1. During inspection of a vertical pressure vessel with an inside diameter of 90 in.
(2.25 meters), a generally corroded area (360 around the vessel ID and 40 inches
in height) was found in a shell course indicating liquid line corrosion. Remaining wall
thickness can be determined by:
A) Only by performing UT thickness on the area of the deepest pit & measuring
remaining wall
B) Averaging remaining wall thickness at equally spaced readings over a length L
= to 20 in.
C) Averaging remaining wall thickness at equally spaced readings over a length L
= to 30 in. D) Averaging remaining wall thickness at equally spaced readings over a
length L = to 40 in.
Answer: C (API 510, Para. 7.4.2.1) L = the lesser of 40 in. or 1/3 Vessel
Diameter (30 in.)
2. A horizontal vessel having a U Stamp & constructed in 1991 must now undergo a
hydrostatic test after an alteration. What is required test pressure at the top
of the vessel?
Given: Original (1991) Vessel U stamp reads MAWP: 1000 psi @ 500F
The S design temp = 15 ksi and S test temp = 16.3 ksi
A) 1630 psi B) 1500 psi C) 1413 psi D) 1300
psi
Answer: A (API 510, Para. 5.8.2.1) See Solution below using the API 510
formula!
Test Pressure in psi (MPa) = 1.5 MAWP (Stest temp/Sdesign temp), before
1999 addendum rule
Solution: 1.5 x 1000 x (16,300 15,000) = 1500 x (1.0866) = 1629.9 psi or
1630 psi
3. Given: A pressure vessel has been in service since January 1, 2001 and has a
history of active corrosion over its service life. Original thickness = .700 inches
(Actual & U-Stamp) & current thickness on Jan. 1, 2011 is .500 inches. Previous
thickness on January 1, 2006 was 0.600 inches. The minimum thickness for this
vessel as listed on the Data Sheet = 0.200 inches and the Vessel Corrosion
Allowance as per the U stamp = .500 inches. Determine corrosion rate,
remaining corrosion allowance and remaining life (RL) for this pressure
vessel?
A) Corrosion Rate = .020 inches per year, RCA = .030 inches and RL = 15 years
B) Corrosion Rate = .050 inches per year, RCA = .500 inches and RL = 10 years
C) Corrosion Rate = .020 inches per year, RCA = .300 inches and RL = 15 years
D) None of these are correct
Page | 1
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Step # 1 Determine metal loss and both the LT & ST Corrosion Rates!
Step # 2 Compare two Corrosion rates & choose the one that best reflects current
conditions!
Step # 3 Determine the RL of the vessel in years given a Minimum t of 0.200
inches
Answer: C (API 510, Para. 7.1 Formulas for LT & ST Corrosion Rates)
Page | 2
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Step # 1 Determine loss & Corr. Rate .750 .600 = .150 in. 15 years = .
010 or 10.0 mpy
Step # 2 Determine remaining CA .600 in. minus .500 in. = .100 inches CA
remaining
Step # 3 Determine RL =0.100 in. .010 = 10.0 Use 10 years RL
5. Given the above information (Assume No RBI), determine the date & the
next type of Inspection (Internal or can an On-Stream inspection be done)
using API 510 rules?
A) Internal inspection absolutely must be performed and will be due on January 1,
2021
B) On-Stream inspection MAY be performed (in lieu of internal) and will be due on
July 1, 2025
C) Either an internal or an On-Stream inspection will be due on January 1, 2021
D) None of these is correct
Answer: D (API 510, Para. 6.5.1.1 & 6.5.2.1) RL Rule Internal due Jan.
1, 2016)
6.5.1.1 Unless justified by a RBI assessment, the period between internal or
on-stream inspections shall not exceed the remaining life of a vessel or 10
yrs, whichever is less.
6.5.2.1 At the discretion of the inspector, an on-stream inspection may be
substituted for the internal inspection in the following situations:
b. When vessel entry for internal inspection is physically possible & all the following
conditions are met:
Item # 1 Vessel general corrosion rate is known to be less than 5MPY
Corrosion rate = 10MPY
Item #2 Vessel remaining life is greater than 10 years It is not It is
exactly 10 years
6. Given the above (assume no RBI), when is the next External inspection
due & why?
