NORTH DIRECTION

KEY PLAN:

LEVEL-+ 0.00m
6T25 mm
PLOT NO:- C-67 (E20-01)
+- 0.0m
R.C Waller Beam
OUTSIDE
LIMIT
BASEMENT CAPPING BEAM 1100 x 1100mm
-1.50 m INSIDE
- 1.5m 10@150mm


EPOXY GROUT
- 2.1m

34T25mm
THICKENSAS-PER THE PLAN
O.D. X 16MM STEEL PIPE
(HORZ. STRUT) TOE
DIM No.Of F.cu Anchor No.of
Retaining Wall WITH 1.2 X 1.1 X 20MM THK. PLATE
PILE PILE
(mm) (N /mm) LEVEL
TYPE LEGEND Piles Type Anchor
BOLTED TO WALER BEAM (m)

MAIN SECANT PILE


PILE
SECONDARY SECANT HARD 900 88 40
4 T32 L= 0.4m
-19.50
SOFT 900 88 20

A1
THICKENS900mm O.D. X
SECANT PILE.
1-176 176
16MM STEEL PIPE (HORZ.
STRUT) SHORING IN THIS DRAWING TOTAL :
WITH 1.1 X 1.2 X 25MM 15mm WELD ALL AROUND THE
THK. PLATE
BOLTED TO WALER BEAM
4T32 STEEL BAR PER STELL PLATE & STEEL PIPE 01 15-APR-2014
PILE TOP & BOTTOM
SIZE OF WELDS = 20mm WEDL @ EACH R.C. PILE
12 Bolts T32mm (600mm)
24T25 REV. DATE DESCRIPTION
LEVEL OF STRUT
12.0m
6T25 mm
12.0m

-6.00m
- 6.0m CLIENT
4 T32 L= 0.4m
SECTION K"(WAILER BEAM ) MRS .SHIRINA MATTAR BINT
RASHID AL-MANSOURY
SECTION-K" Concrete WALLER BEAM
1100 x 1100 mm PLOT.NO SECTOR AREA JOB NO.
CP-493
ABU DHABI
L= -8.0m
-8.0m
C-76 E 20-01 SHORING

INSIDE

PROJECT:
OUTSIDE COMMERCIAL BUILDING
(3B + G + M + 4 +P+ ROOF FLOOR)
12T25 24T25 MAIN STEEL 4 T32 L= 0.4m
6.0m Consultant
T10 @150 SPIRALS
DETAIL OF

12
CORBEL WITH DETAIL OF

00
L= -12.0m

12
-12m CROSS SECTION A1 CORBEL WITH
ONE STRUT

mm
6.0m

00


TWO STRUT

mm

Kojakian Eng'g Consultants



EXCAVATION 1100mm x 1100mm


L= -13.5m L= -13.50m LEVEL 1100mm x 1100mm
-13.5m
-13.60m
Wailer Beam Wailer Beam
A2


MAIN CONTRACTING



900mmO.D. X AS PER PLAN
STEEL PIPE (HORZ. STRUT)
12T25 4 T32 L= 0.4m 12T25 Tension Bars 12T25 Tension Bars
WITH 1.2m X 1.1m WITH THK 20 mm. PLATE
L= -14.0m
BOLTED TO WALER BEAM 900mmO.D. X AS PER PLAN
-14m 6.0m Concrete Corbel Concrete Corbel
STEEL PIPE (HORZ. STRUT)
WITH 1.2m X 1.1m WITH
THK 20 mm. PLATE
BOLTED TO WALER BEAM

27 T25 Cross
12T25
6.0m


27 T25 Cross Piling Contractor
6.0m
PLAN
PLAN Australian Piling


60T25 MAIN STEEL

DETAIL (L)


Technology

mm
1100mm
T10 @150 SPIRALS


L= -18.0m

00
-18 m
1100mm (DETAIL - F)

12
CROSS SECTION A2
TOP VIEW
TOE LEVEL (DETAIL - E) TEL: (02)5504222 FAX: (02)5504221
P.O. BOX: 48181
-19.50 m -19.50 m TOP VIEW Drawing Title

VERTICAL SECTION A-A


SHORING LAYOUT ,DETAILS & SECTIONS

2T16 mm thick 20mm DETAILS&SECTIONS


Drawing No. Revision No.
200 940 200 2825mm 5 15 15 15 15 15 15 15 10
STIRRUPS T10 @ 250 mm -1.50 m 4T16 mm length 40cm
5 5 SH3 01
15 10
Submission Date Scale
15 15
X 600 15
15 08-MAR-2014
4 T 10 15
200 thick 20mm 15
Project ID Plan ID
15
2T16 mm Secant Pile
length 40cmX15cm
15
15 45786
15

940

15 Official Use Only


900 thick 14mm
410 4
200 10 15 15 15 15 15 15 15
GUIDE WALL thick 20mm
X
900 CAPPING BEAM (l.e.v: -1.50) length 40cmX5cm

SECTION X-X 900mm



NORTH DIRECTION

KEY PLAN:



3985cm
753cm 753cm 753cm 753cm 753cm
PLOT NO:- C-67 (E20-01)

45

50
49
25

47
48

51
41

46
21
22
23

29

42
35

44
27

31

33

43
26
24

52
40
28
20

36

38
30

39
34
32

53
37

54
19
12

15
11

17
18
10

16
13
14
2

6
3
1

9
7
8
55
176 56
175 57 DIM No.Of F.cu TOE
Anchor No.of
174
PILE PILE

35
58

35
35

35
(mm) (N /mm) LEVEL

10cm
TYPE LEGEND Piles Type Anchor
(m)

173 59 HARD 900 88 40


528cm

172 60

528cm
-19.50
EXC.LVL=( -13.60m )
171 61 SOFT 900 88

20

170 79 62 1-176 176


cm
55

2 2c 55 SHORING IN THIS DRAWING TOTAL :

169
9 m 63 01 15-APR-2014
168 7 64 REV. DATE DESCRIPTION

167
L I MI 17 LO
T 65 CLIENT

166 c m 12 66 MRS .SHIRINA MATTAR BINT


2 cm

L IMI
T

71

T
RASHID AL-MANSOURY
528cm

165 1 67

528cm
T

L
164
P
68

PLOT.NO SECTOR AREA JOB NO.


CP-493
163 55
55 69 C-76 E 20-01 ABU DHABI SHORING
162 70 PROJECT:
COMMERCIAL BUILDING
EXC.LVL=( -15.30m ) (3B + G + M + 4 +P+ ROOF FLOOR)
2440cm

2440cm
161 71

2620cm
106cm

106cm

160 72 Consultant

159 73
158 55 74 Kojakian Eng'g Consultants
55
157 75

528cm
528cm

156 10cm 76 MAIN CONTRACTING

17 10cm
155 12 77
c m
154 cm 12 78
153 1 7
79

152 PLOT LIMIT 80


79 N=0.0 ,E=0.0 Piling Contractor
151 2c c m
m 2 55
P 81
79
55 Australian Piling
150 T 82 Technology

LO

528cm
528cm

L IMI

149 83

T
P

T
LO L I MI
148
T 84 TEL: (02)5504222 P.O. BOX: 48181 FAX: (02)5504221
Drawing Title
147 85
10cm

SHORING LAYOUT ,DETAILS & SECTIONS


146 86

35
35

SITE PLAN
35
35

145 87 Drawing No. Revision No.

