.37
BCWS 25mm 1,468.72
BCWS 25mm 2,772.72
BCWS 25mm 2,144.96
BCWS 25mm 1,396.43
BCWS 25mm 2,026.37
BCWS 25mm 1,506.56
BCWS 25mm 5,241.72
BCWS 25mm 2,036.30
BCWS 25mm 1,395.13
BCWS 25mm 5,674.98
BCWS 25mm 21,029.60
BCWS 25mm 3,012.75
BCWS 25mm 1,768.70
BCWS 25mm 2,268.14
BCWS 25mm 3,269.26
BCWS 25mm 3,271.74
BCWS 25mm 4,778.75
BCWS 25mm 4,246.41
BCWS 25mm 3,060.10
BCWS 25mm 4,230.56
BCWS 25mm 3,109.59
BCWS 25mm 10,077.23
BCWS 25mm 5,841.64
BCWS 25mm 1,348.36
BCWS 25mm 7,955.91
BCWS 25mm 3,203.39
BCWS 25mm 5,735.22
BCWS 25mm 3,123.53
BCWS 25mm 9,521.30
BCWS 25mm 5,528.54
BCWS 25mm 396.40
BCWS 25mm 6,308.65
BCWS 25mm 10,563.59
BCWS 25mm 4,437.61
BCWS 25mm 12,298.54
BCWS 25mm 684.64
BCWS 25mm 690.59
BCWS 25mm 678.68
BCWS 25mm 3,743.93
BCWS 25mm 705.04
BCWS 25mm 874.58
BCWS 25mm 3,911.37
BCWS 25mm 2,740.09
BCWS 25mm 2,498.32
BCWS 25mm 3,886.63
BCWS 25mm 4,727.64
BCWS 25mm 3,500.76
BCWS 25mm 5,653.71
BCWS 25mm 1,095.02
BCWS 25mm 694.71
BCWS 25mm 953.63
BCWS 25mm 799.25
BCWS 25mm 3347.29
BCWS 25mm 7850.78
BCWS 25mm

BCWS 32mm 25132.31


BCWS 32mm 3469.88
BCWS 32mm 3170.75
BCWS 32mm 25623.1
BCWS 32mm 11804.13
BCWS 32mm 11249.37
BCWS 32mm 9289.55
BCWS 32mm 16822.21
BCWS 32mm 29253.46
BCWS 32mm 12938.22
BCWS 32mm 9194.95
BCWS 32mm 8483.04
BCWS 32mm 15219.12
BCWS 32mm 8084.62
BCWS 32mm 10874.64
BCWS 32mm 21623.52
BCWS 32mm 13490.34
BCWS 32mm 25623.1
BCWS 32mm 11804.13
BCWS 32mm 11249.37
BCWS 32mm 9299.65
BCWS 32mm 19997.65
BCWS 32mm 20145.13
BCWS 32mm 9949.64
BCWS 32mm 16791.33
BCWS 32mm 22492.94
BCWS 32mm 8351.5
BCWS 32mm 547.86
BCWS 32mm 10,257.97
BCWS 32mm 2,314.02
BCWS 32mm 2,621.82
BCWS 32mm 2,875.74
BCWS 32mm 2,621.82
BCWS 32mm 2,875.74
BCWS 32mm 2,621.82
BCWS 32mm 2,875.74
BCWS 32mm 2,621.82
BCWS 32mm 2,875.74
BCWS 32mm 2,621.82
BCWS 32mm 2,875.74
BCWS 32mm 2,621.82
BCWS 32mm 2,875.74
BCWS 32mm 583.05
BCWS 32mm 2,621.91
BCWS 32mm 2,903.34
BCWS 32mm 2,601.83
BCWS 32mm 2,903.34
BCWS 32mm 2,608.85
BCWS 32mm 2,903.34
BCWS 32mm 2,595.02
BCWS 32mm 2,903.34
BCWS 32mm 2,618.62
BCWS 32mm 2,903.34
BCWS 32mm 2,612.90
BCWS 32mm 2,903.34
BCWS 32mm 2,618.82
BCWS 32mm 2,903.34
BCWS 32mm 2,605.81
BCWS 32mm 8,094.42
BCWS 32mm 15,459.56
BCWS 32mm 15,450.32
BCWS 32mm 14,807.85
BCWS 32mm 7,701.21
BCWS 32mm 9,844.80
BCWS 32mm 5,631.49
BCWS 32mm 6,389.73
BCWS 32mm 5,260.34
BCWS 32mm 6,373.06
BCWS 32mm 14,687.37
BCWS 32mm 1,901.01
BCWS 32mm 3,013.37
BCWS 32mm 1,351.91
BCWS 32mm 2,389.85
BCWS 32mm 8,969.92
BCWS 32mm 13,261.14
BCWS 32mm 17,392.72
BCWS 32mm 9,958.49
BCWS 32mm 1270.51
BCWS 32mm

BCWS 40mm 20902.09


BCWS 40mm 12988.67
BCWS 40mm 7518.85
BCWS 40mm 5488.99
BCWS 40mm 5559.77
BCWS 40mm 9012.79
BCWS 40mm 20964.76
BCWS 40mm 18636.72
BCWS 40mm 3129.57
BCWS 40mm 22157.48
BCWS 40mm 22627.75
BCWS 40mm 7518.85
BCWS 40mm 5488.99
BCWS 40mm 5559.77
BCWS 40mm 25183.79
BCWS 40mm 9286.39
BCWS 40mm 22529.3
BCWS 40mm 22581.13
BCWS 40mm 16551.02
BCWS 40mm 17,675.68
BCWS 40mm 9,285.59
BCWS 40mm 10,017.49
BCWS 40mm 4,512.56
BCWS 40mm 26,834.92
BCWS 40mm 21,103.20
BCWS 40mm 7,204.66
BCWS 40mm 10,170.00
BCWS 40mm 8,413.49
BCWS 40mm 2,732.52
BCWS 40mm 8,731.84
BCWS 40mm 21,953.80
BCWS 40mm 7,380.84
BCWS 40mm
BCWS 50mm 18964.98
BCWS 50mm 7738.91
BCWS 50mm 16187.25
BCWS 50mm 21184.05
BCWS 50mm 13710.3
BCWS 50mm 5957.08
BCWS 50mm 7738.91
BCWS 50mm 7512.68
BCWS 50mm 7450.01
BCWS 50mm 6525.56
BCWS 50mm 24693.2
BCWS 50mm 15,954.30
BCWS 50mm 10,779.90
BCWS 50mm 7,773.94
BCWS 50mm

BCWS 65mm 13310.73


BCWS 65mm 13310.73
BCWS 65mm 9240.14
BCWS 65mm 38368.31
BCWS 65mm 13,319.03
BCWS 65mm 21,857.15
BCWS 65mm 9475.08
BCWS 65mm

BCWS 75mm 14362.68


BCWS 75mm 927.12
BCWS 75mm 14362.68
BCWS 75mm 975.43
BCWS 75mm 14,369.43
BCWS 75mm

CWS 150mm 92465.57


CWS 150mm 1832.32
CWS 150mm 6507.16
CWS 150mm 1171.8
CWS 150mm 1171.8
CWS 150mm 1555.11
CWS 150mm 959.95
CWS 150mm 14290.39
CWS 150mm 15000
CWS 150mm 2428.33
CWS 150mm 2390.11
CWS 150mm 2999.54
CWS 150mm 8445.24
CWS 150mm 2323.02
CWS 150mm 5663.14
CWS 150mm
CWS 200mm 18,412.54
CWS 200mm 18,412.54
CWS 200mm

HWR 15mm 9097.54


HWR 15mm 725.76
HWR 15mm 2783.1
HWR 15mm 2783.1
HWR 15mm 2783.1
HWR 15mm 2783.1
HWR 15mm 10603.19
HWR 15mm 4441.43
HWR 15mm 5006.2
HWR 15mm 58744.01
HWR 15mm 2511.72
HWR 15mm 1661.56
HWR 15mm 1661.56
HWR 15mm 1661.56
HWR 15mm 11047.94
HWR 15mm 15293.9
HWR 15mm 22149.18
HWR 15mm 1988.55
HWR 15mm 3320.09
HWR 15mm 9098.73
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 2524.34
HWR 15mm 2513.67
HWR 15mm 3677.39
HWR 15mm 3680.09
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 3843.4
HWR 15mm 3597.4
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 2463.22
HWR 15mm 4853.05
HWR 15mm 3712.17
HWR 15mm 20757.74
HWR 15mm 8057.49
HWR 15mm 2191.34
HWR 15mm 4642.04
HWR 15mm 4642.04
HWR 15mm 8449.04
HWR 15mm 766.83
HWR 15mm 5615.92
HWR 15mm 4367.32
HWR 15mm 3762.71
HWR 15mm 4427.4
HWR 15mm 4397.23
HWR 15mm 6180.44
HWR 15mm 2338.91
HWR 15mm 2271.28
HWR 15mm 2252.78
HWR 15mm 7577.09
HWR 15mm 9504.73
HWR 15mm 3601.63
HWR 15mm 7462.13
HWR 15mm 5338.2
HWR 15mm 1596.93
HWR 15mm 1768.01
HWR 15mm 6072.32
HWR 15mm 1874.76
HWR 15mm 10561.04
HWR 15mm 1856.02
HWR 15mm 1506.38
HWR 15mm 481.63
HWR 15mm 753.49
HWR 15mm 1672.37
HWR 15mm 10817.16
HWR 15mm 4971.93
HWR 15mm 6279.94
HWR 15mm 6695.33
HWR 15mm 944.89
HWR 15mm 3413.32
HWR 15mm 2901.42
HWR 15mm 2858.74
HWR 15mm 10649.09
HWR 15mm 880.65
HWR 15mm 1886.15
HWR 15mm 1814.27
HWR 15mm 23380.02
HWR 15mm 5189.54
HWR 15mm 2876.49
HWR 15mm 2873.22
HWR 15mm 1775.36
HWR 15mm 988.36
HWR 15mm 16566.16
HWR 15mm 6124.85
HWR 15mm 2560.29
HWR 15mm 1261.53
HWR 15mm 1251.84
HWR 15mm 1262.33
HWR 15mm 1269.58
HWR 15mm 1290.13
HWR 15mm 14274.29
HWR 15mm 2858.9
HWR 15mm 3265.06
HWR 15mm 3296.51
HWR 15mm 1268.84
HWR 15mm 5628.17
HWR 15mm 1286.71
HWR 15mm 16546.79
HWR 15mm 7128.89
HWR 15mm 473.57
HWR 15mm 3753.91
HWR 15mm 2817.59
HWR 15mm 7337.63
HWR 15mm 765.26
HWR 15mm 5627.5
HWR 15mm 4219.09
HWR 15mm 2628.69
HWR 15mm 12706.03
HWR 15mm 3197.37
HWR 15mm 6345.93
HWR 15mm 3266.37
HWR 15mm 3244.17
HWR 15mm 5573.87
HWR 15mm 14641.62
HWR 15mm 9989.32
HWR 15mm 2574.41
HWR 15mm 914.55
HWR 15mm 917.6
HWR 15mm 1922.66
HWR 15mm 7307.44
HWR 15mm 7303.32
HWR 15mm 4422.38
HWR 15mm 3429.56
HWR 15mm 3336.14
HWR 15mm 7014.93
HWR 15mm 2007.12
HWR 15mm 1265.14
HWR 15mm 19797.41
HWR 15mm 4221.88
HWR 15mm 2056.41
HWR 15mm 3924.36
HWR 15mm 8471.84
HWR 15mm 3395.29
HWR 15mm 6421.4
HWR 15mm 8444.94
HWR 15mm 10536.93
HWR 15mm 1736.44
HWR 15mm 6110.28
HWR 15mm 2222.65
HWR 15mm 2611.43
HWR 15mm 1635.01
HWR 15mm 1600.5
HWR 15mm 1581.77
HWR 15mm 3449.48
HWR 15mm 717.44
HWR 15mm 20522.11
HWR 15mm 2714.07
HWR 15mm 2132.14
HWR 15mm 6704.64
HWR 15mm 2142.28
HWR 15mm 719.79
HWR 15mm 724.75
HWR 15mm 4050.53
HWR 15mm 4055.53
HWR 15mm 4964.22
HWR 15mm 4523.75
HWR 15mm 3621.25
HWR 15mm 16621.16
HWR 15mm 3292.74
HWR 15mm 974.44
HWR 15mm 2146.69
HWR 15mm 3339.87
HWR 15mm 1000.17
HWR 15mm 1394.86
HWR 15mm 1397.1
HWR 15mm 2358.55
HWR 15mm 11483.88
HWR 15mm 4504.05
HWR 15mm 2636.63
HWR 15mm 9108.46
HWR 15mm 1499.47
HWR 15mm 1512.49
HWR 15mm 1505.52
HWR 15mm 19712.88
HWR 15mm 809.11
HWR 15mm 1526.73
HWR 15mm 3954.96
HWR 15mm 3311.88
HWR 15mm 12824.42
HWR 15mm 8409.26
HWR 15mm 7222.78
HWR 15mm 13878.89
HWR 15mm 1775.11
HWR 15mm 2438.21
HWR 15mm 3160.61
HWR 15mm 14179.85
HWR 15mm 14097.06
HWR 15mm 2577.51
HWR 15mm 2573.78
HWR 15mm 3552.9
HWR 15mm 1779.58
HWR 15mm 2852.62
HWR 15mm 8733.19
HWR 15mm 2087.13
HWR 15mm 2230.94
HWR 15mm 4367.74
HWR 15mm 1271.74
HWR 15mm 4785.56
HWR 15mm 12785.27
HWR 15mm 3923.73
HWR 15mm 4546.69
HWR 15mm 3913.04
HWR 15mm 3913.04
HWR 15mm 1129.54
HWR 15mm 2216.43
HWR 15mm 4641.59
HWR 15mm 2321.97
HWR 15mm 3861.53
HWR 15mm 5505.68
HWR 15mm 1408.13
HWR 15mm 1301.81
HWR 15mm 15177.4
HWR 15mm 7157.09
HWR 15mm 7291.6
HWR 15mm 5665.53
HWR 15mm 724.69
HWR 15mm 7916.22
HWR 15mm 2086.57
HWR 15mm 1035.28
HWR 15mm 2368.63
HWR 15mm 2837.9
HWR 15mm 10288.24
HWR 15mm 7477.08
HWR 15mm 2138.61
HWR 15mm 1208.8
HWR 15mm 4340.03
HWR 15mm 13847.82
HWR 15mm 13160.09
HWR 15mm 6393.42
HWR 15mm 761.9
HWR 15mm 4752.36
HWR 15mm 3347.97
HWR 15mm 703.04
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3797.9
HWR 15mm 3796.66
HWR 15mm 3650.44
HWR 15mm 3643.89
HWR 15mm 4642.04
HWR 15mm 4642.04
HWR 15mm 7577.09
HWR 15mm 2271.28
HWR 15mm 7984.71
HWR 15mm 766.83
HWR 15mm 5615.92
HWR 15mm 2252.78
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 3843.4
HWR 15mm 3779.79
HWR 15mm 3508.6
HWR 15mm 3597.4
HWR 15mm 2338.91
HWR 15mm 3762.71
HWR 15mm 4427.4
HWR 15mm 4397.23
HWR 15mm 6180.44
HWR 15mm 2444.41
HWR 15mm 1800.22
HWR 15mm 16714.7
HWR 15mm 5690.42
HWR 15mm 3487.76
HWR 15mm 7600.96
HWR 15mm 2384.62
HWR 15mm 1603.62
HWR 15mm 5956.05
HWR 15mm 10742.54
HWR 15mm 26217.85
HWR 15mm 2541.45
HWR 15mm 557.89
HWR 15mm 1290.89
HWR 15mm 7852.26
HWR 15mm 5364.82
HWR 15mm 6743.49
HWR 15mm 12361.31
HWR 15mm 5387.44
HWR 15mm 5160.65
HWR 15mm 21731.2
HWR 15mm 2597.11
HWR 15mm 4832.89
HWR 15mm 3330.77
HWR 15mm 4814.05
HWR 15mm 4654.27
HWR 15mm 4962.3
HWR 15mm 4587.46
HWR 15mm 1984.31
HWR 15mm 8744.67
HWR 15mm 7998.2
HWR 15mm 6701.26
HWR 15mm 9947.83
HWR 15mm 3760.26
HWR 15mm 2311.62
HWR 15mm 4987.56
HWR 15mm 2422.09
HWR 15mm 2712.56
HWR 15mm 11270.15
HWR 15mm 5563.89
HWR 15mm 4150.66
HWR 15mm 16836.1
HWR 15mm 6307.33
HWR 15mm 10482.51
HWR 15mm 6126.42
HWR 15mm 13285.16
HWR 15mm 2450.53
HWR 15mm 12367.25
HWR 15mm 5494.8
HWR 15mm 1435.01
HWR 15mm 1874.31
HWR 15mm 2819.63
HWR 15mm 3917.27
HWR 15mm 4746.57
HWR 15mm 2189.8
HWR 15mm 7170.8
HWR 15mm 832.21
HWR 15mm 819.84
HWR 15mm 4748.98
HWR 15mm 3152.84
HWR 15mm 1842.02
HWR 15mm 1819.6
HWR 15mm 1109.82
HWR 15mm 7288.24
HWR 15mm 3360.1
HWR 15mm 5138.13
HWR 15mm 12727.1
HWR 15mm 15457.64
HWR 15mm 4125.31
HWR 15mm 3884.11
HWR 15mm 16783.24
HWR 15mm 3572.38
HWR 15mm 5346.93
HWR 15mm 11217.39
HWR 15mm 1195.85
HWR 15mm 13406.32
HWR 15mm 3130.24
HWR 15mm 10668.47
HWR 15mm 5354.15
HWR 15mm 3188.37
HWR 15mm 4915.78
HWR 15mm 1682.79
HWR 15mm 2378.48
HWR 15mm 7180.7
HWR 15mm 11978.03
HWR 15mm 4879.06
HWR 15mm 5571.11
HWR 15mm 9616.52
HWR 15mm 8775.4
HWR 15mm 4430.65
HWR 15mm 8424.45
HWR 15mm 2214.15
HWR 15mm 6246.96
HWR 15mm 1287.85
HWR 15mm 1158.54
HWR 15mm 2759.42
HWR 15mm 7492.42
HWR 15mm 3373.17
HWR 15mm 5995.37
HWR 15mm 8146.14
HWR 15mm 3992.49
HWR 15mm 4728.55
HWR 15mm 3811.31
HWR 15mm 4207.03
HWR 15mm 3061.07
HWR 15mm 3094.46
HWR 15mm 11560.24
HWR 15mm 4290.91
HWR 15mm 3077.14
HWR 15mm 1045.11
HWR 15mm 4448.68
HWR 15mm 7713
HWR 15mm 3274.59
HWR 15mm 5393.33
HWR 15mm 29572.93
HWR 15mm 4468.84
HWR 15mm 2913.62
HWR 15mm 1512.22
HWR 15mm 3535.22
HWR 15mm 2916.95
HWR 15mm 1095.75
HWR 15mm 2885.62
HWR 15mm 836.44
HWR 15mm 14737.04
HWR 15mm 9776.01
HWR 15mm 9806.44
HWR 15mm 3807.03
HWR 15mm 641.91
HWR 15mm

HWR 20mm 53897.41


HWR 20mm 14895.68
HWR 20mm 18252.57
HWR 20mm 28156.05
HWR 20mm 8664.81
HWR 20mm 17326.79
HWR 20mm 29269.46
HWR 20mm 4180.15
HWR 20mm 11403.98
HWR 20mm 12154.43
HWR 20mm 8408.37
HWR 20mm 9843.3
HWR 20mm 14895.68
HWR 20mm 9908.56
HWR 20mm 27280.33
HWR 20mm 4501.8
HWR 20mm 5039.06
HWR 20mm 8062.46
HWR 20mm 15335.38
HWR 20mm 21195.83
HWR 20mm 7939.55
HWR 20mm 3,795.57
HWR 20mm 3,806.44
HWR 20mm 3,795.57
HWR 20mm 3,806.44
HWR 20mm 3,795.57
HWR 20mm 3,806.44
HWR 20mm 3,795.57
HWR 20mm 3,806.44
HWR 20mm 3,795.57
HWR 20mm 3,806.44
HWR 20mm 3,795.57
HWR 20mm 3,806.44
HWR 20mm 3,767.07
HWR 20mm 3,605.52
HWR 20mm 5,585.27
HWR 20mm 8,446.33
HWR 20mm 753.92
HWR 20mm 2,211.96
HWR 20mm 2,354.57
HWR 20mm 6,200.49
HWR 20mm 2,500.82
HWR 20mm 4,393.20
HWR 20mm 3,747.73
HWR 20mm 4,461.38
HWR 20mm 5,361.73
HWR 20mm 3,783.15
HWR 20mm 3,635.26
HWR 20mm 3,783.15
HWR 20mm 3,770.29
HWR 20mm 3,783.15
HWR 20mm 3,770.78
HWR 20mm 3,783.15
HWR 20mm 3,635.26
HWR 20mm 3,783.15
HWR 20mm 3,792.12
HWR 20mm 3,783.15
HWR 20mm 3,767.07
HWR 20mm 3,783.15
HWR 20mm 3,784.03
HWR 20mm 3,783.15
HWR 20mm 4,631.93
HWR 20mm 2,310.47
HWR 20mm 7,573.31
HWR 20mm 4,623.84
HWR 20mm 28,040.69
HWR 20mm 1,170.27
HWR 20mm 15,428.73
HWR 20mm 9,196.93
HWR 20mm 9,223.54
HWR 20mm 15,499.69
HWR 20mm 1,634.48
HWR 20mm 16,752.53
HWR 20mm 2,558.22
HWR 20mm 2,265.52
HWR 20mm 13,209.09
HWR 20mm 3,145.94
HWR 20mm 1,302.57
HWR 20mm 5,460.51
HWR 20mm 4,375.06
HWR 20mm 1,983.65
HWR 20mm 4,376.73
HWR 20mm 8,700.94
HWR 20mm 140.06
HWR 20mm 758.89
HWR 20mm 13,015.81
HWR 20mm 1,755.69
HWR 20mm 9,795.92
HWR 20mm 13,702.51
HWR 20mm 3,331.70
HWR 20mm 10,354.89
HWR 20mm 34,547.99
HWR 20mm 1,000.74
HWR 20mm 1,008.13
HWR 20mm 1,008.22
HWR 20mm 1,016.72
HWR 20mm 1,007.66
HWR 20mm 6,079.29
HWR 20mm 1,014.35
HWR 20mm 2,744.41
HWR 20mm 2,799.86
HWR 20mm 4,204.17
HWR 20mm 3,300.57
HWR 20mm 2,593.10
HWR 20mm 4,724.24
HWR 20mm 5,425.86
HWR 20mm 5,417.24
HWR 20mm 4,501.07
HWR 20mm 2,350.72
HWR 20mm 2,354.73
HWR 20mm 14,523.18
HWR 20mm 4,574.18
HWR 20mm 599.44
HWR 20mm 6,043.31
HWR 20mm 4,619.71
HWR 20mm 6,070.60
HWR 20mm 2,455.22
HWR 20mm 6,010.20
HWR 20mm 180.35
HWR 20mm 2,153.65
HWR 20mm 2,524.91
HWR 20mm 1,752.94
HWR 20mm 1,888.69
HWR 20mm 4,283.48
HWR 20mm 5,394.57
HWR 20mm 5,380.25
HWR 20mm 2,534.67
HWR 20mm 4,880.97
HWR 20mm 12,302.71
HWR 20mm 4,098.88
HWR 20mm 14,126.87
HWR 20mm 7,014.78
HWR 20mm 9,796.58
HWR 20mm 5,885.34
HWR 20mm 5,847.03
HWR 20mm 8,849.54
HWR 20mm 9,035.61
HWR 20mm 1,517.94
HWR 20mm 1,522.92
HWR 20mm 7,552.99
HWR 20mm 3,958.26
HWR 20mm 2,378.36
HWR 20mm 4,229.53
HWR 20mm 2,312.14
HWR 20mm 4,701.95
HWR 20mm 2,990.84
HWR 20mm 5,293.23
HWR 20mm 5,875.20
HWR 20mm 7,995.00
HWR 20mm 5,395.10
HWR 20mm 6,118.49
HWR 20mm 4,944.50
HWR 20mm 6,510.65
HWR 20mm 4,246.49
HWR 20mm 7,724.34
HWR 20mm 2221.04
HWR 20mm 1283.06
HWR 20mm 6000.03
HWR 20mm

HWR 25mm 8456.99


HWR 25mm 29832.81
HWR 25mm 16795.79
HWR 25mm 39758.98
HWR 25mm 13819.95
HWR 25mm 22366.84
HWR 25mm 29832.81
HWR 25mm 32152.33
HWR 25mm 23998.98
HWR 25mm 30403.07
HWR 25mm 27,913.71
HWR 25mm 19,150.28
HWR 25mm 18,276.75
HWR 25mm 16,721.02
HWR 25mm 8,690.21
HWR 25mm 17,350.49
HWR 25mm 5,937.40
HWR 25mm 12,933.19
HWR 25mm 7,185.35
HWR 25mm 5,031.45
HWR 25mm 26,860.17
HWR 25mm

HWR 32mm 12721.59


HWR 32mm 13678.89
HWR 32mm 12721.59
HWR 32mm 6624.39
HWR 32mm 37754.89
HWR 32mm 19,861.94
HWR 32mm 10,632.99
HWR 32mm 8,167.30
HWR 32mm 15,049.40
HWR 32mm 8653.11
HWR 32mm

HWR 40mm 45144.87


HWR 40mm 7257.87
HWR 40mm 14626.87
HWR 40mm 3868.24
HWR 40mm 42075.81
HWR 40mm 14626.87
HWR 40mm 642.96
HWR 40mm 9123.14
HWR 40mm 2,123.42
HWR 40mm 12,484.49
HWR 40mm

