INTRODUCTION TO FLOW ASSURANCE

PIONEER IN OFFSHORE TECHNOLOGY SINCE 1965

58A rue du Dessous des Berges - 75013 PARIS - FRANCE


Phone : +33 1 44 06 10 00
Fax : +33 1 45 70 87 38
www.doris-engineering.com

R\200060\Commercial\Typing\_GeneralPresentation\doris_pres\PresentationDORISDiapo\PresentationComplte
Slide 1 June 2007
General_Presentation.ppt
INTRODUCTION TO FLOW ASSURANCE

CONTENTS
INTRODUCTION

FLOW ASSURANCE ISSUES

CONCLUSION

Slide 2 June 2007


General_Presentation.ppt
RESERVOIR CHARACTERISTICS
W E

B+C Top
E CL (*)
3120 (DHI) 3125 (N) -
W LOBE 3140 (S)
OUT
A
D
3384 (ODT) -
3463 (DHI-MDT)
W 3463
ODT
E-F
3752

G
2,000 m 2000 m

Reservoir system
(nb of complexes,
stacked sand channel,
lobes)

Slide 3 June 2007


General_Presentation.ppt
CRUDE OIL PROPERTIES - PVT

Laboratory analyses to determine


Crude physical properties

PVT modelling :
Composition set up,
Heavy cut characteristic definition
Thermodynamic package

Slide 4 June 2007


General_Presentation.ppt
RESERVOIR LOCATION

DEEP WATER FIELD ULTRA DEEP WATER FIELD


TYPICAL (WEST AFRICA, BRASIL, G. O. M. )
SHALLOW WATER
FIELD

0 Jacket Platform TLP FPSO SEMI SUB 0


SPAR
0 - 250 - 250

300 - 500 - 500

600
900 - 1000 - 1000

1200
- 1500
1500 - 1500
1800
- 2000
2100 - 2000
2400
- 2500 - 2500
2700
3000
- 3000 - 3000
3300
3600
- 3500 - 3500
3900
4200 - 4000
- 4000

Reservoir
Burial depth Reservoir burial depth down to 10 000 m
(Metres) Slide 5 June 2007
General_Presentation.ppt
RESERVOIR MODEL
PRODUCTION PROFILES PER WELL
A45_P1
25,000 100

90

20,000
Difficulty to interpret well 80
profiles at late life
70

15,000 A45_P1 Oil 60


A45_P1 W ater
A45_P1 Liquid
A45_P1 Gas 50

Flow rate [blpd]


Flow rate [Mscfd]

10,000 40

30

5,000 20

10

0 0

00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19

Slide 6 June 2007


General_Presentation.ppt
FLOW ASSURANCE ISSUES

FLUID MORE AND MORE DIFFICULT TO PRODUCE


Fluid Properties (Wax, Emulsion, Low GOR)
Reservoir properties (Pressure, Temperature)
Environment Characteristic (Cold water, high water depth)

FLOW ASSURANCE TO GUARANTEE THE FLOW

Slide 7 June 2007


General_Presentation.ppt
FLOW ASSURANCE: TO FIND THE BEST WAY

P RESERVOIR

SO4--
ASPHALTENES

WAX
CP

S
ATE
?

RD
HY
VISC CO3--
O ST Y

T
Slide 8 June 2007
General_Presentation.ppt
FOR DIFFERENT FIELD LAYOUTS
Field Architecture :
Well drilling centers
Well target
Subsea Pipeline Network
Topsides facilities location

WATER

PROD

PROD

Slide 9 June 2007


General_Presentation.ppt
BY MANAGING FLOW ASSURANCE ISSUES

HYDRATE WAX
ASPHALTENES
NAPHTENATE
SCALES
FLOW
SLUGS ASSURANCE
EROSION
STRATEGIES CORROSION

TOPSIDES
PROCESS EMULSION
Topsides
FLOW
OPERABILITY ACTIVATION
105 m

Process Deck

2,000,000 bbls storage

Slide 10 June 2007


General_Presentation.ppt
AMONG SEVERAL WAYS

Topsides

E
Multiphase Pump

HYDRATE GAS LIFT


INHIBITORS
Separation
E

GAS LIFT

Slide 11 June 2007


General_Presentation.ppt
FLOW ASSURANCE MAIN TASKS
USE OF THERMO-HYDRAULIC CODES TO DETERMINE:

- Pipe Diameters
VLiquid BUBBLE
- Pipe thermal insulation DOWNWARD SLOPE
(m/s)
SLUGS
- Chemical Requirements UPWARD SLOPE

STRATIFIED VGas
- Production boosting FLOW MAP - HORIZONTAL PIPE (m/s)

- Flow Stability issues


Trend data
P40_riserbase_10Mblpd_lat e_1wA_M42_M41_WC50: PRESSURE BRAN_M42_M41, PI PE_1, 1 [ Pa]
P40_riserbase_15Mblpd_lat e_1wA_M42_M41_WC50: PRESSURE BRAN_M42_M41, PI PE_1, 1 [ Pa]
P40_riserbase_20Mblpd_lat e_1wA_M42_M41_WC50: PRESSURE BRAN_M42_M41, PI PE_1, 1 [ Pa]
P40_riserbase_25Mblpd_lat e_1wA_M42_M41_WC50: PRESSURE BRAN_M42_M41, PI PE_1, 1 [ Pa]
1.75e7
- Topsides Requirements
10 000 blpd