144 88 SH2 01
Submission Date Scale

91
94
95
131

96

93
117

101
137

121

116

98
97
105
132

102

92
115
141

103
114

111
129

124

107
118

110
136

133

128

99
109
134

126

123

90
108

106
125

104
120
119

112
138

135

130
139

127

122

100
113
140
142

89
143

08-MAR-2014
Project ID Plan ID

753cm 753cm 753cm 753cm 753cm 45786


3985cm Official Use Only

4165cm
NORTH DIRECTION

KEY PLAN:

3985cm
753cm

22 SEC
753cm 753cm 753cm 753cm

23 .A-A

45

50
49
25

47
48

51
46
41
21

29

42
35

44
27

31

33

43
26

52
24

40
28
20

36

38
30

39
34

53
32

37

54
12

19
15
11
10

17
18
16
13
14
2

6
3
1

9
5

7
8
55 PLOT NO:- C-67 (E20-01)

176 56
175 57
174

35
58

35
35

35
10cm
173 59 PILE PILE DIM No.Of F.cu
(mm) (N /mm)
TOE
LEVEL
Anchor
Type
No.of
TYPE LEGEND Piles (m) Anchor
528cm

172 60

528cm
SEC
.A-A
EXC.LVL=( -13.60m )
61 HARD 900 88 40
171
-19.50
170 79 62
cm
55
SOFT
2 2c 55 900 88 20
169
9 m 63
168 7 64
SHORING IN THIS DRAWING 1-176 TOTAL : 176
01 15-APR-2014
167 17 65
166 DETAIL -E cm 12 66
REV. DATE DESCRIPTION

1 2 cm CLIENT

7
528cm

165 1 67 MRS .SHIRINA MATTAR BINT

528cm
164 68 RASHID AL-MANSOURY
163 55
55 69 PLOT.NO SECTOR AREA JOB NO.

162 70 C-76 E 20-01 ABU DHABI


CP-493
SHORING
EXC.LVL=( -15.30m )
2440cm

2440cm
161 71

2620cm
DETAIL -F
106cm

106cm
PROJECT:
COMMERCIAL BUILDING
160 72 (3B + G + M + 4 +P+ ROOF FLOOR)
159 73 Consultant

158 55 74
55
157 75

528cm
Kojakian Eng'g Consultants
528cm

156 10cm 76
17 10cm
155 12 77
m
MAIN CONTRACTING

154 cm 2 c
7 1 78
153 1 79
152 79 80
151 2c c m 81
m 2 55 Piling Contractor
79
55
150 82 Australian Piling

528cm
528cm

149 83 Technology
148 84
147 DETAIL -L 85
10cm

TEL: (02)5504222 P.O. BOX: 48181 FAX: (02)5504221


Drawing Title
146 86 SHORING LAYOUT ,DETAILS & SECTIONS

35
35

35
35

145 87 SECANT PILES WITH STRUT


144 88
Drawing No. Revision No.

SH1 01

91
94
Submission Date Scale

95
96

93
131

101
117
137

121

116

98
105

97

92
132

102
115
141

103
111
114
129

107
124

118

110

99
136

133

128

109
134

90
126

123

108

106
125

104
120
119

112
138
139

100
135

130

127

122

113
140
142

89
143

08-MAR-2014
753cm 753cm 753cm 753cm 753cm Project ID Plan ID

45786
3985cm Official Use Only
4165cm
GRD. LVL.
EL. +_ 0.00
Excavation Side Earth Side KEY PLAN:

0.00 GRD. LVL.


EL. +_ 0.00
203x102x23kg/m
900mm O.D. X 16mm
STEEL PIPE (HORZ. STRUT) Fcu = 40N/mm 2 0.00
KING POSTS -1.50
WITH 1.1 X 1.0 X 25mmTHK.
PLATE Fy = 460N/mm 2 1.50m 1
Fcu = 40N/mm 2
@ 1.50m c/c BOLTED TO WALER BEAM
900mm O.D. X 16mm EL. -1.00 GWT
SIZE OF WELDS = 20mm
LEVEL OF STRUT
203x102x23kg/m
STEEL PIPE (HORZ. STRUT)
WITH 1.1 X 1.0 X 25mmTHK.
Fy = 460N/mm 2 1
-2.00m PLATE General Notes
2
KING POSTS -1.50
BOLTED TO WALER BEAM
SIZE OF WELDS = 20mm
CAPING/WAILER @ 1.50m c/c 2
BEAM 3
LEVEL OF STRUT
-2.00m )
No.
PILE TYPE PILE LEGEND DIM TOE
CAPING/WAILER 3
(mm) Of
S.Piles
F.cu
EXCAVATION
/mm
(N LEVEL
LEVEL

8.00
4 BEAM
10.00


B1 B1 B1 4
(Detail - B1) 5.00
(Detail - A1)
Covering = 75mm 5.00
6

L e n g t h (m)
16T25/12.00m
Covering = 75mm
6

L e n g t h (m)
7 A1 A1
A1
7 SHORING IN THIS DRAWING TOTAL :
(s = 150mm c/c) s 750mm dia. SEC. PILES 12.0m 8
s
16T25/ T10-150mm c/c EL. -8.00 Max. Exca. Level 750mm dia. SEC. PILES
12T25/ T10-200mm c/c 11.00m

12T25/11.00m
8
9 REV. DATE DESCRIPTION
OWNER:
EL. -10.00 Max. Exca. Level 9
10.00
Main Reinforcement and
Lateral Stirrups (spiral type) 10.00
Main Reinforcement and (s = 200mm c/c) s
s
11
Lateral Stirrups (spiral type) PLOT.NO SECTOR AREA JOB NO.
11
C9 E18-03 ABU DHABI CP-513
12 SECANT PILES
PROJECT:
12
13
SECANT PILES EL. -13.00 Pile Toe Level
EL. -14.00 Pile Toe Level FOR CAR LIFT AREA 14 750mm
13
CONSULTANT:
750mm

SECTION B-B SECTION A-A 14

200 770 200


STIRRUPS T10 @ 250 mm
2T20 mm DETAIL OF 900mm dia. Strut
Pipe / thk = 16mm
CORBEL MAIN CONTRACTING

12
00
4 T 10

mm
750mm x 1000mm
Capping Beam

12T25 Tension Bars 1000mm x 1200mm Piling Contractor


Steel Plate/thk=20mm
24T25 mm
X 750 11 T25 Cross
Tie Bars Concrete Corbel
Australian Piling
Technology
SECTION X-X

m
200

0m
90
TEL: (02)5504222 P.O. BOX: 48181 FAX: (02)5504221
750mm Drawing Title
2T20 mm

770 PLAN

Secant Pile SHORING LAYOUT

200 Drawing No. Revision No.

GUIDE WALL X SH-01 00


CAPPING BEAM / WALLER BEAM (l.e.v: -1.50m) 750mm x 1000mm Submission Date Scale
ISOMETRIC VIEW
Capping / Waler Beam

11-01-2015
7T25 Tension Bars Project ID Plan ID
OUTSIDE 11 T25 Cross
Tie Bars 59846 1098291
Official Use Only


MAIN SECANT PILE
(HARD)
Concrete Corbel

SECONDARY SECANT
HORIZONTAL SCHEME OF SEC.(N-N) PILE (SOFT)
KEY PLAN:

NW
W
NE
SW

E
1 2 3 4 5 6

SE
S
General Notes

26.40m(BASEMENT LIMIT)
)
PILE TYPE PILE LEGEND DIM
(mm)
No.
Of EXCAVATION
/mm
TOE
F.cu LEVEL
S.Piles (N LEVEL

BASEMENT EXTENSION BASEMENT EXTENSION

P34
P33

P35
P20

P30
P28
P29

P40
P11

P19

P26

P39

P42
P10

P15

P25

P27

P32
P12

P14

P16
P17

P22
P23

P31

P38

P41
P36
P13

P21

P24

P37
P18
P1

P2

P8

P9
P3
P4
P5
P6
P7

P43
P146 P44
P145


P45
P144
P46
P143 SHORING IN THIS DRAWING TOTAL :
A P47
P142
PLOT LIMIT PLOT LIMIT P48
P141 REV. DATE DESCRIPTION
P49 OWNER:
P140
P50
P139
P51
P138 24.40m(PLOT LIMIT ) P52 PLOT.NO SECTOR AREA JOB NO.
P137 P53 C9 E18-03 ABU DHABI CP-513
P136 P54 PROJECT:

P135
P55
P134
P133 EL. -8.00m Max. Exca. Level P56
P57 CONSULTANT:
P132
P58
P131
P59
P130
P60
P129
P61
B 19.20m (BASEMENT
P128 LIMIT) MAIN CONTRACTING
P62
P127 15.20m (PLOT LIMIT )
P63
P126 P64
P125