HWR 65mm 35490.97


HWR 65mm

HWS 100mm 46000.05


HWS 100mm

HWS 150mm 23234.7


HWS 150mm 57440.91
HWS 150mm 18685.2
HWS 150mm

HWS 15mm 989.29


HWS 15mm 788.36
HWS 15mm 2994.86
HWS 15mm 2994.86
HWS 15mm 2994.86
HWS 15mm 2994.86
HWS 15mm 12215.12
HWS 15mm 4688.74
HWS 15mm 4975.55
HWS 15mm 13702.21
HWS 15mm 1979.66
HWS 15mm 1979.66
HWS 15mm 1979.66
HWS 15mm 2859.43
HWS 15mm 12989.23
HWS 15mm 1850.6
HWS 15mm 984.62
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 4594.66
HWS 15mm 1687.21
HWS 15mm 1687.21
HWS 15mm 1687.21
HWS 15mm 1687.21
HWS 15mm 1687.21
HWS 15mm 1687.21
HWS 15mm 1687.21
HWS 15mm 1687.21
HWS 15mm 2370.39
HWS 15mm 2604.32
HWS 15mm 5972.8
HWS 15mm 5956.39
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 6315.01
HWS 15mm 4809.68
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 2424.66
HWS 15mm 8312.04
HWS 15mm 4037.73
HWS 15mm 1900.05
HWS 15mm 5172.55
HWS 15mm 2027.01
HWS 15mm 4933.41
HWS 15mm 15460.03
HWS 15mm 3000.11
HWS 15mm 5770.55
HWS 15mm 3086.78
HWS 15mm 4819.91
HWS 15mm 6895.35
HWS 15mm 3402.48
HWS 15mm 2965.1
HWS 15mm 8866.99
HWS 15mm 2812.41
HWS 15mm 6332.94
HWS 15mm 6640.9
HWS 15mm 881.72
HWS 15mm 680.02
HWS 15mm 5241.56
HWS 15mm 1698.12
HWS 15mm 837.77
HWS 15mm 8094
HWS 15mm 2653.24
HWS 15mm 3283.72
HWS 15mm 2229.97
HWS 15mm 7459.39
HWS 15mm 1907.74
HWS 15mm 1898.25
HWS 15mm 2031.43
HWS 15mm 1433.55
HWS 15mm 4261.28
HWS 15mm 2511.13
HWS 15mm 9745.34
HWS 15mm 6152.7
HWS 15mm 3055.82
HWS 15mm 3112.64
HWS 15mm 3025.63
HWS 15mm 1422.73
HWS 15mm 3105.71
HWS 15mm 3249.97
HWS 15mm 0
HWS 15mm 13944.91
HWS 15mm 2806.85
HWS 15mm 775.99
HWS 15mm 2740.26
HWS 15mm 7176.95
HWS 15mm 1339.15
HWS 15mm 1071.32
HWS 15mm 1339.15
HWS 15mm 1090.8
HWS 15mm 1338.37
HWS 15mm 3126.15
HWS 15mm 10594.74
HWS 15mm 2337.57
HWS 15mm 3119.52
HWS 15mm 3342.96
HWS 15mm 711.01
HWS 15mm 3346.37
HWS 15mm 1903.65
HWS 15mm 6425.02
HWS 15mm 1473.24
HWS 15mm 1787.21
HWS 15mm 6551.52
HWS 15mm 6490
HWS 15mm 1529.5
HWS 15mm 2888.08
HWS 15mm 3287.37
HWS 15mm 3870.64
HWS 15mm 3962.71
HWS 15mm 12351.93
HWS 15mm 1452.86
HWS 15mm 1245.3
HWS 15mm 5056.51
HWS 15mm 2948.58
HWS 15mm 2440.45
HWS 15mm 1817
HWS 15mm 3536.35
HWS 15mm 1559.53
HWS 15mm 9822.53
HWS 15mm 3113.96
HWS 15mm 3920.51
HWS 15mm 1559
HWS 15mm 1553.75
HWS 15mm 1568.87
HWS 15mm 6013.7
HWS 15mm 5680.39
HWS 15mm 3978.02
HWS 15mm 7156.42
HWS 15mm 2039.15
HWS 15mm 3187.48
HWS 15mm 2674.99
HWS 15mm 1460.14
HWS 15mm 1656.73
HWS 15mm 1643.95
HWS 15mm 1624
HWS 15mm 4444.05
HWS 15mm 4659.1
HWS 15mm 1819.92
HWS 15mm 684.18
HWS 15mm 704.71
HWS 15mm 5965.49
HWS 15mm 11012.8
HWS 15mm 3035.77
HWS 15mm 1765.31
HWS 15mm 3368.89
HWS 15mm 4667.96
HWS 15mm 3862.13
HWS 15mm 1510.26
HWS 15mm 1203.23
HWS 15mm 2763.26
HWS 15mm 3719.39
HWS 15mm 2084.22
HWS 15mm 4150.88
HWS 15mm 2427.6
HWS 15mm 1587.36
HWS 15mm 4405.99
HWS 15mm 1170.44
HWS 15mm 2775.61
HWS 15mm 3762.69
HWS 15mm 5242.54
HWS 15mm 1643.34
HWS 15mm 2008.63
HWS 15mm 5950.76
HWS 15mm 8467.63
HWS 15mm 11542.5
HWS 15mm 5029.88
HWS 15mm 5067.23
HWS 15mm 2013.88
HWS 15mm 2281.25
HWS 15mm 4827.72
HWS 15mm 8692.43
HWS 15mm 4823.54
HWS 15mm 4382.75
HWS 15mm 4390.58
HWS 15mm 1447.55
HWS 15mm 7059.04
HWS 15mm 6030.15
HWS 15mm 3386.08
HWS 15mm 3408.48
HWS 15mm 3083.54
HWS 15mm 1702.3
HWS 15mm 10304.8
HWS 15mm 2011.63
HWS 15mm 1950.15
HWS 15mm 1923.04
HWS 15mm 7092.99
HWS 15mm 5464.82
HWS 15mm 8745.83
HWS 15mm 4415.75
HWS 15mm 3184.95
HWS 15mm 5613.77
HWS 15mm 4954.92
HWS 15mm 2528.72
HWS 15mm 2816.3
HWS 15mm 3018.95
HWS 15mm 1962.97
HWS 15mm 995.45
HWS 15mm 5525.74
HWS 15mm 1888.41
HWS 15mm 683.99
HWS 15mm 1218.9
HWS 15mm 4827.74
HWS 15mm 3260
HWS 15mm 13670.22
HWS 15mm 8000.44
HWS 15mm 1446.03
HWS 15mm 1494.72
HWS 15mm 2300.34
HWS 15mm 1638.8
HWS 15mm 2434.08
HWS 15mm 4421.82
HWS 15mm 1369.44
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 1687.21
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 1687.21
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 1687.21
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 1687.21
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 1687.21
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 1687.21
HWS 15mm 6412.03
HWS 15mm 4594.66
HWS 15mm 1687.21
HWS 15mm 3214.95
HWS 15mm 1687.21
HWS 15mm 3146.59
HWS 15mm 1687.21
HWS 15mm 6640.9
HWS 15mm 881.72
HWS 15mm 680.02
HWS 15mm 5241.56
HWS 15mm 1698.12
HWS 15mm 2965.1
HWS 15mm 8430.25
HWS 15mm 2812.41
HWS 15mm 6332.94
HWS 15mm 837.77
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 6315.01
HWS 15mm 6328.01
HWS 15mm 5932.96
HWS 15mm 4809.68
HWS 15mm 3402.48
HWS 15mm 5770.55
HWS 15mm 3086.78
HWS 15mm 4819.91
HWS 15mm 6895.35
HWS 15mm 2676.28
HWS 15mm 1640.11
HWS 15mm 9320.56
HWS 15mm 3067.07
HWS 15mm 6931.83
HWS 15mm 3926.49
HWS 15mm 5419.53
HWS 15mm 2540.93
HWS 15mm 2838.03
HWS 15mm 4926.82
HWS 15mm 925.91
HWS 15mm 2483.86
HWS 15mm 1133.93
HWS 15mm 4050.88
HWS 15mm 2375.62
HWS 15mm 2496.35
HWS 15mm 11075.29
HWS 15mm 3976.91
HWS 15mm 1577.99
HWS 15mm 4473.82
HWS 15mm 8051.14
HWS 15mm 2623.54
HWS 15mm 3352.2
HWS 15mm 2559.52
HWS 15mm 5083.77
HWS 15mm 4462.05
HWS 15mm 2951.72
HWS 15mm 2832.9
HWS 15mm 10045.82
HWS 15mm 2740.23
HWS 15mm 1479.99
HWS 15mm 1777.35
HWS 15mm 1114.44
HWS 15mm 7703.96
HWS 15mm 4101.57
HWS 15mm 7658.95
HWS 15mm 997.71
HWS 15mm 1332.65
HWS 15mm 2694.31
HWS 15mm 2748.06
HWS 15mm 11815.26
HWS 15mm 2878.29
HWS 15mm 4221.6
HWS 15mm 13823.71
HWS 15mm 6332.68
HWS 15mm 4548.48
HWS 15mm 6132.35
HWS 15mm 4554.07
HWS 15mm 1932.46
HWS 15mm 4823.17
HWS 15mm 2944.92
HWS 15mm 2593.65
HWS 15mm 3421.71
HWS 15mm 4628.67
HWS 15mm 1191.99
HWS 15mm 6893.95
HWS 15mm 882.29
HWS 15mm 2938.68
HWS 15mm 4007.68
HWS 15mm 1975.74
HWS 15mm 1281.27
HWS 15mm 3672.3
HWS 15mm 5186.07
HWS 15mm 4800.18
HWS 15mm 6005.18
HWS 15mm 1276.1
HWS 15mm 2111.04
HWS 15mm 1885.53
HWS 15mm 1496.48
HWS 15mm 4996.42
HWS 15mm 8112.44
HWS 15mm 1736.72
HWS 15mm 1921.13
HWS 15mm 2824.67
HWS 15mm 7619.57
HWS 15mm 1732.48
HWS 15mm 4452.74
HWS 15mm 3362.01
HWS 15mm 2114.33
HWS 15mm 3190.09
HWS 15mm 3367.39
HWS 15mm 3101.88
HWS 15mm 3329.79
HWS 15mm 5555.94
HWS 15mm 4950.59
HWS 15mm 4216.13
HWS 15mm 6496.76
HWS 15mm 10318.04
HWS 15mm 8871.37
HWS 15mm 4637.55
HWS 15mm 8265.35
HWS 15mm 9620.25
HWS 15mm 928.97
HWS 15mm 3940.13
HWS 15mm 6392.28
HWS 15mm 3762.79
HWS 15mm 11964.76
HWS 15mm 3750.87
HWS 15mm 5491.56
HWS 15mm 4137.67
HWS 15mm 3362.33
HWS 15mm 3319.67
HWS 15mm 6599.95
HWS 15mm 6500.23
HWS 15mm 2797.58
HWS 15mm 2974.21
HWS 15mm 5083.97
HWS 15mm 2874.64
HWS 15mm 6634.93
HWS 15mm 3647.9
HWS 15mm 6420.81
HWS 15mm 3833.1
HWS 15mm 2971.46
HWS 15mm 1643.73
HWS 15mm 2881.28
HWS 15mm

HWS 20mm 3790.18


HWS 20mm 13660.98
HWS 20mm 16861.01
HWS 20mm 3517.2
HWS 20mm 8144.01
HWS 20mm 9568.93
HWS 20mm 6366.93
HWS 20mm 8623.62
HWS 20mm 11912.53
HWS 20mm 3375.72
HWS 20mm 12448.03
HWS 20mm 4789.83
HWS 20mm 4772.83
HWS 20mm 4270.74
HWS 20mm 5745.46
HWS 20mm 6417.23
HWS 20mm 14377.12
HWS 20mm 9392.79
HWS 20mm 9353.14
HWS 20mm 5538.39
HWS 20mm 5216.2
HWS 20mm 21015.54
HWS 20mm 4302.94
HWS 20mm 7873.61
HWS 20mm 3368.29
HWS 20mm 5424.45
HWS 20mm 2315.46
HWS 20mm 3768.69
HWS 20mm 4224.99
HWS 20mm 2022.43
HWS 20mm 15526.03
HWS 20mm 7577.06
HWS 20mm 3206.7
HWS 20mm 10385.44
HWS 20mm 2616.57
HWS 20mm 3825.69
HWS 20mm 2450.17
HWS 20mm 8144.01
HWS 20mm 4211.43
HWS 20mm 6313.09
HWS 20mm 3030.54
HWS 20mm 9109.18
HWS 20mm 3778.01
HWS 20mm 16985.5
HWS 20mm 5304.76
HWS 20mm 2552.37
HWS 20mm 6788.53
HWS 20mm 3011.72
HWS 20mm 5096.98
HWS 20mm 6479.67
HWS 20mm 4324.44
HWS 20mm 7246.28
HWS 20mm 4958.47
HWS 20mm 6293.05
HWS 20mm 6591.5
HWS 20mm 7044.63
HWS 20mm 5529.18
HWS 20mm 5181.54
HWS 20mm 6045.37
HWS 20mm 6819.56
HWS 20mm 9559.56
HWS 20mm 10489.82
HWS 20mm 6,327.76
HWS 20mm 6,330.65
HWS 20mm 6,327.76
HWS 20mm 6,330.65
HWS 20mm 6,327.76
HWS 20mm 6,330.65
HWS 20mm 6,327.76
HWS 20mm 6,330.65
HWS 20mm 6,327.76
HWS 20mm 6,330.65
HWS 20mm 6,327.76
HWS 20mm 6,330.65
HWS 20mm 4,792.08
HWS 20mm 6,341.83
HWS 20mm 6,307.70
HWS 20mm 9,030.11
HWS 20mm 877.18
HWS 20mm 2,841.86
HWS 20mm 3,439.69
HWS 20mm 6,894.93
HWS 20mm 3,109.55
HWS 20mm 4,793.85
HWS 20mm 5,789.57
HWS 20mm 3,107.50
HWS 20mm 6,419.84
HWS 20mm 5,103.75
HWS 20mm 6,352.56
HWS 20mm 6,419.84
HWS 20mm 6,352.56
HWS 20mm 6,419.84
HWS 20mm 6,352.56
HWS 20mm 6,419.84
HWS 20mm 6,352.56
HWS 20mm 6,419.84
HWS 20mm 6,352.56
HWS 20mm 6,419.84
HWS 20mm 6,352.56
HWS 20mm 6,419.84
HWS 20mm 6,352.56
HWS 20mm 6,352.56
HWS 20mm 5,243.35
HWS 20mm 1,699.45
HWS 20mm 3,025.57
HWS 20mm 6,679.07
HWS 20mm 689.68
HWS 20mm 884.73
HWS 20mm 5,016.95
HWS 20mm 2,538.33
HWS 20mm 2,352.41
HWS 20mm 6,392.13
HWS 20mm 2,459.26
HWS 20mm 6,024.46
HWS 20mm 964.08
HWS 20mm 9,087.31
HWS 20mm 2,717.08
HWS 20mm 2,603.68
HWS 20mm 3,880.59
HWS 20mm 2,317.16
HWS 20mm 4,644.51
HWS 20mm 1,974.46
HWS 20mm 5,573.95
HWS 20mm 2,459.46
HWS 20mm 4,547.18
HWS 20mm 3,184.87
HWS 20mm 8,320.50
HWS 20mm 6,740.71
HWS 20mm 2,471.34
HWS 20mm 2,986.38
HWS 20mm 5,621.90
HWS 20mm 4,564.50
HWS 20mm 3,900.10
HWS 20mm 792.63
HWS 20mm 1,092.53
HWS 20mm 2,956.28
HWS 20mm 807.87
HWS 20mm 3,538.16
HWS 20mm 4,267.61
HWS 20mm 2,867.43
HWS 20mm 2,716.50
HWS 20mm 10,773.00
HWS 20mm 5,546.43
HWS 20mm 5,388.90
HWS 20mm 5,652.19
HWS 20mm 4,380.73
HWS 20mm 4,194.02
HWS 20mm 5,479.81
HWS 20mm 5,454.62
HWS 20mm 10,807.67
HWS 20mm 2,983.22
HWS 20mm 15,321.77
HWS 20mm 14,508.11
HWS 20mm 794.82
HWS 20mm 5,248.26
HWS 20mm 1,574.41
HWS 20mm 12,046.33
HWS 20mm 5,679.15
HWS 20mm 7,885.95
HWS 20mm 3,776.34
HWS 20mm 2,339.39
HWS 20mm 3,673.81
HWS 20mm 4,718.85
HWS 20mm 2,519.34
HWS 20mm 1,782.53
HWS 20mm 2,209.26
HWS 20mm 3,014.90
HWS 20mm 1,399.68
HWS 20mm 1,713.65
HWS 20mm 5,542.66
HWS 20mm 1,732.22
HWS 20mm 5,887.33
HWS 20mm 5,338.13
HWS 20mm 4,202.10
HWS 20mm 2,514.98
HWS 20mm 3,014.65
HWS 20mm 3,521.76
HWS 20mm 4,771.20
HWS 20mm 4,813.79
HWS 20mm 4,512.46
HWS 20mm 4,504.25
HWS 20mm 3,064.83
HWS 20mm 2,090.39
HWS 20mm 6,630.84
HWS 20mm 2,017.35
HWS 20mm 5,559.95
HWS 20mm 3013.49
HWS 20mm
HWS 25mm 5021.95
HWS 25mm 19406.77
HWS 25mm 15719.28
HWS 25mm 21286.24
HWS 25mm 5021.77
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 600.03
HWS 25mm 604.34
HWS 25mm 553.98
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 564.53
HWS 25mm 599.5
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 2966.77
HWS 25mm 5642.31
HWS 25mm 15911.12
HWS 25mm 2300.03
HWS 25mm 7121.86
HWS 25mm 12236.88
HWS 25mm 7502.5
HWS 25mm 5357.59
HWS 25mm 18464.32
HWS 25mm 8235.28
HWS 25mm 7796.93
HWS 25mm 6635.44
HWS 25mm 6468.3
HWS 25mm 4798.6
HWS 25mm 14502.93
HWS 25mm 3896.32
HWS 25mm 6773.04
HWS 25mm 394.43
HWS 25mm 407.81
HWS 25mm 3266.4
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 578.48
HWS 25mm 600.03
HWS 25mm 600.03
HWS 25mm 600.03
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 564.53
HWS 25mm 570.32
HWS 25mm 564.53
HWS 25mm 599.5
HWS 25mm 3833.49
HWS 25mm 5099.61
HWS 25mm 7055.55
HWS 25mm 19634.67
HWS 25mm 14399.27
HWS 25mm 15547.92
HWS 25mm 3844.03
HWS 25mm 3667.73
HWS 25mm 5006.15
HWS 25mm 5155.32
HWS 25mm 3666.33
HWS 25mm 3509.04
HWS 25mm 11764.84
HWS 25mm 16334.89
HWS 25mm 15,123.70
HWS 25mm 15,501.91
HWS 25mm 10,104.05
HWS 25mm 10,119.73
HWS 25mm 5,208.19
HWS 25mm 4,603.64
HWS 25mm 2,610.07
HWS 25mm 5,621.72
HWS 25mm 7,580.34
HWS 25mm 13,766.03
HWS 25mm 8,130.10
HWS 25mm 23,516.61
HWS 25mm 5,622.04
HWS 25mm 11,081.80
HWS 25mm 6,363.95
HWS 25mm 6,476.48
HWS 25mm 6,690.07
HWS 25mm 6,918.98
HWS 25mm 1,636.96
HWS 25mm 1,615.87
HWS 25mm 9,001.55
HWS 25mm 3,536.89
HWS 25mm 13,302.89
HWS 25mm 13,070.21
HWS 25mm 1,078.59
HWS 25mm 7742.55
HWS 25mm

HWS 32mm 24803.54


HWS 32mm 4390.59
HWS 32mm 25558.79
HWS 32mm 11500.78
HWS 32mm 16807.45
HWS 32mm 13045.58
HWS 32mm 8885.59
HWS 32mm 25718.7
HWS 32mm 29229.6
HWS 32mm 11126.44
HWS 32mm 5413.31
HWS 32mm 10426.59
HWS 32mm 10183.35
HWS 32mm 25558.79
HWS 32mm 11500.78
HWS 32mm 8390.95
HWS 32mm 576.50
HWS 32mm 575.53
HWS 32mm 576.50
HWS 32mm 575.53
HWS 32mm 576.50
HWS 32mm 575.53
HWS 32mm 576.50
HWS 32mm 575.53
HWS 32mm 576.50
HWS 32mm 575.53
HWS 32mm 576.50
HWS 32mm 575.53
HWS 32mm 602.09
HWS 32mm 566.68
HWS 32mm 580.29
HWS 32mm 575.89
HWS 32mm 813.04
HWS 32mm 580.29
HWS 32mm 575.89
HWS 32mm 580.29
HWS 32mm 575.89
HWS 32mm 580.29
HWS 32mm 575.89
HWS 32mm 580.29
HWS 32mm 575.89
HWS 32mm 580.29
HWS 32mm 575.89
HWS 32mm 580.29
HWS 32mm 575.89
HWS 32mm 575.89
HWS 32mm 19702.67
HWS 32mm 11782.19
HWS 32mm 6444.06
HWS 32mm 38475.16
HWS 32mm 8491.77
HWS 32mm 20876.23
HWS 32mm 7592.68
HWS 32mm 18,379.35
HWS 32mm 14,815.80
HWS 32mm 17,953.87
HWS 32mm 14,717.00
HWS 32mm 8,786.60
HWS 32mm 17,340.79
HWS 32mm 9,382.18
HWS 32mm 26,819.15
HWS 32mm

HWS 40mm 18904.57


HWS 40mm 5686.59
HWS 40mm 7545.82
HWS 40mm 5542.91
HWS 40mm 20997.77
HWS 40mm 4952.92
HWS 40mm 39807.76
HWS 40mm 5988.49
HWS 40mm 7889.68
HWS 40mm 22489.35
HWS 40mm 7545.82
HWS 40mm 5542.91
HWS 40mm 16787.24
HWS 40mm 9548.01
HWS 40mm 18899.99
HWS 40mm 6281.4
HWS 40mm 30373.49
HWS 40mm 9,570.25
HWS 40mm 2,336.16
HWS 40mm 4,051.94
HWS 40mm 8,810.62
HWS 40mm 7,440.24
HWS 40mm

HWS 50mm 7468.17


HWS 50mm 16833.51
HWS 50mm 13656.35
HWS 50mm 7468.17
HWS 50mm 939.88
HWS 50mm 15873.64
HWS 50mm 6581.74
HWS 50mm 38051.51
HWS 50mm 15,660.04
HWS 50mm 10,902.41
HWS 50mm 21,106.05
HWS 50mm

HWS 65mm 13011.93


HWS 65mm 13011.93
HWS 65mm 9154.85
HWS 65mm 13,024.03
HWS 65mm 9057.9
HWS 65mm

HWS 75mm 14460.43


HWS 75mm 790.07
HWS 75mm 14460.43
HWS 75mm 812.28
HWS 75mm 14,493.43
HWS 75mm

SW 15mm 8106.48
SW 15mm 11952.59
SW 15mm 3545.23
SW 15mm 3597.65
SW 15mm 1375.02
SW 15mm 6573.86
SW 15mm 2937.3
SW 15mm 2700.06
SW 15mm 2673.28
SW 15mm

SW 20mm 13765.58
SW 20mm 8084.01
SW 20mm

SW 25mm 45121.2
SW 25mm 15495.74
SW 25mm 28942.44
SW 25mm 10,089.86
SW 25mm 10846.72
SW 25mm

SW 32mm 29270.14
SW 32mm 31409.26
SW 32mm 1282.34
SW 32mm 3994.34
SW 32mm 57,579.41
SW 32mm 33,410.15
SW 32mm 20,091.24
SW 32mm 37.97
SW 32mm 7566
SW 32mm

Riser Pipes
Size No. of Riser Floor Height
150mm 1 4.25
150mm 1 4.25
40mm 1 4.25
32mm 1 4.25
100mm 1 5
100mm 1 5
25mm 1 5
25mm 1 5

Detail and Dimensions


Item Description
Detail Size

AAV BCWS 25mm


AAV HWS 25mm
AAV SW 25mm

Drain Valve 100mm


Drain Valve 100mm
Drain Valve 100mm

DRV HWR 15mm


DRV HWR 15mm
DRV HWR 15mm

DRV HWR 20mm


DRV HWR 20mm
DRV HWR 20mm

DRV HWR 25mm


DRV SW 25mm
DRV HWR 25mm

DRV HWR 40mm

Float Valve 150mm


Float Valve 200mm
Float Valve 75mm
Isolation Valve CWS 100mm

Isolation Valve CWS 150mm

Isolation Valve HWS 15mm


Isolation Valve HWR 15mm
Isolation Valve HWS 15mm
Isolation Valve HWR 15mm
Isolation Valve HWS 15mm
Isolation Valve HWR 15mm
Isolation Valve SW 15mm
Isolation Valve HWS 15mm
Isolation Valve HWR 15mm

Isolation Valve HWS 20mm


Isolation Valve HWR 20mm
Isolation Valve BCWS 20mm
Isolation Valve BCWS 20mm
Isolation Valve HWS 20mm
Isolation Valve BCWS 20mm
Isolation Valve BCWS 20mm
Isolation Valve BCWS 20mm
Isolation Valve HWS 20mm
Isolation Valve HWR 20mm
Isolation Valve BCWS 20mm
Isolation Valve HWS 20mm
Isolation Valve HWR 20mm
Isolation Valve SW 20mm
Isolation Valve BCWS 20mm

Isolation Valve BCWS 25mm


Isolation Valve HWS 25mm
Isolation Valve HWR 25mm
Isolation Valve BCWS 25mm
Isolation Valve BCWS 25mm
Isolation Valve BCWS 25mm
Isolation Valve HWS 25mm
Isolation Valve BCWS 25mm
Isolation Valve HWS 25mm
Isolation Valve HWR 25mm
Isolation Valve BCWS 25mm
Isolation Valve HWS 25mm
Isolation Valve HWR 25mm
Isolation Valve SW 25mm
Isolation Valve BCWS 25mm
Isolation Valve HWS 25mm
Isolation Valve HWR 25mm
Isolation Valve SW 25mm
Isolation Valve BCWS 25mm

Isolation Valve BCWS 32mm


Isolation Valve HWS 32mm
Isolation Valve SW 32mm
Isolation Valve SW 32mm
Isolation Valve BCWS 32mm
Isolation Valve BCWS 32mm
Isolation Valve HWS 32mm
Isolation Valve HWR 32mm
Isolation Valve BCWS 32mm
Isolation Valve HWS 32mm
Isolation Valve HWR 32mm

Isolation Valve BCWS 40mm


Isolation Valve HWR 40mm
Isolation Valve HWS 40mm
Isolation Valve BCWS 40mm
Isolation Valve HWS 40mm
Isolation Valve HWR 40mm
Isolation Valve BCWS 40mm
Isolation Valve HWS 40mm
Isolation Valve HWR 40mm
Isolation Valve HWS 40mm

Isolation Valve BCWS 50mm


Isolation Valve BCWS 50mm
Isolation Valve HWS 50mm
Isolation Valve BCWS 50mm
Isolation Valve HWS 50mm
Isolation Valve CWS 50mm

Isolation Valve BCWS 65mm


Isolation Valve HWS 65mm
Isolation Valve BCWS 65mm
Isolation Valve HWS 65mm

Isolation Valve CWS 75mm


Isolation Valve BCWS 75mm
Isolation Valve HWS 75mm
Isolation Valve BCWS 75mm
Isolation Valve HWS 75mm

PRV BCWS 150mm

PRV HWR 25mm

PRV SW 32mm
PRV BCWS 40mm
PRV HWS 40mm

PRV CWS 50mm

PRV BCWS 65mm


PRV HWS 65mm

PRV BCWS 75mm


PRV HWS 75mm

RV HWR 40mm

Solenoid Valve HWS 150mm

Solenoid Valve HWS 40mm

WHA

Tank Vent With Insect

Dimensions
Item Description
Size mm
BCWS Drop 15mm 3500
BCWS Drop 15mm 3500
BCWS Drop 15mm 4250
BCWS Drop 15mm 3750
BCWS Drop 15mm 3750
BCWS Drop 15mm 3500
BCWS Drop 15mm 3500
BCWS Drop 15mm 4250
BCWS Drop 15mm 3750
BCWS Drop 15mm 3750
BCWS Drop 15mm 3250
BCWS Drop 15mm 4000
BCWS Drop 15mm 3500
BCWS Drop 15mm 3500
BCWS Drop 15mm 3250
BCWS Drop 15mm 4000
BCWS Drop 15mm 3500
BCWS Drop 15mm 3500
BCWS Drop 15mm 2000
BCWS Drop 15mm 2750
BCWS Drop 15mm 2250
BCWS Drop 15mm 2250
BCWS Drop 15mm 3900
BCWS Drop 15mm 3400
BCWS Drop 15mm 3400
BCWS Drop 15mm 4000
BCWS Drop 15mm 3500
BCWS Drop 15mm 3500
BCWS Drop 15mm 3250
BCWS Drop 15mm 3250
BCWS Drop 15mm 4000
BCWS Drop 15mm 3500
BCWS Drop 15mm 3500

HWS Drop 15mm 3250


HWS Drop 15mm 4000
HWS Drop 15mm 3500
HWS Drop 15mm 3500
HWS Drop 15mm 3250
HWS Drop 15mm 4000
HWS Drop 15mm 3500
HWS Drop 15mm 3500
HWS Drop 15mm 2000
HWS Drop 15mm 2750
HWS Drop 15mm 2250
HWS Drop 15mm 2250
HWS Drop 15mm 4000
HWS Drop 15mm 3500
HWS Drop 15mm 3500
HWS Drop 15mm 3250
HWS Drop 15mm 3250
HWS Drop 15mm 4000
HWS Drop 15mm 3500
HWS Drop 15mm 3500

Dimensions
Item Description
Size Length mm
P-101 EWC
P-101d EWC
P-102 EWC
P-103 EWC
P-103 EWC

P-101d Plain Sink


P-102 Plain Sink
P-103 Plain Sink
P-103 Plain Sink
P-101 Shower
P-102 Shower
P-103 Shower
P-104 Shower

P-101d Sink with board


P-102 Sink with board
P-103 Sink with board
P-104 Sink with board

P-102 Urinal
P-103 Urinal
P-104 Urinal

P-102 Wash Basin (Flat Edge)


P-103 Wash Basin (Flat Edge)
P-103 Wash Basin (Flat Edge)

P-101 Wash Basin (Round Edge)


P-101d Wash Basin (Round Edge)
P-102 Wash Basin (Round Edge)
P-103 Wash Basin (Round Edge)
P-103 Wash Basin (Round Edge)

Dimension
Item Description Type
-

Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
waste

Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
waste

Pipe RWP
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
waste
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe Vent
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
waste

Pipe RWP
Pipe soil
Pipe soil
Pipe soil
Pipe soil
Pipe soil
Pipe soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
waste

Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe RWP
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
waste

Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
waste

Pipe waste HDPE


Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Kitchen drain HDPE

Pipe waste HDPE


Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Kitchen drain HDPE

Pipe waste HDPE


Pipe waste HDPE
Pipe waste HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Kitchen drain HDPE

Pipe waste HDPE


Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Kitchen drain HDPE

Pipe waste HDPE


Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Kitchen drain HDPE

Pipe Kitchen drain HDPE


Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Kitchen drain HDPE

Pipe waste HDPE


Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe waste HDPE
Pipe Kitchen drain HDPE
Pipe Kitchen drain HDPE
Kitchen drain HDPE

Pipe Pressurized line


Pipe Pressurized line
Pipe Pressurized line
Pressurized line

Pipe Pressurized line


Pipe Pressurized line
Pipe Pressurized line
Pipe Pressurized line
Pipe Pressurized line
Pipe Pressurized line
Pipe Pressurized line
Pipe Pressurized line
Pipe Pressurized line
Pipe Pressurized line
Pipe Pressurized line
Pipe Pressurized line
Pipe Pressurized line
Pressurized line

Pipe waste
Pipe waste
Pipe waste
Pipe waste
waste

Pipe Soil
Pipe Soil
Pipe Soil
Soil

Pipe Sewer
Pipe Sewer
Pipe Sewer
Pipe Sewer
Pipe Sewer
Pipe Sewer
Pipe Sewer
Pipe Sewer
Pipe Sewer
Pipe Sewer
Pipe Sewer
Pipe Sewer
Pipe Sewer
Pipe Sewer
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe Soil
Pipe waste
Pipe waste
Pipe waste
Pipe waste
Pipe waste
waste

Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree

Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree

Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree
Bend 45 degree

Bend 45 degree
Bend 45 degree
Bend 45 degree

Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degee
Bend 90 degee
Bend 90 degee
Bend 90 degee
Bend 90 degee
Bend 90 degee

Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree

Bend 90 degree
Bend 90 degree
Bend 90 degree
Bend 90 degree

Bend 90 degree
Bend 90 degree

Reducer
Reducer
Reducer
Reducer
Reducer
Reducer
Reducer

Reducer
Reducer
Reducer
Reducer
Reducer
Reducer
Reducer

Reducer
Reducer
Reducer
Reducer

Reducer
Reducer
Reducer
Reducer
Reducer

Reducer
Reducer
Reducer
Reducer

Reducer
Reducer
Reducer
Reducer
Reducer
Reducer

Reducer
Reducer
Reducer
Reducer
Reducer
Reducer

Reducer
Reducer

Reducer
Reducer

Reducer
Reducer
Reducer
Reducer

Tee Plain Tee


Tee Plain Tee
Tee Plain Tee
Tee Plain Tee
Tee Plain Tee
Tee Plain Tee

Tee Double Y-Tee


Tee Double Y-Tee

Tee Double Y-Tee


Tee Double Y-Tee

Tee Double Y-Tee


Tee Double Y-Tee
Tee Double Y-Tee

Tee Double Y-Tee


Tee Double Y-Tee
Tee Double Y-Tee
Tee Double Y-Tee

Tee Double Y-Tee


Tee Double Y-Tee
Tee Double Y-Tee
Tee Double Y-Tee

Tee Double Y-Tee


Tee Double Y-Tee
Tee Double Y-Tee

Tee Double Y-Tee


Tee Double Y-Tee

Tee Double Y-Tee


Tee Double Y-Tee

Tee Double Y-Tee


Tee Double Y-Tee

Tee Double Y-Tee


Tee Double Y-Tee

Tee Double Y-Tee


Tee Double Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee

Tee Y-Tee
Tee Y-Tee
Tee Y-Tee

Rain water outlet RWO


Rain water outlet RWO

Rain water outlet RWO


Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO
Rain water outlet RWO

Vent Cowl Vent


Vent Cowl Vent

Access Cap Hepseal


Access Cap Hepseal

Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB
Catch Basin CB

Chamber Final inspection FIC-1


Chamber Final inspection FIC-2
Chamber Final inspection FIC-3
Chamber Final inspection FIC-3

Trench Drain Grating


Trench Drain Grating
Trench Drain Grating

Trench Drain Grating


Trench Drain Grating
Trench Drain Grating
Trench Drain Grating
Trench Drain Grating
Trench Drain Grating
Trench Drain Grating

Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO

Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO

Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO

Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO
Cleanout CO

Clean out CO
Clean out CO
Clean out CO
Cleanout CO
Cleanout CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO
Clean out CO

Clean out CO
Clean out CO

Floor Cleanout FCO


Floor Cleanout FCO

Floor Cleanout FCO


Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO
Floor Cleanout FCO

Floor Cleanout FCO


Floor Cleanout FCO
Floor Cleanout FCO

Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD
Floor Drain FD

Floor Drain FD
Floor Drain FD

Floor Trap FT
Floor Trap FT

Fish scale trap


Fish scale trap

Pit Drainage
Pit Drainage

Grease Trap Pit Drainage


Grease Trap Pit Drainage

Gully Trap Dry DGT


Gully Trap Dry DGT-B3
Gully Trap Dry DGT-B4
Gully Trap Dry DGT-B4

Gully Trap GT
Gully Trap GT-1
Gully Trap GT-1

Gully Trap GT-2


Gully Trap GT-3
Gully Trap GT-4
Gully Trap GT-5
Gully Trap GT-6
Gully Trap GT-6

Manhole DMH-4A
Manhole DMH-4C
Manhole DMH
Manhole DMH
Manhole MH-1
Manhole MH-2
Manhole MH-3
Manhole MH-4
Manhole MH-6
Manhole MH-7
Manhole MH-8
Manhole MH-5
Manhole MH-5

Plant Chemical Treatment Plant


Plant Chemical Treatment Plant

Pit Sand Trap


Pit Sand Trap

Pit Sand Trap


Pit Sand Trap
Pit Sand Trap

Tank Collection Tank


Tank Collection Tank

Sump pit Drainage


Sump pit Drainage

Sump pit Drainage


Sump pit Drainage
Sump pit Drainage
Sump pit Drainage
Sump pit Drainage
Sump pit Drainage

Press. Break Manhole PBMH-2


Press. Break Manhole PBMH-1
Press. Break Manhole PBMH-3
Press. Break Manhole PBMH-3

Pump Sump pump 3 L/S


Pump Sump pump 3 L/S
Pump Sump pump 3 L/S
Pump Sump pump 3 L/S
Pump Sump pump 3 L/S
Pump Sump pump 3 L/S
Pump Sump pump 3 L/S
Pipe
Qty. Unit
2,381.99 m
1,157.93 m
648.53 m
419.70 m
172.17 m
118.88 m
45.00 m
51.64 m
91.70 m

159.20 m
20.41 m

2,216.78 m
1,037.05 m
418.47 m
145.87 m
156.22 m
35.49 m

1,693.92 m
1,027.28 m
578.22 m
501.66 m
266.99 m
154.54 m
57.26 m
45.02 m
51.00 m
103.61 m

43.46 m
21.85 m
115.50 m
188.89 m

3,900.15 m
2,112.75 m

Qty. Unit
1 No.
1 No.
1 No.
1 set
1 set
1 set
1 set
1 set
1 No.
1 No.
1 No.
1 No.
1 No.
1 No.
1 No.
2 set
1 set
1 set
1 set

es
Qty. Unit
736 No.
576 No.
299 No.
103 No.
18 No.
10 No.
7 No.
5 No.
8 No.
5 No.
6 No.
4 No.
8 No.
3 No.
1 No.
1 No.
2 No.
1 No.
6 No.
6 No.
1 No.
1 No.
1 No.
1 No.
5 No.
3 No.
1 No.
1 No.
1 No.
198 No.
3 No.
15 No.

e
Dimensions
Total Qty Unit
Size Qty.