A) Jan 1, 2016 External inspections never exceed a lesser of 5 yrs or the
Internal/OSI interval
B) Jan 1, 2016 Because external inspections may NEVER exceed 5 years without
RBI
C) Jan 1, 2014 Because external inspections may NEVER exceed 5 years without
RBI
D) Jan 1, 2021 At the same time as the On-Stream inspection as allowed by API
510
Answer: C (API 510, Para. 6.4.1) Last external insp was Jan. 1, 2009 Due
Jan 1, 2014
6.4.1 Unless justified by RBI assessment, each aboveground vessel shall be given a
visual external insp at an interval that does not exceed the lesser of five years
or the required internal/on-stream inspection.
Page | 3
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
7. On April 1, 2011, the remaining life of a vessel was been determined to
be exactly 3 years. What is the latest possible date allowed by the code to
perform a next Internal or OSI inspection and to also perform the next
external inspection?
A) Next Internal or OSI AND external inspection interval = 1.5 years, due on October
1, 2012
B) Next Internal or OSI AND external inspection interval = 2 years, due on April 1,
2013
C) Next Internal or OSI AND external inspection interval = 3 years, due on April 1,
2014
D) None of these is correct. External inspection will be required before an
internal/OSI.
Answer: B (API 510, Para. 6.5.1.1 & 6.4.1)
Solution: RL = 3 years Apply RL less than 4 years rule in 6.5.1.1 Maximum = 2
years
External inspection will be 5 years or the internal/OSI interval whichever is
less
Solution: We must inspect no later than 2 yrs for both Internal/OSI &
External Inspection
6.5.1.1 When remaining life is less than 4 years, inspection interval may be full
remaining life up to a maximum of two years The RL rule does not
apply here!!!
6.4.1 Unless justified by an RBI assessment, each aboveground vessel shall be
given a visual external inspection at an interval that does not exceed the lesser of
five years or the required internal/on-stream inspection. It is preferred to
perform this inspection while the vessel is in operation. Per most
inspection plans, do externals just before shutdowns!
A) Take baseline & 1,000 hour service UT thickness measurements & follow-up UT
thereafter
B) Corrosion rates may be estimated owner/users experience (old records) or
similar service
C) Corrosion rates may be estimated from any published data regarding sour crudes
D) None of these is correct
Answer: A (API 510, Para. 7.1.2) Read question well No alternatives
except UT
Page | 4
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
9. Regarding the question above, if it is later determined that an
inaccurate corrosion rate was assumed, what must be done regarding the
corrosion rate for RL calculations?
A) Make subsequent determinations at appropriate intervals until an accurate rate is
established
B) Consult the corrosion specialist to determine which rate to apply, ST or LT
Corrosion rate
C) Corrosion rate in the remaining life calcs shall be changed to the actual corrosion
rate
D) Nothing because the corrosion rate will be likely to keep changing again and
again
Answer: C (API 510, Para. 7.1.2) Read the last paragraph (sentence) in
the section
10. What is MDMT & Charpy Impact test temp required for a 5 mm or -
sized test specimen? (Assume SA-516 Gr. 70 plate (2.25 in.) quenched and
tempered & now is requiring Impact Test)
A) 0F & -20F B) 30F & 10F C) 67F & 47F D) None of these
Ans: A (Fig UCS-66 (4) Pg 181 Curve D Table UCS-66 Pg 184 Table UG-84.2 Pg
69
Step 1 Determine what curve on Page 181 B or D quenched & tempered = D
Pg 184 Use MDMT Column for D & row for 2.25 in. (use F values) = 0F Now go to
Pg 69 Table & a 5 mm specimen is a - sized so there is 20F reduction from 0F
or -20F Answer = A
11. Using Fig. UW-16.1 (a), determine value for tc Assume t = 38 mm & tn
= 22 mm!