P65 Piling Contractor


P124
P66
P123 P67 Australian Piling
P122 Technology
P68
C P121 P69
P120 P70
TEL: (02)5504222 P.O. BOX: 48181 FAX: (02)5504221

PLOT LIMIT PLOT LIMIT Drawing Title


P119 SHORING LAYOUT


EL. -10.00m Max. Exca. LevelP71 SITE PLAN
P118 P72 Drawing No.
D
Revision No.
P117
P73 SH-03 00

P116 Submission Date Scale


P101

P81

P74
P111

P80
P109

P107

P88
P96
P104

P94

P91

P84
P110

P103

P85

P83
P82

P77
P76
P106

P102

P100

P97

P93

P86

P79
P95

P90
P108
P113
P115

P99
P98

P92

P89

P87

P78
P105

P75
P112
P114

11-01-2015
BASEMENT EXTENSION BASEMENT EXTENSION Project ID Plan ID

59846 1098291
Official Use Only
KEY PLAN:

NW
W
NE
SW

26.40m(BASEMENT LIMIT)

E
SE
S
General Notes

8.30m 8.30m 8.30m

A
)
No.
PILE TYPE PILE LEGEND DIM EXCAVATION
TOE
(mm) Of /mm LEVEL
F.cu
(N LEVEL
S.Piles

P34
P20

P35
P33
P30
P11

P28
P29
P19

P40
P10

P26
P15

P39

P42
P12

P25
P14

P27
P16
P17

P22

P32
P23
P13

P21

P36
P31

P38

P41
P24

P37
P18
P1
P2

P8
P9
P3
P4
P5
P6
P7

P43
P146 P44

45m
45m
P145
Section (N-N) P45

A

P144

P46
P143
SHORING IN THIS DRAWING TOTAL :

P47
P142

ST
E
P48

90 PIP
EL
REV. DATE DESCRIPTION

0 E
P141

m (H
T)
TR m

m O
OWNER:
U P49
. S 6m

R
A A
RZ 1

O. Z.
O .X

P140

D. S
(H .D

P50

X TR
PE O

16 UT
PI

P139

m )
L mm

m
P51
EE 00

8.85mP138 8.85m
ST 9

m PLOT.NO SECTOR AREA JOB NO.

10
.5 P52 C9 E18-03 ABU DHABI CP-513

.54
P137 10 P53
PROJECT:

m
P136 45m
45m P54
P135
P55 CONSULTANT:
P134
P133 EL. -8.00m Max. Exca. Level P56
P57
P132
P58
P131
P59
MAIN CONTRACTING

P130
P60
P129
P61
19.20m (BASEMENT
P128 LIMIT)
45m
P62 Piling Contractor
P127 45m
P63
P126 10 Australian Piling
.54 4 m B P64 B Technology
P125 m .5
10 P65

U m
TR 6m
T)
ST

.S X1
P124
90 EL

TEL: (02)5504222 FAX: (02)5504221


E

P.O. BOX: 48181


0 PI

P66

RZ .
8.85mP123 8.85m

O .D
Drawing Title
m PE

(H O
m (

SHORING LAYOUT
H

PE m
O. OR

P67

PI m
D. Z

L 00
X .S

P122

EE 9
16 TR

P68
m U

Drawing No. Revision No.


m T)

ST
P121 P69
SH-02 00
P120 P70
Submission Date Scale

11-01-2015
P119
EL. -10.00m Max. Exca. LevelP71 Project ID Plan ID

P118 P72
59846 1098291
45m

45m

B
P117 Official Use Only

P73
P116
P101

P81

P74
P111

P80
P109

P107

P96

P88
P104

P94

P91

P84
P110

P103

P85

P83
P82

P77
P76
P100
P102
P106

P97

P95

P93

P86
P90

P79
P108
P115

P113

P99
P98

P87
P92

P89

P78
P105

P75
P112
P114

8.30m 8.30m 8.30m


B
KEY PLAN:


General Notes

SEC.B-B PILE PILE DIM No.Of
(N
F.cu
/mm)
TOE
LEVEL
Anchor No.of
LEGEND (mm) Piles

37
Type

36
26
27
22
20

23
24

28
Anchor

25

30

33
29
TYPE

32

35
21

34
14

31
10

13
11
(m)

12

15
16
17
18
19
6
4

8
9
7
5
3
2
1
180 HARD 750 1 40
38 -14.00
179
39 HARD 750 2 40
178
177 NEW SEC M-M 40 NEW SEC M-M
176 DETAIL -L SEC.B-B 41
42
HARD 750 78 40
-14.00
175 SOFT 750 79 20
174 43
173 44 HARD 750 10 40
45 -16.50
172


NEW SEC.K-K 46 NEW SEC.K-K SOFT 750 10 20
171 47


170
1-180 180


48
SHORING IN THIS DRAWING TOTAL :


169
168 49
167 50 08-FEB-2014

166
EXC.LVL=(-10.00m)
51 REV. DATE DESCRIPTION
52 OWNER:
165 M/S ABDULLAH & MATAR MOHAMED MURAD
164 53 MOHAMED AL BALOUSHI &

163 54 HEIRS OF SALEM MOHAMED MURAD AL BALOUSH


(SAIF ,SALMA ,MOHAMMED ,HASA , AND SAEED& )

162 55 HIS WIDOW WADEHA GHASAB SAEED AL AMERI,

161 56 PLOT.NO SECTOR AREA JOB NO.


CP-490
160 57 C175 ME-11 M.B.Z.CITY (SHORING)


159 58 PROJECT:

158 EXC.LVL=(-11.50m) 59 COMMERCIAL DEVELOPMENT


157 60
156 61 CONSULTANT:

155 62
63
154


64
153
65
152
SEC. .A-A151 SEC. .A-A 66
MAIN CONTRACTING
150 67
149 68
69 HASHIM CONTRACTING
148


70 & GEN. MAINT.
147
146 DETAIL -E 71
72
Piling Contractor
145 Australian Piling
144 73
Technology
143 74
142 EXC.LVL=(-10.00m)
75
141 76 TEL: (02)5504222
Drawing Title
P.O. BOX: 48181 FAX: (02)5504221

140 77 SHORING LAYOUT ,DETAILS & SECTIONS

139 78 First Layer of Strut


138 79 Drawing No. Revision No.
80

137 SH1 00

81


136 Submission Date Scale

135 82
08-FEB-2014
83
134 Project ID Plan ID
133 84
85 36726 820665
132
131 86 Official Use Only

87
130 SEC.N-N
129 88
128 89
91 90
98

96
101

94
111

99

95
97

93
122
121
123

108
114
120
119
118
117

112

103

92
127

106
115

113

104
125

105

100
126

124

116

110
109

107

102

SEC.N-N
KEY PLAN:
INSIDE INSIDE
LEVEL+- 0.00m INSIDE LEVEL+- 0.00m LEVEL+- 0.00m LEVEL+- 0.00m

OUTSIDE
LIMIT
BASEMENT CAPPING BEAM OUTSIDE
LIMIT
BASEMENT CAPPING BEAM OUTSIDE
LIMIT
BASEMENT CAPPING BEAM OUTSIDE
LIMIT
BASEMENT CAPPING BEAM
-1.00 m -1.00 m -1.00 m -1.00 m INSIDE
General Notes
DIM No.Of F.cu TOE
PILE PILE (N Anchor No.of
LEGEND (mm) Piles
/mm) LEVEL Type
TYPE (m) Anchor
Retaining Wall
900mm O.D. X 16MM Retaining Wall Retaining Wall Retaining Wall
STEEL PIPE (HORZ. STRUT)