32 mm 578.50 m
40 mm 647.77 m
50 mm 256.11 m
75 mm 1,917.14 m
100 mm 3,347.31 m
150 mm 1,109.41 m
200 mm 1,835.30 m

32 mm 176.19 m
40 mm 37.65 m
50 mm 63.63 m
75 mm 29.51 m
100 mm 284.18 m
150 mm 99.74 m
200 mm 325.80 m

75 mm 101.43 m
100 mm 296.46 m

75 mm 11.30
100 mm 14.74
200 mm 235.13

75 mm 339 No.
100 mm 280 No.
150 mm 100 No.
200 mm 45 No.
75 mm 295 No.
100 mm 481 No.
150 mm 35 No.
200 mm 2 No.

75x32 mm 60 No.
75x40 mm 50 No.
75x50 mm 4 No.
100x32 mm 56 No.
100x40 mm 71 No.
100x50 mm 23 No.
150x32 mm 5 No.
150x50 mm 15 No.
200x32 mm 5 No.
200x50 mm 9 No.
75x75x75 mm 14 No.

75x75x75x75mm 1 No.
100x100x50x50mm 2 No.
100x100x75x75mm 2 No.
100x100x100x100mm 11 No.
150x150x75x75 mm 3 No.
150x150x150x150 mm 2 No.
200x200x150x50 mm 1 No.
200x200x200x100 mm 2 No.
200x200x200x150 mm 1 No.
200x200x150x150 mm 1 No.
200x200x200x200 mm 1 No.

75x75x32 mm 60 No.
75x75x40 mm 50 No.
75x75x50 mm 2 No.
75x75x75 mm 103 No.
100x100x32 mm 56 No.
100x100x40 mm 71 No.
100x100x50 mm 21 No.
100x100x75 mm 181 No.
100x100x100 mm 319 No.
150x150x32 mm 5 No.
150x150x50 mm 15 No.
150x150x75 mm 24 No.
150x150x100 mm 24 No.
150x150x150 mm 46 No.
200x200x32 mm 5 No.
200x200x50 mm 8 No.
200x200x75 mm 51 No.
200x200x100 mm 133 No.
200x200x150 mm 40 No.
200x200x200 mm 39 No.

50 mm 8 No.
100 mm 2 No.
150 mm 32 No.

150 mm 32 No.
150 mm 14 No.
150 mm 6 m
300 mm 23.69 m
40 mm 37 No.
50 mm 83 No.
75 mm 134 No.
100 mm 559 No.
150 mm 55 No.
200 mm 45 No.
75 mm 3 No.
100 mm 21 No.
150 mm 56 No.
200 mm 45 No.
75 mm 373 No.
100 mm 4 No.
100 mm 1 No.
450x450 mm 1 No.

400x400x350 mm 2 No.
3000x2000x1500 mm 1 No.
800x800xmm 3 No.
600x600 mm 2 No.
300x300 mm 5 No.
700x700 mm 19 No.
1 No.
600x600x600 mm 1 No.
1000x1000x1000 mm 2 No.
2000x1500x1500 mm 1 No.
1500x1500x2400 mm 1 No.
3000x2000x3000 mm 5 No.
900x900 mm 3 No.
600x600 mm 33 No.
600x600 mm 3 No.
6m Head 12 No.

ly
sions
Similar Floors Qty unit
Length M

46.64 46.64 m
46.64 m

80.71 80.71 m
6.75 6.75 m
87.45 m

26.03 26.03 m
72.52 72.52 m
6.68 6.68 m
21.15 21.15 m
49.99 49.99 m
16.18 16.18 m
1.57 1.57 m
38.97 38.97 m
36.93 36.93 m
19.27 19.27 m
9.10 9.10 m
7.68 7.68 m
2.82 2.82 m
2.95 2.95 m
2.89 2.89 m
2.73 2.73 m
6.37 6.37 m
2.19 2.19 m
13.61 13.61 m
7.87 7.87 m
2.32 2.32 m
2.18 2.18 m
4.35 4.35 m
21.95 21.95 m
5.91 5.91 m
3.01 3.01 m
4.16 4.16 m
15.64 15.64 m
2.03 2.03 m
6.96 6.96 m
0.90 0.90 m
2.76 2.76 m
11.58 11.58 m
2.77 2.77 m
0.89 0.89 m
6.71 6.71 m
2.46 2.46 m
2.91 2.91 m
3.48 3.48 m
27.04 27.04 m
1.99 1.99 m
6.14 6.14 m
6.08 6.08 m
6.14 6.14 m
6.08 6.08 m
6.14 6.14 m
6.08 6.08 m
6.14 6.14 m
6.08 6.08 m
6.14 6.14 m
6.08 6.08 m
6.14 6.14 m
6.08 6.08 m
6.14 6.14 m
6.08 6.08 m
6.08 6.08 m
2.21 2.21 m
2.47 2.47 m
5.68 5.68 m
5.66 5.66 m
6.04 6.04 m
6.05 6.05 m
6.04 6.04 m
6.05 6.05 m
6.04 6.04 m
6.05 6.05 m
6.04 6.04 m
6.05 6.05 m
6.04 6.04 m
6.05 6.05 m
6.04 6.04 m
6.05 6.05 m
6.04 6.04 m
1.82 1.82 m
2.66 2.66 m
6.04 6.04 m
6.05 6.05 m
2.49 2.49 m
4.32 4.32 m
1.83 1.83 m
16.41 16.41 m
5.89 5.89 m
1.94 1.94 m
4.75 4.75 m
3.23 3.23 m
4.71 4.71 m
4.45 4.45 m
4.73 4.73 m
7.54 7.54 m
2.87 2.87 m
3.05 3.05 m
7.05 7.05 m
5.75 5.75 m
6.51 6.51 m
3.23 3.23 m
7.05 7.05 m
5.66 5.66 m
1.65 1.65 m
10.02 10.02 m
8.52 8.52 m
8.84 8.84 m
3.38 3.38 m
2.59 2.59 m
1.89 1.89 m
2.01 2.01 m
1.96 1.96 m
9.22 9.22 m
1.63 1.63 m
0.44 0.44 m
1.68 1.68 m
10.24 10.24 m
1.41 1.41 m
3.97 3.97 m
1.07 1.07 m
5.73 5.73 m
3.08 3.08 m
3.22 3.22 m
0.46 0.46 m
2.67 2.67 m
3.05 3.05 m
3.06 3.06 m
3.13 3.13 m
3.42 3.42 m
2.57 2.57 m
1.26 1.26 m
6.70 6.70 m
6.15 6.15 m
4.64 4.64 m
4.42 4.42 m
12.22 12.22 m
2.74 2.74 m
6.43 6.43 m
5.74 5.74 m
2.45 2.45 m
0.95 0.95 m
1.17 1.17 m
0.95 0.95 m
1.16 1.16 m
0.95 0.95 m
3.78 3.78 m
0.54 0.54 m
3.24 3.24 m
2.98 2.98 m
3.15 3.15 m
22.22 22.22 m
6.67 6.67 m
1.89 1.89 m
6.90 6.90 m
0.80 0.80 m
3.88 3.88 m
0.58 0.58 m
3.68 3.68 m
7.25 7.25 m
0.31 0.31 m
10.42 10.42 m
7.38 7.38 m
3.57 3.57 m
3.81 3.81 m
5.70 5.70 m
3.61 3.61 m
2.88 2.88 m
3.16 3.16 m
1.64 1.64 m
3.13 3.13 m
7.76 7.76 m
2.39 2.39 m
4.79 4.79 m
3.05 3.05 m
4.04 4.04 m
1.41 1.41 m
10.81 10.81 m
3.78 3.78 m
1.41 1.41 m
1.40 1.40 m
1.40 1.40 m
3.38 3.38 m
6.38 6.38 m
2.16 2.16 m
5.67 5.67 m
9.91 9.91 m
4.16 4.16 m
5.65 5.65 m
6.45 6.45 m
3.27 3.27 m
2.97 2.97 m
3.77 3.77 m
3.76 3.76 m
6.70 6.70 m
7.88 7.88 m
5.91 5.91 m
0.39 0.39 m
0.40 0.40 m
1.89 1.89 m
3.90 3.90 m
0.95 0.95 m
3.92 3.92 m
1.47 1.47 m
1.37 1.37 m
0.68 0.68 m
0.67 0.67 m
0.70 0.70 m
2.55 2.55 m
3.64 3.64 m
1.01 1.01 m
4.42 4.42 m
3.84 3.84 m
9.86 9.86 m
0.89 0.89 m
0.98 0.98 m
2.09 2.09 m
1.25 1.25 m
4.55 4.55 m
1.54 1.54 m
2.04 2.04 m
0.67 0.67 m
5.66 5.66 m
9.28 9.28 m
4.46 4.46 m
3.37 3.37 m
10.67 10.67 m
7.90 7.90 m
4.88 4.88 m
4.61 4.61 m
2.20 2.20 m
14.24 14.24 m
6.23 6.23 m
3.27 3.27 m
2.32 2.32 m
13.02 13.02 m
0.64 0.64 m
9.28 9.28 m
2.99 2.99 m
10.55 10.55 m
5.31 5.31 m
1.57 1.57 m
2.11 2.11 m
1.24 1.24 m
3.17 3.17 m
6.39 6.39 m
1.19 1.19 m
4.60 4.60 m
4.45 4.45 m
4.44 4.44 m
2.40 2.40 m
1.89 1.89 m
5.52 5.52 m
5.53 5.53 m
8.93 8.93 m
8.22 8.22 m
5.06 5.06 m
5.05 5.05 m
2.64 2.64 m
0.85 0.85 m
0.65 0.65 m
15.25 15.25 m
2.69 2.69 m
3.95 3.95 m
6.39 6.39 m
2.09 2.09 m
1.03 1.03 m
2.06 2.06 m
2.27 2.27 m
1.67 1.67 m
- m
2.06 2.06 m
1.32 1.32 m
2.53 2.53 m
3.93 3.93 m
15.50 15.50 m
1.26 1.26 m
4.43 4.43 m
3.36 3.36 m
7.60 7.60 m
14.04 14.04 m
4.05 4.05 m
1.76 1.76 m
6.14 6.14 m
6.08 6.08 m
6.14 6.14 m
6.08 6.08 m
6.14 6.14 m
6.08 6.08 m
6.14 6.14 m
6.08 6.08 m
6.14 6.14 m
6.08 6.08 m
6.14 6.14 m
6.08 6.08 m
6.14 6.14 m
6.08 6.08 m
4.92 4.92 m
4.92 4.92 m
7.05 7.05 m
5.66 5.66 m
1.65 1.65 m
3.23 3.23 m
3.05 3.05 m
7.03 7.03 m
5.36 5.36 m
6.51 6.51 m
6.04 6.04 m
6.05 6.05 m
6.04 6.04 m
6.05 6.05 m
6.04 6.04 m
6.05 6.05 m
6.04 6.04 m
6.05 6.05 m
6.04 6.04 m
6.05 6.05 m
6.04 6.04 m
6.05 6.05 m
5.67 5.67 m
1.82 1.82 m
2.66 2.66 m
2.87 2.87 m
4.71 4.71 m
4.45 4.45 m
4.73 4.73 m
7.54 7.54 m
3.06 3.06 m
3.28 3.28 m
4.05 4.05 m
8.64 8.64 m
10.43 10.43 m
2.87 2.87 m
1.58 1.58 m
3.29 3.29 m
5.22 5.22 m
7.17 7.17 m
4.30 4.30 m
5.30 5.30 m
2.94 2.94 m
12.22 12.22 m
15.65 15.65 m
3.25 3.25 m
6.63 6.63 m
5.62 5.62 m
6.47 6.47 m
6.46 6.46 m
12.04 12.04 m
5.86 5.86 m
7.21 7.21 m
4.50 4.50 m
4.43 4.43 m
2.71 2.71 m
1.79 1.79 m
6.38 6.38 m
7.81 7.81 m
5.39 5.39 m
4.56 4.56 m
8.98 8.98 m
3.56 3.56 m
4.04 4.04 m
3.87 3.87 m
4.70 4.70 m
3.74 3.74 m
7.78 7.78 m
7.46 7.46 m
4.40 4.40 m
4.15 4.15 m
14.77 14.77 m
6.44 6.44 m
4.53 4.53 m
7.86 7.86 m
2.26 2.26 m
8.79 8.79 m
1.48 1.48 m
2.13 2.13 m
1.02 1.02 m
7.89 7.89 m
5.01 5.01 m
8.52 8.52 m
2.19 2.19 m
11.67 11.67 m
9.55 9.55 m
1.15 1.15 m
0.71 0.71 m
2.15 2.15 m
1.29 1.29 m
0.34 0.34 m
5.09 5.09 m
5.81 5.81 m
8.72 8.72 m
0.85 0.85 m
3.26 3.26 m
8.27 8.27 m
5.30 5.30 m
3.28 3.28 m
1.36 1.36 m
4.38 4.38 m
2.52 2.52 m
1.01 1.01 m
1.16 1.16 m
2.71 2.71 m
7.18 7.18 m
5.33 5.33 m
3.62 3.62 m
1.57 1.57 m
4.73 4.73 m
2.24 2.24 m
4.22 4.22 m
1.96 1.96 m
1.99 1.99 m
1.72 1.72 m
2.76 2.76 m
1.40 1.40 m
7.56 7.56 m
4.77 4.77 m
6.23 6.23 m
6.77 6.77 m
3.29 3.29 m
4.29 4.29 m
2.21 2.21 m
12.16 12.16 m
2.11 2.11 m
3.54 3.54 m
4.64 4.64 m
2.81 2.81 m
3.27 3.27 m
2.54 2.54 m
4.44 4.44 m
2.00 2.00 m
7.71 7.71 m
1.10 1.10 m
2.64 2.64 m
8.06 8.06 m
2.94 2.94 m
3.92 3.92 m
7.79 7.79 m
6.34 6.34 m
3.66 3.66 m
9.08 9.08 m
2.40 2.40 m
10.94 10.94 m
3.19 3.19 m
5.93 5.93 m
10.20 10.20 m
0.53 0.53 m
0.58 0.58 m
4.56 4.56 m
0.22 0.22 m
3.17 3.17 m
6.58 6.58 m
2.38 2.38 m
3.33 3.33 m
0.60 0.60 m
3.92 3.92 m
2,381.99 m

32.80 32.80 m
6.49 6.49 m
6.15 6.15 m
0.57 0.57 m
0.59 0.59 m
0.57 0.57 m
0.59 0.59 m
0.57 0.57 m
0.59 0.59 m
0.57 0.57 m
0.59 0.59 m
0.57 0.57 m
0.59 0.59 m
0.57 0.57 m
0.59 0.59 m
0.57 0.57 m
0.59 0.59 m
0.59 0.59 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.57 0.57 m
0.58 0.58 m
0.58 0.58 m
0.59 0.59 m
2.33 2.33 m
3.36 3.36 m
4.70 4.70 m
4.34 4.34 m
5.95 5.95 m
10.54 10.54 m
8.89 8.89 m
9.61 9.61 m
7.30 7.30 m
14.84 14.84 m
6.45 6.45 m
11.04 11.04 m
9.16 9.16 m
3.43 3.43 m
9.28 9.28 m
5.50 5.50 m
6.75 6.75 m
12.18 12.18 m
7.96 7.96 m
6.63 6.63 m
3.55 3.55 m
8.38 8.38 m
10.07 10.07 m
1.07 1.07 m
7.96 7.96 m
9.64 9.64 m
9.48 9.48 m
0.39 0.39 m
0.40 0.40 m
7.45 7.45 m
3.15 3.15 m
8.97 8.97 m
3.90 3.90 m
1.08 1.08 m
2.47 2.47 m
3.31 3.31 m
2.34 2.34 m
0.57 0.57 m
0.59 0.59 m
0.57 0.57 m
0.59 0.59 m
0.57 0.57 m
0.59 0.59 m
0.57 0.57 m
0.59 0.59 m
0.57 0.57 m
0.59 0.59 m
0.57 0.57 m
0.59 0.59 m
0.57 0.57 m
0.59 0.59 m
0.59 0.59 m
0.77 0.77 m
3.36 3.36 m
4.70 4.70 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.57 0.57 m
9.56 9.56 m
3.94 3.94 m
4.87 4.87 m
4.81 4.81 m
6.57 6.57 m
2.56 2.56 m
10.42 10.42 m
4.18 4.18 m
0.40 0.40 m
5.37 5.37 m
9.27 9.27 m
3.46 3.46 m
11.53 11.53 m
17.22 17.22 m
8.20 8.20 m
16.47 16.47 m
9.37 9.37 m
4.99 4.99 m
8.17 8.17 m
3.52 3.52 m
4.62 4.62 m
5.26 5.26 m
5.12 5.12 m
3.38 3.38 m
3.35 3.35 m
10.21 10.21 m
2.62 2.62 m
12.87 12.87 m
5.41 5.41 m
2.47 2.47 m
1.81 1.81 m
1.68 1.68 m
2.11 2.11 m
2.18 2.18 m
1.83 1.83 m
1.68 1.68 m
2.12 2.12 m
2.17 2.17 m
1.81 1.81 m
1.69 1.69 m
0.45 0.45 m
2.19 2.19 m
1.69 1.69 m
1.81 1.81 m
1.69 1.69 m
1.84 1.84 m
1.65 1.65 m
1.47 1.47 m
1.68 1.68 m
2.09 2.09 m
2.22 2.22 m
1.83 1.83 m
1.68 1.68 m
1.83 1.83 m
2.11 2.11 m
2.18 2.18 m
1.67 1.67 m
1.82 1.82 m
2.10 2.10 m
2.15 2.15 m
10.06 10.06 m
3.50 3.50 m
4.72 4.72 m
3.31 3.31 m
7.59 7.59 m
2.89 2.89 m
5.66 5.66 m
1.59 1.59 m
7.12 7.12 m
3.25 3.25 m
10.68 10.68 m
3.15 3.15 m
6.54 6.54 m
4.51 4.51 m
2.17 2.17 m
1.78 1.78 m
2.04 2.04 m
2.21 2.21 m
1.82 1.82 m
1.66 1.66 m
2.04 2.04 m
2.21 2.21 m
1.82 1.82 m
1.66 1.66 m
2.04 2.04 m
2.21 2.21 m
1.82 1.82 m
1.66 1.66 m
2.04 2.04 m
2.21 2.21 m
1.82 1.82 m
1.66 1.66 m
2.04 2.04 m
2.21 2.21 m
1.82 1.82 m
1.66 1.66 m
2.04 2.04 m
2.21 2.21 m
1.82 1.82 m
1.66 1.66 m
2.08 2.08 m
0.74 0.74 m
0.40 0.40 m
1.08 1.08 m
0.82 0.82 m
7.86 7.86 m
5.56 5.56 m
4.44 4.44 m
8.64 8.64 m
2.65 2.65 m
3.14 3.14 m
4.14 4.14 m
4.96 4.96 m
5.01 5.01 m
8.19 8.19 m
4.13 4.13 m
1.28 1.28 m
5.84 5.84 m
2.20 2.20 m
2.40 2.40 m
5.47 5.47 m
11.51 11.51 m
12.48 12.48 m
5.07 5.07 m
5.10 5.10 m
4.27 4.27 m
4.47 4.47 m
5.30 5.30 m
5.50 5.50 m
5.80 5.80 m
11.64 11.64 m
6.70 6.70 m
7.73 7.73 m
4.82 4.82 m
2.49 2.49 m
5.07 5.07 m
29.62 29.62 m
1.11 1.11 m
3.50 3.50 m
3.52 3.52 m
6.63 6.63 m
6.16 6.16 m
3.64 3.64 m
3.40 3.40 m
1.33 1.33 m
1.47 1.47 m
2.77 2.77 m
2.14 2.14 m
1.40 1.40 m
2.03 2.03 m
1.51 1.51 m
5.24 5.24 m
2.04 2.04 m
1.40 1.40 m
5.67 5.67 m
21.03 21.03 m
3.01 3.01 m
1.77 1.77 m
2.27 2.27 m
3.27 3.27 m
3.27 3.27 m
4.78 4.78 m
4.25 4.25 m
3.06 3.06 m
4.23 4.23 m
3.11 3.11 m
10.08 10.08 m
5.84 5.84 m
1.35 1.35 m
7.96 7.96 m
3.20 3.20 m
5.74 5.74 m
3.12 3.12 m
9.52 9.52 m
5.53 5.53 m
0.40 0.40 m
6.31 6.31 m
10.56 10.56 m
4.44 4.44 m
12.30 12.30 m
0.68 0.68 m
0.69 0.69 m
0.68 0.68 m
3.74 3.74 m
0.71 0.71 m
0.87 0.87 m
3.91 3.91 m
2.74 2.74 m
2.50 2.50 m
3.89 3.89 m
4.73 4.73 m
3.50 3.50 m
5.65 5.65 m
1.10 1.10 m
0.69 0.69 m
0.95 0.95 m
0.80 0.80 m
3.35 3.35 m
7.85 7.85 m
1,157.93 m

25.13 25.13 m
3.47 3.47 m
3.17 3.17 m
25.62 25.62 m
11.80 11.80 m
11.25 11.25 m
9.29 9.29 m
16.82 16.82 m
29.25 29.25 m
12.94 12.94 m
9.19 9.19 m
8.48 8.48 m
15.22 15.22 m
8.08 8.08 m
10.87 10.87 m
21.62 21.62 m
13.49 13.49 m
25.62 25.62 m
11.80 11.80 m
11.25 11.25 m
9.30 9.30 m
20.00 20.00 m
20.15 20.15 m
9.95 9.95 m
16.79 16.79 m
22.49 22.49 m
8.35 8.35 m
0.55 0.55 m
10.26 10.26 m
2.31 2.31 m
2.62 2.62 m
2.88 2.88 m
2.62 2.62 m
2.88 2.88 m
2.62 2.62 m
2.88 2.88 m
2.62 2.62 m
2.88 2.88 m
2.62 2.62 m
2.88 2.88 m
2.62 2.62 m
2.88 2.88 m
0.58 0.58 m
2.62 2.62 m
2.90 2.90 m
2.60 2.60 m
2.90 2.90 m
2.61 2.61 m
2.90 2.90 m
2.60 2.60 m
2.90 2.90 m
2.62 2.62 m
2.90 2.90 m
2.61 2.61 m
2.90 2.90 m
2.62 2.62 m
2.90 2.90 m
2.61 2.61 m
8.09 8.09 m
15.46 15.46 m
15.45 15.45 m
14.81 14.81 m
7.70 7.70 m
9.84 9.84 m
5.63 5.63 m
6.39 6.39 m
5.26 5.26 m
6.37 6.37 m
14.69 14.69 m
1.90 1.90 m
3.01 3.01 m
1.35 1.35 m
2.39 2.39 m
8.97 8.97 m
13.26 13.26 m
17.39 17.39 m
9.96 9.96 m
1.27 1.27 m
648.53 m

20.90 20.90 m
12.99 12.99 m
7.52 7.52 m
5.49 5.49 m
5.56 5.56 m
9.01 9.01 m
20.96 20.96 m
18.64 18.64 m
3.13 3.13 m
22.16 22.16 m
22.63 22.63 m
7.52 7.52 m
5.49 5.49 m
5.56 5.56 m
25.18 25.18 m
9.29 9.29 m
22.53 22.53 m
22.58 22.58 m
16.55 16.55 m
17.68 17.68 m
9.29 9.29 m
10.02 10.02 m
4.51 4.51 m
26.83 26.83 m
21.10 21.10 m
7.20 7.20 m
10.17 10.17 m
8.41 8.41 m
2.73 2.73 m
8.73 8.73 m
21.95 21.95 m
7.38 7.38 m
419.70 m
18.96 18.96 m
7.74 7.74 m
16.19 16.19 m
21.18 21.18 m
13.71 13.71 m
5.96 5.96 m
7.74 7.74 m
7.51 7.51 m
7.45 7.45 m
6.53 6.53 m
24.69 24.69 m
15.95 15.95 m
10.78 10.78 m
7.77 7.77 m
172.17 m

13.31 13.31 m
13.31 13.31 m
9.24 9.24 m
38.37 38.37 m
13.32 13.32 m
21.86 21.86 m
9.48 9.48 m
118.88 m

14.36 14.36 m
0.93 0.93 m
14.36 14.36 m
0.98 0.98 m
14.37 14.37 m
45.00 m

92.47 92.47 m
1.83 1.83 m
6.51 6.51 m
1.17 1.17 m
1.17 1.17 m
1.56 1.56 m
0.96 0.96 m
14.29 14.29 m
15.00 15.00 m
2.43 2.43 m
2.39 2.39 m
3.00 3.00 m
8.45 8.45 m
2.32 2.32 m
5.66 5.66 m
159.20 m
18.41 18.41 m
2.00 2.00 m
20.41 m

