Sunteți pe pagina 1din 12

Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 1

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H09 MIN

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard

3-Phase, LG, LL, & LLG Fault Currents

Swing V-Control Load Total

Number of Buses: 1 0 24 25

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total

Number of Branches: 2 0 0 22 0 0 24

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total

Number of Machines: 0 1 0 0 0 1

System Frequency: 50.00

Unit System: English

Project Filename: Bida Faris PU3 R0

Output Filename: H:\Relay Setting Calclation\A-11184\Bida Faris PU\Bida Faris PU\Untitled.SQ2S


Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 2

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H09 MIN

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Global 0

Cable Resistance: Yes Global 0


Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 3

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H09 MIN

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

BIDA FARIS 11KV Load 11.000 11.500 1 90.79 30.00


AIS-PU-3
BIDA FARIS 33 kV-PU1 Load 33.000 33.000 1 98.48 -0.22
BIDA FARIS 33KV -PU2 Load 33.000 33.000 1 98.48 -0.20

BIDA FARIS 33KV Load 33.000 33.000 1 98.48 -0.20


GIS-PU-3
Bus1 Load 33.000 33.000 1 100.00 0.00
Bus7 Load 33.000 33.000 1 100.00 0.00
Bus8 Load 33.000 33.000 1 100.00 0.00
Bus9 Load 33.000 33.000 1 100.00 0.00
Bus14 Load 33.000 33.000 1 100.00 0.00
Bus16 Load 11.000 11.500 1 100.00 30.00
Bus18 Load 33.000 33.000 1 100.00 0.00
Bus19 Load 33.000 33.000 1 100.00 0.00
Bus25 Load 33.000 33.000 1 100.00 0.00
Bus26 Load 33.000 33.000 1 100.00 0.00
Bus28 Load 33.000 33.000 1 100.00 0.00
Bus35 Load 11.000 11.500 1 100.00 30.00
Bus36 Load 11.000 11.500 1 100.00 30.00
Bus37 Load 11.000 11.500 1 100.00 30.00
Bus38 Load 11.000 11.500 1 100.00 30.00
Bus39 Load 0.415 0.434 1 100.00 60.00
Bus40 Load 11.000 11.500 1 91.02 30.00
Bus41 Load 11.000 11.500 1 100.00 30.00
Bus42 Load 11.000 11.500 1 100.00 30.00
LVAC PANEL Load 0.415 0.434 1 100.00 60.00

NEW RAMAH GRID-33KV SWNG 33.000 33.000 1 100.00 0.00


BUS

25 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 4

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H09 MIN

Line/Cable Input Data

ohms or siemens per 1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (C) R1 X1 Y1 R0 X0 Y0

0.415KV LVAC INC 1.0MCUN3 35 39.4 0.0 1 0 0.1473565 0.024384 0.0000309 0.464173 0.0599846
CABLE1
11KV AUX TRF CABLE1 11MCUS3 95 39.4 0.0 1 0 0.0546254 0.0310896 0.000032 0.1720701 0.0764804

11KV TRF INC CABLE 11MCUS1 500 39.4 0.0 2 0 0.0112335 0.030419 0.0000593 0.0353854 0.0748315

33KV CABLE C1 33MCUS3 240 164.0 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

33KV CABLE C1 33MCUS3 240 164.0 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

33KV CABLE- C1 33MCUS3 240 164.0 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

33KV CABLE-C1 33MCUS3 240 164.0 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

33KV CABLE1 FROM H37 33MCUS3 240 164.0 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

33KV-CABLE- C3 33MCUS3 240 1640.4 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

33KV-TRF INC CABLE 33MCUS3 240 42.7 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

Cable4 11MCUS3 240 984.3 0.0 1 0 0.0215859 0.027432 0.0000456 0.0679954 0.0674827

Cable5 11MCUS3 240 984.3 0.0 1 0 0.0215859 0.027432 0.0000456 0.0679954 0.0674827