WITH 1.1 X 1.2 X 25MM
900mm O.D. X 16MM

900mm O.D. X 16MM

900mm O.D. X 16MM HARD 750 1 40
THK. PLATE STEEL PIPE (HORZ. STRUT) STEEL PIPE (HORZ. STRUT) STEEL PIPE (HORZ. STRUT)
22T25 BOLTED TO WALER BEAM 7T 25 WITH 1.1 X 1.2 X 25MM 11T 25 WITH 1.1 X 1.2 X 25MM 7T 25 WITH 1.1 X 1.2 X 25MM -14.00
SIZE OF WELDS = 20mm THK. PLATE THK. PLATE THK. PLATE
5.00m 12.0m BOLTED TO WALER BEAM 12.0m BOLTED TO WALER BEAM 12.0m BOLTED TO WALER BEAM
HARD 750 2 40
SIZE OF WELDS = 20mm SIZE OF WELDS = 20mm SIZE OF WELDS = 20mm
LEVEL OF STRUT
-3.50m
LEVEL OF STRUT LEVEL OF STRUT LEVEL OF STRUT
-3.50m -3.50m -3.50m HARD 750 78 40
-14.00
SECTION-K" SOFT 750 79 20
SECTION-K" SECTION-K" SECTION-K"

HARD 750 10 40
-16.50
SOFT 750 10 20


SHORING IN THIS DRAWING 1-180 TOTAL : 180

B1
K1
M1

22T25

12.0m A1 22T25 MAIN STEEL

14T25 MAIN STEEL

22T25 MAIN STEEL

14T25 MAIN STEEL
08-FEB-2014
T10 @150 SPIRALS T10 @150 SPIRALS T10 @150 SPIRALS T10 @150 SPIRALS
REV. DATE DESCRIPTION
OWNER:
CROSS SECTION A1 CROSS SECTION B1 CROSS SECTION K1 CROSS SECTION M1
M/S ABDULLAH & MATAR MOHAMED MURAD
7T 25 11T 25 7T 25 MOHAMED AL BALOUSHI &
12.0m EXCAVATION
12.0m EXCAVATION
12.0m EXCAVATION
HEIRS OF SALEM MOHAMED MURAD AL BALOUSH
(SAIF ,SALMA ,MOHAMMED ,HASA , AND SAEED& )
LEVEL LEVEL LEVEL
EXCAVATION
-10.00 m -10.00 m -10.00 m HIS WIDOW WADEHA GHASAB SAEED AL AMERI,
LEVEL
-11.50m PLOT.NO SECTOR AREA JOB NO.
CP-490
C175 ME-11 M.B.Z.CITY (SHORING)
PROJECT:

COMMERCIAL DEVELOPMENT

CONSULTANT:

TOE LEVEL TOE LEVEL TOE LEVEL TOE LEVEL


-16.50 m -14.00 m -14.00 m -14.00 m

A-A
VERTICAL SECTION VERTICAL SECTIONB-B)
( VERTICAL SECTIONK-K)
( VERTICAL SECTIONM-M)
(

4T16 mm R.C Waller Beam 2T16 mm DETAIL OF


MAIN CONTRACTING

12
1100 x 1100mm CORBEL(1) FOR

00
10@150mm

4T16 mm LAYER STRUT(1) HASHIM CONTRACTING

mm


EPOXY GROUT

& GEN. MAINT.


1100mm x 1100mm
24T25mm 900mm O.D. X 16MM STEEL PIPE
(HORZ. STRUT) Wailer Beam
200 790 200
WITH 1.2 X 1.1 X 20MM THK. PLATE
400


BOLTED TO WALER BEAM
Piling Contractor
STIRRUPS T10 @ 250 mm
900mmO.D. X AS PER PLAN
-1.00 m STEEL PIPE (HORZ. STRUT)

12T25 Tension Bars WITH 1.2m X 1.1m WITH THK 20 mm. PLATE
BOLTED TO WALER BEAM Australian Piling
2T16 mm Secant Pile
Concrete Corbel
Technology
27 T25 Cross
4 T 10 SECANT PILE. 750
TEL: (02)5504222 P.O. BOX: 48181 FAX: (02)5504221
15mm WELD ALL AROUND THE
STELL PLATE & STEEL PIPE Drawing Title
4T32 STEEL BAR PER
PLAN SHORING LAYOUT ,DETAILS & SECTIONS
CAPPING BEAM (l.e.v: -1.00)
PILE TOP & BOTTOM
WEDL @ EACH R.C. PILE
12 Bolts T32mm (600mm)

4T16 mm 1100mm
DETAILS&SECTIONS
Drawing No. Revision No.
SECTION K"(WAILER BEAM ) (DETAIL - E)
TOP VIEW SH2 00
750
Submission Date Scale
SECTION X-X
OUTSIDE SECONDARY SECANT
PILE
thick 20mm
08-FEB-2014
MAIN SECANT PILE 3225mm 5 13 13 13 13 13 1313 13 5
length 40cm Project ID Plan ID
5 5
13 36726 820665
X
DETAIL (L) 13
13 Official Use Only

200
thick 20mm
13

Concrete WALLER BEAM
length 40cmX15cm 13
13

790 13

1100 x 1100 mm thick 16mm 8


5
200 5 13 13 13 13 13 13 13 13 10
GUIDE WALL X 4 T25 L= 0.4m 4 T25 L= 0.4m 4 T25 L= 0.4m 4 T25 L= 0.4m thick 20mm
length 40cmX5cm

90cm

INSIDE

General Notes
INSIDE INSIDE
LEVEL-+ 0.00m INSIDE LEVEL +
- 0.00m LEVEL-+ 0.00m

OUTSIDE
LIMIT
BASEMENT CAPPING BEAM OUTSIDE
LIMIT
BASEMENT CAPPING BEAM OUTSIDE
LIMIT
BASEMENT CAPPING BEAM
-2.00 m -2.00 m -2.00 m


PERIMETER: 112 m
Retaining Wall Retaining Wall Retaining Wall DIM No.Of F.cu TOE
PILE PILE (N /mm) LEVEL
TYPE LEGEND (mm) Piles (m)
23T32 19T25 16T25
900mm O.D. X 16mm 900mm O.D. X 16mm
12.00m 900mm O.D. X 16mm
7.0m 5.0m
HARD 900 34 45
STEEL PIPE (HORZ. STRUT) STEEL PIPE (HORZ. STRUT) STEEL PIPE (HORZ. STRUT)
WITH 1.1 X 1.2 X 25MM WITH 1.1 X 1.2 X 25MM WITH 1.1 X 1.2 X 25MM H
THK. PLATE THK. PLATE THK. PLATE
BOLTED TO WALER BEAM
SIZE OF WELDS = 20mm
BOLTED TO WALER BEAM
SIZE OF WELDS = 20mm
BOLTED TO WALER BEAM
SIZE OF WELDS = 20mm -23.00
S
LEVEL OF STRUT LEVEL OF STRUT
SOFT 900 35 20


LEVEL OF STRUT
-6.00m -6.00m -6.00m


SECTION-K" SECTION-K" SECTION-K" HARD H 900 20 45
-19.50
SOFT s 900 20 20

A1 B1 K1

HARD 900 20


H 45

23T32 MAIN STEEL 19T25 MAIN STEEL 16T25 MAIN STEEL


-17.00
SOFT s 900 19 20
T10 @150 SPIRALS T10 @150 SPIRALS T10 @150 SPIRALS

CROSS SECTION A1 CROSS SECTION B1 CROSS SECTION K1

19T25 16T25 SHORING IN THIS DRAWING 1-148 TOTAL : 148


12.0m EXCAVATION
12.0m EXCAVATION
LEVEL LEVEL
EXCAVATION
23T32 LEVEL
-14.00 m -12.60 m 02 09-NOV-2014
12.00m -16.00m
REV. DATE DESCRIPTION
OWNER NAME
INHERITORS OF
MOHAMED BAKHEET MOHAMED
BAKHEET AL MAZROUEI
PLOT.NO SECTOR AREA JOB NO.