A) 6 mm B) 13 mm
Page | 5
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
C) 19 mm D) 22 mm
Answer: A (ASME Section VIII, Div. 1, UW-16.b Symbols & See the Legend & See
Figure)
Solve for tmin = 19 mm or 22 mm (lesser = 19mm) 0.7 x t min or 19 mm
= 13.3 mm
Solve for tc = lesser of tmin or 13.3 mm or 6 mm = 6 mm
14. Given a vessel with .500 in. seamless ellipsoidal heads and a 24 inch
OD seamless piping shell (.375 in. wall), attached by RT Type 1 Category A
Butt Joints (Lethal Service), Corrosion Allowance = .125 inches, Design
Pressure is 600 psi at 300 F, and the material stress values are given as
S = 20 ksi for head and S = 19.7 ksi for shell
Determine E & required minimum t for 2:1 ellipsoidal heads show your
calculations!
Page | 6
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
C) E = 0.85 & required head t = 0.368 in.
D) E = 1, and required head t = 0.390 in.
For a vessel calculation, the following is given for questions 15 & 16 (see
the next page):
Page | 7
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Answer: D (UG-32d & formula 1) No RT =.70 per Table UW-12 See
L.1.5.1.c example
Answer: D (UG-27c & formula 1) See also Appendix L-1.5.3.a example for
practice
Page | 8
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Answer: B UCS-66 (c) (4) same applies for B16.5 flanges Top left
column, pg 183
Page | 9
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
21. How many tensile & guided bend tests are needed for a PQR coupon
using material grade A516 Grade 70 that is 3/4 inch (20 mm) thick?
A) Two tensile tests & four guided bend tests (2 face + 2 root bends are required)
B) Two tensile tests & four guided bend tests (4 face bends are required)
C) Two tensile tests & four guided bend tests (4 side bends are required)
D) None of these are correct
Answer: C Table Qw-451 See the Row for 19 mm 38 mm thickness
22. Are guided bend test results acceptable for A516 Grade 70 at a 3/4 in.
(20 mm) thick PQR Coupon (4 side bends taken), if Specimen # 1 = 3.0 mm
slag, Specimen # 2 = 3.0 mm porosity, and Specimen # 3 = 2.9 mm slag,
and specimen # 4 had 3.0 mm of porosity?
23. Using illustration above and Figure UG-37.1, what is the total area
required (A value) for a reinforced nozzle, given a shell opening of 13.00
in. (value d) with a shell required thickness of 1 inch (value tr) & what is
the Dp value (repad OD) to be used in any calcs?
A) A = 1.1 inches & Dp = 17.75 inches B) A = 1.3 inches & Dp = 18.75 inches
C) A = 1.5 inches & Dp = 19.38 inches D) None of these is correct
Answer: D Fig. UG-37.1 & Legend = A = dtr (shortcut formula) = 13.00 x
1.00 = 13.00 in.
Dp = 12.750 + 3 + 3 = 18.750 inches = OD of Nozzle + 2 (repad value of 3
inches shown)
Solution: Answer = D because A = 13.0 inches and value Dp = 18.75 in.
(repad O.D.)
Page | 10
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
24. Determine the correct wire number, wire set & wire diameter for a film
side radiograph taken on a .875 inch thick nozzle to flange circumferential
weld?
A) 8 wire, Set B, Wire Diameter 0.016 B) 9 wire, Set B, Wire Diameter 0.020
C) 10 wire, Set B, Wire Diameter 0.025 D) 11 wire, Set B, Wire Diameter 0.030
Answer = B: Wire-Type Essential Wire # 9 = Set B = Wire Diameter =
0.020in (0.51mm)
Step 1 Use thickness given in exam question = .875 in.
Step 2 Add weld reinforcement (Tables UW-3 & UW-35) = 3/16 or .188 in.
Step 3 Add .875 + .188 = 1.063 in for a Cat. B Butt welded Nozzle to Flg girth weld
UW-3 Solution: Use Over 1.00 thru 1.50 row (T-276) Film Side Column
9 wire T-233.2
25. If a radiograph (gamma radiography) has a density equal to 2.4 in the
area of interest adjacent to a single wire-type IQI, what is the acceptable
density range along the weld?