1.7e7

15 000 blpd
25 000 blpd

1.65e7
Pa

1.6e7
Pressure (Pa)

1.55e7

20 000 blpd
Time (s)
1.5e7
0 5000 10000 15000 20000
Time [s]

Slide 12 June 2007


General_Presentation.ppt
FLOW ASSURANCE IS NOT ALONE

TOPSIDES

MEAN SEA LEVEL

SPS

CHOKE UFR RISER

TREE FLOWLINE
SEABED

WELLS
&
DRILLING

RESERVOIR

Slide 13 June 2007


General_Presentation.ppt
FA ITERATION STEPS WITH
RESERVOIR & WELL ENGINEERS

Slide 14 June 2007


General_Presentation.ppt
SUBSEA SYSTEM DESIGN IS BASED ON
OTHER REQUIREMENTS AS WELL

ENVIRONMENTAL DATA

CONSTRUCTION FLOATER
METHODS EXCURSION

PIPE
DEEPWATER
SIZES RISER INSTALLATION
(FA) DESIGN METHODS

THERMAL RISER
SPECIFICATIONS COMPONENENTS
(FA) SPEC.
GAS LIFT
INJECTION
(FA)

Slide 15 June 2007


General_Presentation.ppt
RISER INSULATED SYSTEM : HYBRID RISER TOWER

Flexibles jumpers
(dynamic bundles)

Buoyancy tank
(air cans)

Taper joint (or hinge


connection)

Riser bundle
Core pipe (integral/non integral)
(tether)

Flexjoint
(taper joint)

Spools (jumper)

Slide 16 June 2007


General_Presentation.ppt
FLOW ASSURANCE REQUIREMENTS

Influence of WellHead Flowing Temperature and Tie-back distance on insulation selection


1500 m Water Depth

80
Wet Bundle PIP
75 Insulation Insulation Insulation

70

65 36 25 39 19 31
40 32 26 36

60

30 20 32 15 Electrical
26
55
33 26 20 29 Heating

WHFT (C)
50

23 15 16 23 20
45
25 20 25 12

40

35

30
0 5 10 15 20 25 30 35 40 45 50 55 60
Tie Back distance (km)

Pipe insulation selection based on available technology

Slide 17 June 2007


General_Presentation.ppt
FLOW ASSURANCE REQUIRES SPECIFIC
OPERATIONAL PROCEDURES
HYDRATE MANAGEMENT BASED ON FLUID DISPLACEMENT

REQUIRES

TO LOOP THE

PRODUCTION LINE

1 3

2 4

DRY OIL
LIQUID (OIL + WATER)

GAS METHANOL
Slide 18 June 2007
General_Presentation.ppt
FLOW ASSURANCE REQUIRES MONITORING
TO VALIDATE OPERATIONAL PROCEDURES

DEDICATED

TEMPERATURE

SENSORS AT

RISER BASE

Slide 19 June 2007


General_Presentation.ppt
FLOW ASSURANCE REQUIRES CALIBRATION
OF THE MONITORING (1/2)
Temperature drop measured at manifold header during thermal tests on site

55
53
51
r301
49
r302
47
l301
45
l302
43
41
39
37

T (C)
35
33
31
29
27
25
23
21
19
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0
t (h)

60.00

50.00

40.00

30.00

Time (hours)
20.00

10.00

T initial
0.00
0 2 4 6 8 10 12 14 16 18
Temperature (C)

P30 shutdown during warm-up P30 test P50 shutdown during warmup P50 test P10 test P10 after 8 days production

T initial

ON SITE MEASUREMENT OF THE THERMAL

INSULATION PERFORMANCES
Slide 20 June 2007
General_Presentation.ppt
FLOW ASSURANCE REQUIRES CALIBRATION
OF THE MONITORING (2/2)

TEMPERATURE PROBE

Slide 21 June 2007


General_Presentation.ppt
FLOW ASSURANCE REQUIRES TO BE UPDATED
DURING THE PRODUCTION

FLOW ASSURANCE STUDIES

ARE STILL REQUIRED DURING

FIELD PRODUCTION

TO UPDATE PROCEDURES

TEMPERATURE PROBE

Slide 22 June 2007


General_Presentation.ppt
FLOW ASSURANCE - CONCLUSION

Flow Assurance discipline has to be considered as a


transverse discipline
To Study the Fluid transfer from reservoir to
subsea and subsea to topsides
Involvement in conceptual studies to support
field architecture development
Involvement in operational issues

Slide 23 June 2007


General_Presentation.ppt
FLOW ASSURANCE HUMAN RESSOURCES

DONT BE
WRONG
OFFSHORE IS
STILL
INNOVATIVE
Slide 24 June 2007
General_Presentation.ppt
FLOW ASSURANCE HUMAN RESSOURCES

So, Ready to join


the Engineering
Team ?