9.10 9.10 m
0.73 0.73 m
2.78 2.78 m
2.78 2.78 m
2.78 2.78 m
2.78 2.78 m
10.60 10.60 m
4.44 4.44 m
5.01 5.01 m
58.74 58.74 m
2.51 2.51 m
1.66 1.66 m
1.66 1.66 m
1.66 1.66 m
11.05 11.05 m
15.29 15.29 m
22.15 22.15 m
1.99 1.99 m
3.32 3.32 m
9.10 9.10 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
2.52 2.52 m
2.51 2.51 m
3.68 3.68 m
3.68 3.68 m
3.84 3.84 m
3.78 3.78 m
3.84 3.84 m
3.78 3.78 m
3.84 3.84 m
3.78 3.78 m
3.84 3.84 m
3.78 3.78 m
3.84 3.84 m
3.78 3.78 m
3.84 3.84 m
3.78 3.78 m
3.84 3.84 m
3.60 3.60 m
3.84 3.84 m
3.78 3.78 m
2.46 2.46 m
4.85 4.85 m
3.71 3.71 m
20.76 20.76 m
8.06 8.06 m
2.19 2.19 m
4.64 4.64 m
4.64 4.64 m
8.45 8.45 m
0.77 0.77 m
5.62 5.62 m
4.37 4.37 m
3.76 3.76 m
4.43 4.43 m
4.40 4.40 m
6.18 6.18 m
2.34 2.34 m
2.27 2.27 m
2.25 2.25 m
7.58 7.58 m
9.50 9.50 m
3.60 3.60 m
7.46 7.46 m
5.34 5.34 m
1.60 1.60 m
1.77 1.77 m
6.07 6.07 m
1.87 1.87 m
10.56 10.56 m
1.86 1.86 m
1.51 1.51 m
0.48 0.48 m
0.75 0.75 m
1.67 1.67 m
10.82 10.82 m
4.97 4.97 m
6.28 6.28 m
6.70 6.70 m
0.94 0.94 m
3.41 3.41 m
2.90 2.90 m
2.86 2.86 m
10.65 10.65 m
0.88 0.88 m
1.89 1.89 m
1.81 1.81 m
23.38 23.38 m
5.19 5.19 m
2.88 2.88 m
2.87 2.87 m
1.78 1.78 m
0.99 0.99 m
16.57 16.57 m
6.12 6.12 m
2.56 2.56 m
1.26 1.26 m
1.25 1.25 m
1.26 1.26 m
1.27 1.27 m
1.29 1.29 m
14.27 14.27 m
2.86 2.86 m
3.27 3.27 m
3.30 3.30 m
1.27 1.27 m
5.63 5.63 m
1.29 1.29 m
16.55 16.55 m
7.13 7.13 m
0.47 0.47 m
3.75 3.75 m
2.82 2.82 m
7.34 7.34 m
0.77 0.77 m
5.63 5.63 m
4.22 4.22 m
2.63 2.63 m
12.71 12.71 m
3.20 3.20 m
6.35 6.35 m
3.27 3.27 m
3.24 3.24 m
5.57 5.57 m
14.64 14.64 m
9.99 9.99 m
2.57 2.57 m
0.91 0.91 m
0.92 0.92 m
1.92 1.92 m
7.31 7.31 m
7.30 7.30 m
4.42 4.42 m
3.43 3.43 m
3.34 3.34 m
7.01 7.01 m
2.01 2.01 m
1.27 1.27 m
19.80 19.80 m
4.22 4.22 m
2.06 2.06 m
3.92 3.92 m
8.47 8.47 m
3.40 3.40 m
6.42 6.42 m
8.44 8.44 m
10.54 10.54 m
1.74 1.74 m
6.11 6.11 m
2.22 2.22 m
2.61 2.61 m
1.64 1.64 m
1.60 1.60 m
1.58 1.58 m
3.45 3.45 m
0.72 0.72 m
20.52 20.52 m
2.71 2.71 m
2.13 2.13 m
6.70 6.70 m
2.14 2.14 m
0.72 0.72 m
0.72 0.72 m
4.05 4.05 m
4.06 4.06 m
4.96 4.96 m
4.52 4.52 m
3.62 3.62 m
16.62 16.62 m
3.29 3.29 m
0.97 0.97 m
2.15 2.15 m
3.34 3.34 m
1.00 1.00 m
1.39 1.39 m
1.40 1.40 m
2.36 2.36 m
11.48 11.48 m
4.50 4.50 m
2.64 2.64 m
9.11 9.11 m
1.50 1.50 m
1.51 1.51 m
1.51 1.51 m
19.71 19.71 m
0.81 0.81 m
1.53 1.53 m
3.95 3.95 m
3.31 3.31 m
12.82 12.82 m
8.41 8.41 m
7.22 7.22 m
13.88 13.88 m
1.78 1.78 m
2.44 2.44 m
3.16 3.16 m
14.18 14.18 m
14.10 14.10 m
2.58 2.58 m
2.57 2.57 m
3.55 3.55 m
1.78 1.78 m
2.85 2.85 m
8.73 8.73 m
2.09 2.09 m
2.23 2.23 m
4.37 4.37 m
1.27 1.27 m
4.79 4.79 m
12.79 12.79 m
3.92 3.92 m
4.55 4.55 m
3.91 3.91 m
3.91 3.91 m
1.13 1.13 m
2.22 2.22 m
4.64 4.64 m
2.32 2.32 m
3.86 3.86 m
5.51 5.51 m
1.41 1.41 m
1.30 1.30 m
15.18 15.18 m
7.16 7.16 m
7.29 7.29 m
5.67 5.67 m
0.72 0.72 m
7.92 7.92 m
2.09 2.09 m
1.04 1.04 m
2.37 2.37 m
2.84 2.84 m
10.29 10.29 m
7.48 7.48 m
2.14 2.14 m
1.21 1.21 m
4.34 4.34 m
13.85 13.85 m
13.16 13.16 m
6.39 6.39 m
0.76 0.76 m
4.75 4.75 m
3.35 3.35 m
0.70 0.70 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.80 3.80 m
3.65 3.65 m
3.64 3.64 m
4.64 4.64 m
4.64 4.64 m
7.58 7.58 m
2.27 2.27 m
7.98 7.98 m
0.77 0.77 m
5.62 5.62 m
2.25 2.25 m
3.84 3.84 m
3.78 3.78 m
3.84 3.84 m
3.78 3.78 m
3.84 3.84 m
3.78 3.78 m
3.84 3.84 m
3.78 3.78 m
3.84 3.84 m
3.78 3.78 m
3.84 3.84 m
3.78 3.78 m
3.51 3.51 m
3.60 3.60 m
2.34 2.34 m
3.76 3.76 m
4.43 4.43 m
4.40 4.40 m
6.18 6.18 m
2.44 2.44 m
1.80 1.80 m
16.71 16.71 m
5.69 5.69 m
3.49 3.49 m
7.60 7.60 m
2.38 2.38 m
1.60 1.60 m
5.96 5.96 m
10.74 10.74 m
26.22 26.22 m
2.54 2.54 m
0.56 0.56 m
1.29 1.29 m
7.85 7.85 m
5.36 5.36 m
6.74 6.74 m
12.36 12.36 m
5.39 5.39 m
5.16 5.16 m
21.73 21.73 m
2.60 2.60 m
4.83 4.83 m
3.33 3.33 m
4.81 4.81 m
4.65 4.65 m
4.96 4.96 m
4.59 4.59 m
1.98 1.98 m
8.74 8.74 m
8.00 8.00 m
6.70 6.70 m
9.95 9.95 m
3.76 3.76 m
2.31 2.31 m
4.99 4.99 m
2.42 2.42 m
2.71 2.71 m
11.27 11.27 m
5.56 5.56 m
4.15 4.15 m
16.84 16.84 m
6.31 6.31 m
10.48 10.48 m
6.13 6.13 m
13.29 13.29 m
2.45 2.45 m
12.37 12.37 m
5.49 5.49 m
1.44 1.44 m
1.87 1.87 m
2.82 2.82 m
3.92 3.92 m
4.75 4.75 m
2.19 2.19 m
7.17 7.17 m
0.83 0.83 m
0.82 0.82 m
4.75 4.75 m
3.15 3.15 m
1.84 1.84 m
1.82 1.82 m
1.11 1.11 m
7.29 7.29 m
3.36 3.36 m
5.14 5.14 m
12.73 12.73 m
15.46 15.46 m
4.13 4.13 m
3.88 3.88 m
16.78 16.78 m
3.57 3.57 m
5.35 5.35 m
11.22 11.22 m
1.20 1.20 m
13.41 13.41 m
3.13 3.13 m
10.67 10.67 m
5.35 5.35 m
3.19 3.19 m
4.92 4.92 m
1.68 1.68 m
2.38 2.38 m
7.18 7.18 m
11.98 11.98 m
4.88 4.88 m
5.57 5.57 m
9.62 9.62 m
8.78 8.78 m
4.43 4.43 m
8.42 8.42 m
2.21 2.21 m
6.25 6.25 m
1.29 1.29 m
1.16 1.16 m
2.76 2.76 m
7.49 7.49 m
3.37 3.37 m
6.00 6.00 m
8.15 8.15 m
3.99 3.99 m
4.73 4.73 m
3.81 3.81 m
4.21 4.21 m
3.06 3.06 m
3.09 3.09 m
11.56 11.56 m
4.29 4.29 m
3.08 3.08 m
1.05 1.05 m
4.45 4.45 m
7.71 7.71 m
3.27 3.27 m
5.39 5.39 m
29.57 29.57 m
4.47 4.47 m
2.91 2.91 m
1.51 1.51 m
3.54 3.54 m
2.92 2.92 m
1.10 1.10 m
2.89 2.89 m
0.84 0.84 m
14.74 14.74 m
9.78 9.78 m
9.81 9.81 m
3.81 3.81 m
0.64 0.64 m
2,216.78 m

53.90 53.90 m
14.90 14.90 m
18.25 18.25 m
28.16 28.16 m
8.66 8.66 m
17.33 17.33 m
29.27 29.27 m
4.18 4.18 m
11.40 11.40 m
12.15 12.15 m
8.41 8.41 m
9.84 9.84 m
14.90 14.90 m
9.91 9.91 m
27.28 27.28 m
4.50 4.50 m
5.04 5.04 m
8.06 8.06 m
15.34 15.34 m
21.20 21.20 m
7.94 7.94 m
3.80 3.80 m
3.81 3.81 m
3.80 3.80 m
3.81 3.81 m
3.80 3.80 m
3.81 3.81 m
3.80 3.80 m
3.81 3.81 m
3.80 3.80 m
3.81 3.81 m
3.80 3.80 m
3.81 3.81 m
3.77 3.77 m
3.61 3.61 m
5.59 5.59 m
8.45 8.45 m
0.75 0.75 m
2.21 2.21 m
2.35 2.35 m
6.20 6.20 m
2.50 2.50 m
4.39 4.39 m
3.75 3.75 m
4.46 4.46 m
5.36 5.36 m
3.78 3.78 m
3.64 3.64 m
3.78 3.78 m
3.77 3.77 m
3.78 3.78 m
3.77 3.77 m
3.78 3.78 m
3.64 3.64 m
3.78 3.78 m
3.79 3.79 m
3.78 3.78 m
3.77 3.77 m
3.78 3.78 m
3.78 3.78 m
3.78 3.78 m
4.63 4.63 m
2.31 2.31 m
7.57 7.57 m
4.62 4.62 m
28.04 28.04 m
1.17 1.17 m
15.43 15.43 m
9.20 9.20 m
9.22 9.22 m
15.50 15.50 m
1.63 1.63 m
16.75 16.75 m
2.56 2.56 m
2.27 2.27 m
13.21 13.21 m
3.15 3.15 m
1.30 1.30 m
5.46 5.46 m
4.38 4.38 m
1.98 1.98 m
4.38 4.38 m
8.70 8.70 m
0.14 0.14 m
0.76 0.76 m
13.02 13.02 m
1.76 1.76 m
9.80 9.80 m
13.70 13.70 m
3.33 3.33 m
10.35 10.35 m
34.55 34.55 m
1.00 1.00 m
1.01 1.01 m
1.01 1.01 m
1.02 1.02 m
1.01 1.01 m
6.08 6.08 m
1.01 1.01 m
2.74 2.74 m
2.80 2.80 m
4.20 4.20 m
3.30 3.30 m
2.59 2.59 m
4.72 4.72 m
5.43 5.43 m
5.42 5.42 m
4.50 4.50 m
2.35 2.35 m
2.35 2.35 m
14.52 14.52 m
4.57 4.57 m
0.60 0.60 m
6.04 6.04 m
4.62 4.62 m
6.07 6.07 m
2.46 2.46 m
6.01 6.01 m
0.18 0.18 m
2.15 2.15 m
2.52 2.52 m
1.75 1.75 m
1.89 1.89 m
4.28 4.28 m
5.39 5.39 m
5.38 5.38 m
2.53 2.53 m
4.88 4.88 m
12.30 12.30 m
4.10 4.10 m
14.13 14.13 m
7.01 7.01 m
9.80 9.80 m
5.89 5.89 m
5.85 5.85 m
8.85 8.85 m
9.04 9.04 m
1.52 1.52 m
1.52 1.52 m
7.55 7.55 m
3.96 3.96 m
2.38 2.38 m
4.23 4.23 m
2.31 2.31 m
4.70 4.70 m
2.99 2.99 m
5.29 5.29 m
5.88 5.88 m
8.00 8.00 m
5.40 5.40 m
6.12 6.12 m
4.94 4.94 m
6.51 6.51 m
4.25 4.25 m
7.72 7.72 m
2.22 2.22 m
1.28 1.28 m
6.00 6.00 m
1,037.05 m

8.46 8.46 m
29.83 29.83 m
16.80 16.80 m
39.76 39.76 m
13.82 13.82 m
22.37 22.37 m
29.83 29.83 m
32.15 32.15 m
24.00 24.00 m
30.40 30.40 m
27.91 27.91 m
19.15 19.15 m
18.28 18.28 m
16.72 16.72 m
8.69 8.69 m
17.35 17.35 m
5.94 5.94 m
12.93 12.93 m
7.19 7.19 m
5.03 5.03 m
26.86 26.86 m
413.47 m

12.72 12.72 m
13.68 13.68 m
12.72 12.72 m
6.62 6.62 m
37.75 37.75 m
19.86 19.86 m
10.63 10.63 m
8.17 8.17 m
15.05 15.05 m
8.65 8.65 m
145.87 m

45.14 45.14 m
7.26 7.26 m
14.63 14.63 m
3.87 3.87 m
42.08 42.08 m
14.63 14.63 m
0.64 0.64 m
9.12 9.12 m
2.12 2.12 m
12.48 12.48 m
151.97 m

35.49 35.49 m
35.49 m

46.00 46.00 m
46.00 m

23.23 23.23 m
57.44 57.44 m
18.69 18.69 m
99.36 m

0.99 0.99 m
0.79 0.79 m
2.99 2.99 m
2.99 2.99 m
2.99 2.99 m
2.99 2.99 m
12.22 12.22 m
4.69 4.69 m
4.98 4.98 m
13.70 13.70 m
1.98 1.98 m
1.98 1.98 m
1.98 1.98 m
2.86 2.86 m
12.99 12.99 m
1.85 1.85 m
0.98 0.98 m
6.41 6.41 m
4.59 4.59 m
6.41 6.41 m
4.59 4.59 m
6.41 6.41 m
4.59 4.59 m
6.41 6.41 m
4.59 4.59 m
6.41 6.41 m
4.59 4.59 m
6.41 6.41 m
4.59 4.59 m
6.41 6.41 m
4.59 4.59 m
4.59 4.59 m
1.69 1.69 m
1.69 1.69 m
1.69 1.69 m
1.69 1.69 m
1.69 1.69 m
1.69 1.69 m
1.69 1.69 m
1.69 1.69 m
2.37 2.37 m
2.60 2.60 m
5.97 5.97 m
5.96 5.96 m
6.32 6.32 m
6.33 6.33 m
6.32 6.32 m
6.33 6.33 m
6.32 6.32 m
6.33 6.33 m
6.32 6.32 m
6.33 6.33 m
6.32 6.32 m
6.33 6.33 m
6.32 6.32 m
6.33 6.33 m
6.32 6.32 m
4.81 4.81 m
6.32 6.32 m
6.33 6.33 m
2.42 2.42 m
8.31 8.31 m
4.04 4.04 m
1.90 1.90 m
5.17 5.17 m
2.03 2.03 m
4.93 4.93 m
15.46 15.46 m
3.00 3.00 m
5.77 5.77 m
3.09 3.09 m
4.82 4.82 m
6.90 6.90 m
3.40 3.40 m
2.97 2.97 m
8.87 8.87 m
2.81 2.81 m
6.33 6.33 m
6.64 6.64 m
0.88 0.88 m
0.68 0.68 m
5.24 5.24 m
1.70 1.70 m
0.84 0.84 m
8.09 8.09 m
2.65 2.65 m
3.28 3.28 m
2.23 2.23 m
7.46 7.46 m
1.91 1.91 m
1.90 1.90 m
2.03 2.03 m
1.43 1.43 m
4.26 4.26 m
2.51 2.51 m
9.75 9.75 m
6.15 6.15 m
3.06 3.06 m
3.11 3.11 m
3.03 3.03 m
1.42 1.42 m
3.11 3.11 m
3.25 3.25 m
- - m
13.94 13.94 m
2.81 2.81 m
0.78 0.78 m
2.74 2.74 m
7.18 7.18 m
1.34 1.34 m
1.07 1.07 m
1.34 1.34 m
1.09 1.09 m
1.34 1.34 m
3.13 3.13 m
10.59 10.59 m
2.34 2.34 m
3.12 3.12 m
3.34 3.34 m
0.71 0.71 m
3.35 3.35 m
1.90 1.90 m
6.43 6.43 m
1.47 1.47 m
1.79 1.79 m
6.55 6.55 m
6.49 6.49 m
1.53 1.53 m
2.89 2.89 m
3.29 3.29 m
3.87 3.87 m
3.96 3.96 m
12.35 12.35 m
1.45 1.45 m
1.25 1.25 m
5.06 5.06 m
2.95 2.95 m
2.44 2.44 m
1.82 1.82 m
3.54 3.54 m
1.56 1.56 m
9.82 9.82 m
3.11 3.11 m
3.92 3.92 m
1.56 1.56 m
1.55 1.55 m
1.57 1.57 m
6.01 6.01 m
5.68 5.68 m
3.98 3.98 m
7.16 7.16 m
2.04 2.04 m
3.19 3.19 m
2.67 2.67 m
1.46 1.46 m
1.66 1.66 m
1.64 1.64 m
1.62 1.62 m
4.44 4.44 m
4.66 4.66 m
1.82 1.82 m
0.68 0.68 m
0.70 0.70 m
5.97 5.97 m
11.01 11.01 m
3.04 3.04 m
1.77 1.77 m
3.37 3.37 m
4.67 4.67 m
3.86 3.86 m
1.51 1.51 m
1.20 1.20 m
2.76 2.76 m
3.72 3.72 m
2.08 2.08 m
4.15 4.15 m
2.43 2.43 m
1.59 1.59 m
4.41 4.41 m
1.17 1.17 m
2.78 2.78 m
3.76 3.76 m
5.24 5.24 m
1.64 1.64 m
2.01 2.01 m
5.95 5.95 m
8.47 8.47 m
11.54 11.54 m
5.03 5.03 m
5.07 5.07 m
2.01 2.01 m
2.28 2.28 m
4.83 4.83 m
8.69 8.69 m
4.82 4.82 m
4.38 4.38 m
4.39 4.39 m
1.45 1.45 m
7.06 7.06 m
6.03 6.03 m
3.39 3.39 m
3.41 3.41 m
3.08 3.08 m
1.70 1.70 m
10.30 10.30 m
2.01 2.01 m
1.95 1.95 m
1.92 1.92 m
7.09 7.09 m
5.46 5.46 m
8.75 8.75 m
4.42 4.42 m
3.18 3.18 m
5.61 5.61 m
4.95 4.95 m
2.53 2.53 m
2.82 2.82 m
3.02 3.02 m
1.96 1.96 m
1.00 1.00 m
5.53 5.53 m
1.89 1.89 m
0.68 0.68 m
1.22 1.22 m
4.83 4.83 m
3.26 3.26 m
13.67 13.67 m
8.00 8.00 m
1.45 1.45 m
1.49 1.49 m
2.30 2.30 m
1.64 1.64 m
2.43 2.43 m
4.42 4.42 m
1.37 1.37 m
6.41 6.41 m
4.59 4.59 m
1.69 1.69 m
6.41 6.41 m
4.59 4.59 m
1.69 1.69 m
6.41 6.41 m
4.59 4.59 m
1.69 1.69 m
6.41 6.41 m
4.59 4.59 m
1.69 1.69 m
6.41 6.41 m
4.59 4.59 m
1.69 1.69 m
6.41 6.41 m
4.59 4.59 m
1.69 1.69 m
6.41 6.41 m
4.59 4.59 m
1.69 1.69 m
3.21 3.21 m
1.69 1.69 m
3.15 3.15 m
1.69 1.69 m
6.64 6.64 m
0.88 0.88 m
0.68 0.68 m
5.24 5.24 m
1.70 1.70 m
2.97 2.97 m
8.43 8.43 m
2.81 2.81 m
6.33 6.33 m
0.84 0.84 m
6.32 6.32 m
6.33 6.33 m
6.32 6.32 m
6.33 6.33 m
6.32 6.32 m
6.33 6.33 m
6.32 6.32 m
6.33 6.33 m
6.32 6.32 m
6.33 6.33 m
6.32 6.32 m
6.33 6.33 m
5.93 5.93 m
4.81 4.81 m
3.40 3.40 m
5.77 5.77 m
3.09 3.09 m
4.82 4.82 m
6.90 6.90 m
2.68 2.68 m
1.64 1.64 m
9.32 9.32 m
3.07 3.07 m
6.93 6.93 m
3.93 3.93 m
5.42 5.42 m
2.54 2.54 m
2.84 2.84 m
4.93 4.93 m
0.93 0.93 m
2.48 2.48 m
1.13 1.13 m
4.05 4.05 m
2.38 2.38 m
2.50 2.50 m
11.08 11.08 m
3.98 3.98 m
1.58 1.58 m
4.47 4.47 m
8.05 8.05 m
2.62 2.62 m
3.35 3.35 m
2.56 2.56 m
5.08 5.08 m
4.46 4.46 m
2.95 2.95 m
2.83 2.83 m
10.05 10.05 m
2.74 2.74 m
1.48 1.48 m
1.78 1.78 m
1.11 1.11 m
7.70 7.70 m
4.10 4.10 m
7.66 7.66 m
1.00 1.00 m
1.33 1.33 m
2.69 2.69 m
2.75 2.75 m
11.82 11.82 m
2.88 2.88 m
4.22 4.22 m
13.82 13.82 m
6.33 6.33 m
4.55 4.55 m
6.13 6.13 m
4.55 4.55 m
1.93 1.93 m
4.82 4.82 m
2.94 2.94 m
2.59 2.59 m
3.42 3.42 m
4.63 4.63 m
1.19 1.19 m
6.89 6.89 m
0.88 0.88 m
2.94 2.94 m
4.01 4.01 m
1.98 1.98 m
1.28 1.28 m
3.67 3.67 m
5.19 5.19 m
4.80 4.80 m
6.01 6.01 m
1.28 1.28 m
2.11 2.11 m
1.89 1.89 m
1.50 1.50 m
5.00 5.00 m
8.11 8.11 m
1.74 1.74 m
1.92 1.92 m
2.82 2.82 m
7.62 7.62 m
1.73 1.73 m
4.45 4.45 m
3.36 3.36 m
2.11 2.11 m
3.19 3.19 m
3.37 3.37 m
3.10 3.10 m
3.33 3.33 m
5.56 5.56 m
4.95 4.95 m
4.22 4.22 m
6.50 6.50 m
10.32 10.32 m
8.87 8.87 m
4.64 4.64 m
8.27 8.27 m
9.62 9.62 m
0.93 0.93 m
3.94 3.94 m
6.39 6.39 m
3.76 3.76 m
11.96 11.96 m
3.75 3.75 m
5.49 5.49 m
4.14 4.14 m
3.36 3.36 m
3.32 3.32 m
6.60 6.60 m
6.50 6.50 m
2.80 2.80 m
2.97 2.97 m
5.08 5.08 m
2.87 2.87 m
6.63 6.63 m
3.65 3.65 m
6.42 6.42 m
3.83 3.83 m
2.97 2.97 m
1.64 1.64 m
2.88 2.88 m
1,693.92 m

3.79 3.79 m
13.66 13.66 m
16.86 16.86 m
3.52 3.52 m
8.14 8.14 m
9.57 9.57 m
6.37 6.37 m
8.62 8.62 m
11.91 11.91 m
3.38 3.38 m
12.45 12.45 m
4.79 4.79 m
4.77 4.77 m
4.27 4.27 m
5.75 5.75 m
6.42 6.42 m
14.38 14.38 m
9.39 9.39 m
9.35 9.35 m
5.54 5.54 m
5.22 5.22 m
21.02 21.02 m
4.30 4.30 m
7.87 7.87 m
3.37 3.37 m
5.42 5.42 m
2.32 2.32 m
3.77 3.77 m
4.22 4.22 m
2.02 2.02 m
15.53 15.53 m
7.58 7.58 m
3.21 3.21 m
10.39 10.39 m
2.62 2.62 m
3.83 3.83 m
2.45 2.45 m
8.14 8.14 m
4.21 4.21 m
6.31 6.31 m
3.03 3.03 m
9.11 9.11 m
3.78 3.78 m
16.99 16.99 m
5.30 5.30 m
2.55 2.55 m
6.79 6.79 m
3.01 3.01 m
5.10 5.10 m
6.48 6.48 m
4.32 4.32 m
7.25 7.25 m
4.96 4.96 m
6.29 6.29 m
6.59 6.59 m
7.04 7.04 m
5.53 5.53 m
5.18 5.18 m
6.05 6.05 m
6.82 6.82 m
9.56 9.56 m
10.49 10.49 m
6.33 6.33 m
6.33 6.33 m
6.33 6.33 m
6.33 6.33 m
6.33 6.33 m
6.33 6.33 m
6.33 6.33 m
6.33 6.33 m
6.33 6.33 m
6.33 6.33 m
6.33 6.33 m
6.33 6.33 m
4.79 4.79 m
6.34 6.34 m
6.31 6.31 m
9.03 9.03 m
0.88 0.88 m
2.84 2.84 m
3.44 3.44 m
6.89 6.89 m
3.11 3.11 m
4.79 4.79 m
5.79 5.79 m
3.11 3.11 m
6.42 6.42 m
5.10 5.10 m
6.35 6.35 m
6.42 6.42 m
6.35 6.35 m
6.42 6.42 m
6.35 6.35 m
6.42 6.42 m
6.35 6.35 m
6.42 6.42 m
6.35 6.35 m
6.42 6.42 m
6.35 6.35 m
6.42 6.42 m
6.35 6.35 m
6.35 6.35 m
5.24 5.24 m
1.70 1.70 m
3.03 3.03 m
6.68 6.68 m
0.69 0.69 m
0.88 0.88 m
5.02 5.02 m
2.54 2.54 m
2.35 2.35 m
6.39 6.39 m
2.46 2.46 m
6.02 6.02 m
0.96 0.96 m
9.09 9.09 m
2.72 2.72 m
2.60 2.60 m
3.88 3.88 m
2.32 2.32 m
4.64 4.64 m
1.97 1.97 m
5.57 5.57 m
2.46 2.46 m
4.55 4.55 m
3.18 3.18 m
8.32 8.32 m
6.74 6.74 m
2.47 2.47 m
2.99 2.99 m
5.62 5.62 m
4.56 4.56 m
3.90 3.90 m
0.79 0.79 m
1.09 1.09 m
2.96 2.96 m
0.81 0.81 m
3.54 3.54 m
4.27 4.27 m
2.87 2.87 m
2.72 2.72 m
10.77 10.77 m
5.55 5.55 m
5.39 5.39 m
5.65 5.65 m
4.38 4.38 m
4.19 4.19 m
5.48 5.48 m
5.45 5.45 m
10.81 10.81 m
2.98 2.98 m
15.32 15.32 m
14.51 14.51 m
0.79 0.79 m
5.25 5.25 m
1.57 1.57 m
12.05 12.05 m
5.68 5.68 m
7.89 7.89 m
3.78 3.78 m
2.34 2.34 m
3.67 3.67 m
4.72 4.72 m
2.52 2.52 m
1.78 1.78 m
2.21 2.21 m
3.01 3.01 m
1.40 1.40 m
1.71 1.71 m
5.54 5.54 m
1.73 1.73 m
5.89 5.89 m
5.34 5.34 m
4.20 4.20 m
2.51 2.51 m
3.01 3.01 m
3.52 3.52 m
4.77 4.77 m
4.81 4.81 m
4.51 4.51 m
4.50 4.50 m
3.06 3.06 m
2.09 2.09 m
6.63 6.63 m
2.02 2.02 m
5.56 5.56 m
3.01 3.01 m
1,027.28 m
5.02 5.02 m
19.41 19.41 m
15.72 15.72 m
21.29 21.29 m
5.02 5.02 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.60 0.60 m
0.60 0.60 m
0.60 0.60 m
0.55 0.55 m
0.56 0.56 m
0.57 0.57 m
0.56 0.56 m
0.57 0.57 m
0.56 0.56 m
0.57 0.57 m
0.56 0.56 m
0.57 0.57 m
0.56 0.56 m
0.57 0.57 m
0.56 0.56 m
0.57 0.57 m
0.56 0.56 m
0.60 0.60 m
0.56 0.56 m
0.57 0.57 m
2.97 2.97 m
5.64 5.64 m
15.91 15.91 m
2.30 2.30 m
7.12 7.12 m
12.24 12.24 m
7.50 7.50 m
5.36 5.36 m
18.46 18.46 m
8.24 8.24 m
7.80 7.80 m
6.64 6.64 m
6.47 6.47 m
4.80 4.80 m
14.50 14.50 m
3.90 3.90 m
6.77 6.77 m
0.39 0.39 m
0.41 0.41 m
3.27 3.27 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.60 0.60 m
0.58 0.58 m
0.60 0.60 m
0.60 0.60 m
0.60 0.60 m
0.56 0.56 m
0.57 0.57 m
0.56 0.56 m
0.57 0.57 m
0.56 0.56 m
0.57 0.57 m
0.56 0.56 m
0.57 0.57 m
0.56 0.56 m
0.57 0.57 m
0.56 0.56 m
0.57 0.57 m
0.56 0.56 m
0.60 0.60 m
3.83 3.83 m
5.10 5.10 m
7.06 7.06 m
19.63 19.63 m
14.40 14.40 m
15.55 15.55 m
3.84 3.84 m
3.67 3.67 m
5.01 5.01 m
5.16 5.16 m
3.67 3.67 m
3.51 3.51 m
11.76 11.76 m
16.33 16.33 m
15.12 15.12 m
15.50 15.50 m
10.10 10.10 m
10.12 10.12 m
5.21 5.21 m
4.60 4.60 m
2.61 2.61 m
5.62 5.62 m
7.58 7.58 m
13.77 13.77 m
8.13 8.13 m
23.52 23.52 m
5.62 5.62 m
11.08 11.08 m
6.36 6.36 m
6.48 6.48 m
6.69 6.69 m
6.92 6.92 m
1.64 1.64 m
1.62 1.62 m
9.00 9.00 m
3.54 3.54 m
13.30 13.30 m
13.07 13.07 m
1.08 1.08 m
7.74 7.74 m
578.22 m

24.80 24.80 m
4.39 4.39 m
25.56 25.56 m
11.50 11.50 m
16.81 16.81 m
13.05 13.05 m
8.89 8.89 m
25.72 25.72 m
29.23 29.23 m
11.13 11.13 m
5.41 5.41 m
10.43 10.43 m
10.18 10.18 m
25.56 25.56 m
11.50 11.50 m
8.39 8.39 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.60 0.60 m
0.57 0.57 m
0.58 0.58 m
0.58 0.58 m
0.81 0.81 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
0.58 0.58 m
19.70 19.70 m
11.78 11.78 m
6.44 6.44 m
38.48 38.48 m
8.49 8.49 m
20.88 20.88 m
7.59 7.59 m
18.38 18.38 m
14.82 14.82 m
17.95 17.95 m
14.72 14.72 m
8.79 8.79 m
17.34 17.34 m
9.38 9.38 m
26.82 26.82 m
501.66 m

18.90 18.90 m
5.69 5.69 m
7.55 7.55 m
5.54 5.54 m
21.00 21.00 m
4.95 4.95 m
39.81 39.81 m
5.99 5.99 m
7.89 7.89 m
22.49 22.49 m
7.55 7.55 m
5.54 5.54 m
16.79 16.79 m
9.55 9.55 m
18.90 18.90 m
6.28 6.28 m
30.37 30.37 m
9.57 9.57 m
2.34 2.34 m
4.05 4.05 m
8.81 8.81 m
7.44 7.44 m
266.99 m

7.47 7.47 m
16.83 16.83 m
13.66 13.66 m
7.47 7.47 m
0.94 0.94 m
15.87 15.87 m
6.58 6.58 m
38.05 38.05 m
15.66 15.66 m
10.90 10.90 m
21.11 21.11 m
154.54 m

13.01 13.01 m
13.01 13.01 m
9.15 9.15 m
13.02 13.02 m
9.06 9.06 m
57.26 m

14.46 14.46 m
0.79 0.79 m
14.46 14.46 m
0.81 0.81 m
14.49 14.49 m
45.02 m

8.11 8.11 m
11.95 11.95 m
3.55 3.55 m
3.60 3.60 m
1.38 1.38 m
6.57 6.57 m
2.94 2.94 m
2.70 2.70 m
2.67 2.67 m
43.46 m

13.77 13.77 m
8.08 8.08 m
21.85 m

45.12 45.12 m
15.50 15.50 m
28.94 28.94 m
10.09 10.09 m
10.85 10.85 m
110.50 m

29.27 29.27 m
31.41 31.41 m
1.28 1.28 m
3.99 3.99 m
57.58 57.58 m
33.41 33.41 m
20.09 20.09 m
0.04 0.04 m
7.57 7.57 m
184.64 m

Floors Extra Total Unit


1 4.25 m
1 4.25 m
1 4.25 m
1 4.25 m
1 5 m
1 5 m
1 5 m
1 5 m

Dimensions
Similar Floors Qty unit
Qty

2 2 No.
2 2 No.
1 1 No.
5

1 1 No.
1 1 No.
1 1 No.
3

2 2 No.
3 3 No.
1 1 No.
6

2 2 No.
1 1 No.
1 1 No.
4

4 4 No.
1 1 No.
3 3 No.
8

3 3 No.