A) 2.0 to 3.1 B) 2.1 to 3.0 C) 2.2 to 3.1 D) 2.0 4.0 for
gamma RT
Answer: A (ASME V, Art. 2, T-282.2) Apply the Density variation rule of
-15% to +30%
2.4 x 85% or .85 (-15% rule) = 2.04 = 2.0 2.4 x 130% or 1.3 (+30% rule)
= 3.12 = 3.1
26. What is the minimum penetrant dwell time when performing a PT
examination on vessel weld (Plate material = A516 Grade 70) at a
temperature of 45F?
Page | 11
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
C) Accept the weld, as 1mm undercut is allowed on non-PWHTd welds per
ASME VIII, Div 1.
D) Reject the weld because it exceeds the ASME Section VIII, Div. I code
allowed tolerance
QUESTION # 29
Given: CALCULATE MAWP @ SHELL
FOR A PROPOSED 10-YEAR RUN
Original vessel thickness was found to be 0.975 inches thick (Baseline UT on January
1, 1986)
Latest vessel thickness taken during an internal vessel inspection on Jan. 1, 2011
was 0.860 in.
Vessel U-stamp reads Design:150 psi @ 350F, RT 1, Corrosion Allowance = 0.250
inches!
Pressure vessel Minimum thickness required on the data sheet & the U-stamp = .
725 inches!
Date of last external inspection was January 1, 2009 when a CUI survey was also
performed! The lower half of the vessel in hydrocarbon service has a SS strip lining
and both VT & UT have found no metal loss over 25 years. Low readings are located
in the vapor space at the shell and top head. Corrosion rates have remained
steady for the vessels 25 year service life.
Additional Given Information: Shell S Value = 16 ksi, Lethal Service &
Full Radiography
Internal Radius = 82 in. Established Corrosion Rate = 4.6 mils or .0046
inches per year
Page | 12
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
A) t = .860 and MAWP = 167 psi that is greater than 150 psi design, so a 10 year
run is OK
B) t = .814 and MAWP = 158 psi that is greater than 150 psi design, so a 10 year
run is OK
C) t = .768 and MAWP = 149 psi that is less than 150 psi design, so a 10 year run is
NOT OK
D) None of these is correct, but the MAWP is greater than 150 psi design & a 10
year run is OK
Answer: C (ASME VIII, UG-27.c.1 Formula 1 & API 510 Section 7.3.3
Formula for MAWP)
First step Solve for t using API 510 Code rules &
formula
7.3.3 In corrosive service, the wall thickness used in these computations
shall be the actual thickness as determined by inspection (see 5.6.2) minus
twice the estimated corrosion loss before the date of the next inspection, as
defined by:
t = tactual 2 (Crate x Iinternal) API 510, Para. 7.3.3 = .860 2 (.0046 x 10) =
.768
Correct is 16,000 (1) (.768) = 12,288 (82 + .461) or 82.461 = 149 psi <
150, so not OK
A) Inspector may use similar service results from another similar vessel at
owner/users location
B) Shell thickness measurements taken internally (during int. insp.) at typical
CUI problem areas
C) Use of special removable & replaceable type insulation is a preferred
method of 510 code
D) None of these is correct per API 510
Page | 13
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
o o
A) 30 F (17 C) above the material MDMT
B) 30o F (17oC) above ambient metal temp
C) 10o F (6oC) above the material MDMT
D) 10o F (6oC) above ambient metal temp
Ans: C (API 510, Int. & On-stream Insp Rules, Par. 6.5.1.2) Reason:
In this case, 30 calendar years of operation is equal to 10 actual
operation years! External interval ALWAYS = 5 years
Page | 14
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
34. When installing a fillet-welded patch adjacent to an existing
fillet-welded patch, the distance between the toes of the fillet weld
shall not be less than:
A) 4 x the square root of (vessel inside radius x actual vessel wall thickness
under the patch)
B) 2 x the square root of (vessel inside radius x actual vessel wall thickness
under the patch)
C) 2 x the square root of (vessel inside radius x nominal vessel wall thickness
under the patch)
D) 4 x the square root of (vessel inside radius x nominal vessel wall thickness
under the patch)
35. Assuming no RBI and the Internal Inspection Interval has been
set at 4 years, what is the maximum external inspection interval
allowed per API 510 rules?