C-37 E-14 ABU DHABI CP-505


PROJECT:
BAKHEET
COMMERCIAL & RESIDENTIAL TOWER
TOE LEVEL TOE LEVEL TOE LEVEL
3 BASEMENTS WITH 34 PARKING BAYS,
-23.00 m -19.50 m -17.00 m GROUND FL. WITH RETAIL AREA,
MEZZANINE FL. WITH OFFICES,

VERTICAL SECTION A-A VERTICAL SECTIONB-B)
( VERTICAL SECTIONK-K)
( 18 TYPICAL FLOORS
CONSULTANT :
200 940 200
STIRRUPS T10 @ 250 mm 4T16 mm R.C Waller Beam 2T20 mm

12
1000 x 1000mm
DETAIL OF ENGINEERING CONSULTANTS

00
10@150mm Architects, Engineers, Planners & Interior Designers
CORBEL(1)

mm


EPOXY GROUT 9th FLOOR AL KHAZNA TOWER TELEPHONE + 971 2 6762100


1000mm x 1000mm AL NAJDA STREET FAX + 971 2 6762302
4 T 10

18T25mm
P.O. Box 33937, ABU DHABI EMAIL: arkonsul@emirates.net.ae

12T20 mm Wailer Beam


900mm O.D. X 16mm STEEL PIPE
(HORZ. STRUT)
UNITED ARAB EMIRATES www.arkonsult.net

WITH 1.2 X 1.1 X 20MM THK. PLATE MAIN CONTRACTING


HASHIM
BOLTED TO WALER BEAM
900mmO.D. X AS PER PLAN

60cm
STEEL PIPE (HORZ. STRUT)
9T25 Tension Bars
CONTRACTING & GEN. MAINT.
WITH 1.2m X 1.1m WITH THK 20 mm. PLATE
BOLTED TO WALER BEAM
Concrete Corbel
Piling Contractor
900
SECTION X-X 17 T25 Cross Australian Piling
X 2T20 mm Technology
SECANT PILE. Secant Pile
200 15mm WELD ALL AROUND THE
4T32 STEEL BAR PER
PILE TOP & BOTTOM
STELL PLATE & STEEL PIPE
90 cm PLAN TEL: (02)5504222
Drawing Title
P.O. BOX: 48181 FAX: (02)5504221

WEDL @ EACH R.C. PILE


940 12 Bolts T32mm (600mm) SHORING LAYOUT ,DETAILS & SECTIONS


1000mm
200
4T16 mm CAPPING BEAM (l.e.v: -2.00) (DETAIL - E) DETAILS&SECTIONS
GUIDE WALL X SECTION K"(WAILER BEAM ) TOP VIEW Drawing No. Revision No.

02 02
Submission Date Scale

12
00
DETAIL OF 20-AUG-2014

mm

CORBEL(2)


thick 20mm
thick 20mm Project ID Plan ID


1832mm 2532mm
1000mm x 1000mm
length 40cm length 40cm
OUTSIDE SECONDARY SECANT
Wailer Beam 10093 923136


PILE
MAIN SECANT PILE 900mmO.D. X AS PER PLAN
STEEL PIPE (HORZ. STRUT)
Official Use Only
9T25 Tension Bars WITH 1.2m X 1.1m WITH THK 20 mm. PLATE
BOLTED TO WALER BEAM

Concrete Corbel

thick 20mm
H S H S H S H S
thick 20mm
length 40cmX15cm length 40cmX15cm

24 T25 Cross
thick 16mm thick 16mm

thick 20mm

PLAN
thick 20mm length 40cmX5cm
length 40cmX5cm

LONG STRUT 90cm CONFECTION SHORT STRUT 90cm CONFECTION


INSIDE

1000mm
DETAIL (L) (DETAIL - M)
TOP VIEW
General Notes

26.40m Basement Limit SEC.B-B


5.488m 5.812m 5.812m 5.488m
SEC.B-B

31
PERIMETER: 112 m

26
21

24

27
28

34
20

22

25

29

32
23

30
12

15
13

16
14
11

17

33
18
10

19
7
5
2

8
9
6
3
1
DIM No.Of F.cu TOE
S PILE PILE
H s H s H s H s H s H s H s H s H s H s H s H s H s H s H s H s TYPE LEGEND (mm) Piles
(N /mm) LEVEL
148 H (m)

H
35

S
147 H Wailer Beam
45
1.00m
s 36 HARD H 900 34
146 S SEC.B-B H -23.00

45m

45m
45m

45m
SEC.B-B
37 S
145 H ST 9
s 38 SOFT 900 35 20

T)
TR m
EE 00

U
. S 6m
L mm
SEC. .A-A144 S SEC. .A-A

RZ 1
PI
H

O .X
PE O
39

(H .D
(H .D

PE O
O .X

PI
L mm
RZ 1
143 H . S 6m
s 40
HARD H 900 20 45

EE 00
TR m

ST 9
5.488m S 5.488m

-T
U

142
T)
-19.50

.T
H

SEC
45m
45m 41

6.5
ST 9

6m
SOFT 900 20

T)
s
20

TR m
EE 00
141 H

U
. S 6m
s 42

6.5
L mm

6m
RZ 1
PI

O .X
PE O

(H .D
(H .D
140 S

PE O
O .X H

PI
43
RZ 1

L mm
. S 6m
HARD 900 20

EE 00
45
TR m
139 H H

ST 9
S 44
U

-T
T)

.T
-17.00

SEC
14
138 S

m
H

.47
45

.47
TYPICAL SOFT s 900 19 20

14

m
137 H
136 S
DETAIL -E H
S 46
SHORING IN THIS DRAWING 1-148 TOTAL : 148
47
SEC

135 H
5.488m S 5.488m
48
.G-G

45m 02 09-NOV-2014
134 S 45m H
49 REV. DATE DESCRIPTION
133 H S
50
OWNER NAME
INHERITORS OF
MOHAMED BAKHEET MOHAMED
132 S H
51 BAKHEET AL MAZROUEI
SEC

131 H S JOB NO.

DETAIL -M 52
PLOT.NO SECTOR AREA
.G-G

130 S SEC. .A-A H SEC. .A-A C-37 E-14 ABU DHABI CP-505
53 PROJECT:
BAKHEET
129 H
Wailer Beam

Wailer Beam
S
54 COMMERCIAL & RESIDENTIAL TOWER
128 S H 3 BASEMENTS WITH 34 PARKING BAYS,
5.488m 55 5.488m
DETAIL -L
GROUND FL. WITH RETAIL AREA,

127 H S
MEZZANINE FL. WITH OFFICES,

56 18 TYPICAL FLOORS

126 S H CONSULTANT :

31.24m Basement Limit 57


125 H S
58 ENGINEERING CONSULTANTS
Architects, Engineers, Planners & Interior Designers

124 S H
59
9th FLOOR AL KHAZNA TOWER TELEPHONE + 971 2 6762100
AL NAJDA STREET FAX + 971 2 6762302
P.O. Box 33937, ABU DHABI EMAIL: arkonsul@emirates.net.ae

123 H 45m S
60
UNITED ARAB EMIRATES www.arkonsult.net

45m MAIN CONTRACTING


122 S H HASHIM
61 CONTRACTING & GEN. MAINT.
121 H S
62 Piling Contractor
5.488m S 5.488m
120 H 63
Australian Piling
s Technology
119 H m
7 64
14

.4
.47

14
TEL: (02)5504222 FAX: (02)5504221
118 S
P.O. BOX: 48181

H 65
Drawing Title
m

m UT)
m SHORING LAYOUT ,DETAILS & SECTIONS
ST

117 H 16 TR
s
90 EL
E

S
66
0 PI

. X Z.
m PE

.D R
SHORING SHOP DRAWING
m (

O O
H

H
116 S
O. OR

m E(
6.5
D. Z

m P
H 67
0 PI Drawing No. Revision No.
X .S

90 EL
6m
16 TR

45m

6m
45m s
m U

E
115 H ST
01
m T)

68 02

6.5
114 S

U m
Submission Date Scale

TR 6m
T)
H 69
ST

.S X1
90 EL
E
0 PI

RZ .
20-AUG-2014
m PE

O .D
113 H
5.488m s 5.488m
m (

(H O
70
H

SEC.K-K
O. OR

PE m
PI m
D. Z

Project ID Plan ID

L 00
X .S

112 S
EE 9
16 TR

H 71
m U

10093 923136
m T)