1 1 No.
1 1 No.
1 1 No.
8 8 No.

5 5 No.

11 11 No.
21 21 No.
19 19 No.
20 20 No.
158 158 No.
203 203 No.
1 1 No.
123 123 No.
180 180 No.
736

85 85 No.
129 129 No.
2 2 No.
13 13 No.
4 4 No.
21 21 No.
8 8 No.
157 157 No.
6 6 No.
5 5 No.
125 125 No.
11 11 No.
3 3 No.
2 2 No.
5 5 No.
576

87 87 No.
11 11 No.
3 3 No.
1 1 No.
2 2 No.
4 4 No.
2 2 No.
2 2 No.
3 3 No.
1 1 No.
42 42 No.
40 40 No.
3 3 No.
3 3 No.
48 48 No.
39 39 No.
5 5 No.
2 2 No.
1 1 No.
299

40 40 No.
34 34 No.
2 2 No.
4 4 No.
1 1 No.
6 6 No.
5 5 No.
1 1 No.
3 3 No.
4 4 No.
3 3 No.
103

4 4 No.
2 2 No.
1 1 No.
2 2 No.
1 1 No.
1 1 No.
2 2 No.
2 2 No.
2 2 No.
1 1 No.
18

1 1 No.
2 2 No.
2 2 No.
2 2 No.
2 2 No.
1 1 No.
10

1 1 No.
1 1 No.
3 3 No.
2 2 No.
7

1 1 No.
1 1 No.
1 1 No.
1 1 No.
1 1 No.
5

1 1 No.

1 1 No.

1 1 No.
1 1 No.
1 1 No.
2

1 1 No.

3 3 No.
3 3 No.
6

3 3 No.
3 3 No.
6

1 1 No.

1 1 No.

1 1 No.

198 198 No.

3 3 No.

sions
Similar Floors Qty unit
m
3.5 14 49 m
3.5 2 7 m
4.25 64 272 m
3.75 74 277.5 m
3.75 74 277.5 m
3.5 14 49 m
3.5 2 7 m
4.25 64 272 m
3.75 74 277.5 m
3.75 74 277.5 m
3.25 12 39 m
4 84 336 m
3.5 74 259 m
3.5 74 259 m
3.25 3 9.75 m
4 2 8 m
3.5 5 17.5 m
3.5 3 10.5 m
2 2 4 m
2.75 30 82.5 m
2.25 36 81 m
2.25 33 74.25 m
3.9 2 7.8 m
3.4 2 6.8 m
3.4 2 6.8 m
4 45 180 m
3.5 38 133 m
3.5 43 150.5 m
3.25 21 68.25 m
3.25 2 6.5 m
4 32 128 m
3.5 45 157.5 m
3.5 31 108.5 m
3900.15 m

3.25 12 39 m
4 84 336 m
3.5 74 259 m
3.5 74 259 m
3.25 3 9.75 m
4 2 8 m
3.5 5 17.5 m
3.5 3 10.5 m
2 2 4 m
2.75 30 82.5 m
2.25 36 81 m
2.25 33 74.25 m
4 45 180 m
3.5 38 133 m
3.5 43 150.5 m
3.25 21 68.25 m
3.25 2 6.5 m
4 32 128 m
3.5 45 157.5 m
3.5 31 108.5 m
2112.75 m

sions
Similar Floors Qty unit
Length M
14 No.
2 No.
64 No.
74 No.
74 No.
Total Qty. 228 No.

12 No.
84 No.
74 No.
74 No.
Total Qty. 244 No.

2 No.
30 No.
36 No.
33 No.
Total Qty. 101 No.

3 No.
2 No.
5 No.
3 No.
Total Qty. 13 No.

2 No.
2 No.
2 No.
Total Qty. 6 No.

45 No.
38 No.
43 No.
Total Qty. 126 No.

21 No.
2 No.
32 No.
45 No.
31 No.
Total Qty. 131 No.

Dimensions
No./Pcs Total Qty
Size Qty.

32 mm 0.20 150 30.00


32 mm 1.38 14 19.37
32 mm 0.50 14 6.96
32 mm 1.37 12 16.38
32 mm 0.50 12 5.97
32 mm 0.46 4 1.85
32 mm 1.40 4 5.61
32 mm 0.49 24 11.84
32 mm 1.38 24 33.23
32 mm 1.02 4 4.06
32 mm 0.50 4 2.00
32 mm 0.41 6 2.47
32 mm 1.37 6 8.22
32 mm 0.49 26 12.83
32 mm 1.38 26 36.00
32 mm 1.02 4 4.06
32 mm 0.50 4 2.00
32 mm 0.73 1 0.73
32 mm 0.73 1 0.73
32 mm 3.36 1 3.36
32 mm 1.33 1 1.33
32 mm 1.02 1 1.02
32 mm 1.00 1 1.00
32 mm 1.31 1 1.31
32 mm 0.54 1 0.54
32 mm 0.54 1 0.54
32 mm 0.78 1 0.78
32 mm 1.59 1 1.59
32 mm 0.89 1 0.89
32 mm 0.87 1 0.87
32 mm 0.89 1 0.89
32 mm 0.87 1 0.87
32 mm 4.80 1 4.80
32 mm 4.79 1 4.79
32 mm 1.38 1 1.38
32 mm 0.50 1 0.50
32 mm 1.37 1 1.37
32 mm 0.50 1 0.50
32 mm 1.40 1 1.40
32 mm 0.46 1 0.46
32 mm 2.33 1 2.33
32 mm 2.41 1 2.41
32 mm 0.84 1 0.84
32 mm 1.32 1 1.32
32 mm 0.73 1 0.73
32 mm 1.61 1 1.61
32 mm 2.59 1 2.59
32 mm 1.41 1 1.41
32 mm 1.95 1 1.95
32 mm 2.72 1 2.72
32 mm 1.51 1 1.51
32 mm 1.62 1 1.62
32 mm 0.48 1 0.48
32 mm 2.06 1 2.06
32 mm 1.65 1 1.65
32 mm 0.73 1 0.73
32 mm 1.57 1 1.57
32 mm 0.73 1 0.73
32 mm 0.89 1 0.89
32 mm 1.60 1 1.60
32 mm 2.62 1 2.62
32 mm 0.50 1 0.50
32 mm 0.95 1 0.95
32 mm 2.28 1 2.28
32 mm 1.05 1 1.05
32 mm 0.62 1 0.62
32 mm 0.49 1 0.49
32 mm 1.38 1 1.38
32 mm 1.02 1 1.02
32 mm 0.50 1 0.50
32 mm 1.37 1 1.37
32 mm 0.41 1 0.41
32 mm 0.99 1 0.99
32 mm 2.97 1 2.97
32 mm 0.63 1 0.63
32 mm 2.57 1 2.57
32 mm 0.21 1 0.21
32 mm 2.87 1 2.87
32 mm 1.08 1 1.08
32 mm 0.85 1 0.85
32 mm 0.40 1 0.40
32 mm 1.28 1 1.28
32 mm 2.93 1 2.93
32 mm 1.44 1 1.44
32 mm 2.15 1 2.15
32 mm 0.15 1 0.15
32 mm 0.15 1 0.15
32 mm 0.15 1 0.15
32 mm 1.96 1 1.96
32 mm 1.68 1 1.68
32 mm 1.78 1 1.78
32 mm 1.43 1 1.43
32 mm 3.05 1 3.05
32 mm 0.76 1 0.76
32 mm 6.77 1 6.77
32 mm 0.37 1 0.37
32 mm 1.20 1 1.20
32 mm 1.29 1 1.29
32 mm 0.44 1 0.44
32 mm 0.36 1 0.36
32 mm 0.59 1 0.59
32 mm 0.59 1 0.59
32 mm 0.59 1 0.59
32 mm 1.73 1 1.73
32 mm 3.24 1 3.24
32 mm 0.64 1 0.64
32 mm 0.67 1 0.67
32 mm 0.54 1 0.54
32 mm 0.53 1 0.53
32 mm 3.19 1 3.19
32 mm 1.02 1 1.02
32 mm 0.89 1 0.89
32 mm 0.69 1 0.69
32 mm 2.93 1 2.93
32 mm 0.82 1 0.82
32 mm 0.81 1 0.81
32 mm 1.68 1 1.68
32 mm 2.21 1 2.21
32 mm 0.60 1 0.60
32 mm 0.60 1 0.60
32 mm 0.85 1 0.85
32 mm 1.53 1 1.53
32 mm 0.53 1 0.53
32 mm 1.49 1 1.49
32 mm 0.91 1 0.91
32 mm 0.64 1 0.64
32 mm 0.95 1 0.95
32 mm 1.83 1 1.83
32 mm 0.61 1 0.61
32 mm 0.67 1 0.67
32 mm 0.71 1 0.71
32 mm 0.43 1 0.43
32 mm 0.43 1 0.43
32 mm 0.43 1 0.43
32 mm 3.33 1 3.33
32 mm 1.28 1 1.28
32 mm 1.28 1 1.28
32 mm 0.42 1 0.42
32 mm 0.50 1 0.50
32 mm 0.41 1 0.41
32 mm 2.48 1 2.48
32 mm 2.47 1 2.47
32 mm 2.45 1 2.45
32 mm 1.15 1 1.15
32 mm 0.67 1 0.67
32 mm 2.46 1 2.46
32 mm 0.36 1 0.36
32 mm 0.54 1 0.54
32 mm 2.16 1 2.16
32 mm 1.39 1 1.39
32 mm 0.73 1 0.73
32 mm 0.73 1 0.73
32 mm 0.43 1 0.43
32 mm 0.64 1 0.64
32 mm 0.64 1 0.64
32 mm 0.71 1 0.71
32 mm 0.69 1 0.69
32 mm 0.84 1 0.84
32 mm 0.61 1 0.61
32 mm 0.50 1 0.50
32 mm 0.48 1 0.48
32 mm 0.48 1 0.48
32 mm 0.50 1 0.50
32 mm 0.50 1 0.50
32 mm 0.48 1 0.48
32 mm 0.45 1 0.45
32 mm 0.45 1 0.45
32 mm 3.78 1 3.78
32 mm 1.21 1 1.21
32 mm 1.57 1 1.57
32 mm 1.59 1 1.59
32 mm 0.70 1 0.70
32 mm 2.01 1 2.01
32 mm 1.51 1 1.51
32 mm 1.67 1 1.67
32 mm 0.74 1 0.74
32 mm 0.96 1 0.96
32 mm 0.48 1 0.48
32 mm 1.43 1 1.43
32 mm 1.42 1 1.42
32 mm 0.42 1 0.42
32 mm 1.87 1 1.87
32 mm 1.01 1 1.01
32 mm 0.97 1 0.97
32 mm 1.69 1 1.69
32 mm 0.74 1 0.74
32 mm 2.97 1 2.97
32 mm 0.63 1 0.63
32 mm 0.42 1 0.42
32 mm 1.29 1 1.29
32 mm 1.13 1 1.13
32 mm 2.87 1 2.87
32 mm 0.21 1 0.21
32 mm 3.29 1 3.29
32 mm 1.50 1 1.50
32 mm 0.53 1 0.53
32 mm 0.39 1 0.39
32 mm 0.86 1 0.86
32 mm 0.24 1 0.24
32 mm 0.24 1 0.24
32 mm 0.21 1 0.21
32 mm 0.98 1 0.98
32 mm 1.75 1 1.75
32 mm 0.58 1 0.58
32 mm 0.32 1 0.32
32 mm 2.54 1 2.54
32 mm 2.80 1 2.80
32 mm 0.49 1 0.49
32 mm 2.54 1 2.54
32 mm 5.96 1 5.96
32 mm 0.50 1 0.50
32 mm 3.23 1 3.23
32 mm 2.62 1 2.62
32 mm 0.89 1 0.89
32 mm 4.17 1 4.17
32 mm 1.06 1 1.06
32 mm 1.59 1 1.59
32 mm 1.54 1 1.54
32 mm 0.82 1 0.82
32 mm 1.39 1 1.39
32 mm 1.39 1 1.39
32 mm 1.63 1 1.63
32 mm 0.71 1 0.71
32 mm 0.46 1 0.46
32 mm 1.32 1 1.32
32 mm 0.46 1 0.46
32 mm 2.23 1 2.23
32 mm 2.52 1 2.52
32 mm 0.75 1 0.75
32 mm 0.74 1 0.74
32 mm 0.73 1 0.73
32 mm 0.74 1 0.74
32 mm 0.74 1 0.74
32 mm 0.69 1 0.69
32 mm 0.77 1 0.77
32 mm 0.40 1 0.40
32 mm 0.19 1 0.19
32 mm 0.55 1 0.55
32 mm 0.68 1 0.68
32 mm 1.09 1 1.09
32 mm 0.81 1 0.81
32 mm 0.67 1 0.67
32 mm 3.24 1 3.24
32 mm 0.35 1 0.35
32 mm 0.35 1 0.35
32 mm 0.78 1 0.78
32 mm 0.71 1 0.71
32 mm 6.69 1 6.69
32 mm 0.69 1 0.69
32 mm 2.02 1 2.02
32 mm 3.36 1 3.36
32 mm 0.96 1 0.96
32 mm 1.14 1 1.14
32 mm 1.31 1 1.31
32 mm 1.13 1 1.13
32 mm 1.16 1 1.16
32 mm 1.16 1 1.16
32 mm 9.26 1 9.26
32 mm 1.51 1 1.51
32 mm 0.27 1 0.27
32 mm 0.27 1 0.27
32 mm 0.27 1 0.27
32 mm 0.27 1 0.27
32 mm 0.80 1 0.80
32 mm 1.25 1 1.25
32 mm 0.72 1 0.72
32 mm 1.32 1 1.32
32 mm 1.56 1 1.56
32 mm 1.00 1 1.00
32 mm 0.43 1 0.43
32 mm 0.77 1 0.77
32 mm 0.39 1 0.39
32 mm 0.85 1 0.85
32 mm 1.74 1 1.74
32 mm 2.11 1 2.11
32 mm 0.33 1 0.33
32 mm 3.35 1 3.35
32 mm 1.94 1 1.94
32 mm 1.19 1 1.19
32 mm 2.15 1 2.15
32 mm 0.91 1 0.91
32 mm 1.32 1 1.32
32 mm 0.78 1 0.78
32 mm 2.30 1 2.30
32 mm 0.63 1 0.63
32 mm 1.19 1 1.19
32 mm 2.16 1 2.16
32 mm 0.41 1 0.41
32 mm 1.20 1 1.20
32 mm 1.94 1 1.94
32 mm 0.97 1 0.97
32 mm 1.42 1 1.42
32 mm 0.63 1 0.63
32 mm 1.42 1 1.42
32 mm 1.19 1 1.19
32 mm 1.76 1 1.76
32 mm 0.65 1 0.65
32 mm 0.74 1 0.74
32 mm 0.74 1 0.74
32 mm 2.66 1 2.66
32 mm 2.64 1 2.64
32 mm 3.26 1 3.26
32 mm Total 578.50

40 mm 0.20 150 30.00


40 mm 1.41 14 19.71
40 mm 1.56 14 21.85
40 mm 1.56 12 18.73
40 mm 1.41 12 16.89
40 mm 0.98 4 3.94
40 mm 1.43 4 5.71
40 mm 1.41 24 33.80
40 mm 1.56 24 37.53
40 mm 1.41 4 5.63
40 mm 1.38 4 5.54
40 mm 1.39 6 8.36
40 mm 1.64 6 9.86
40 mm 0.54 5 2.70
40 mm 1.41 26 36.62
40 mm 1.56 26 40.66
40 mm 1.41 4 5.63
40 mm 1.38 4 5.54
40 mm 1.41 1 1.41
40 mm 1.56 1 1.56
40 mm 1.41 1 1.41
40 mm 1.56 1 1.56
40 mm 1.43 1 1.43
40 mm 0.98 1 0.98
40 mm 0.60 1 0.60
40 mm 3.16 1 3.16
40 mm 0.68 1 0.68
40 mm 0.39 1 0.39
40 mm 0.70 1 0.70
40 mm 3.81 1 3.81
40 mm 0.55 1 0.55
40 mm 1.47 1 1.47
40 mm 1.41 1 1.41
40 mm 1.56 1 1.56
40 mm 1.41 1 1.41
40 mm 1.38 1 1.38
40 mm 1.64 1 1.64
40 mm 1.39 1 1.39
40 mm 0.54 1 0.54
40 mm 2.64 1 2.64
40 mm 2.26 1 2.26
40 mm 1.29 1 1.29
40 mm 0.39 1 0.39
40 mm 0.39 1 0.39
40 mm 0.80 1 0.80
40 mm 0.77 1 0.77
40 mm 2.81 1 2.81
40 mm 0.69 1 0.69
40 mm 0.22 1 0.22
40 mm 0.22 1 0.22
40 mm 0.22 1 0.22
40 mm 1.09 1 1.09
40 mm 2.15 1 2.15
40 mm 2.15 1 2.15
40 mm 3.35 1 3.35
40 mm 0.67 1 0.67
40 mm 2.09 1 2.09
40 mm 1.98 1 1.98
40 mm 0.88 1 0.88
40 mm 0.56 1 0.56
40 mm 3.10 1 3.10
40 mm 0.31 1 0.31
40 mm 0.43 1 0.43
40 mm 0.44 1 0.44
40 mm 7.63 1 7.63
40 mm 0.74 1 0.74
40 mm 1.14 1 1.14
40 mm 3.36 1 3.36
40 mm 1.25 1 1.25
40 mm 1.24 1 1.24
40 mm 1.21 1 1.21
40 mm 2.77 1 2.77
40 mm 2.48 1 2.48
40 mm 2.95 1 2.95
40 mm 5.65 1 5.65
40 mm 1.94 1 1.94
40 mm 10.34 1 10.34
40 mm 1.45 1 1.45
40 mm 0.56 1 0.56
40 mm 0.59 1 0.59
40 mm 1.13 1 1.13
40 mm 0.49 1 0.49
40 mm 0.40 1 0.40
40 mm 0.79 1 0.79
40 mm 0.57 1 0.57
40 mm 1.30 1 1.30
40 mm 0.71 1 0.71
40 mm 2.42 1 2.42
40 mm 8.49 1 8.49
40 mm 8.49 1 8.49
40 mm 7.61 1 7.61
40 mm 1.13 1 1.13
40 mm 1.42 1 1.42
40 mm 1.06 1 1.06
40 mm 2.74 1 2.74
40 mm 6.60 1 6.60
40 mm 6.61 1 6.61
40 mm 0.61 1 0.61
40 mm 0.61 1 0.61
40 mm 2.04 1 2.04
40 mm 0.63 1 0.63
40 mm 2.63 1 2.63
40 mm 2.63 1 2.63
40 mm 0.57 1 0.57
40 mm 0.64 1 0.64
40 mm 0.69 1 0.69
40 mm 1.21 1 1.21
40 mm 0.82 1 0.82
40 mm 0.57 1 0.57
40 mm 0.58 1 0.58
40 mm 0.57 1 0.57
40 mm 1.10 1 1.10
40 mm 0.51 1 0.51
40 mm 0.80 1 0.80
40 mm 4.65 1 4.65
40 mm 3.32 1 3.32
40 mm 1.65 1 1.65
40 mm 0.51 1 0.51
40 mm 0.74 1 0.74
40 mm 0.59 1 0.59
40 mm 4.63 1 4.63
40 mm 1.01 1 1.01
40 mm 0.43 1 0.43
40 mm 0.55 1 0.55
40 mm 0.24 1 0.24
40 mm 0.23 1 0.23
40 mm 5.05 1 5.05
40 mm 0.81 1 0.81
40 mm 1.29 1 1.29
40 mm 0.58 1 0.58
40 mm 0.49 1 0.49
40 mm 0.80 1 0.80
40 mm 0.94 1 0.94
40 mm 2.29 1 2.29
40 mm 1.35 1 1.35
40 mm 1.37 1 1.37
40 mm 0.43 1 0.43
40 mm 0.68 1 0.68
40 mm 0.39 1 0.39
40 mm 0.80 1 0.80
40 mm 0.80 1 0.80
40 mm 0.39 1 0.39
40 mm 0.69 1 0.69
40 mm 0.43 1 0.43
40 mm 0.94 1 0.94
40 mm 1.35 1 1.35
40 mm 2.29 1 2.29
40 mm 2.24 1 2.24
40 mm 0.39 1 0.39
40 mm 0.80 1 0.80
40 mm 2.56 1 2.56
40 mm 2.61 1 2.61
40 mm 0.68 1 0.68
40 mm 0.77 1 0.77
40 mm 2.81 1 2.81
40 mm 4.37 1 4.37
40 mm 1.01 1 1.01
40 mm 2.12 1 2.12
40 mm 2.85 1 2.85
40 mm 5.16 1 5.16
40 mm 1.56 1 1.56
40 mm 0.59 1 0.59
40 mm 3.15 1 3.15
40 mm 0.51 1 0.51
40 mm 0.51 1 0.51
40 mm 0.64 1 0.64
40 mm 1.92 1 1.92
40 mm 0.56 1 0.56
40 mm 0.30 1 0.30
40 mm 1.97 1 1.97
40 mm 1.04 1 1.04
40 mm 5.58 1 5.58
40 mm 5.56 1 5.56
40 mm 0.62 1 0.62
40 mm 0.85 1 0.85
40 mm 2.42 1 2.42
40 mm 0.55 1 0.55
40 mm 1.59 1 1.59
40 mm 3.46 1 3.46
40 mm 1.65 1 1.65
40 mm 2.00 1 2.00
40 mm 0.50 1 0.50
40 mm 4.46 1 4.46
40 mm 5.19 1 5.19
40 mm 1.19 1 1.19
40 mm 1.21 1 1.21
40 mm 3.86 1 3.86
40 mm 2.53 1 2.53
40 mm 4.85 1 4.85
40 mm 0.62 1 0.62
40 mm 3.96 1 3.96
40 mm 4.89 1 4.89
40 mm 4.27 1 4.27
40 mm 1.43 1 1.43
40 mm 4.12 1 4.12
40 mm 2.15 1 2.15
40 mm 6.57 1 6.57
40 mm 1.70 1 1.70
40 mm 0.87 1 0.87
40 mm 0.59 1 0.59
40 mm 0.59 1 0.59
40 mm Total 647.77

50 mm 4.80 8 38.40
50 mm 3.50 2 7.00
50 mm 7.40 1 7.40
50 mm 2.12 1 2.12
50 mm 4.07 1 4.07
50 mm 17.03 1 17.03
50 mm 1.22 24 29.25
50 mm 1.34 4 5.38
50 mm 1.31 6 7.86
50 mm 1.22 26 31.68
50 mm 1.34 4 5.38
50 mm 1.26 1 1.26
50 mm 1.22 1 1.22
50 mm 1.34 1 1.34
50 mm 1.31 1 1.31
50 mm 9.85 1 9.85
50 mm 4.49 1 4.49
50 mm 3.18 1 3.18
50 mm 4.77 1 4.77
50 mm 1.88 1 1.88
50 mm 8.81 1 8.81
50 mm 10.17 1 10.17
50 mm 5.22 1 5.22
50 mm 5.22 1 5.22
50 mm 3.54 1 3.54
50 mm 6.70 1 6.70
50 mm 5.87 1 5.87
50 mm 6.32 1 6.32
50 mm 2.68 1 2.68
50 mm 0.51 1 0.51
50 mm 3.65 1 3.65
50 mm 7.48 1 7.48
50 mm 5.08 1 5.08
50 mm Total 256.11
75 mm 5.00 39 195.00
75 mm 5.00 5 25.00
75 mm 4.66 5 23.30
75 mm 4.50 37 166.50
75 mm 4.50 7 31.50
75 mm 5.10 31 158.10
75 mm 1.61 1 1.61
75 mm 1.09 1 1.09
75 mm 4.37 1 4.37
75 mm 6.54 1 6.54
75 mm 1.15 1 1.15
75 mm 5.89 1 5.89
75 mm 4.55 1 4.55
75 mm 4.50 1 4.50
75 mm 12.50 1 12.50
75 mm 11.33 1 11.33
75 mm 6.24 1 6.24
75 mm 6.12 1 6.12
75 mm 6.83 1 6.83
75 mm 7.14 1 7.14
75 mm 4.50 1 4.50
75 mm 5.52 1 5.52
75 mm 2.33 1 2.33
75 mm 6.03 1 6.03
75 mm 12.12 1 12.12
75 mm 4.66 1 4.66
75 mm 9.52 1 9.52
75 mm 7.12 1 7.12
75 mm 2.13 1 2.13
75 mm 24.83 1 24.83
75 mm 2.41 1 2.41
75 mm 7.48 1 7.48
75 mm 9.80 1 9.80
75 mm 1.88 1 1.88
75 mm 7.86 1 7.86
75 mm 10.08 1 10.08
75 mm 10.69 1 10.69
75 mm 6.08 1 6.08
75 mm 7.96 1 7.96
75 mm 8.38 1 8.38
75 mm 1.69 1 1.69
75 mm 7.90 1 7.90
75 mm 10.02 1 10.02
75 mm 7.74 1 7.74
75 mm 18.78 1 18.78
75 mm 1.51 1 1.51
75 mm 4.13 1 4.13
75 mm 0.74 1 0.74
75 mm 8.61 1 8.61
75 mm 0.83 1 0.83
75 mm 18.28 1 18.28
75 mm 18.40 1 18.40
75 mm 0.69 1 0.69
75 mm 4.24 1 4.24
75 mm 2.54 14 35.61
75 mm 1.20 14 16.85
75 mm 1.20 12 14.44
75 mm 3.23 12 38.75
75 mm 2.91 4 11.65
75 mm 1.45 4 5.80
75 mm 1.01 24 24.26
75 mm 1.25 24 29.97
75 mm 0.53 4 2.11
75 mm 1.25 4 4.99
75 mm 3.44 6 20.65
75 mm 1.54 6 9.26
75 mm 0.71 5 3.55
75 mm 0.83 5 4.15
75 mm 1.01 26 26.28
75 mm 1.25 26 32.46
75 mm 0.53 4 2.11
75 mm 1.25 4 4.99
75 mm 0.83 1 0.83
75 mm 0.97 1 0.97
75 mm 2.92 1 2.92
75 mm 9.93 1 9.93
75 mm 8.40 1 8.40
75 mm 13.93 1 13.93
75 mm 2.21 1 2.21
75 mm 1.72 1 1.72
75 mm 2.97 1 2.97
75 mm 9.59 1 9.59
75 mm 1.05 1 1.05
75 mm 1.12 1 1.12
75 mm 4.10 1 4.10
75 mm 1.95 1 1.95
75 mm 1.95 1 1.95
75 mm 1.95 1 1.95
75 mm 1.95 1 1.95
75 mm 1.95 1 1.95
75 mm 1.30 1 1.30
75 mm 1.30 1 1.30
75 mm 1.44 1 1.44
75 mm 0.93 1 0.93
75 mm 1.45 1 1.45
75 mm 1.45 1 1.45
75 mm 1.63 1 1.63
75 mm 1.63 1 1.63
75 mm 1.63 1 1.63
75 mm 1.63 1 1.63
75 mm 1.63 1 1.63
75 mm 1.40 1 1.40
75 mm 0.99 1 0.99
75 mm 0.73 1 0.73
75 mm 0.73 1 0.73
75 mm 2.72 1 2.72
75 mm 8.94 1 8.94
75 mm 0.83 1 0.83
75 mm 8.94 1 8.94
75 mm 7.49 1 7.49
75 mm 5.75 1 5.75
75 mm 2.14 1 2.14
75 mm 2.54 1 2.54
75 mm 1.20 1 1.20
75 mm 1.20 1 1.20
75 mm 3.23 1 3.23
75 mm 1.45 1 1.45
75 mm 2.91 1 2.91
75 mm 5.16 1 5.16
75 mm 1.98 1 1.98
75 mm 0.53 1 0.53
75 mm 4.57 1 4.57
75 mm 4.27 1 4.27
75 mm 4.95 1 4.95
75 mm 3.62 1 3.62
75 mm 2.54 1 2.54
75 mm 1.04 1 1.04
75 mm 1.72 1 1.72
75 mm 2.50 1 2.50
75 mm 1.78 1 1.78
75 mm 8.02 1 8.02
75 mm 6.76 1 6.76
75 mm 1.67 1 1.67
75 mm 5.04 1 5.04
75 mm 6.09 1 6.09
75 mm 0.50 1 0.50
75 mm 0.43 1 0.43
75 mm 1.07 1 1.07
75 mm 0.53 1 0.53
75 mm 1.16 1 1.16
75 mm 1.16 1 1.16
75 mm 1.68 1 1.68
75 mm 2.30 1 2.30
75 mm 1.74 1 1.74
75 mm 2.24 1 2.24
75 mm 5.60 1 5.60
75 mm 1.06 1 1.06
75 mm 0.31 1 0.31
75 mm 0.38 1 0.38
75 mm 6.23 1 6.23
75 mm 5.90 1 5.90
75 mm 1.16 1 1.16
75 mm 1.16 1 1.16
75 mm 5.67 1 5.67
75 mm 6.65 1 6.65
75 mm 1.43 1 1.43
75 mm 5.47 1 5.47
75 mm 0.36 1 0.36
75 mm 1.46 1 1.46
75 mm 1.58 1 1.58
75 mm 0.98 1 0.98
75 mm 2.40 1 2.40
75 mm 1.99 1 1.99
75 mm 12.99 1 12.99
75 mm 2.27 1 2.27
75 mm 0.58 1 0.58
75 mm 3.38 1 3.38
75 mm 0.32 1 0.32
75 mm 1.66 1 1.66
75 mm 8.60 1 8.60
75 mm 0.31 1 0.31
75 mm 0.94 1 0.94
75 mm 5.21 1 5.21
75 mm 1.94 1 1.94
75 mm 1.21 1 1.21
75 mm 0.27 1 0.27
75 mm 1.07 1 1.07
75 mm 5.19 1 5.19
75 mm 1.12 1 1.12
75 mm 9.47 1 9.47
75 mm 1.22 1 1.22
75 mm 1.27 1 1.27
75 mm 1.90 1 1.90
75 mm 5.31 1 5.31
75 mm 21.37 1 21.37
75 mm 0.96 1 0.96
75 mm 1.16 1 1.16
75 mm 0.66 1 0.66
75 mm 0.60 1 0.60
75 mm 0.65 1 0.65
75 mm 11.71 1 11.71
75 mm 0.58 1 0.58
75 mm 0.72 1 0.72
75 mm 1.05 1 1.05
75 mm 0.91 1 0.91
75 mm 1.55 1 1.55
75 mm 0.35 1 0.35
75 mm 1.25 1 1.25
75 mm 1.01 1 1.01
75 mm 1.25 1 1.25
75 mm 0.53 1 0.53
75 mm 1.54 1 1.54
75 mm 3.44 1 3.44
75 mm 0.71 1 0.71
75 mm 0.83 1 0.83
75 mm 7.58 1 7.58
75 mm 9.88 1 9.88
75 mm 1.46 1 1.46
75 mm 0.53 1 0.53
75 mm 0.23 1 0.23
75 mm 2.79 1 2.79
75 mm 0.81 1 0.81
75 mm 3.15 1 3.15
75 mm 0.35 1 0.35
75 mm 4.42 1 4.42
75 mm 0.29 1 0.29
75 mm 4.80 1 4.80
75 mm 0.38 1 0.38
75 mm 0.66 1 0.66
75 mm 0.66 1 0.66
75 mm 0.52 1 0.52
75 mm 0.53 1 0.53
75 mm 0.60 1 0.60
75 mm 0.60 1 0.60
75 mm 2.43 1 2.43
75 mm 0.65 1 0.65
75 mm 3.54 1 3.54
75 mm 1.85 1 1.85
75 mm 1.29 1 1.29
75 mm 1.29 1 1.29
75 mm 8.70 1 8.70
75 mm 1.08 1 1.08
75 mm 3.38 1 3.38
75 mm 0.68 1 0.68
75 mm 4.16 1 4.16
75 mm 1.69 1 1.69
75 mm 0.58 1 0.58
75 mm 4.97 1 4.97
75 mm 5.93 1 5.93
75 mm 2.55 1 2.55
75 mm 2.21 1 2.21
75 mm 9.55 1 9.55
75 mm 10.42 1 10.42
75 mm 0.99 1 0.99
75 mm 0.99 1 0.99
75 mm 0.35 1 0.35
75 mm 0.46 1 0.46
75 mm 0.39 1 0.39
75 mm 1.95 1 1.95
75 mm 1.95 1 1.95
75 mm 0.49 1 0.49
75 mm 1.14 1 1.14
75 mm 2.15 1 2.15
75 mm 0.76 1 0.76
75 mm 0.44 1 0.44
75 mm 0.31 1 0.31
75 mm 1.01 1 1.01
75 mm 0.46 1 0.46
75 mm 0.47 1 0.47
75 mm 0.87 1 0.87
75 mm 1.00 1 1.00
75 mm 6.14 1 6.14
75 mm 0.30 1 0.30
75 mm 1.45 1 1.45
75 mm 7.06 1 7.06
75 mm 1.06 1 1.06
75 mm 0.47 1 0.47
75 mm 2.00 1 2.00
75 mm 0.29 1 0.29
75 mm 0.29 1 0.29
75 mm 0.29 1 0.29
75 mm 0.62 1 0.62
75 mm 0.62 1 0.62
75 mm 1.17 1 1.17
75 mm 0.29 1 0.29
75 mm 0.29 1 0.29
75 mm 0.29 1 0.29
75 mm 0.29 1 0.29
75 mm 0.12 1 0.12
75 mm 0.24 1 0.24
75 mm 1.71 1 1.71
75 mm 0.34 1 0.34
75 mm 0.34 1 0.34
75 mm 0.38 1 0.38
75 mm 1.14 1 1.14
75 mm 0.43 1 0.43
75 mm 2.25 1 2.25
75 mm 8.76 1 8.76
75 mm 4.30 1 4.30
75 mm 2.21 1 2.21
75 mm 1.04 1 1.04
75 mm 1.04 1 1.04
75 mm 1.92 1 1.92
75 mm 1.93 1 1.93
75 mm 1.14 1 1.14
75 mm 0.43 1 0.43
75 mm 0.23 1 0.23
75 mm 2.79 1 2.79
75 mm 0.81 1 0.81
75 mm 4.42 1 4.42
75 mm 3.15 1 3.15
75 mm 0.36 1 0.36
75 mm 0.38 1 0.38
75 mm 0.29 1 0.29
75 mm 2.30 1 2.30
75 mm 2.85 1 2.85
75 mm 2.08 1 2.08
75 mm 1.49 1 1.49
75 mm 1.57 1 1.57
75 mm 1.85 1 1.85
75 mm 1.85 1 1.85
75 mm 1.11 1 1.11
75 mm 1.11 1 1.11
75 mm 0.59 1 0.59
75 mm 0.63 1 0.63
75 mm 0.63 1 0.63
75 mm 0.63 1 0.63
75 mm 0.75 1 0.75
75 mm 0.75 1 0.75
75 mm 0.75 1 0.75
75 mm 0.70 1 0.70
75 mm 0.70 1 0.70
75 mm 1.22 1 1.22
75 mm 0.37 1 0.37
75 mm 0.37 1 0.37
75 mm 0.37 1 0.37
75 mm 0.37 1 0.37
75 mm 0.36 1 0.36
75 mm 0.36 1 0.36
75 mm 0.37 1 0.37
75 mm 0.94 1 0.94
75 mm 1.88 1 1.88
75 mm 1.07 1 1.07
75 mm 1.55 1 1.55
75 mm 0.49 1 0.49
75 mm 4.55 1 4.55
75 mm 0.52 1 0.52
75 mm 1.36 1 1.36
75 mm 1.42 1 1.42
75 mm 9.77 1 9.77
75 mm 4.41 1 4.41
75 mm 3.90 1 3.90
75 mm 3.17 1 3.17
75 mm 3.44 1 3.44
75 mm 2.35 1 2.35
75 mm 1.57 1 1.57
75 mm 1.56 1 1.56
75 mm 0.84 1 0.84
75 mm 1.34 1 1.34
75 mm 1.34 1 1.34
75 mm 1.34 1 1.34
75 mm 2.30 1 2.30
75 mm 0.75 1 0.75
75 mm 1.69 1 1.69
75 mm 11.87 1 11.87
75 mm 1.40 1 1.40
75 mm 1.41 1 1.41
75 mm 3.78 1 3.78
75 mm 2.27 1 2.27
75 mm 0.39 1 0.39
75 mm 1.19 1 1.19
75 mm 1.19 1 1.19
75 mm 1.52 1 1.52
75 mm 5.41 1 5.41
75 mm 1.10 1 1.10
75 mm 2.73 1 2.73
75 mm 1.18 1 1.18
75 mm 1.19 1 1.19
75 mm 3.80 1 3.80
75 mm 1.71 1 1.71
75 mm 1.51 1 1.51
75 mm 0.63 1 0.63
75 mm Total 1917.14