A) Five (5) years is the maximum inspection interval allowed
B) Four (4) years is the maximum inspection interval allowed
C) Two (2) years is the maximum inspection interval allowed
D) None of these is correct per API 510 rules
Page | 15
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
AWAY FROM A WELD is corroded & joint efficiency is less than 1.0,
an independent calc using an appropriate weld joint factor (typically
= 1.0) can be made. For this calculation, the surface at a weld
includes (what distance)?
A) 1 inch on either side of a weld (measured from toe) regardless of
thickness
B) 2 inches on either side of a weld (measured from toe) regardless of
thickness
C) 1 inch (OR 2 x t required) on either side of a weld (measured from toe),
use greater value
D) 2 inches (OR 2 x t required) on either side of a weld (measured from toe),
use greater value
Ans: C (API 510, Par. 7.4.5) FFS Analysis of Corroded Regions Joint
Efficiency Adjustments
38. For a pressure vessel constructed in 1950 having no nameplate
and minimal design and construction documentation, which of the
following is a correct action to be taken for calcs?
A) Use allowable stress values of the 1999 Addenda (based on current design
factors)
B) Use allowable stress values from Code Case 2290 (based on current
design factors)
C) Use allowable stress values of the current ASME Code (based on design
factor of 3.5)
D) None of these is the correct action to take
Ans: D (510, Par. 7.7) Evaluation of existing Equip (Minimal
documentation) Must know!
39. Assuming no RBI, a maximum internal inspection interval using
the MAWP method is:
A) Determined by MAWP calcs B) 10 yrs
C) 15 yrs D) 20 yrs
Ans: B (API 510, Int. & On-stream Insp Rules, Par. 6.5.1.3)
Alternative MAWP calc method
40. When a pressure vessel remaining life is 1.5 years, the internal
or on-stream inspection Interval may be a maximum of:
A) Only of the vessels remaining life (0.75 years in this case)
B) Full remaining life (1.5 years in this case)
C) A maximum of 3 years in this case
D) A maximum of 2 years in this case
Page | 16
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Answer: B (API 510, Internal & On-stream Inspection Rules, Para.
6.5.1.1)
41. When PWHT is performed for environmental-assisted cracking
resistance, LOCAL PWHT MAY be substituted for 360-degree banding
on local repairs on all materials, provided that:
A) Local PWHT may NEVER be substituted for 360 banding to prevent
environmental cracking B) Local PWHT temp is maintained for a distance not
less than 2 x base metal t (from weld toe)
C) A preheat of 300F (150C) or higher, as specified in the WPS, is
maintained during welding
D) A metallurgical review shall be conducted to assess whether the
procedure is acceptable
Ans: D (510, Int. & OSI (Insp.), Par. 6.5.2.1.b.6) Phys. Poss.
Environmental Cracking & Hydrogen Damage Rules API 571, 4.5.1,
4.5.2, 4.5.3, 5.1.2.3, & 5.1.3.1 5 DMs!
Answer: A (510, Int. & OSI (Insp.), Par. 6.5.2.2) Physically Possible
7 Rules to allow OSI!
Page | 17
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
44. If a RBI assessment is not performed, what is the greatest
possible time period allowed by API 510 between testing of pressure
relieving devices?
A) 5 years (for all services)
B) 10 years (for non corrosive services)
C) At intervals often enough to verify reliability
D) None of these is correct because the quality assurance manual must be
followed
Ans: B (510, 6.6.2.2 PZV Rules for Insp Intervals = Five yrs &
10 yrs 2 Rules to KNOW)
45. When calculating corrosion rates using API 510 formulas, which
of the following statements is FALSE regarding the value for t
initial?