ST

111 H s
72 Official Use Only
45m

45m

45m

45m

110 S
H 73
109 H Wailer Beam
s 74
S H H H
S S S H sH sH sH sH sH sH sH sH sH sH sH sH sH
108

87

81
98

95
99

97

85
84
93

88
91

82
96

83
101

75
86
94
102

80

77
76
107

92

78
100
103

79
89
90
105
104
106

5.488m 5.812m 5.812m SEC.K-K 5.488m


General Notes

W PERIMETER: 266 m

NW
7366cm
SW DIM No.Of F.cu TOE
PILE PILE Anchor No.of
(N/mm) LEVEL
TYPE LEGEND (mm) Piles Type Anchor
(m)
NE
S
HARD 800 62 50

A39

A40

A41

A42

A43

A44

A45

A46

A47

A48

A49

A50

A51

A52

A53

A54

A55

A56

A57

A58

A59

A60

A61

SE
E
-20.00 61
BASEMENT LIMIT
180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm 180cm
BASEMENT LIMIT A
600cm
SOFT 800 61 20

SEC. .D-D
600cm 600cm 700cm 750cm

E 231344.6567 E 231362.0135

P121
P106

P110

P119
P114

P116
P105

P107

P109

P115

P117
P101
P102

P104

P112
P113

P120
P100

P103

P108

P118
P111
P37

P68
P45
P39

P50
P13

P66
P67
P42

P44

P54
P14

P99
P32

P40

P47
P17

P34

P53
P21

P72
P33

P49

P63

P69
P70
P16

P35

P43

P60

P62

P65

P85
P26

P36

P38

P57

P61

P95
P18

P30
P10

P12

P56

P64

P71

P78

P91

P96
P11

P46

P97
P15

P58

P77
P20

P24

P27

P51

P59

P75

P80

P86
P19

P23

P29

P48

P52

P55

P81

P98
P22

P82
P83

P87

P92
P28

P31

P73

P93
P41

P89
P25

P94
P88

P90
P74

P76

P79

P84
P2
P1

P3
P4
P5
P6
P7
P8
P9
N 2710276.3567 P438 N 2710347.9426 HARD 800 23 60
P122
P437 P123 -23.00

5cm
P436 P124
A38 SOFT 800 23 20

45
SEC.D-D
P125

45
P435
180cm

45
45
P434 P126
P433 P127
A37 P432 P128

10
180cm

HARD 800 43 60

61
P129
P431

cm

750cm
P130
B 34
P430
A36 P429 U
T)
P131 -25.00
180cm

TR M
P428
S
. 0M P132
800 44
RZ 2

SOFT 20
O X
P427 20
(H .D. P133
A35 45
E
P O
51 PI M
P134
P426 cm EL M
180cm

E
P135
0
ST 90
P425
P424 T) P136
A34
HARD 800
T)
50
RU P137
31
P423 U T M
180cm

R . S 0M
P422
T M RZ 2 P138
-23.00
. S 16M O .X

28
Z (H .D
P421 T) P139

99
R PE O
A33 O .X PI M

cm
U
P420
R (H .D P140
800 31
T M L
180cm

SOFT
. S 6M PE O EE 0 M
SEC. .N -N SEC.N -N
20
P419 RZ X 1 PI M ST 90 P141

700cm
L
P418
O .
EE 00
M P142
A32 P417 P E
(H .D
O ST 10 37 P143
180cm

PI M 48
P144
D 62
P416 L M cm
EE 00
45
A31 P415 89cm ST 10 UC
(457 X 191 X 98)
P145
P146 HARD 800 60 50
P414
180cm

P413
P412
UC
(457 X 191 X 98)
P147
P148 -21.00
A30 P411 P149
TYPICAL SOFT 800 60 20
180cm

P150
DETAIL -F
P410
P409 P151
A29 P152
P1-P438 P438
P408
180cm

600cm
P407 P153 SHORING IN THIS DRAWING TOTAL :
P154
A28 P406
45 P155
SEC. .D-D P405 SEC.D-D
01
180cm

P404 P156 20-MAY-2014


P403 P157
4464cm

A27 P402 P158


00 28-DEC-2013
180cm

P401 P159
P400 P160
A26 P399 P161 REV. DATE DESCRIPTION
180cm

P398 P162

600cm
P163 Master developer
A25 P397 5cm P164
P396
45
180cm

P395 P165
P394 P166
A24 P393 P167
180cm

P392 P168
P391 P169 PLOT.NO SECTOR AREA JOB NO.
A23 P390 P170

C-23 W-5 ABU DHABI


180cm

P389 DETAIL -(L) P171


CP-484
P388 P172
A22 P387 P173
180cm

P386 P174 PROJECT:


P385 5cm P175 3 Basements + Ground + Mezzanine

6642cm
A 21

974cm
P384 P176
P383 P177 + 35 Typical Floors + Roof
P382 P178 Principal Consultant
P381 P179
P380 P180
P379 P181
P378 P182
P377 P183
P376 P184
P375
P374
PLOT LIMIT P185
P186 Structural HVAC :
45
DETAIL -L P373
P187
P188
P372

600cm
P189
P371
P370 P190
P369 900 MM O.D. X 20MM P191 T: 02-6767976 Po Box 127489

26 F: 02-6767990 Abu Dhabi, UAE


www.implement-ae.com

P368 STEEL PIPE (HORZ. STRUT) P192


P367
P193 MAIN CONTRACTING
P194
P366
P365
P195 ARABIAN
P196
CONSTRUCTION CO. (ACC)
P3 64

45 P197
Q
P3
P 63

P198
.Q -
P3 362

Piling Contractor

600cm
SEC
P3 61

P199
P3 60

P200
P 59

PLOT LIMIT Australian Piling


P3 358

P201
P 57

P202
P3 356

BASEMENT LIMIT Technology


P 55

P203
Q P3 354
P3 53

P204
E 231388.390
P3 52

UC
P205
P3 51

(457 X 191 X 98)

P206 TEL: (02)5504222 P.O. BOX: 48181 FAX: (02)5504221


50

Drawing Title
N 2710265.750
P3 349
.Q -

45 P207
P 48

UC
m

(457 X 191 X 98)

M )
P

P3 347
SEC

P208
5c

M T
SHORING LAYOUT ,DETAILS & SECTIONS

m
P3 46

16 TRU SEC. .A -A SEC.A -A

c
P209

48
P3 45

.X S

37

700cm
P3 4

.D RZ. M )
4

M T P210
P3 43

TOE LEVEL
O
O 16 TRU
First Layer of Strut & Anchor
P 42

M E (H P211
.X S
P3 341

M P .D Z. P212
P3 40

00 PI O OR
= -23.0m
39

10 EL
M (H m M T) P213 Drawing No. Revision No.
SE

18 9c
P3 338

0c E M IPE 9 M U
ST
C
P3 37

20 TR
m 28 P214
.
20

0
P

.X .S
.G-G

0 P
P3 36

10 EL .D Z P215
01 01
P3 35

18 O OR
A

0c E
P3 34

H
m ST M ( P216
19

M PE
P3 33

18 0 PI P217
P3 32

0
9 EL
A

0c
P3 31

E
m m Submission Date Scale
18

ST 1c P218
32 0

5
3

18 20 45
9

P219
A

0c
P 28

m M T)
SEC
17

P220
P

M U
P3 327

09-DEC-2013
3

20 TR
P

18 S
.G-G

P3 26

X .
. P221
A

0c .D Z
P3 25

m O OR
16

750cm
34 H
P 24

12 M E(
M P
P222
P3 323

cm 18 0 PI
A

0c 90 EL P223 Project ID Plan ID


P 22

m
15

SEC. .P-P

m
P3 321

ST P224

1c
SEC.T - T
18
P3 20

6
A

10
0c P225
42675 856756
P3 19

m
BASEMENT LIMIT
14

P 18

18 P226
P3 317
A

0c P227
P3 16

45

45
m
45
13

45
5cm
E 231426.5012
P3 15

18 P228 Official Use Only


P3 14
A

0c
P3 13

m P229
12

P 12

18 P230
N 2710332.3069
P3 311
A

0c
P3 10

m
11

P231
09

P301
P308

P304

P302
P305
P307
P306

P303

P299
P298

P295

P285
P297

P282
P296

P291
P292

P286

P281
P294

P278
P290

P279
P300

P287

18
P293

P289

P277

P275

P267
P288

P283

P268
P284

P280

P274
P273
P272

P270
P276

P271

P269

P261
P265

P263

P257

P251
P266

P264

P256
P262

P255

P247
P254
P260
P259

P252

P250

P244
P258

P238
P237
P253

P249
P248

P243
P246

P242
P241

P239
P245

P234
P236
P240

P235

P233
P232
A

0cm
10
A

SEC. .P-P
9

600cm 600cm 700cm 750cm


SEC.T - T

600cm
A

180cm 180cm 180cm 180cm 180cm 180cm 180cm PLOT LIMIT


TOE LEVEL E 231425.720
PLOT LIMIT
A 2

A 1
A 3
A 4
A 5
A 6
A 7
A 8

= -25.0m
E 231415.230 N 2710329.150
4685cm
N 2710286.850
NW
7366cm General Notes
SW