100 mm 3.20 2 6.40


100 mm 3.86 14 54.06
100 mm 0.83 14 11.68
100 mm 0.85 12 10.15
100 mm 4.55 12 54.57
100 mm 0.29 4 1.17
100 mm 4.25 4 16.98
100 mm 5.00 39 195.00
100 mm 0.61 24 14.64
100 mm 0.40 4 1.60
100 mm 1.49 4 5.96
100 mm 1.87 6 11.23
100 mm 3.33 6 19.99
100 mm 4.50 37 166.50
100 mm 0.61 26 15.86
100 mm 0.40 4 1.60
100 mm 1.49 4 5.96
100 mm 0.49 1 0.49
100 mm 0.49 1 0.49
100 mm 0.49 1 0.49
100 mm 0.49 1 0.49
100 mm 0.49 1 0.49
100 mm 0.49 1 0.49
100 mm 0.44 1 0.44
100 mm 0.44 1 0.44
100 mm 0.44 1 0.44
100 mm 0.44 1 0.44
100 mm 0.44 1 0.44
100 mm 0.44 1 0.44
100 mm 1.03 1 1.03
100 mm 3.39 1 3.39
100 mm 0.74 1 0.74
100 mm 3.39 1 3.39
100 mm 0.74 1 0.74
100 mm 30.16 1 30.16
100 mm 18.08 1 18.08
100 mm 1.85 1 1.85
100 mm 0.89 1 0.89
100 mm 2.46 1 2.46
100 mm 0.83 1 0.83
100 mm 3.86 1 3.86
100 mm 0.85 1 0.85
100 mm 4.55 1 4.55
100 mm 0.29 1 0.29
100 mm 4.25 1 4.25
100 mm 1.20 1 1.20
100 mm 2.42 1 2.42
100 mm 0.82 1 0.82
100 mm 3.08 1 3.08
100 mm 2.71 1 2.71
100 mm 0.50 1 0.50
100 mm 0.35 1 0.35
100 mm 2.41 1 2.41
100 mm 0.35 1 0.35
100 mm 2.41 1 2.41
100 mm 0.35 1 0.35
100 mm 2.41 1 2.41
100 mm 0.35 1 0.35
100 mm 2.41 1 2.41
100 mm 0.35 1 0.35
100 mm 2.41 1 2.41
100 mm 0.35 1 0.35
100 mm 2.41 1 2.41
100 mm 0.35 1 0.35
100 mm 2.41 1 2.41
100 mm 0.90 1 0.90
100 mm 1.75 1 1.75
100 mm 4.37 1 4.37
100 mm 3.62 1 3.62
100 mm 0.77 1 0.77
100 mm 3.58 1 3.58
100 mm 4.60 1 4.60
100 mm 0.70 1 0.70
100 mm 1.71 1 1.71
100 mm 3.07 1 3.07
100 mm 0.36 1 0.36
100 mm 3.05 1 3.05
100 mm 0.36 1 0.36
100 mm 3.05 1 3.05
100 mm 0.36 1 0.36
100 mm 3.05 1 3.05
100 mm 0.36 1 0.36
100 mm 3.05 1 3.05
100 mm 0.36 1 0.36
100 mm 3.05 1 3.05
100 mm 0.36 1 0.36
100 mm 3.05 1 3.05
100 mm 2.72 1 2.72
100 mm 0.30 1 0.30
100 mm 2.79 1 2.79
100 mm 0.30 1 0.30
100 mm 3.04 1 3.04
100 mm 3.36 1 3.36
100 mm 11.68 1 11.68
100 mm 9.19 1 9.19
100 mm 5.37 1 5.37
100 mm 1.23 1 1.23
100 mm 0.65 1 0.65
100 mm 0.66 1 0.66
100 mm 2.67 1 2.67
100 mm 9.88 1 9.88
100 mm 1.02 1 1.02
100 mm 6.67 1 6.67
100 mm 5.55 1 5.55
100 mm 0.48 1 0.48
100 mm 12.87 1 12.87
100 mm 0.94 1 0.94
100 mm 5.34 1 5.34
100 mm 0.64 1 0.64
100 mm 13.44 1 13.44
100 mm 5.78 1 5.78
100 mm 1.31 1 1.31
100 mm 9.58 1 9.58
100 mm 6.00 1 6.00
100 mm 1.97 1 1.97
100 mm 1.05 1 1.05
100 mm 14.09 1 14.09
100 mm 0.40 1 0.40
100 mm 3.42 1 3.42
100 mm 0.62 1 0.62
100 mm 13.01 1 13.01
100 mm 0.20 1 0.20
100 mm 13.14 1 13.14
100 mm 3.69 1 3.69
100 mm 3.68 1 3.68
100 mm 4.20 1 4.20
100 mm 23.32 1 23.32
100 mm 3.79 1 3.79
100 mm 0.46 1 0.46
100 mm 0.93 1 0.93
100 mm 3.56 1 3.56
100 mm 15.04 1 15.04
100 mm 5.52 1 5.52
100 mm 0.61 1 0.61
100 mm 11.43 1 11.43
100 mm 0.09 1 0.09
100 mm 1.14 1 1.14
100 mm 2.10 1 2.10
100 mm 18.79 1 18.79
100 mm 2.07 1 2.07
100 mm 4.84 1 4.84
100 mm 0.66 1 0.66
100 mm 6.81 1 6.81
100 mm 2.42 1 2.42
100 mm 7.96 1 7.96
100 mm 2.07 1 2.07
100 mm 2.37 1 2.37
100 mm 28.55 1 28.55
100 mm 1.29 1 1.29
100 mm 0.84 1 0.84
100 mm 5.16 1 5.16
100 mm 1.82 1 1.82
100 mm 0.49 1 0.49
100 mm 3.49 1 3.49
100 mm 0.56 1 0.56
100 mm 1.33 1 1.33
100 mm 0.57 1 0.57
100 mm 0.57 1 0.57
100 mm 0.81 1 0.81
100 mm 1.21 1 1.21
100 mm 1.43 1 1.43
100 mm 1.05 1 1.05
100 mm 1.06 1 1.06
100 mm 4.38 1 4.38
100 mm 0.92 1 0.92
100 mm 3.83 1 3.83
100 mm 11.66 1 11.66
100 mm 0.84 1 0.84
100 mm 1.55 1 1.55
100 mm 0.61 1 0.61
100 mm 0.40 1 0.40
100 mm 1.49 1 1.49
100 mm 3.33 1 3.33
100 mm 1.87 1 1.87
100 mm 10.03 1 10.03
100 mm 2.57 1 2.57
100 mm 8.21 1 8.21
100 mm 4.96 1 4.96
100 mm 4.17 1 4.17
100 mm 5.11 1 5.11
100 mm 2.46 1 2.46
100 mm 0.80 1 0.80
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 4.02 1 4.02
100 mm 6.81 1 6.81
100 mm 0.52 1 0.52
100 mm 0.52 1 0.52
100 mm 0.49 1 0.49
100 mm 0.49 1 0.49
100 mm 2.61 1 2.61
100 mm 0.80 1 0.80
100 mm 9.19 1 9.19
100 mm 1.05 1 1.05
100 mm 0.63 1 0.63
100 mm 0.45 1 0.45
100 mm 5.99 1 5.99
100 mm 1.94 1 1.94
100 mm 11.46 1 11.46
100 mm 1.50 1 1.50
100 mm 1.10 1 1.10
100 mm 3.36 1 3.36
100 mm 1.07 1 1.07
100 mm 0.58 1 0.58
100 mm 0.38 1 0.38
100 mm 0.38 1 0.38
100 mm 3.30 1 3.30
100 mm 9.37 1 9.37
100 mm 1.44 1 1.44
100 mm 0.42 1 0.42
100 mm 3.01 1 3.01
100 mm 8.41 1 8.41
100 mm 0.50 1 0.50
100 mm 4.77 1 4.77
100 mm 3.46 1 3.46
100 mm 2.89 1 2.89
100 mm 7.12 1 7.12
100 mm 0.88 1 0.88
100 mm 9.28 1 9.28
100 mm 0.79 1 0.79
100 mm 2.74 1 2.74
100 mm 6.92 1 6.92
100 mm 5.80 1 5.80
100 mm 6.36 1 6.36
100 mm 3.42 1 3.42
100 mm 0.33 1 0.33
100 mm 0.33 1 0.33
100 mm 8.83 1 8.83
100 mm 2.95 1 2.95
100 mm 0.62 1 0.62
100 mm 8.81 1 8.81
100 mm 1.20 1 1.20
100 mm 3.50 1 3.50
100 mm 0.40 1 0.40
100 mm 10.08 1 10.08
100 mm 13.04 1 13.04
100 mm 8.42 1 8.42
100 mm 0.92 1 0.92
100 mm 1.24 1 1.24
100 mm 2.11 1 2.11
100 mm 1.84 1 1.84
100 mm 0.40 1 0.40
100 mm 2.48 1 2.48
100 mm 9.15 1 9.15
100 mm 1.08 1 1.08
100 mm 6.42 1 6.42
100 mm 3.81 1 3.81
100 mm 0.30 1 0.30
100 mm 6.08 1 6.08
100 mm 0.45 1 0.45
100 mm 0.43 1 0.43
100 mm 0.43 1 0.43
100 mm 1.67 1 1.67
100 mm 4.26 1 4.26
100 mm 5.72 1 5.72
100 mm 0.44 1 0.44
100 mm 0.43 1 0.43
100 mm 0.44 1 0.44
100 mm 1.67 1 1.67
100 mm 4.25 1 4.25
100 mm 0.36 1 0.36
100 mm 0.36 1 0.36
100 mm 0.46 1 0.46
100 mm 11.07 1 11.07
100 mm 3.46 1 3.46
100 mm 5.03 1 5.03
100 mm 1.71 1 1.71
100 mm 4.67 1 4.67
100 mm 1.53 1 1.53
100 mm 1.53 1 1.53
100 mm 2.60 1 2.60
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 1.41 1 1.41
100 mm 7.33 1 7.33
100 mm 1.12 1 1.12
100 mm 1.18 1 1.18
100 mm 8.73 1 8.73
100 mm 4.43 1 4.43
100 mm 5.20 1 5.20
100 mm 0.85 1 0.85
100 mm 0.52 1 0.52
100 mm 1.78 1 1.78
100 mm 2.75 1 2.75
100 mm 8.23 1 8.23
100 mm 2.55 1 2.55
100 mm 7.35 1 7.35
100 mm 1.16 1 1.16
100 mm 1.10 1 1.10
100 mm 4.96 1 4.96
100 mm 4.17 1 4.17
100 mm 0.80 1 0.80
100 mm 2.43 1 2.43
100 mm 13.43 1 13.43
100 mm 2.18 1 2.18
100 mm 2.19 1 2.19
100 mm 7.19 1 7.19
100 mm 3.10 1 3.10
100 mm 16.51 1 16.51
100 mm 7.91 1 7.91
100 mm 0.98 1 0.98
100 mm 0.98 1 0.98
100 mm 0.50 1 0.50
100 mm 0.48 1 0.48
100 mm 0.48 1 0.48
100 mm 2.00 1 2.00
100 mm 0.46 1 0.46
100 mm 7.03 1 7.03
100 mm 4.23 1 4.23
100 mm 1.80 1 1.80
100 mm 7.04 1 7.04
100 mm 3.32 1 3.32
100 mm 1.07 1 1.07
100 mm 1.06 1 1.06
100 mm 4.26 1 4.26
100 mm 5.72 1 5.72
100 mm 4.26 1 4.26
100 mm 0.44 1 0.44
100 mm 1.67 1 1.67
100 mm 0.43 1 0.43
100 mm 0.41 1 0.41
100 mm 0.54 1 0.54
100 mm 1.67 1 1.67
100 mm 0.42 1 0.42
100 mm 0.43 1 0.43
100 mm 0.45 1 0.45
100 mm 0.36 1 0.36
100 mm 0.35 1 0.35
100 mm 7.50 1 7.50
100 mm 1.31 1 1.31
100 mm 3.30 1 3.30
100 mm 3.02 1 3.02
100 mm 7.60 1 7.60
100 mm 6.05 1 6.05
100 mm 5.41 1 5.41
100 mm 1.10 1 1.10
100 mm 0.56 1 0.56
100 mm 0.49 1 0.49
100 mm 0.83 1 0.83
100 mm 7.98 1 7.98
100 mm 8.47 1 8.47
100 mm 3.03 1 3.03
100 mm 0.80 1 0.80
100 mm 0.79 1 0.79
100 mm 5.62 1 5.62
100 mm 4.91 1 4.91
100 mm 2.75 1 2.75
100 mm 0.57 1 0.57
100 mm 0.55 1 0.55
100 mm 4.94 1 4.94
100 mm 2.82 1 2.82
100 mm 0.52 1 0.52
100 mm 0.52 1 0.52
100 mm 2.00 1 2.00
100 mm 0.91 1 0.91
100 mm 1.01 1 1.01
100 mm 1.01 1 1.01
100 mm 3.27 1 3.27
100 mm 0.83 1 0.83
100 mm 0.45 1 0.45
100 mm 5.00 39 195.00
100 mm 5.00 5 25.00
100 mm 4.50 37 166.50
100 mm 4.50 3 13.50
100 mm 4.50 1 4.50
100 mm 15.26 1 15.26
100 mm 16.39 1 16.39
100 mm 11.94 1 11.94
100 mm 15.89 1 15.89
100 mm 7.39 1 7.39
100 mm 7.64 1 7.64
100 mm 3.05 1 3.05
100 mm 7.78 1 7.78
100 mm 7.88 1 7.88
100 mm 2.61 1 2.61
100 mm 10.59 1 10.59
100 mm 0.60 1 0.60
100 mm 4.28 1 4.28
100 mm 11.44 1 11.44
100 mm 0.80 1 0.80
100 mm 1.32 1 1.32
100 mm 0.42 1 0.42
100 mm 1.98 1 1.98
100 mm 1.51 1 1.51
100 mm 1.19 1 1.19
100 mm 1.19 1 1.19
100 mm 1.19 1 1.19
100 mm 1.19 1 1.19
100 mm 1.19 1 1.19
100 mm 1.19 1 1.19
100 mm 1.19 1 1.19
100 mm 1.70 1 1.70
100 mm 5.68 1 5.68
100 mm 6.25 1 6.25
100 mm 2.08 1 2.08
100 mm 0.60 1 0.60
100 mm 5.00 1 5.00
100 mm 2.71 1 2.71
100 mm 1.76 1 1.76
100 mm 1.76 1 1.76
100 mm 1.76 1 1.76
100 mm 1.76 1 1.76
100 mm 1.76 1 1.76
100 mm 1.76 1 1.76
100 mm 1.55 1 1.55
100 mm 0.20 1 0.20
100 mm 15.04 1 15.04
100 mm 15.10 1 15.10
100 mm 8.76 1 8.76
100 mm 4.03 1 4.03
100 mm 20.26 1 20.26
100 mm 1.82 1 1.82
100 mm 10.70 1 10.70
100 mm 2.22 1 2.22
100 mm 7.96 1 7.96
100 mm 1.28 1 1.28
100 mm 10.74 1 10.74
100 mm 1.28 1 1.28
100 mm 16.80 1 16.80
100 mm 7.52 1 7.52
100 mm 0.96 1 0.96
100 mm 6.70 1 6.70
100 mm 2.25 1 2.25
100 mm 1.66 1 1.66
100 mm 4.32 1 4.32
100 mm 1.21 1 1.21
100 mm 1.42 1 1.42
100 mm 13.26 1 13.26
100 mm 7.84 1 7.84
100 mm 4.60 1 4.60
100 mm 6.61 1 6.61
100 mm 4.74 1 4.74
100 mm 8.84 1 8.84
100 mm 7.85 1 7.85
100 mm 7.58 1 7.58
100 mm 3.44 1 3.44
100 mm 6.21 1 6.21
100 mm 1.51 1 1.51
100 mm 12.89 1 12.89
100 mm 1.81 1 1.81
100 mm 12.15 1 12.15
100 mm 1.33 1 1.33
100 mm 13.00 1 13.00
100 mm 7.19 1 7.19
100 mm 2.08 1 2.08
100 mm 2.76 1 2.76
100 mm 0.83 1 0.83
100 mm 1.83 1 1.83
100 mm 13.37 1 13.37
100 mm 4.35 1 4.35
100 mm 8.42 1 8.42
100 mm 4.61 1 4.61
100 mm 2.08 1 2.08
100 mm 12.32 1 12.32
100 mm 8.38 1 8.38
100 mm 0.46 1 0.46
100 mm 7.56 1 7.56
100 mm 8.98 1 8.98
100 mm 0.59 1 0.59
100 mm 14.36 1 14.36
100 mm 10.32 1 10.32
100 mm 2.38 1 2.38
100 mm 4.34 1 4.34
100 mm 2.87 1 2.87
100 mm 7.82 1 7.82
100 mm 5.82 1 5.82
100 mm 2.33 1 2.33
100 mm 6.89 1 6.89
100 mm 9.36 1 9.36
100 mm 3.76 1 3.76
100 mm 0.47 1 0.47
100 mm 3.93 1 3.93
100 mm 7.34 1 7.34
100 mm 4.68 1 4.68
100 mm 6.39 1 6.39
100 mm 4.59 1 4.59
100 mm 10.11 1 10.11
100 mm 19.49 1 19.49
100 mm 16.14 1 16.14
100 mm 15.44 1 15.44
100 mm 7.83 1 7.83
100 mm 0.74 1 0.74
100 mm 2.41 1 2.41
100 mm 1.12 1 1.12
100 mm 8.36 1 8.36
100 mm 2.09 1 2.09
100 mm 0.97 1 0.97
100 mm 7.95 1 7.95
100 mm 3.34 1 3.34
100 mm 6.42 1 6.42
100 mm 2.57 1 2.57
100 mm 5.19 1 5.19
100 mm 1.91 1 1.91
100 mm 5.34 1 5.34
100 mm 2.57 1 2.57
100 mm 0.75 1 0.75
100 mm 10.29 1 10.29
100 mm 3.57 1 3.57
100 mm 4.54 1 4.54
100 mm 11.27 1 11.27
100 mm 0.74 1 0.74
100 mm 0.74 1 0.74
100 mm 11.69 1 11.69
100 mm 5.32 1 5.32
100 mm 5.27 1 5.27
100 mm 0.49 1 0.49
100 mm 3.33 1 3.33
100 mm 5.82 1 5.82
100 mm 11.62 1 11.62
100 mm 0.90 1 0.90
100 mm 7.83 1 7.83
100 mm 7.38 1 7.38
100 mm 1.85 1 1.85
100 mm 4.80 1 4.80
100 mm 4.87 1 4.87
100 mm 5.75 1 5.75
100 mm 7.38 1 7.38
100 mm 1.85 1 1.85
100 mm 7.84 1 7.84
100 mm 4.60 1 4.60
100 mm 6.61 1 6.61
100 mm 8.84 1 8.84
100 mm 4.80 1 4.80
100 mm 10.89 1 10.89
100 mm 13.43 1 13.43
100 mm 7.44 1 7.44
100 mm 12.71 1 12.71
100 mm 7.55 1 7.55
100 mm 14.24 1 14.24
100 mm 4.80 1 4.80
100 mm 4.80 1 4.80
100 mm 4.41 1 4.41
100 mm 4.46 1 4.46
100 mm 2.92 1 2.92
100 mm 5.04 1 5.04
100 mm 5.19 1 5.19
100 mm 1.91 1 1.91
100 mm 2.89 1 2.89
100 mm 3.27 1 3.27
100 mm 2.57 1 2.57
100 mm 2.57 1 2.57
100 mm 10.13 1 10.13
100 mm 8.31 1 8.31
100 mm 8.33 1 8.33
100 mm 0.80 1 0.80
100 mm 6.91 1 6.91
100 mm 1.72 1 1.72
100 mm 11.19 1 11.19
100 mm 6.51 1 6.51
100 mm 3.15 1 3.15
100 mm 10.36 1 10.36
100 mm 3.36 1 3.36
100 mm 9.79 1 9.79
100 mm 2.95 1 2.95
100 mm 9.33 1 9.33
100 mm 10.33 1 10.33
100 mm 3.01 1 3.01
100 mm 7.52 1 7.52
100 mm 8.87 1 8.87
100 mm 0.40 1 0.40
100 mm 6.22 1 6.22
100 mm 4.97 1 4.97
100 mm 8.19 1 8.19
100 mm 8.36 1 8.36
100 mm 8.80 1 8.80
100 mm 5.85 1 5.85
100 mm 1.13 1 1.13
100 mm 6.48 1 6.48
100 mm 6.27 1 6.27
100 mm 6.18 1 6.18
100 mm 6.18 1 6.18
100 mm 5.01 1 5.01
100 mm Total 3347.31

150 mm 5.00 14 70.00


150 mm 4.50 12 54.00
150 mm 4.50 14 63.00
150 mm 16.92 1 16.92
150 mm 4.21 1 4.21
150 mm 9.78 1 9.78
150 mm 0.66 1 0.66
150 mm 2.41 1 2.41
150 mm 2.15 1 2.15
150 mm 2.54 1 2.54
150 mm 2.63 1 2.63
150 mm 5.48 1 5.48
150 mm 5.48 1 5.48
150 mm 20.26 1 20.26
150 mm 13.33 1 13.33
150 mm 2.33 1 2.33
150 mm 10.82 1 10.82
150 mm 1.96 1 1.96
150 mm 22.59 1 22.59
150 mm 0.99 1 0.99
150 mm 9.14 1 9.14
150 mm 22.49 1 22.49
150 mm 5.96 1 5.96
150 mm 2.04 1 2.04
150 mm 0.77 1 0.77
150 mm 5.94 1 5.94
150 mm 0.90 1 0.90
150 mm 14.66 1 14.66
150 mm 0.80 1 0.80
150 mm 20.34 1 20.34
150 mm 1.03 1 1.03
150 mm 28.91 1 28.91
150 mm 9.30 1 9.30
150 mm 9.35 1 9.35
150 mm 0.69 1 0.69
150 mm 10.80 1 10.80
150 mm 22.65 1 22.65
150 mm 1.08 1 1.08
150 mm 3.52 1 3.52
150 mm 9.38 1 9.38
150 mm 3.24 1 3.24
150 mm 9.42 1 9.42
150 mm 0.61 1 0.61
150 mm 15.99 1 15.99
150 mm 27.96 1 27.96
150 mm 1.21 1 1.21
150 mm 10.63 1 10.63
150 mm 0.53 1 0.53
150 mm 10.56 1 10.56
150 mm 17.95 1 17.95
150 mm 14.78 1 14.78
150 mm 7.02 1 7.02
150 mm 3.57 1 3.57
150 mm 11.90 1 11.90
150 mm 12.06 1 12.06
150 mm 2.84 1 2.84
150 mm 10.90 1 10.90
150 mm 4.81 1 4.81
150 mm 0.61 1 0.61
150 mm 6.58 1 6.58
150 mm 0.90 1 0.90
150 mm 6.09 1 6.09
150 mm 31.03 1 31.03
150 mm 17.30 1 17.30
150 mm 0.16 1 0.16
150 mm 0.16 1 0.16
150 mm 1.73 1 1.73
150 mm 19.60 1 19.60
150 mm 16.30 1 16.30
150 mm 30.40 1 30.40
150 mm 26.25 1 26.25
150 mm 30.95 1 30.95
150 mm 42.89 1 42.89
150 mm 4.60 1 4.60
150 mm 5.20 1 5.20
150 mm 12.38 1 12.38
150 mm 3.77 1 3.77
150 mm 22.03 1 22.03
150 mm 27.07 1 27.07
150 mm 28.27 1 28.27
150 mm 7.32 1 7.32
150 mm 12.06 1 12.06
150 mm 5.38 1 5.38
150 mm 0.60 1 0.60
150 mm 5.58 1 5.58
150 mm 0.75 1 0.75
150 mm 0.65 1 0.65
150 mm 21.76 1 21.76
150 mm 6.28 1 6.28
150 mm 1.94 1 1.94
150 mm 6.21 1 6.21
150 mm 1.59 1 1.59
150 mm 1.59 1 1.59
150 mm 1.61 1 1.61
150 mm 1.64 1 1.64
150 mm 0.55 1 0.55
150 mm 1.24 1 1.24
150 mm 1.24 1 1.24
150 mm 1.24 1 1.24
150 mm 0.94 1 0.94
150 mm 0.94 1 0.94
150 mm 1.77 1 1.77
150 mm 1.89 1 1.89
150 mm 1.12 1 1.12
150 mm 0.76 1 0.76
150 mm 1.99 1 1.99
150 mm 1.44 1 1.44
150 mm 1.44 1 1.44
150 mm 1.44 1 1.44
150 mm 2.56 1 2.56
150 mm 6.62 1 6.62
150 mm 0.91 1 0.91
150 mm 0.91 1 0.91
150 mm 1.26 1 1.26
150 mm 1.26 1 1.26
150 mm 1.40 1 1.40
150 mm 2.00 1 2.00
150 mm 1.38 1 1.38
150 mm 1.23 1 1.23
150 mm 1.24 1 1.24
150 mm 1.35 1 1.35
150 mm 1.41 1 1.41
150 mm 1.42 1 1.42
150 mm Total 1109.41