A) t initial = the initial thickness at the same CML as t actual (for any given
CML in inches or mm)
B) t initial = the initial thickness at a different CML from the one determining
the lowest t actual
C) t initial may a first thickness measurement taken (new vessel) at a given
CML (inches or mm)
D) t initial may be the thickness at the start of a new corrosion rate
environment at a given CML
47. For a pressure vessel with .425 inch nominal hemispherical heads
(head segment welds are RT Type 1 butt joints) and 24 inch OD seamless
pipe shell (.500 in. nom. wall) attached by RT Type 1 Category A Butt Joints
Page | 18
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
(Lethal Service), Corrosion Allowance = .125 inches, Design Pressure is
600 psi at 300F. S = 20 ksi for heads & 19.7 ksi for shell
48. After rolling a plate into a cylinder designed for internal pressure it is measured for
out of roundness and it is acceptable if the out-of-roundness is no more than:
A) 1% B) 2%
C) 3% D) None of these are correct
49. What is the maximum length of a rounded indication when spot radiography has been
specified for a given pressure vessel as per ASME Section VIII, Division 1?
Page | 19
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
B) 6 mm
D) None of these are correct
Ans: D (ASME VIII, Div I, UW-52.c.3 Rounded indications are not a factor No limit
50. Welder ABC has welded a performance test coupon inch thick in the 6G position.
Welder DEF has welded performance test coupons inch thick in 2G & 5G combination.
Which statement below is true regarding the number and type of test specimens required
for each of these welders to pass their qualification tests?
A) Welder ABC must pass 2 side bend tests & Welder DEF must pass 4 side bend tests
B) Welder ABC must pass 4 side bend tests & Welder DEF must pass 8 side bend tests
C) Welder ABC must pass 6 side bend tests & Welder DEF must pass 12 side bend tests
D) None of these are correct
Ans: D (ASME IX Table QW-452.1.a & 3 Notes) API 577, Section 8 Table QW-452.1a)
See Note 1 ABC must pass 4 side bend tests & Welder DEF must pass 6 side bend tests
Page | 20
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
52. Which of these should be considered an alteration to a pressure
vessel per API 510?
Page | 21
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
56. Per API 510, all on-stream inspections should be conducted by:
A) An Inspector only
B) Either an inspector or examiner
C) An inspector approved Examiner
D) An owner/user approved and trained examiner
A) After an alteration
B) After temporary repairs
C) After most routine repairs
D) At the discretion of the Inspector
59. The principal reason for inspecting a pressure relief device is to:
Answer: A (API 510, Par. 6.6 & 6.6.2.1 & API 576 Ch. 6, Para. 6.1.1)
API website Sample Q
Page | 22
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
60. To be considered valid by an Inspector, PQRs must be certified
by:
A) Mechanical tests per ASME IX
B) Approved Test Lab Signature & date
C) A corresponding and supporting WPS
D) The owner user inspection organization
Answer: B (API 510 Body of Knowledge Part 2 (Notes) 2013 exams
Must know
A) Ductility B) Hardness
C) Density D) Toughness
62. A relief valve has been shipped lying down on its side. This is a
problem because:
Page | 23
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
but the Inspector should look for blisters on the shell ID, not on the
discolored tubes
A) Weld all around (in field) B) Weld Spot weld (in field)
C) Plug weld (in field) D) Weld all around
Answer: D Ref: Appendices & Fig A-4 Std Weld Symbols Field
weld has black flag
A) Fluorescent PT Method
B) Radiographic Testing Method
C) Fluorescent Magnetic Particle Method
D) Close visual Inspection with good lighting
Page | 24
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Answer: C Ref: API 572 Sect 9.4.4.2 & 9.3.14 & Figure 17 WFMPT
is most sensitive for CS
A) Controlled-deposition welding
B) Temper-bead welding
C) Half-bead welding
D) None of these
Page | 25
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Answer = A Ref: API 510, Section 3.11 (Definition of Controlled-
Deposition Welding)
A) Repair Plan
B) Quality Plan
C) Inspection Plan
D) QA Inspection/Repair Mgmt System
Page | 26
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Answer = B Ref: API 510, Sect 3.59 (Definition of Temper
Embrittlement)
76. For P1, P3, P4, and P5 materials (for purpose of API 510
examination) the lower transition temperature and upper
transformation temperature regarding PWHT will be (respectively):
Answer = D Ref: API 510, Sect 2 (References) See the API 510
BODY OF KNOWLEDGE
A) Materials
B) Equipment
C) Workmanship
D) Quality Assurance
Page | 27
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Answer = D Ref: API 510, Par. 5.5.6.1.a/b CUI Inspection!