O/G OHL FEEDER -2 11MCUS3 240 22965.9 0.0 1 0 0.0215859 0.027432 0.0000456 0.0679954 0.0674827

O/G OHL FEEDER -4 11MCUS3 240 22965.9 0.0 1 0 0.0215859 0.027432 0.0000456 0.0679954 0.0674827

33KV -OHL1 182. 27887.1 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

33kV-OHL1 182. 16732.3 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

33KV-OHL1 182. 28051.2 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

33kV-OHL3 210 16076.1 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

33kV-OHL5 210 11154.9 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

33kV-OHL7 210 11154.9 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

O/G OHL FEEDER -1 182. 22965.9 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

O/G OHL FEEDER -3 182. 22965.9 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

Line / Cable resistances are listed at the specified temperatures.


Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 5

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H09 MIN

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T2 15.000 33.000 11.500 14.13 10.00 0 0 0 0 0 14.13 Dyn -30.00

T4 0.050 11.000 0.415 3.90 10.00 0 0 0 0 0 3.90 Dyn -30.00

2-Winding Transformer Grounding Input Data

Grounding
Transformer Rating Conn. Primary Secondary

ID MVA Prim. kV Sec. kV Type Type kV Amp ohm Type kV Amp ohm

T2 15.000 33.000 11.500 D/Y Solid

T4 0.050 11.000 0.415 D/Y Solid


Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 6

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H09 MIN

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

T2 2W XFMR Bus14 Bus16 9.03 90.33 90.78

T4 2W XFMR Bus40 Bus39 692.21 6922.14 6956.67

0.415KV LVAC INC CABLE1 Cable Bus39 LVAC PANEL 308.20 51.00 312.39 0.0000002

11KV AUX TRF CABLE1 Cable BIDA FARIS 11KV AIS-PU-3 Bus40 0.16 0.09 0.19 0.0001665

11KV TRF INC CABLE Cable Bus16 BIDA FARIS 11KV AIS-PU-3 0.02 0.05 0.05 0.0006173

33KV CABLE C1 Cable Bus18 BIDA FARIS 33KV -PU2 0.03 0.05 0.06 0.0040565

33KV CABLE C1 Cable NEW RAMAH GRID-33KV Bus25 0.03 0.05 0.06 0.0040565
BUS
33KV CABLE- C1 Cable Bus19 BIDA FARIS 33 kV-PU1 0.03 0.05 0.06 0.0040565

33KV CABLE-C1 Cable NEW RAMAH GRID-33KV Bus26 0.03 0.05 0.06 0.0040565
BUS
33KV CABLE1 FROM H37 Cable NEW RAMAH GRID-33KV Bus28 0.03 0.05 0.06 0.0040565
BUS
33KV-CABLE- C3 Cable BIDA FARIS 33 kV-PU1 BIDA FARIS 33KV GIS-PU-3 0.33 0.49 0.59 0.0405653