200 mm 78.82 1 78.82


200 mm 58.16 1 58.16
200 mm 70.02 1 70.02
200 mm 71.00 1 71.00
200 mm 62.22 1 62.22
200 mm 76.24 1 76.24
200 mm 8.03 1 8.03
200 mm 6.92 1 6.92
200 mm 23.91 1 23.91
200 mm 23.68 1 23.68
200 mm 12.42 1 12.42
200 mm 35.56 1 35.56
200 mm 33.41 1 33.41
200 mm 20.03 1 20.03
200 mm 34.50 1 34.50
200 mm 24.46 1 24.46
200 mm 14.03 1 14.03
200 mm 13.66 1 13.66
200 mm 34.07 1 34.07
200 mm 27.60 1 27.60
200 mm 13.22 1 13.22
200 mm 23.91 1 23.91
200 mm 19.61 1 19.61
200 mm 6.61 1 6.61
200 mm 15.47 1 15.47
200 mm 15.17 1 15.17
200 mm 69.51 1 69.51
200 mm 68.34 1 68.34
200 mm 72.40 1 72.40
200 mm 56.90 1 56.90
200 mm 61.29 1 61.29
200 mm 75.23 1 75.23
200 mm 5.21 1 5.21
200 mm 6.27 1 6.27
200 mm 33.75 1 33.75
200 mm 35.12 1 35.12
200 mm 7.81 1 7.81
200 mm 10.81 1 10.81
200 mm 0.48 1 0.48
200 mm 0.49 1 0.49
200 mm 1.22 1 1.22
200 mm 0.39 1 0.39
200 mm 59.46 1 59.46
200 mm 43.66 1 43.66
200 mm 25.23 1 25.23
200 mm 52.96 1 52.96
200 mm 48.76 1 48.76
200 mm 42.62 1 42.62
200 mm 4.37 1 4.37
200 mm 19.79 1 19.79
200 mm 5.11 1 5.11
200 mm 23.16 1 23.16
200 mm 2.20 1 2.20
200 mm 1.13 1 1.13
200 mm 11.88 1 11.88
200 mm 31.46 1 31.46
200 mm 44.65 1 44.65
200 mm 5.67 1 5.67
200 mm 43.49 1 43.49
200 mm 41.10 1 41.10
200 mm 0.69 1 0.69
200 mm Total 1835.30

32 mm 0.85 1 0.85
32 mm 0.84 1 0.84
32 mm 0.64 1 0.64
32 mm 5.33 1 5.33
32 mm 0.70 1 0.70
32 mm 0.60 1 0.60
32 mm 1.12 1 1.12
32 mm 2.36 1 2.36
32 mm 2.48 1 2.48
32 mm 1.13 1 1.13
32 mm 1.36 1 1.36
32 mm 0.78 1 0.78
32 mm 1.46 1 1.46
32 mm 1.56 1 1.56
32 mm 1.99 1 1.99
32 mm 2.47 1 2.47
32 mm 1.18 1 1.18
32 mm 1.35 1 1.35
32 mm 1.51 1 1.51
32 mm 1.91 1 1.91
32 mm 0.65 1 0.65
32 mm 0.59 1 0.59
32 mm 6.76 1 6.76
32 mm 5.24 1 5.24
32 mm 0.90 1 0.90
32 mm 0.64 1 0.64
32 mm 2.36 1 2.36
32 mm 2.26 1 2.26
32 mm 0.40 1 0.40
32 mm 0.40 1 0.40
32 mm 5.26 1 5.26
32 mm 2.64 1 2.64
32 mm 0.10 1 0.10
32 mm 0.35 1 0.35
32 mm 0.68 1 0.68
32 mm 1.52 1 1.52
32 mm 3.61 1 3.61
32 mm 3.36 1 3.36
32 mm 0.31 1 0.31
32 mm 0.69 1 0.69
32 mm 1.95 1 1.95
32 mm 0.63 1 0.63
32 mm 1.89 1 1.89
32 mm 2.59 1 2.59
32 mm 0.58 1 0.58
32 mm 2.53 1 2.53
32 mm 0.78 1 0.78
32 mm 3.24 1 3.24
32 mm 0.44 1 0.44
32 mm 3.21 1 3.21
32 mm 0.73 1 0.73
32 mm 2.24 1 2.24
32 mm 5.99 1 5.99
32 mm 0.29 1 0.29
32 mm 0.38 1 0.38
32 mm 0.05 1 0.05
32 mm 0.63 1 0.63
32 mm 2.44 1 2.44
32 mm 0.93 1 0.93
32 mm 1.80 1 1.80
32 mm 1.24 1 1.24
32 mm 1.17 1 1.17
32 mm 0.78 1 0.78
32 mm 1.53 1 1.53
32 mm 1.48 1 1.48
32 mm 3.42 1 3.42
32 mm 0.26 1 0.26
32 mm 2.06 1 2.06
32 mm 4.76 1 4.76
32 mm 1.73 1 1.73
32 mm 2.08 1 2.08
32 mm 0.33 1 0.33
32 mm 1.79 1 1.79
32 mm 2.46 1 2.46
32 mm 0.48 1 0.48
32 mm 0.16 1 0.16
32 mm 2.22 1 2.22
32 mm 1.50 1 1.50
32 mm 0.94 1 0.94
32 mm 0.87 1 0.87
32 mm 0.85 1 0.85
32 mm 2.61 1 2.61
32 mm 0.41 1 0.41
32 mm 2.97 1 2.97
32 mm 1.50 1 1.50
32 mm 2.32 1 2.32
32 mm 1.48 1 1.48
32 mm 0.78 1 0.78
32 mm 0.48 1 0.48
32 mm 1.51 1 1.51
32 mm 2.31 1 2.31
32 mm 2.11 1 2.11
32 mm 1.93 1 1.93
32 mm 1.86 1 1.86
32 mm 1.33 1 1.33
32 mm 2.50 1 2.50
32 mm 0.26 1 0.26
32 mm 1.09 1 1.09
32 mm 1.13 1 1.13
32 mm 3.21 1 3.21
32 mm 2.32 1 2.32
32 mm 2.55 1 2.55
32 mm 2.57 1 2.57
32 mm 1.22 1 1.22
32 mm Total 176.19

40 mm 1.09 1 1.09
40 mm 0.74 1 0.74
40 mm 3.03 1 3.03
40 mm 2.11 1 2.11
40 mm 0.46 1 0.46
40 mm 0.56 1 0.56
40 mm 3.51 1 3.51
40 mm 6.53 1 6.53
40 mm 6.55 1 6.55
40 mm 0.35 1 0.35
40 mm 0.35 1 0.35
40 mm 0.35 1 0.35
40 mm 1.44 1 1.44
40 mm 1.53 1 1.53
40 mm 2.16 1 2.16
40 mm 1.51 1 1.51
40 mm 1.27 1 1.27
40 mm 0.57 1 0.57
40 mm 2.26 1 2.26
40 mm 1.26 1 1.26
40 mm Total 37.65

50 mm 4.88 1 4.88
50 mm 14.26 1 14.26
50 mm 3.62 1 3.62
50 mm 3.56 1 3.56
50 mm 1.33 1 1.33
50 mm 0.63 1 0.63
50 mm 2.14 1 2.14
50 mm 2.14 1 2.14
50 mm 2.21 1 2.21
50 mm 2.23 1 2.23
50 mm 2.18 1 2.18
50 mm 1.16 1 1.16
50 mm 0.82 1 0.82
50 mm 0.66 1 0.66
50 mm 1.01 1 1.01
50 mm 1.02 1 1.02
50 mm 1.01 1 1.01
50 mm 0.78 1 0.78
50 mm 1.25 1 1.25
50 mm 0.59 1 0.59
50 mm 1.27 1 1.27
50 mm 1.27 1 1.27
50 mm 0.61 1 0.61
50 mm 1.13 1 1.13
50 mm 1.13 1 1.13
50 mm 1.35 1 1.35
50 mm 2.25 1 2.25
50 mm 0.49 1 0.49
50 mm 1.02 1 1.02
50 mm 4.44 1 4.44
50 mm 1.21 1 1.21
50 mm Total 63.63

75 mm 1.44 1 1.44
75 mm 1.37 1 1.37
75 mm 6.02 1 6.02
75 mm 0.34 1 0.34
75 mm 0.55 1 0.55
75 mm 0.42 1 0.42
75 mm 4.00 1 4.00
75 mm 1.00 1 1.00
75 mm 2.42 1 2.42
75 mm 0.47 1 0.47
75 mm 2.04 1 2.04
75 mm 2.77 1 2.77
75 mm 0.71 1 0.71
75 mm 1.83 1 1.83
75 mm 2.83 1 2.83
75 mm 0.66 1 0.66
75 mm 0.66 1 0.66
75 mm Total 29.51

100 mm 8.19 1 8.19


100 mm 1.41 1 1.41
100 mm 2.54 1 2.54
100 mm 7.13 1 7.13
100 mm 8.33 1 8.33
100 mm 13.99 1 13.99
100 mm 1.55 1 1.55
100 mm 2.29 1 2.29
100 mm 0.86 1 0.86
100 mm 5.04 1 5.04
100 mm 13.14 1 13.14
100 mm 0.91 1 0.91
100 mm 0.43 1 0.43
100 mm 2.03 1 2.03
100 mm 31.74 1 31.74
100 mm 3.10 1 3.10
100 mm 0.72 1 0.72
100 mm 1.25 1 1.25
100 mm 9.80 1 9.80
100 mm 0.94 1 0.94
100 mm 14.06 1 14.06
100 mm 1.04 1 1.04
100 mm 21.18 1 21.18
100 mm 2.69 1 2.69
100 mm 1.32 1 1.32
100 mm 0.66 1 0.66
100 mm 13.72 1 13.72
100 mm 5.45 1 5.45
100 mm 3.72 1 3.72
100 mm 14.35 1 14.35
100 mm 10.78 1 10.78
100 mm 1.82 1 1.82
100 mm 4.61 1 4.61
100 mm 4.49 1 4.49
100 mm 11.23 1 11.23
100 mm 6.11 1 6.11
100 mm 14.82 1 14.82
100 mm 13.84 1 13.84
100 mm 0.21 1 0.21
100 mm 5.20 1 5.20
100 mm 10.61 1 10.61
100 mm 5.56 1 5.56
100 mm 1.35 1 1.35
100 mm Total 284.18

150 mm 10.54 1 10.54


150 mm 13.50 1 13.50
150 mm 10.73 1 10.73
150 mm 13.52 1 13.52
150 mm 19.32 1 19.32
150 mm 14.98 1 14.98
150 mm 17.15 1 17.15
150 mm Total 99.74

200 mm 30.56 1 30.56


200 mm 23.58 1 23.58
200 mm 29.98 1 29.98
200 mm 12.73 1 12.73
200 mm 31.66 1 31.66
200 mm 13.43 1 13.43
200 mm 24.23 1 24.23
200 mm 1.87 1 1.87
200 mm 65.87 1 65.87
200 mm 63.43 1 63.43
200 mm 1.20 1 1.20
200 mm 24.44 1 24.44
200 mm 2.82 1 2.82
200 mm Total 325.80

75 mm 4.50 1 4.50
75 mm 9.94 1 9.94
75 mm 86.99 1 86.99
75 mm Total 101.43

100 mm 4.50 1 4.50


100 mm 4.50 1 4.50
100 mm 4.50 1 4.50
100 mm 4.50 1 4.50
100 mm 1.84 1 1.84
100 mm 1.66 1 1.66
100 mm 5.07 1 5.07
100 mm 3.33 1 3.33
100 mm 3.33 1 3.33
100 mm 51.12 1 51.12
100 mm 19.26 1 19.26
100 mm 96.13 1 96.13
100 mm 96.71 1 96.71
100 mm Total 296.46

75 mm 0.53 1 0.53
75 mm 5.34 1 5.34
75 mm 1.94 1 1.94
75 mm 3.48 1 3.48
75 mm Total 11.30

100 mm 2.90 1 2.90


100 mm 6.20 1 6.20
100 mm 5.63 1 5.63
100 mm Total 14.74

200 mm 14.46 1 14.46


200 mm 3.40 1 3.40
200 mm 9.88 1 9.88
200 mm 1.04 1 1.04
200 mm 1.29 1 1.29
200 mm 14.40 1 14.40
200 mm 0.80 1 0.80
200 mm 1.47 1 1.47
200 mm 1.17 1 1.17
200 mm 0.58 1 0.58
200 mm 0.39 1 0.39
200 mm 15.46 1 15.46
200 mm 14.40 1 14.40
200 mm 14.40 1 14.40
200 mm 6.82 1 6.82
200 mm 7.14 1 7.14
200 mm 14.81 1 14.81
200 mm 12.36 1 12.36
200 mm 33.51 1 33.51
200 mm 7.62 1 7.62
200 mm 6.27 1 6.27
200 mm 32.44 1 32.44
200 mm 20.43 1 20.43
200 mm 0.59 1 0.59
200 mm Total 235.13

75 mm 49.00 1 49.00
75 mm 2.00 1 2.00
75 mm 2.00 1 2.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 19.00 1 19.00
75 mm 73.00 1 73.00
75 mm 79.00 1 79.00
75 mm 1.00 24 24.00
75 mm 1.00 4 4.00
75 mm 1.00 6 6.00
75 mm 1.00 5 5.00
75 mm 1.00 26 26.00
75 mm 1.00 4 4.00
75 mm 3.00 1 3.00
75 mm 3.00 1 3.00
75 mm 3.00 1 3.00
75 mm 3.00 1 3.00
75 mm 24.00 1 24.00
75 mm Total 339.00

100 mm 1.00 1 1.00


100 mm 123.00 1 123.00
100 mm 10.00 1 10.00
100 mm 21.00 1 21.00
100 mm 3.00 1 3.00
100 mm 7.00 1 7.00
100 mm 1.00 14 14.00
100 mm 1.00 12 12.00
100 mm 1.00 4 4.00
100 mm 1.00 24 24.00
100 mm 1.00 4 4.00
100 mm 1.00 6 6.00
100 mm 1.00 26 26.00
100 mm 1.00 4 4.00
100 mm 1.00 1 1.00
100 mm 20.00 1 20.00
100 mm Total 280.00

150 mm 1.00 1 1.00


150 mm 1.00 1 1.00
150 mm 2.00 1 2.00
150 mm 40.00 1 40.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm Total 100.00

200 mm 2.00 1 2.00


200 mm 43.00 1 43.00
200 mm Total 45.00

75 mm 5.00 39 195.00
75 mm 5.00 5 25.00
75 mm 10.00 1 10.00
75 mm 29.00 1 29.00
75 mm 21.00 1 21.00
75 mm 11.00 1 11.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm Total 295.00

100 mm 5.00 39 195.00


100 mm 5.00 39 195.00
100 mm 5.00 5 25.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 17.00 1 17.00
100 mm 19.00 1 19.00
100 mm 24.00 1 24.00
100 mm Total 481.00

150 mm 1.00 14 14.00


150 mm 1.00 2 2.00
150 mm 19.00 1 19.00
150 mm Total 35.00

200 mm 1.00 2 2.00


200 mm Total 2.00

75x32 mm 1.00 14 14.00


75x32 mm 1.00 12 12.00
75x32 mm 1.00 4 4.00
75x32 mm 15.00 1 15.00
75x32 mm 6.00 1 6.00
75x32 mm 9.00 1 9.00
75x32 mm Total 60.00

75x40 mm 1.00 14 14.00


75x40 mm 1.00 12 12.00
75x40 mm 1.00 4 4.00
75x40 mm 3.00 1 3.00
75x40 mm 12.00 1 12.00
75x40 mm 5.00 1 5.00
75x40 mm Total 50.00

75x50 mm 1.00 2 2.00


75x50 mm 1.00 1 1.00
75x50 mm 1.00 1 1.00
75x50 mm Total 4.00

100x32 mm 5.00 1 5.00


100x32 mm 4.00 1 4.00
100x32 mm 29.00 1 29.00
100x32 mm 18.00 1 18.00
100x32 mm Total 56.00

100x40 mm 5.00 1 5.00


100x40 mm 34.00 1 34.00
100x40 mm 32.00 1 32.00
100x40 mm Total 71.00

100x50 mm 2.00 1 2.00


100x50 mm 3.00 1 3.00
100x50 mm 5.00 1 5.00
100x50 mm 8.00 1 8.00
100x50 mm 5.00 1 5.00
100x50 mm Total 23.00

150x32 mm 1.00 1 1.00


150x32 mm 1.00 1 1.00
150x32 mm 1.00 1 1.00
150x32 mm 1.00 1 1.00
150x32 mm 1.00 1 1.00
150x32 mm Total 5.00

150x50 mm 15.00 1 15.00


150x50 mm Total 15.00

200x32 mm 5.00 1 5.00


200x32 mm Total 5.00

200x50 mm 1.00 1 1.00


200x50 mm 2.00 1 2.00
200x50 mm 6.00 1 6.00
200x50 mm Total 9.00

75x75x75 mm 3.00 1 3.00


75x75x75 mm 3.00 1 3.00
75x75x75 mm 3.00 1 3.00
75x75x75 mm 3.00 1 3.00
75x75x75 mm 2.00 1 2.00
75x75x75 mm Total 14.00

75x75x75x75mm 1.00 1 1.00


75x75x75x75mm Total 1.00

100x100x50x50mm 2.00 1 2.00


100x100x50x50mm Total 2.00

100x100x75x75mm 1.00 1 1.00


100x100x75x75mm 1.00 1 1.00
100x100x75x75mm Total 2.00

100x100x100x100mm 4.00 1 4.00


100x100x100x100mm 3.00 1 3.00
100x100x100x100mm 4.00 1 4.00
100x100x100x100mm Total 11.00

150x150x75x75 mm 1.00 1 1.00


150x150x75x75 mm 1.00 1 1.00
150x150x75x75 mm 1.00 1 1.00
150x150x75x75 mm Total 3.00

150x150x150x150 mm 1.00 1 1.00


150x150x150x150 mm 1.00 1 1.00
150x150x150x150 mm Total 2.00

200x200x150x50 mm 1.00 1 1.00


200x200x150x50 mm Total 1.00

200x200x200x100 mm 2.00 1 2.00


200x200x200x100 mm Total 2.00

200x200x200x150 mm 1.00 1 1.00


200x200x200x150 mm Total 1.00

200x200x150x150 mm 1.00 1 1.00


200x200x150x150 mm Total 1.00

200x200x200x200 mm 1.00 1 1.00


200x200x200x200 mm Total 1.00

75x75x32 mm 1.00 14 14.00


75x75x32 mm 1.00 12 12.00
75x75x32 mm 1.00 4 4.00
75x75x32 mm 15.00 1 15.00
75x75x32 mm 6.00 1 6.00
75x75x32 mm 9.00 1 9.00
75x75x32 mm Total 60.00

75x75x40 mm 1.00 14 14.00


75x75x40 mm 1.00 12 12.00
75x75x40 mm 1.00 4 4.00
75x75x40 mm 3.00 1 3.00
75x75x40 mm 12.00 1 12.00
75x75x40 mm 5.00 1 5.00
75x75x40 mm Total 50.00
75x75x50 mm 2.00 1 2.00
75x75x50 mm Total 2.00

75x75x75 mm 1.00 24 24.00


75x75x75 mm 1.00 4 4.00
75x75x75 mm 1.00 6 6.00
75x75x75 mm 1.00 5 5.00
75x75x75 mm 1.00 26 26.00
75x75x75 mm 1.00 4 4.00
75x75x75 mm 19.00 1 19.00
75x75x75 mm 5.00 1 5.00
75x75x75 mm 6.00 1 6.00
75x75x75 mm 4.00 1 4.00
75x75x75 mm Total 103.00

100x100x32 mm 5.00 1 5.00


100x100x32 mm 4.00 1 4.00
100x100x32 mm 29.00 1 29.00
100x100x32 mm 18.00 1 18.00
100x100x32 mm Total 56.00

100x100x40 mm 5.00 1 5.00


100x100x40 mm 34.00 1 34.00
100x100x40 mm 32.00 1 32.00
100x100x40 mm Total 71.00

100x100x50 mm 3.00 1 3.00


100x100x50 mm 5.00 1 5.00
100x100x50 mm 8.00 1 8.00
100x100x50 mm 5.00 1 5.00
100x100x50 mm Total 21.00

100x100x75 mm 1.00 1 1.00


100x100x75 mm 1.00 1 1.00
100x100x75 mm 1.00 1 1.00
100x100x75 mm 1.00 1 1.00
100x100x75 mm 1.00 1 1.00
100x100x75 mm 1.00 1 1.00
100x100x75 mm 1.00 1 1.00
100x100x75 mm 1.00 1 1.00
100x100x75 mm 1.00 1 1.00
100x100x75 mm 1.00 1 1.00
100x100x75 mm 19.00 1 19.00
100x100x75 mm 73.00 1 73.00
100x100x75 mm 79.00 1 79.00
100x100x75 mm Total 181.00

100x100x100 mm 1.00 14 14.00


100x100x100 mm 1.00 12 12.00
100x100x100 mm 1.00 4 4.00
100x100x100 mm 1.00 24 24.00
100x100x100 mm 1.00 4 4.00
100x100x100 mm 1.00 6 6.00
100x100x100 mm 1.00 26 26.00
100x100x100 mm 1.00 4 4.00
100x100x100 mm 68.00 1 68.00
100x100x100 mm 3.00 1 3.00
100x100x100 mm 88.00 1 88.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm 1.00 1 1.00
100x100x100 mm Total 319.00

150x150x32 mm 1.00 1 1.00


150x150x32 mm 1.00 1 1.00
150x150x32 mm 1.00 1 1.00
150x150x32 mm 1.00 1 1.00
150x150x32 mm 1.00 1 1.00
150x150x32 mm Total 5.00

150x150x50 mm 15.00 1 15.00


150x150x50 mm Total 15.00

150x150x75 mm 24.00 1 24.00


150x150x75 mm Total 24.00

150x150x100 mm 21.00 1 21.00


150x150x100 mm 3.00 1 3.00
150x150x100 mm Total 24.00

150x150x150 mm 1.00 1 1.00


150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 1.00 1 1.00
150x150x150 mm 3.00 1 3.00
150x150x150 mm 2.00 1 2.00
150x150x150 mm 24.00 1 24.00
150x150x150 mm Total 46.00

200x200x32 mm 5.00 1 5.00


200x200x32 mm Total 5.00

200x200x50 mm 2.00 1 2.00


200x200x50 mm 6.00 1 6.00
200x200x50 mm Total 8.00

200x200x75 mm 49.00 1 49.00


200x200x75 mm 2.00 1 2.00
200x200x75 mm Total 51.00

200x200x100 mm 123.00 1 123.00


200x200x100 mm 10.00 1 10.00
200x200x100 mm Total 133.00

200x200x150 mm 40.00 1 40.00


200x200x150 mm Total 40.00

200x200x200 mm 31.00 1 31.00


200x200x200 mm 8.00 1 8.00
200x200x200 mm Total 39.00

50 mm 8.00 1 8.00
50 mm Total 8.00

100 mm 2.00 1 2.00


100 mm Total 2.00
150 mm 3.00 1 3.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm Total 32.00

150 mm 32.00 1 32.00


150 mm Total 32.00

150 mm 1.00 14 14.00


150 mm Total 14.00

600x600 mm 1.00 1 1.00


600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm Total 33.00

600x600 mm 1.00 1 1.00


600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm Total 3.00

150 mm 3.00 1 3.00


150 mm 3.00 1 3.00
150 mm Total 6.00

300 mm 3.90 1 3.90


300 mm 5.70 1 5.70
300 mm 2.78 1 2.78
300 mm 2.78 1 2.78
300 mm 4.72 1 4.72
300 mm 3.80 1 3.80
300 mm Total 23.69

40 mm 5.00 1 5.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm 1.00 1 1.00
40 mm Total 37.00

50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 24 24.00
50 mm 1.00 4 4.00
50 mm 1.00 6 6.00
50 mm 1.00 26 26.00
50 mm 1.00 4 4.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm 1.00 1 1.00
50 mm Total 83.00

75 mm 11.00 1 11.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 26 26.00
75 mm 1.00 24 24.00
75 mm 1.00 4 4.00
75 mm 1.00 6 6.00
75 mm 1.00 5 5.00
75 mm 1.00 26 26.00
75 mm 1.00 4 4.00
75 mm 1.00 4 4.00
75 mm Total 134.00

100 mm 85.00 1 85.00


100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 1 1.00
100 mm 1.00 4 4.00
100 mm 1.00 39 39.00
100 mm 1.00 39 39.00
100 mm 1.00 39 39.00
100 mm 1.00 5 5.00
100 mm 1.00 37 37.00
100 mm 1.00 37 37.00
100 mm 1.00 3 3.00
100 mm 1.00 26 26.00
100 mm Total 559.00

150 mm 8.00 1 8.00


150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 12 12.00
150 mm 1.00 14 14.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm Total 55.00

200 mm 45.00 1 45.00


200 mm Total 45.00

75 mm 3.00 1 3.00
75 mm Total 3.00

100 mm 1.00 1 1.00


100 mm 20.00 1 20.00
100 mm Total 21.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm 1.00 1 1.00
150 mm Total 56.00

200 mm 2.00 1 2.00


200 mm 43.00 1 43.00
200 mm Total 45.00

75 mm 1.00 26 26.00
75 mm 1.00 4 4.00
75 mm 1.00 24 24.00
75 mm 1.00 4 4.00
75 mm 1.00 6 6.00
75 mm 1.00 5 5.00
75 mm 1.00 26 26.00
75 mm 1.00 4 4.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm 1.00 1 1.00
75 mm Total 373.00

100 mm 4.00 1 4.00


100 mm Total 4.00

100 mm 1.00 1 1.00


100 mm Total 1.00

450x450 mm 1.00 1 1.00


450x450 mm Total 1.00

400x400x350 mm 2.00 1 2.00


400x400x350 mm Total 2.00

3000x2000x1500 mm 1.00 1 1.00


3000x2000x1500 mm Total 1.00

800x800xmm 1.00 1 1.00


800x800xmm 1.00 1 1.00
800x800xmm 1.00 1 1.00
800x800xmm Total 3.00

600x600x500 mm 1.00 1 1.00


600x600 mm 1.00 1 1.00
600x600 mm Total 2.00

300x300 mm 1.00 1 1.00


300x300 mm 1.00 1 1.00
300x300 mm 1.00 1 1.00
300x300 mm 1.00 1 1.00
300x300 mm 1.00 1 1.00
300x300 mm Total 5.00

600x600 mm 1.00 1 1.00


600x600 mm 1.00 1 1.00
600x600 mm 4.00 1 4.00
600x600 mm 5.00 1 5.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
600x600 mm 1.00 1 1.00
700x700 mm 1.00 1 1.00
700x700 mm Total 19.00

1.00 1 1.00
Total 1.00

600x600x600 mm 1.00 1 1.00


600x600x600 mm Total 1.00

1000x1000x1000 mm 1.00 1 1.00


1000x1000x1000 mm 1.00 1 1.00
1000x1000x1000 mm Total 2.00

2000x1500x1500 mm 1.00 1 1.00


2000x1500x1500 mm Total 1.00

1500x1500x2400 mm 1.00 1 1.00


1500x1500x2400 mm Total 1.00

3000x2000x2950 mm 1.00 1 1.00


3000x2000x3100 mm 1.00 1 1.00
3000x2000x3100 mm 1.00 1 1.00
3000x2000x3300 mm 1.00 1 1.00
3000x2000x3000 mm 1.00 1 1.00
3000x2000x3000 mm Total 5.00

900x600 mm 1.00 1 1.00


900x900 mm 1.00 1 1.00
900x900 mm 1.00 1 1.00
900x900 mm Total 3.00

6m Head 1.00 2 2.00


6m Head 1.00 2 2.00
6m Head 1.00 2 2.00
6m Head 1.00 2 2.00
6m Head 1.00 2 2.00
6m Head 1.00 2 2.00
6m Head Total 12.00
Remarks

Remarks
Remarks

Ground Floor Qty only


Remarks

uPVC
uPVC
uPVC
uPVC
uPVC
uPVC
uPVC

HDPE
HDPE
HDPE
HDPE
HDPE
HDPE
HDPE

under Ground
under Ground
under Ground
Remarks
Remarks

Cooled Water Tank


Filtered Water Tank
Raw Water Tank

Filtered Water Tank


Raw Water Tank
Cooled Water Tank
Size assumed, on tanks
for Bib Tap

for Bib Tap

for Bib Tap

for Future use


1 Tank Each

Remarks

EWC
EWC
EWC
EWC
EWC
EWC
EWC
EWC
EWC
EWC
Plain Sink
Plain Sink
Plain Sink
Plain Sink
Sink with board
Sink with board
Sink with board
Sink with board
Shower
Shower
Shower
Shower
Urinal
Urinal
Urinal
Wash Basin (Flat Edge)
Wash Basin (Flat Edge)
Wash Basin (Flat Edge)
Wash Basin (Round Edge)
Wash Basin (Round Edge)
Wash Basin (Round Edge)
Wash Basin (Round Edge)
Wash Basin (Round Edge)

Plain Sink
Plain Sink
Plain Sink
Plain Sink
Sink with board
Sink with board
Sink with board
Sink with board
Shower
Shower
Shower
Shower
Wash Basin (Flat Edge)
Wash Basin (Flat Edge)
Wash Basin (Flat Edge)
Wash Basin (Round Edge)
Wash Basin (Round Edge)
Wash Basin (Round Edge)
Wash Basin (Round Edge)
Wash Basin (Round Edge)

Remarks
Unit Remarks

m drop for WB
m single bed-14 No.
m single bed-14 No.
m single bed-12 No.
m single bed-12 No.
m Isolated bed-4 No.
m Isolated bed-4 No.
m single bed- 24 No.
m single bed- 24 No.
m Isolated bed- 4 No.
m Isolated bed- 4 No.
m VIP Bed
m VIP Bed
m single bed- 26 No.
m single bed- 26 No.
m Isolated bed- 4 No.
m Isolated bed- 4 No.
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m drop for Sink


m single bed-14 No.
m single bed-14 No.
m single bed-12 No.
m single bed-12 No.
m Isolated bed-4 No.
m Isolated bed-4 No.
m single bed- 24 No.
m single bed- 24 No.
m Isolated bed- 4 No.
m Isolated bed- 4 No.
m VIP Bed
m VIP Bed
m Family room
m single bed- 26 No.
m single bed- 26 No.
m Isolated bed- 4 No.
m Isolated bed- 4 No.
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m Riser
m security drop
m
m
m
m
m single bed- 24 No.
m Isolated bed- 4 No.
m VIP Bed
m single bed- 26 No.
m Isolated bed- 4 No.
m VIP Bed
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m Riser
m Riser
m Family room
m Riser
m Riser
m Riser
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m single bed-14 No.
m single bed-14 No.
m single bed-12 No.
m single bed-12 No.
m Isolated bed-4 No.
m Isolated bed-4 No.
m single bed- 24 No.
m single bed- 24 No.
m Isolated bed- 4 No.
m Isolated bed- 4 No.
m VIP Bed
m VIP Bed
m Family room
m Family room
m single bed- 26 No.
m single bed- 26 No.
m Isolated bed- 4 No.
m Isolated bed- 4 No.
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m Riser
m single bed-14 No.
m single bed-14 No.
m single bed-12 No.
m single bed-12 No.
m Isolated bed-4 No.
m Isolated bed-4 No.
m Riser
m single bed- 24 No.
m Isolated bed- 4 No.
m Isolated bed- 4 No.
m VIP Bed
m VIP Bed
m Riser
m single bed- 26 No.
m Isolated bed- 4 No.
m Isolated bed- 4 No.
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m Riser
m Riser
m Riser
m Riser
m Riser
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m Riser
m Riser
m Riser
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m
m
m
m
m
m
m

m drop
m
m
m

m drop
m drop
m drop
m drop
m
m
m
m
m
m
m
m
m
m

m Under ground
m Under ground
m Under ground
m Under ground
m

m Under ground
m Under ground
m Under ground
m

m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under Ground
m Under ground
m Under ground
m Under ground
m Under ground
m Under ground
m

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No. single bed- 24 No.
No. Isolated bed- 4 No.
No. VIP Bed
No. Family room
No. single bed- 24 No.
No. Isolated bed- 4 No.
No.
No.
No. FCO
No.
No.
No.