80. Assuming no RBI and the Internal Inspection Interval has been
set at 8 years, what is the maximum external inspection interval
allowed per API 510 rules?
A) Eight (8) years is the maximum inspection interval since it cannot exceed
the Internal interval
B) Five (5) years is the maximum inspection interval allowed by API 510
given these conditions
C) Four (4) years is the maximum inspection interval allowed by API 510
given these conditions
D) None of these is correct per API 510 rules
Answer: B (API 510, External Inspection Rules, Para. 6.4.1)
81. RBI can be used to determine:
82. Per API 510, shell insert (flush) patches must meet all of these
requirements EXCEPT:
Answer: C (API 510, Para. 8.1.5.2.2) The 1-inch radius rule must be
met Must know
Page | 28
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Answer = A Ref: API 510, Para. 5.5.2.1 Internal Inspection
84. The API 510 recommended shell temp during a hydrostatic test
(A vessel = 2.5 in. thick)?
A) 30 o F above MDMT
B) 30 o F above ambient
C) 10 o F above MDMT
D) 10 o F above ambient
A) 650F (345C)
B) 700F (371C)
C) 750F (400C)
D) 800F (427C)
A) Within 6 in24 in (150600 mm) of exam surface & at an angle not less
than 20 to surface
B) Within 6 in12 in (150300 mm) of exam surface & at an angle not less
than 20 to surface
C) Within 12in-24 in (300-600 mm) of exam surface & at an angle not less
than 20 to surface
D) None of these is correct
A) Weldability B) Composition
C) Welding Process types D) Mechanical properties
Page | 29
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
88. Before performing any inspection, inspectors shall familiarize
themselves with prior history of the vessel and should review:
A) Prior inspection results & repairs, current inspection plan & similar service
inspection results
B) Prior repairs & prior inspection plans & similar service inspection results
only
C) Prior inspection & repair results & similar service inspection results only
D) Prior inspection and repair results only
Page | 30
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
92. Preheat temps used in making welding repairs shall be in
accordance with the applicable code and qualified welding
procedure, and the inspector should assure that:
A) Both welders and supervisors know the required preheat values
B) Welders know the minimum preheat temperature requirements
C) The minimum preheat temperature is measured and maintained
D) None of these are correct per API 510
Page | 31
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Answer = D Ref: API 510, Para. 5.5.2.3 Internal Inspection of
Deposits and Linings
98. Which of the following statements are NOT TRUE regarding On-
Stream Inspections?
Page | 32
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
C) Welded attachments such as reinforcement plates & clips checking for
cracks or defects
D) Associated structure, allowance for expansion, and general vessel
alignment on its supports
100. If vessel stamp shows a 1997 construction date & a vessel has
not been rerated, then what is the minimum test pressure is to be
applied to satisfy API 510 code requirements?