PERIMETER: 266 m
NE
S PILE PILE DIM No.Of F.cu TOE
Anchor No.of

D 30
D31
D32
D33
D34
D35
D36
D37
D38
D39
D40
D41
D42
D43
D44
D45
D46
D47
D48
D49
D50
D51
D52
D53
D54
D55
D56
D57
D58
D59
D60
D61
D62
(N/mm) LEVEL

SE
TYPE LEGEND (mm) Piles Type Anchor
E (m)
120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm

BASEMENT LIMIT BASEMENT LIMIT HARD 800 62 50

SEC. .D'-D'
E 231362.0135 -20.00 61
E 231344.6567 A

P121
P106

P119
P110

P114

P116
P105

P107

P109

P115

P117
P101
P102

P104

P112
P113

P120
P100

P103

P108

P118
P111
P37

P68
P45
P39

P50

P66
P13

P67
P14

P42

P44

P54
P32

P40

P47

P99
P17

P21

P34

P53
P33

P49

P63

P72
P65

P69
P70
P16

P26

P35

P43

P60

P62

P85
P36

P38

P57

P61

P95
P30
P18
P10

P12

P56

P64

P71

P78

P91

P96
P11

P46

P97
P15

P58

P77
P24

P27

P75

P80

P86
P20

P29

P48

P51

P59
P19

P23

P52

P55

P81

P98
SOFT

P22

P31

P73

P82
P83

P87

P92
P93
P28
P25

P41

P89
P90

P94
P88
P74
800 61

P76

P79

P84
20

P2
P1

P3
P4
P5
P6
P7
P8
P9
N 2710276.3567 P438 P122
N 2710347.9426
P437 P123

5cm
P436 P124
HARD 800 23 60

SEC.D'-D'
D P435
P125
29 P126 -23.00
120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm
P434
D P433 P127

D
28 P432 P128 SOFT 800 23 20
P129
27 P431
P430 P130
D P429 P131

D
26 P428 P132 HARD 800 43 60
-25.00 B 34
P427 P133
25 P426 P134
D P135
800 44
P425
24 P424 P136 SOFT 20
D P423 P137
23 P422 SEC.D'-D' P138
D SEC. .D'-D' P139
HARD 800 50
P421
22
D
P420 P140
31
21 P419 P141
P142
-23.00
P418
800 31
D
SOFT
P143
20
P417
20 P416 P144
D P415 P145
19 P146
D 62
P414
D
18 P413
P412
P147
P148 HARD 800 60 50
D
17 P411 P149
P150 -21.00
P410
D
16 P409 SEC. .N' -N' P151
P152
SEC.N' -N' SOFT 800 60 20
P408
D P407 P153
15
D
P406
P405
P154
P155
SHORING IN THIS DRAWING P1-P438 TOTAL : P438
14 P404 P156
D
01
P157
P403
20-MAY-2014
4464cm

13 P402 P158
D P159
12 P401
P400 P160 00 28-DEC-2013
D P399 P161
11 P398 P162
REV. DATE DESCRIPTION
D P397 5cm P163
10 P396 P164 Master developer
D P395 P165
9 P394 P166
D P393 P167
8 P392 P168
D P391 P169
7 P390 P170 PLOT.NO SECTOR AREA JOB NO.
D P171
ABU DHABI
P389
D
6 P388 P172
P173
C-23 W-5 CP-484
P387
5 P386 P174
D PROJECT:
P175
P385 5cm 3 Basements + Ground + Mezzanine

6642cm
4 P384 P176
D P383 P177 + 35 Typical Floors + Roof
3 P382 P178
D P179 Principal Consultant
P381
2 P380 P180
D P379 P181
1 P378 P182
P377 P183
P376 P184
P375
P374
PLOT LIMIT P185
P186 Structural HVAC :
P373 P187
P188
P372
P189
P371
P370 P190
P369 P191 T: 02-6767976
F: 02-6767990
Po Box 127489
Abu Dhabi, UAE
www.implement-ae.com

P368 P192
P193 MAIN CONTRACTING
SEC. .A' -A' P367 SEC.A' -A '
P366
P365
P194
P195
ARABIAN
P196
CONSTRUCTION CO. (ACC)
- Q"
P3 64

P197
.Q"
P3
P 63

P198
Piling Contractor
SEC
P3 362
P3 61

P199
60

P200
Australian Piling
P3 359

PLOT LIMIT
P3 58

P201
P

P3 57

P202
Technology
P 56

BASEMENT LIMIT
P3 355

P203
P 54
P3 353

P204
E 231388.390 TEL: (02)5504222 P.O. BOX: 48181 FAX: (02)5504221
P 52

P205
P3 351

Drawing Title
- Q"

P206
50

N 2710265.750
.Q"

P3 349

P207
P3 48

SHORING LAYOUT ,DETAILS & SECTIONS


SEC

m
P

P3 47

P208
5c
P3 46

12
0c SEC. .A' -A' P209 SEC.A' -A '
P3 45

m
Second Layer of Anchor
P3 44

12
0c P210
4

P3 43

m
B3

TOE LEVEL 12
42

0 P211
3

P3 341

cm Drawing No. Revision No.


EC.

P212
B3

12
P 40
P

= -23.0m 0c
2

P3 339

.G

m P213
B3

'-G'
P 38

12
0c
02 01
1

P3 337

m P214
B3

12
3

0c P215
0

P3 335

m
B3

P 34

12 P216
P

0c
9

Submission Date Scale


P3 333

m
B2

P217
P 32

12
0c
8

P3 331

m
S

P218
B2

12
P 30
EC.

0c
09-DEC-2013
7

P3 329

P219
G'-

m
B2

P 28

12
G'

0c P220
6

P3 327

m
B2

12
P3 26

0c P221 Plan ID
Project ID
5

P3 25

m
B2

34
P 24

1 12 P222
0c
4

2c
P3 323

SEC. .P''-P''

m m P223
B2

42675 856756
P 22

12
0c
3

P3 321

m P224
B2

P3 20

12
0c
2

P225
P3 19

SEC. .T'-T'
m
BASEMENT LIMIT
B2

P 18

12 P226
0c Official Use Only
1

P3 317

m
B2

12 P227
P3 16

0c
0

5cm E 231426.5012
P3 15

m
B2

12 P228
P3 14

0c
9

P3 13

m P229
B1

12
P 12

0c
N 2710332.3069
8

P230
P3 311

m
B1

12
P3 10

0c P231
7

09

m
P301
B1

P308

P304

P302
P305
P307
P306

P303

P299
P298

SEC. .P''-P''P295

P285
P297

P282
P296

P291
P292
P294

P286

P281

P278
P290

P279
P300

P287
P293

P289

P277

P275

P267
P288

P283

P268
P284

P280

P274
P273
P272

P270
P276

P271

P269

P261
P265

P263

P257

P251
P266

P264

P256

12
P262

P255
P254

P247
P260
P259

P252

P250

P244
P258

P238
P237
P253

P249
P248

P243
P246

P242
P241

P239
P245

P234
P236
P240

P235

P233
P232
0c
6

m
B1

12
0c
5

m
B1

4
B1

PLOT LIMIT
3

SEC.T' - T'
B1

120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm120cm
TOE LEVEL E 231425.720
B 12
B 11
B 10
B9
B8
B7
B6
B5
B4
B3
B2
B1