33KV-TRF INC CABLE Cable BIDA FARIS 33KV GIS-PU-3 Bus14 0.01 0.01 0.02 0.0010547

Cable4 Cable BIDA FARIS 11KV AIS-PU-3 Bus36 1.61 2.04 2.60 0.0059314

Cable5 Cable BIDA FARIS 11KV AIS-PU-3 Bus42 1.61 2.04 2.60 0.0059314

O/G OHL FEEDER -2 Cable BIDA FARIS 11KV AIS-PU-3 Bus37 37.48 47.64 60.62 0.1383996

O/G OHL FEEDER -4 Cable BIDA FARIS 11KV AIS-PU-3 Bus38 37.48 47.64 60.62 0.1383996

33KV -OHL1 Line Bus26 Bus9 19.49 30.13 35.88 0.0277695

33kV-OHL1 Line Bus28 Bus1 11.69 18.08 21.53 0.0166617

33KV-OHL1 Line Bus25 Bus8 19.60 30.31 36.09 0.0279329

33kV-OHL3 Line Bus1 Bus7 11.24 17.37 20.69 0.0160083

33kV-OHL5 Line Bus8 Bus19 7.80 12.05 14.35 0.0111078

33kV-OHL7 Line Bus9 Bus18 7.80 12.05 14.35 0.0111078

O/G OHL FEEDER -1 Line Bus36 Bus35 132.17 204.31 243.33 0.0027773

O/G OHL FEEDER -3 Line Bus42 Bus41 132.17 204.31 243.33 0.0027773
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 7

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H09 MIN

Power Grid Input Data

% Impedance
Rating 100 MVA Base
Grounding
Power Grid ID Connected Bus ID MVASC kV R X" R/X" Type

NEW RAMAH GRID-MIN NEW RAMAH GRID-33KV 685.892 33.000 1.45072 14.50720 0.10 Wye - Solid
FAULT BUS
Total Connected Power Grids ( = 1 ): 685.892 MVA
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 8

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H09 MIN

SHORT- CIRCUIT REPORT

Fault at bus: Bus16


Nominal kV = 11.000
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus16 Total 0.00 3.145 0.00 97.23 89.56 3.622 3.622 3.83E+001 1.48E+002 9.28E+000 9.28E+001

BIDA FARIS 11KV Bus16 0.00 0.000 0.00 97.23 89.56 0.000 0.000
AIS-PU-3
Bus14 Bus16 56.88 3.145 70.14 78.79 95.65 3.622 3.622 * 3.83E+001 1.48E+002 9.28E+000 9.28E+001

Bus40 BIDA FARIS 11KV 0.00 0.000 0.00 97.23 89.56 0.000 0.000
AIS-PU-3
Bus36 BIDA FARIS 11KV 0.00 0.000 0.00 97.23 89.56 0.000 0.000
AIS-PU-3
Bus42 BIDA FARIS 11KV 0.00 0.000 0.00 97.23 89.56 0.000 0.000
AIS-PU-3
Bus37 BIDA FARIS 11KV 0.00 0.000 0.00 97.23 89.56 0.000 0.000
AIS-PU-3
Bus38 BIDA FARIS 11KV 0.00 0.000 0.00 97.23 89.56 0.000 0.000
AIS-PU-3
BIDA FARIS 33KV Bus14 56.89 1.096 70.15 78.79 95.65 0.729 0.000 4.98E+001 5.68E+001
GIS-PU-3

Bus39 Bus40 0.00 0.000 56.14 100.00 51.71 0.000 0.000

Bus35 Bus36 0.00 0.000 0.00 97.23 89.56 0.000 0.000

Bus41 Bus42 0.00 0.000 0.00 97.23 89.56 0.000 0.000

BIDA FARIS 33 BIDA FARIS 33KV 57.21 1.096 70.38 78.89 95.65 0.729 0.000 4.98E+001 5.68E+001
kV-PU1 GIS-PU-3

LVAC PANEL Bus39 0.00 0.000 56.14 100.00 51.71 0.000 0.000

Bus19 BIDA FARIS 33 57.24 1.096 70.41 78.90 95.65 0.729 0.000 5.01E+001 5.63E+001
kV-PU1

Bus8 Bus19 65.38 1.096 76.19 81.69 95.65 0.729 0.000 5.01E+001 5.63E+001

Bus25 Bus8 86.60 1.096 90.84 90.09 95.65 0.729 0.000 5.79E+001 4.42E+001

NEW RAMAH Bus25 86.64 1.096 90.86 90.10 95.65 0.729 0.000 7.75E+001 1.39E+001
GRID-33KV BUS

Bus26 NEW RAMAH 86.64 0.000 90.86 90.10 95.65 0.000 0.000
GRID-33KV BUS
Bus28 NEW RAMAH 86.64 0.000 90.86 90.10 95.65 0.000 0.000
GRID-33KV BUS
NEW RAMAH NEW RAMAH 95.65 1.096 95.65 95.65 95.65 0.729 0.000 1.45E+000 1.45E+001 2.90E+000 2.90E+001
GRID-MIN FAULT GRID-33KV BUS
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 9

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H09 MIN

(Cont.)