Page | 33
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
A) Every five years, with the vessel in operation or out of operation, it
doesnt matter
B) Lesser of 5 yrs or required internal/on-stream inspection interval, vessel in
operation
C) Lesser of 5 yrs or required internal/on-stream inspection interval, vessel
not in operation
D) Lesser of 5 yrs or required internal/on-stream inspection interval, as the
Inspector requests
Answer: B (API 510, Definition of inspection, Para. 6.4.1)
105. The inspector shall approve all specified repair and alteration
work at designated hold points and after completion of the work in
accordance with the:
A) Repair plan B) Inspection Plan
C) QA Plan D) QC Plan
Page | 34
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
D) No, it is not possible to exempt any vessel from its internal inspection with
any of the above
Page | 35
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
B) Excavating a defect and contour blend-grinding per API 579
C) Lap Band repairs and Weld overlays of corroded areas
D) Excavating a defect and repair welding the excavation
Answer: A (API 510 Section/Para. 8.1.1 Make sure you know the
routine repair rule)
Page | 36
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
B) General pitting type corrosion of stainless steels
C) Chloride SCC of austenitic stainless steels
D) None of the above attack stainless steels
118. If white salts are found at cracks in a vessel, what is the likely
damage mechanism?
119. The rules for impact testing of carbon steel in Section VIII, Div.
1, Carbon steel vessel materials require what kind(s) of impact
tests?
Page | 37
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
B) Izod & Charpy V-notch
C) Charpy V-notch
D) Brinnell
A) Properties of a weldment
B) Suitability of the weldment
C) Record for weldment construction
D) None of these are correct per API 577
123. The PQR shall record all of the following items except:
A) Chemical composition of the deposited weld metal and the base metal
B) Chemical composition of the deposited weld metal
C) Tensile strength of filler metal and base metal
D) Chemical composition of the base metal
A) 3-month period
B) Six-month period
C) Nine-month period
D) Twelve-month period
Page | 39
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Answer: B Ref: API 577, Sect. 9.4.1 NDE MT General
132. Assuming no RBI and the Internal Inspection Interval has been
set at 4 years, what is the maximum external inspection interval
allowed per API 510 rules?
A) Five (5) years = maximum inspection interval allowed by API 510 rules
B) Four (4) years = maximum inspection interval allowed by API 510 rules
C) Two (2) years = maximum inspection interval allowed by API 510 rules
D) None of these is correct per API 510 rules
133. When a pressure vessel remaining life is less than 4 years, the
internal or on-stream inspection Interval may be:
A) Full remaining life (but less than 4 years)
Page | 40
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
B) Full remaining life up to a maximum of 3 years
C) Full remaining life up to a maximum of 2 years
D) Only of the vessels remaining life in all cases where remaining life is
less than 4 years
Ans: B (510, Para. 6.6.6 & API 576, Para 5.3.2 & Fig 30) PZV
Spring Failure Cause = Corrosion
Page | 41
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
A) Temperatures above Charpy Impact transition temperatures
B) Charpy Impact temperatures have no relationship to Brittle Fracture
occurrences
C) Temperatures below ambient and only in thick sections
D) Temperatures below Charpy Impact transition temperatures
A) Coke Drums
B) Deaerators
C) Thermal or Catalytic Reactors
D) None of these
A) Surface initiated, narrow and along the grain boundaries, and oxide filled
craze cracks
Page | 42
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
B) Surface initiated, generally wide and transgranular, oxide filled and
dagger shaped
C) Surface or subsurface initiated, wide, oxide filled and spider-web
appearance
D) None of these are correct
144. After an RBI assessment has been conducted, the results can
then be used to establish the:
Page | 43
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
A) Isolated and local metal loss and Blistering
B) Surface connected cracking and subsurface cracking
C) Metallurgical changes and material property changes
D) Dimensional changes and Microfissuring/microvoid formation
A) Carbon steels
B) C 0.5 Moly
C) 1.25Cr 0.5 Mo
D) 2.25Cr 1 Mo
Answer = D API 510 (Definition 3.59, Para 5.8.6.1 last sentence) &
571 Para 4.2.3.2.a
149. Severe internal grooving with deep pitting was found at the
bottom of a 4-inch CS elbow in a steam condensate system. This
damage was most likely caused by:
Page | 44
NAME/BADGE #: __________________________________________________ Date:
____________
API 510 PRACTICE EXAM B (150 QUESTIONS)
Answer = D See Paragraph 4.3.6.5.b Appearance or Morphology
of Damage
Page | 45