No.
No.
No.
No.
No.
No.
No. single bed-14 No.
No. single bed-12 No.
No. Isolated bed-4 No.
No. single bed- 24 No.
No. Isolated bed- 4 No.
No. VIP Bed
No. single bed- 24 No.
No. Isolated bed- 4 No.
No. FCO
No. FCO
No.

No.
No.
No.
No.
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No. FCO
No.

No. FCO
No. FCO
No.

No. Riser
No. Riser
No.
No.
No.
No.
No.
No.
No.
No.
No.

No. Riser
No. Riser
No. Riser
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

No. Riser
No.
No.
No.

No.
No.

No. single bed-14 No.


No. single bed-12 No.
No. Isolated bed-4 No.
No.
No.
No.
No.

No. single bed-14 No.


No. single bed-12 No.
No. Isolated bed-4 No.
No.
No.
No.
No.

No.
No.
No.
No.

No.
No.
No.
No.
No.

No.
No.
No.
No.

No.
No.
No.
No.
No.
No.

No.
No.
No.
No.
No.
No.

No.
No.

No.
No.

No.
No.
No.
No.

No.
No.
No.
No.
No.
No.

No.
No.

No.
No.

No.
No.
No.

No.
No.
No.
No.

No.
No.
No.
No.

No.
No.
No.

No.
No.

No.
No.

No.
No.

No.
No.

No.
No.

No. single bed-14 No.


No. single bed-12 No.
No. Isolated bed-4 No.
No.
No.
No.
No.

No. single bed-14 No.


No. single bed-12 No.
No. Isolated bed-4 No.
No.
No.
No.
No.
No.
No.

No. single bed- 24 No.


No. Isolated bed- 4 No.
No. VIP Bed
No. Family room
No. single bed- 24 No.
No. Isolated bed- 4 No.
No.
No.
No.
No.
No.

No.
No.
No.
No.
No.

No.
No.
No.
No.

No.
No.
No.
No.
No.

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

No. single bed-14 No.


No. single bed-12 No.
No. Isolated bed-4 No.
No. single bed- 24 No.
No. Isolated bed- 4 No.
No. VIP Bed
No. single bed- 24 No.
No. Isolated bed- 4 No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

No.
No.
No.
No.
No.
No.

No.
No.

No.
No.

No.
No.
No.

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

No.
No.

No.
No.
No.

No.
No.
No.

No.
No.
No.

No.
No.

No.
No.
No.

No.
No.

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

No. Riser
No.

No. RWP Riser


No.

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

No.
No.
No.
No.

m
m
m

m
m
m
m
m
m
m

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No. single bed- 24 No.
No. Isolated bed- 4 No.
No. VIP Bed
No. single bed- 26 No.
No. Isolated bed- 4 No.
No.
No.
No.
No.
No.
No.

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No. single bed-26 No.
No. single bed- 24 No.
No. Isolated bed- 4 No.
No. VIP Bed
No. Family room
No. single bed- 26 No.
No. Isolated bed- 4 No.
No. Isolated bed-4 No.
No.

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No. Isolated bed-4 No.
No. Riser
No. Riser
No. Riser
No. Riser
No. Riser
No. Riser
No. Riser
No. single bed-26 No.
No.

No.
No.
No.
No. Riser
No. Riser
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

No.
No.

No.
No.

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

No.
No.
No.

No. single bed-26 No.


No. Isolated bed-4 No.
No. single bed- 24 No.
No. Isolated bed- 4 No.
No. VIP Bed
No. Family room
No. single bed- 26 No.
No. Isolated bed- 4 No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

No.
No.

No.
No.

No.
No.

No.
No.

No. kitchen
No.

No.
No.
No.
No.

No.
No.
No.

No.
No.
No.
No.
No.
No.

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

No.
No.

No. assumed
No.

No.
No.
No.

No.
No.

No. including valve chamber


No.

No. including valve chamber


No. including valve chamber
No. including valve chamber
No. including valve chamber
No. including valve chamber
No.

No.
No.
No.
No.

No. 1D+1S
No. 1D+1S
No. 1D+1S
No. 1D+1S
No. 1D+1S
No. 1D+1S
No.
Summary
Dimensions
S .No. Item Description
Size
1 Fire Pipe 100mm
2 Fire Pipe 125mm
3 Fire Pipe 150mm
4 Fire Pipe 25mm
5 Fire Pipe 32mm
6 Fire Pipe 40mm
7 Fire Pipe 50mm
8 Fire Pipe 65mm
9 Fire Pipe 80mm

10 Drain Riser 50mm


11 Sprinkler Riser 150mm
12 Wet Riser 100mm
13 Wet Riser 100mm

14 Diesel engine pump


15 Electrical Driven pump
16 Jockey pump

17 4-WAY Breaching Inlet Connection 150mm dia.


18 AAV
19 ACV
20 Automatic Air Vent with Valve 150mm
21 Co2 portable fire extingusher (5 Kg)
22 Concealed/Upright Sprinkler
23 FHC
24 Foam bladder
25 Foam portable extingusher (5.5 Kg)
26 Ionization detector
27 Isolation Valve 150mm dia. 150mm
28 Issolation Valve 65mm dia. 65mm
29 No.V 150mm dia.
30 Preaction Valve 100mm 100mm
31 Preaction Valve 25mm 25mm
32 Preaction Valve 32mm 32mm
33 Preaction Valve 40mm 40mm
34 Preaction Valve 65mm 65mm
35 Pressure Gauge
36 Pressure reduce valve 25mm dia. 25mm
37 Pressure reduce valve 65mm dia. 65mm
38 Side wall sprinkler
39 W/P Sounder + Flasher
40 Zone Control valve
41 Foam Nozzle
42 Deluge Valve 80mm 80mm
mmary
Qty unit Remarks

1,231.58 m
72.26 m
620.38 m
7,224.75 m
1,222.88 m
870.04 m
805.58 m
1,239.83 m
552.15 m

43.10 m
43.10 m
61.50 m
64.65 m

2 Nos
2 Nos
2 Nos

4 Nos
10 Nos
4 Nos
2 Nos
46 Nos
2,963 Nos
43 Nos
1 Nos
12 Nos
2 Nos
14 Nos
104 Nos
4 Nos
5 Nos
3 Nos
1 Nos
1 Nos
2 Nos
30 Nos
30 Nos
5 Nos
31 Nos
1 Nos
11 Nos
32 Nos
1 Nos
Summary-Electrical
Service Item

Equipment Equipment
Equipment Equipment
Equipment Equipment
Panel & DB Equipment

Panel & DB Equipment

Panel & DB Equipment

Panel & DB Equipment

Panel & DB Equipment

Panel & DB Equipment

Panel & DB Equipment

Panel & DB Equipment

Panel & DB Panel & DB


Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Summary-Electrical
Service Item
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Summary-Electrical
Service Item
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Summary-Electrical
Service Item
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
Panel & DB Panel & DB
ISOLATOR ISOLATOR
ISOLATOR ISOLATOR
ISOLATOR ISOLATOR
ISOLATOR ISOLATOR
Summary-Electrical
Service Item
ISOLATOR ISOLATOR
ISOLATOR ISOLATOR
Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable

Cable Cable
Tray Tray
Summary-Electrical
Service Item
Tray Tray
Tray Tray
Telephone Telephone
Telephone Telephone
Telephone Telephone
Telephone Telephone
Telephone Telephone

Telephone Telephone

Telephone Telephone

Telephone Telephone

Telephone Telephone

Telephone Telephone

Telephone Telephone

Telephone Telephone

Telephone Telephone

Telephone Telephone

Telephone Telephone
Trunking Trunking
Fire Alarm Fire Alarm
Fire Alarm Fire Alarm
Fire Alarm Fire Alarm
Fire Alarm Fire Alarm
Fire Alarm Fire Alarm
Fire Alarm Fire Alarm
Fire Alarm Fire Alarm
Fire Alarm Fire Alarm
Fire Alarm Fire Alarm
Low Current Low Current
Low Current Low Current
Low Current Low Current
Low Current Low Current
Low Current Low Current
Low Current Low Current
Low Current Low Current
Low Current Low Current
Summary-Electrical
Service Item
Low Current Low Current
Low Current Low Current
Low Current Low Current
Low Current Low Current
Low Current Low Current
Low Current Low Current
Low Current Low Current
Low Current Low Current

Low Current Low Current

Low Current Low Current


Low Current Low Current

Low Current Low Current

Low Current Low Current


Low Current Low Current
Low Current Low Current
Low Current Low Current
Low Current Low Current
Low Current Low Current

Low Current Low Current

Low Current Low Current


Low Current Low Current
Lighting Lighting

Lighting Lighting
Lighting Lighting
Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting
Summary-Electrical
Service Item
Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting

Lighting Lighting
Lighting Lighting

Power Power

Power Power

Power Power

Power Power

Power Power
Summary-Electrical
Service Item
Power Power
Power Power
Power Power

Power Power

Power Power

Power Power

Power Power

Power Power

Power Power

Power Power

Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Power Power
Lighting Control Lighting Control
Summary-Electrical
Service Item
Lighting Control Lighting Control
Summary-Electrical
Size Qty Unit

1500KVA DRY TYPE TRANSFORMER 7 No.


HV SWITCHGEAR 1 No.
2500 A BUSBAR TRUNKING 74.4 m
MDB-G 1 No.

MDB-1 1 No.

MDB-2 1 No.

MDB-3 1 No.

MDB-4 1 No.

MDB-5 1 No.

MDB-6 1 No.

MDB-7 1 No.

SMDB - L2E 1 No.


SMDB - L3E 1 No.
SMDB - R1E 1 No.
MCC - R2E 1 No.
MCC - R3E 1 No.
MCC - R4E 1 No.
MCC - R5E 1 No.
Capacitor Bank 1 No.
CHILLER-1 1 No.
CHILLER-2 1 No.
MCC-R4N 1 No.
MCC-R3N 1 No.
MCC-R2N 1 No.
Capacitor Bank 1 No.
SMDB-G31N 1 No.
SMDB-F11N 1 No.
SMDB-S21N 1 No.
SMDB-B11N 1 No.
SMDB-R2N 1 No.
MCC-B1N 1 No.
Capacitor Bank 1 No.
SMDB-G11N 1 No.
SMDB-F21N 1 No.
SMDB-S31N 1 No.
SMDB-G22N 1 No.
Capacitor Bank 1 No.
Summary-Electrical
Size Qty Unit
SMDB-G21N 1 No.
SMDB-F31N 1 No.
SMDB-S11N 1 No.
SMDB-BCAL 1 No.
SMDB-K 1 No.
Capacitor Bank 1 No.
CHILLER-3 1 No.
CHILLER-4 1 No.
SMDB-L1E 1 No.
SMDB-R2E 1 No.
Capacitor Bank 1 No.
SMDB-G11E 1 No.
SMDB-G21E 1 No.
SMDB-G31E 1 No.
SMDB-B11E 1 No.
MCC-B1E 1 No.
MCC-B2E 1 No.
MCC-B4E 1 No.
DB-R21N 1 No.
CU-R22N 1 No.
DB-R21E 1 No.
DB-R11E 1 No.
DB-L.F31E 1 No.
DB-M.F31E 1 No.
DB-L.F21E 1 No.
DB-L.F22E 1 No.
DB-L.F21N 1 No.
DB-L.F22N 1 No.
DB-P.F21N 1 No.
DB-P.F22N 1 No.
DB-P.F23N 1 No.
DB-P.F24N 1 No.
DB-M.F21N 1 No.
DB-M.F22N 1 No.
DB-L.F31N 1 No.
DB-P.F31N 1 No.
DB-P.F32N 1 No.
DB-M.F31N 1 No.
DB-P.F31U 1 No.
CU-FCS 1 No.
DB-L.F11N 1 No.
DB-L.F12N 1 No.
DB-P.F11N 1 No.
DB-P.F12N 1 No.
DB-P.F13N 1 No.
DB-M.F11N 1 No.
Summary-Electrical
Size Qty Unit
DB-M.F12N 1 No.
DB-M.F13N 1 No.
DB-L.G11E 1 No.
DB-L.F11E 1 No.
DB-L.F12E 1 No.
SMDB-S11E 1 No.
DB-L.G31E 1 No.
DB-L.G32E 1 No.
SMDB-F31E 1 No.
SMDB-S31E 1 No.
DB-P.G31U 1 No.
SMDB-F31U 1 No.
SMDB-S31U 1 No.
DB-P.G11U 1 No.
DB-P.F11U 1 No.
DB-P.F12U 1 No.
DB-P.G21U 1 No.
DB-P.F12U 1 No.
DB-KIT1 1 No.
DB-KIT2 1 No.
DB-KIT3 1 No.
SMDB-KIT (Basement) 1 No.
DB-L.G21N 1 No.
DB-L.G22N 1 No.
DB-P.G21N 1 No.
DB-P.G22N 1 No.
DB-P.G23N 1 No.
DB-P.G24N 1 No.
DB-P.G25N 1 No.
DB-M.G21N 1 No.
DB-M.G22N 1 No.
DB-L.G11N 1 No.
DB-P.G11N 1 No.
DB-P.G12N 1 No.
DB-M.G11N 1 No.
DB-M.G12N 1 No.
DB-G.CAF 1 No.
DB-L.G31N 1 No.
DB-L.G32N 1 No.
DB-P.G31N 1 No.
DB-M.G31N 1 No.
DB-P.S21U 1 No.
DB-P.S22U 1 No.
DB-P.S23U 1 No.
DB-P.SOT1 1 No.
DB-P.SOT2 1 No.
Summary-Electrical
Size Qty Unit
DB-P.SOT3 1 No.
DB-L.S21E 1 No.
DB-L.S22E 1 No.
DB-P.S21E 1 No.
DB-M.S21E 1 No.
DB-M.S22E 1 No.
DB-L.S31E 1 No.
DB-P.S31E 1 No.
DB-M.S31E 1 No.
DB-L.S11E 1 No.
DB-SRS1 1 No.
DB-SRS2 1 No.
DB-P.S31U 1 No.
CU-P.SCS 1 No.
DB-L.S31N 1 No.
DB-L.S32N 1 No.
DB-P.S31N 1 No.
DB-P.S32N 1 No.
DB-P.S33N 1 No.
DB-L.S21N 1 No.
DB-L.S22N 1 No.
DB-P.S21N 1 No.
DB-P.S23N 1 No.
DB-L.B11N 1 No.
DB-L.B12N 1 No.
DB-L.B13N 1 No.
DB-L.B14N 1 No.
DB-P.B11N 1 No.
DB-P.B12N 1 No.
DB-P.B13N 1 No.
DB-P.B14N 1 No.
DB-M.B11N 1 No.
DB-KITE 1 No.
PABX 1 No.
DB-L.B11E 1 No.
DB-L.B12E 1 No.
DB-L.B13E 1 No.
DB-P.B11U 1 No.
DB-SER 1 No.
SMDB-G11U 1 No.
SMDB-G21U 1 No.
SMDB-G31U 1 No.
ISOLATOR 160A TPN 4 No.
ISOLATOR 20A TP 6 No.
ISOLATOR 32A TPN 37 No.
ISOLATOR 40A TP 26 No.
Summary-Electrical
Size Qty Unit
ISOLATOR 63A TPN 4 No.
ISOLATOR 80A TPN 18 No.
1C 50mm2 XLPE/SWA/LSF+ 1C 25mm2 ECC 160 m

2C 2.5mm2 XLPE/SWA/PVC + 1C 2.5mm2 PVC/ECC 2164 m

3C 10mm2 XLPE/SWA/PVC + 1C 10mm2 PVC/ECC 643 m

3C 16mm2 XLPE/SWA/PVC + 1C 10mm2 PVC/ECC 182 m

4C 6mm2 XLPE/SWA/LSF+ 1C 6mm2 ECC 179 m

4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 PVC/ECC 1808 m

4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 PVC/ECC 3154 m

4C 25mm2 XLPE/SWA/LSF+ 1C 16mm2 ECC 614 m

4C 35mm2 XLPE/SWA/LSF+ 1C 16mm2 ECC 372 m

4C 50mm2 XLPE/SWA/LSF + 1C 25mm2 ECC 331 m

4C 70mm2 XLPE/SWA/LSF + 1C 35mm2 ECC 376 m

4C 95mm2 XLPE/SWA/LSF + 1C 50mm2 ECC 326 m

4C 120mm2 XLPE/SWA/LSF + 1C 70mm2 ECC 177 m

4C 150mm2 XLPE/SWA/LSF + 1C 95mm2 ECC 169 m

4C 185mm2 XLPE/SWA/LSF + 1C 95mm2 ECC 2221 m

4C 240mm2 XLPE/SWA/LSF + 1C 240mm2 ECC 785 m

4x4C 240mm2 XLPE/SWA/LSF + 2x1C 240mm2 ECC 422 m

4C 6mm2 FIRE RATED CABLE + 1C 6mm2 PVC/ECC 29 m

4C 10mm2 FIRE RATED CABLE + 1C 10mm2 ECC 451 m

4C 16mm2 FIRE RATED CABLE + 1C 16mm2 PVC/ECC 1114 m

4C 25mm2 FIRE RATED CABLE + 1C 16mm2 ECC 1080 m

2x6 CORE MULTIMODE FIBER OPTIC CABLE 1383 m


600mm HDGI CABLE TRAY 229.53 m
Summary-Electrical
Size Qty Unit
300mm HDGI CABLE TRAY 101.3 m
450mm HDGI CABLE TRAY 151.25 m
Intermediate Distribution Terminal 14 No.
Main Distribution Terminal 1 No.
ODF 2 No.
Private Automatic Branch Exchange 1 No.
Quadrable Rj45 Outlet (2 Voice & 2 Data) Connected To Idt Through 4 Nos.
4-Pair Utp Cat-6A Cable 272 No.

Quadrable Rj45 Outlet (2 Voice And 2 Data, Installed Within Bedhead Unit)
Connected To Idt Through 4 Nos. 4-Pair Utp Cat-6A Cable 16 No.
Single Rj45 Data Outlet (For Wireless Access Point) Connected To Idt
Through 4-Pair Utp Cat-6A Cable 92 No.
Single Rj45 Data Outlet (Installed Within Bedhead Unit) Connected To Idt
Through 4-Pair Utp Cat-6A Cable 31 No.

Single Rj45 Data Outlet Connected To Idt Through 4-Pair Utp Cat-6A Cable 3 No.
Single Rj45 Voice Outlet (For Pay Phone) Connected To Idt Through 4-Pair
Utp Cat-6A Cable 4 No.

Single Rj45 Voice Outlet Connected To Idt Through 4-Pair Utp Cat-6A Cable 8 No.
Single Rj45 Voice Outlet Installed At Bench Level Connected To Idt Through
4-Pair Utp Cat-6A Cable 110 No.
Twin Rj45 Data Outlet Connected To Idt Through 2 Nos. 4-Pair Utp Cat-6A
Cable 17 No.

Twin Rj45 Outlet (1 Voice And 1 Data, Installed Within Bedhead Unit)
Connected To Idt Through 2 Nos. 4-Pair Utp Cat-6A Cable 150 No.
Twin Rj45 Outlet (1 Voice & 1 Data) Connected To Idt Through 2 Nos. 4-
Pair Utp Cat-6A Cable 267 No.
3 Compartment Each 100X150Mm Gi Trunking 2197.25 m
1X8W Emergency Exit Light 167 No.
1X8Wemergency Light 933 No.
Addressable Break Glass Unit 53 No.
Addressable Heat Detector 46 No.
Addressable Ionisation Smoke Detector 1055 No.

Analogue Addressable Fire Alarm Control/Repeater Panel 5 No.


Ceiling Mounted / Recessed Fire Alarm Speaker 513 No.
Central Emergency Battery Panel 8 No.

Wall Mounted / Recessed Fire Alarm Speaker With Flasher 40 No.


ACR 90 No.
ACU 3 No.
Annunciator Panel To Be Installed In Staff Rooms With 6 No.
CCTV 1 No.
CTC 9 No.
DC 149 No.
DCP 9 No.
Decorative Wall Mounted Sound Projector Type Cs-1 9 No.
Summary-Electrical
Size Qty Unit

Decorative Wall Mounted Sound Projector Type Cs-1 (Weather Proof) 40 No.
DL 58 No.
EX 28 No.
Ip Based Digital Color Fixed Dome Camera 83 No.

Ip Based Digital Color Fixed Dome Camera (Weather Proof) 32 No.


MATV 1 No.
MC 1 No.
NCS 18 No.

Nurse Prescence Unit (To Be Installed In Each Patient Room/Ward) With


'Prescence' Switch, 'Cancel' Switch, And Other Features As Specified. 109 No.
Nurses Call Pull Cord With Reassurance Led And Call Cancel Switch (To
Be Installed At Toilet) As Specified 108 No.
Nurses Call Unit ( To Be Installed In The Bed Head Unit) 125 No.

Over Door Light With Three Solid State Lamps (Red,Yellow And Green) To
Be Installed Over The Door To Each Patient Room/Ward And With Clear
Indication For The Following 137 No.
PAS 1 No.
Recessed Ceiling Speaker Type S-1 542 No.
Sat/Tv/Fm Outlet 5 No.
Sat/Tv/Fm Outlet Installed Above False Ceiling 168 No.
Staff Assist Call Panel To Be Installed In 34 No.
Surface Mounted With 2.5" High Red Led Display Single Sided Digital
Clock Assembly 25 No.

Surface Mounted With 4.0" High Red Led Display Double Sided Digital
Clock Assembly For Corridors/Common Areas. 16 No.

Tv Splitter Box Located In The Ward Corridor Above False Ceiling 8 No.
VC 49 No.

1X13 W Compact Fluorescent Lamp Recessed Downlight To Ip44 (C2) 63 No.

1X14 W T5 Fluorescent Lamp Over Mirror Light To Ip44 (F7) 196 No.
1X150 W Metal Halide Lamp Flood Light To Ip65 (Fl1) 37 No.

1X18/1X36 W Standard Fluorescent Lamp Cove Light (Cl1) 213 No.

1X18/1X36 W Standard Fluorescent Lamp Cove Light (Cl1) (1X18) 13 No.


1X18/1X36W Standard Fluorescent Lamp Over Mirror Light With Prismatic
Diffuser Cover To Ip44 (M1) 20 No.
1X32 W Compact Fluorescent Lamp Wall Light Suitable For Lift Shaft To
Ip65 (W2) 53 No.
1X35 W Halogen Lamp Spot Light With Adjustable Reflector Of 20%%D To
Ip44 (S2) 111 No.

1X36 W Standard Fluorescent Lamp Recessed Slot Light Fitting (F6) 97 No.
Summary-Electrical
Size Qty Unit
1X42 W Compact Fluorescent Lamp Surface Mounted Light Fitting To Ip44
(D1) 58 No.
1X42 W Compact Fluorescent Lamp Wall Light Suitable For Ramp Lighting
To Ip65 (W1) 17 No.

1X42 W Compact Fluorescent Lamp Wall Light To Ip65 (W3) 102 No.
1X50 W Halogen Lamp Spot Light With Adjustable Reflector Of 20%%D To
Ip20 (S1) 1144 No.
1X70 W Metal Halide Lamp Decorative Surface Mounted Light Fitting To
Ip65 (B6) 128 No.
1X70 W Metal Halide Lamp Recessed Downlight With Decorative Ring To
Ip20 (B5) 16 No.

2X13 W Compact Fluorescent Lamp Recessed Downlight To Ip44 (C1) 357 No.
2X18 W Compact Fluorescent Lamp Recessed Downlight (Square Shape)
To Ip20 (B2) 35 No.
2X18 W Compact Fluorescent Lamp Recessed Downlight With Decorative
Ring To Ip20 (B1) 2436 No.

2X24 W T5 Lamp Recessed Direct/Indirect Light Fitting To Ip20 (F5) 467 No.
2X26 W Compact Fluorescent Lamp Recessed Downlight With Decorative
Pendant Ring To Ip20 (B4) 13 No.
2X26 W Compact Fluorescent Lamp Recessed Downlight With Decorative
Ring To Ip20 (B3) 553 No.

2X36 W Standard Fluorescent Lamp Recessed Mounted Clean Light Fitting


Suitable For Operation Theatre Installation (F8) 117 No.
2X36 W Standard Fluorescent Lamp Surface Mounted Light Fitting To Ip65
(F1) 709 No.
4X14 W T5 Lamp Recessed Light Fitting Suitable For Office Installation To
Ip20 (F3) 225 No.
4X18W Standard Fluorescent Lamp Recessed Light Clean Room Fitting
(F4) 476 No.
4X18W Standard Fluorescent Lamp Recessed Light Fitting With Prismatic
Diffuser To Ip44 (F2) 601 No.
Bed Head Unit Light With 2 Nos. 54 W T5 Fluorescent Lamp For
Direct/Indirect Lighting, And 1 No. 39 W T5 Fluorescent Lamp For
Reading/Night Light. (Bhu-L) 106 No.
Push button 20 No.
Switch 911 No.

13A 240V 50 Hz 2 Pole & Earth Bs 1363 Switch Socket Outlet Above
Bench Level With High Integrity Earthing 167 No.
13A 240V 50 Hz 2 Pole & Earth Bs 1363 Switch Socket Outlet
Weatherproof To Ip56 89 No.
13A 240V 50 Hz 2 Pole & Earth Bs 1363 Switch Socket Outlet With High
Integrity Earthing 1361 No.

13A 240V 50 Hz 2 Pole & Earth Bs 1363 Switch Socket Outlet Fed From
Emergency Supply With High Integrity Earthing & Red Rockers. 5 No.

13A 240V 50 Hz 2 Pole & Earth Bs 1363 Switch Socket Outlet Installed At
Higher Level Within False Ceiling With High Integrity Earthing 646 No.
Summary-Electrical
Size Qty Unit
150Mm Hdgi Cable Tray For Power Cables + 600Mm Hdgi Cable Tray For
Telecom Cables. 25.64 No.
15A, 240V, 2Pole & Earth Switched Socket Outlet 4 No.
16A 400V 50 Hz 3 Pole, N, & Earth Industrial Switch Socket Outlet Installed
At Bench Level 8 No.

2 Gang 13A 240V 50 Hz 2 Pole & Earth Bs 1363 Switch Socket Outlet
Above Bench Level With High Integrity Earthing 190 No.
2 Gang 13A 240V 50 Hz 2 Pole & Earth Bs 1363 Switch Socket Outlet
Weatherproof To Ip56 18 No.

2 Gang 13A 240V 50 Hz 2 Pole & Earth Bs 1363 Switch Socket Outlet
Above False Ceiling Level With High Integrity Earthing 153 No.

2 Gang 13A 240V 50 Hz 2 Pole & Earth Bs 1363 Switch Socket Outlet Fed
From Emergency Supply With High Integrity Earthing & Red Rockers. 9 No.

2 Gang 13A 240V 50 Hz 2 Pole & Earth Bs 1363 Switch Socket Outlet Fed
From Ups Supply With High Integrity Earthing & Red Rockers. 151 No.
2 Gang 13A 240V 50 Hz 2 Pole & Earth Bs 1363 Switch Socket Outlet With
High Integrity Earthing 764 No.

2 Gang 13A 240V 50 Hz 2 Pole & Earth Bs 1363 Switch Socket Outlet With
High Integrity Earthing (Floor Mounted) 4 No.
3 Compartment 150X150Mm Gi Trunking For L.V Wiring, Low Current &
Fire Alarm. 180.9 m
300Mm Hdgi Cable Tray 2.5 m
32A 400V 50 Hz 3 Pole, N, & Earth Industrial Switch Socket Outlet Installed
At Bench Level 1 No.
900mm HDGI Cable Tray 46 m
BHU-1 33 No.
BHU-10 2 No.
BHU-2 31 No.
BHU-3 32 No.
BHU-4 8 No.
BHU-5 11 No.
BHU-6 12 No.
BHU-7 15 No.
BHU-8 13 No.
BHU-VIP 5 No.
Control Panel 26 No.
Distribution Board (Db) 16 No.
Flex Outlet With 20A D.P Switch 48 No.
Hdgi Cable Tray 250.5 m
Isolator 103 No.
Push Button 47 No.
Submain Distribution Panel Board (Smdb) 10 No.

TP&N Isolator Rating Same As The Braker Feeding The Circuit 64 No.
PID 138 No.
Summary-Electrical
Size Qty Unit
LCP 6 No.