Fault at bus: Bus16


Nominal kV = 11.000
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus9 Bus26 86.64 0.000 90.86 90.10 95.65 0.000 0.000

Bus1 Bus28 86.64 0.000 90.86 90.10 95.65 0.000 0.000

Bus18 Bus9 86.64 0.000 90.86 90.10 95.65 0.000 0.000

Bus7 Bus1 86.64 0.000 90.86 90.10 95.65 0.000 0.000

BIDA FARIS 33KV Bus18 86.64 0.000 90.86 90.10 95.65 0.000 0.000
-PU2

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 3.145 3.622 2.724 3.597
Peak Current (kA), Method C : 6.541 7.532 5.665 7.480
Breaking Current (kA, rms, symm) : 3.622 2.724 3.597
Steady State Current (kA, rms) : 3.145 3.622 2.724 3.597

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer.
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 10

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H09 MIN

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

Bus16 11.000 3.145 6.541 3.145 3.622 7.532 3.622 3.622 2.724 5.665 2.724 2.724 3.597 7.480 3.597 3.597

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 11

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H09 MIN

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)

ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

Bus16 11.000 0.50631 1.95454 2.01906 0.50631 1.95454 2.01906 0.12276 1.22759 1.23371 0.00000 0.00000 0.00000
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 12

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H09 MIN

Sequence-of-Operation Event Summary Report

Symmetrical 3-Phase Fault between Bus16 and 11KV TRF INC CABLE. Adjacent to Bus16.

Time (ms) ID If (kA) T1 (ms) T2 (ms) Condition


0.0 H02-TRF DIFF-87T-PU3 0.0 Phase - 87

40.0 BIDA FARIS PU3 K03 CB 40.0 Tripped by H02-TRF DIFF-87T-PU3 Phase - 87

50.0 BIDA FARIS PU3 H03-CB 50.0 Tripped by H02-TRF DIFF-87T-PU3 Phase - 87

1386 BIDA FARIS PU3H03 (OC-EF) 1.096 1386 Phase - OC1 - 51

1436 BIDA FARIS PU3 H03-CB 50.0 Tripped by BIDA FARIS PU3H03 (OC-EF) Phase - OC1 - 51

2104 BIDA FARIS PU1H01 (OC-EF) 1.096 2104 Phase - OC1 - 51

2104 BIDA FARIS PU3H01 (OC-EF) 1.096 2104 Phase - OC1 - 51

2154 BIDA FARIS PU1 H01-CB 50.0 Tripped by BIDA FARIS PU1H01 (OC-EF) Phase - OC1 - 51

2154 BIDA FARIS PU3 H01-CB 50.0 Tripped by BIDA FARIS PU3H01 (OC-EF) Phase - OC1 - 51

2727 BIDA FARIS PU1 H03(OC-EF) 1.096 2727 Phase - OC1 - 51

2777 BIDA FARIS PU1 H03-CB 50.0 Tripped by BIDA FARIS PU1 H03(OC-EF) Phase - OC1 - 51

2797 NEW RAMAH GRIDH09-OC & 1.096 2797 Phase - OC1 - 51


EF
2847 NEW RAMAH GRID H09-CB 50.0 Tripped by NEW RAMAH GRIDH09-OC & EF Phase - OC1 - 51

5000 NEW RAMAH GRID H09-SEF 1.096 5000 Phase - OC1 - 51

5050 NEW RAMAH GRID H09-CB 50.0 Tripped by NEW RAMAH GRID H09-SEF Phase - OC1 - 51

S-ar putea să vă placă și