PLOT LIMIT = -25.0m


E 231415.230 N 2710329.150
4685cm
N 2710286.850
General Notes

PERIMETER: 266 m

DIM No.Of F.cu TOE

PLOT LIMIT
PILE PILE Anchor No.of
(N/mm) LEVEL

PLOT LIMIT

PLOT LIMIT
(0.00 ) GATE LEVEL TYPE LEGEND (mm) Piles Type Anchor

PLOT LIMIT
OUTSIDE CAPPING BEAM (m)
INSIDE
+0.25m SECTION "W" SECTION "W"

RETAINING SIDE
RETAINING SIDE

RETAINING SIDE
Retaining Wall
SECONDARY SECANT

MAIN SECANT PILE

TOP OF STEEL
-0.75m (+ 0.25 m )CAPPING BEAM (+ 0.25 m )CAPPING BEAM

50

3.85m
TOP OF STEEL
-0.75m
CAPPING BEAM TOP OF STEEL
-0.75m
CAPPING BEAM SECTION"6" CAPPING BEAM
(- 1.70 m )
HARD 800 62

3.85m

3.85m
-20.00
-3.60 m

A 61

1.00m
10@150
PILE

5cm

EXCAVATION SIDE
7 wir strands 7 wir strands
PVC Spacer PVC Spacer 7 wir strands CAPPING BEAM
Pvc Grouting Pipe -3.60 m Pvc Grouting Pipe -3.60 m

SOFT 800 61
PVC Spacer

20
Pvc Grouting Pipe

ion ion
16T 40
gat ) gat ) ion
n
Elo (mm
n
Elo (mm gat )

EXCAVATION SIDE

EXCAVATION SIDE
n
(-4.00 m ) ANCHOR LEVEL(A)
o
El (mm
(-4.00 m ) ANCHOR(A) LEVEL (-4.00 m ) ANCHOR(A) LEVEL

30
ils
ber s .27 ils
ber s .27

30

30
eta 29 eta 29 ils
ber s .27
Grouting Body(D=140mm) Grouting Body(D=140mm)

m m eta
(Fcu=20N/mm) (Fcu=20N/mm)

Nu trand Nu trand 29
Grouting Body(D=140mm)

D D
(Fcu=20N/mm)

THICKENS AS-PER THE


ho
rs
ho
rs
rs
D u m n d
c c N tra

Retaining Wall

Retaining Wall
o
) of S ) of S
20T25
PLAN O.D. X 16MM SECTION (1-1) n SECTION (1-1) n h
60
eA eA nc ) of S
HARD 800 23
SECTION (1-1)
abl (m abl (m eA
STEEL PIPE (HORZ. STRUT) FULL LENGTH
4 4 m
T
cin
g T ng abl (m 4 0=
WITH 1.1 X 1.2 X 20MM
aci

Retaining Wall
g
T
1.5
0m 0m
Spa Sp cin
THK. PLATE 1.5 1.5
=1 =1
Spa
1
FL TH
5cm 5cm
y y
cit cit
-23.00
BOLTED TO WALER BEAM
0 FL
H 0 FL
H
pa 1.8 GT pa 1.8 GT ity G

10@120
0
SIZE OF WELDS = 20mm
Ca ) EN Ca ) EN pac 1.8 EN
(Kn 8 EL (Kn 8 EL
Ca n)
(K 8 EE
L
FRE FRE
LEVEL OF STRUT 5cm
8.6 8.6 .6 FR

3.0m
r r
88
-4.60m .1
28 28
cho cho
SOFT
.

800 23
SEC
or
20
.1
An
S EC.
An SEC
. .1
ch 2
19T 32 19T 32 An
TH TH H
A
G A
G m GT
LEN . .1
A
LEN LEN 0=
5.0
0m 0m
.0 5.0 D
ND ND N
=5
BL SEC
. .1 =
BO
SEC . .1
BO BO
BL BL
6.0m

SECTION-K" SEC
D1
ion ion
HARD 800 43
Anchor-"A" 4 Strand(7 steel wire 15.24 mm)

60
Anchor-"A" 4 Strand(7 steel wire 15.24 mm) (-7.90 m ) ANCHOR(B) LEVEL Anchor-"A" 4 Strand(7 steel wire 15.24 mm) (-7.90 m ) ANCHOR(B) LEVEL

gat ) gat )
Grad 270 -Low Relax(ASTM A416) Grad 270 -Low Relax(ASTM A416) Grad 270 -Low Relax(ASTM A416)

o n on ion
El (mm El (mm gat )

35

35
34
(-7.90 m ) ANCHOR (D) LEVEL

-25.00 B
.43 .43 o n
ils
ber s ils
ber s El (mm

23.25m

25.25m
25.25m

eta 25 eta 25
OUTSIDE

INSIDE

D m d D m d
rs u an rs u an ils
ber s

35
A1 .97

18.30m
h o N tr h o N tr eta m 27
nc ) of S nc ) of S Nu trand
D
le A le A rs

800 44
m m
.00 .00 ho
SOFT 20
Tab (m 8 Tab (m 8 c
) of S
=8 =8
g g n
n H n H le A
FL FL
c i T c i T
EXCAVATION a G a G Tab (m 6 =Hm
y
Sp
EN y
Sp
EN ing 9.0T
G
LEVEL
pa
cit
1.2
0
EEL pa
cit
1.2
0
E EL Sp a c
L EFNL
Ca n) R Ca n) R y E
F F cit FRE
-14.85 m
0
(K 53 SEC
. .2 MAX. EXCAVATION LVL -14.85 m
(K 53 C. .2
MAX. EXCAVATION LVL -14.85 m
pa
Ca n) 1.2
or 10 cho
r 10 SE (K . .3
nch H An H SEC
GT GT
HARD 800
5
50
A r 86
cho
L EN L EN An
31
m m
B .00 B .00
H
MAX. EXCAVATION LVL -13.70 m

ND ND GT
= 8 = 8

BO BO LEN -23.00
BL .2 BL
SEC D m
800 Fcu = 60N/mm2 SEC
.2 0=
7.0
ND
.3
8 Strand(7 steel wire 15.24 mm)
G1 8 Strand(7 steel wire 15.24 mm)
G1 BL SEC
BO
Anchor-"B" Anchor-"B"
Fy = 460N/mm 2 Grad 270 -Low Relax(ASTM A416) Grad 270 -Low Relax(ASTM A416)
20cm

75 75
SOFT 800 31
6 Strand(7 steel wire 15.24 mm)
Anchor-"D"

20
Working.Load=5700KN Grad 270 -Low Relax(ASTM A416)
10@150
120cm

16 T 40 MAIN STEEL 800 Fcu = 60N/mm2 800 Fcu = 60N/mm2

D 62
800
7 wir strands 75 75 Fy = 460N/mm2 7 wir strands 75 75 Fy = 460N/mm2 7 wir strands

HARD 800 60 50
60cm

T10 @150 SPIRALS Pvc Grouting Pipe PVC Spacer Pvc Grouting Pipe PVC Spacer Pvc Grouting Pipe PVC Spacer

Working.Load=4500KN Working.Load=5700KN 75 75

-21.00
CROSS SECTION A1 19T32 MAIN STEEL 19T32 MAIN STEEL

Grouting Body(D=140mm) Grouting Body(D=140mm) Grouting Body(D=140mm)


(Fcu=20N/mm) T10 @150 SPIRALS (Fcu=20N/mm) T10 @150 SPIRALS (Fcu=20N/mm)
20 T 25 MAIN STEEL

SECTION (2-2) SECTION (2-2) SECTION (3-3)


SOFT 800 60 20
T10 @150 SPIRALS

CROSS SECTION G1 CROSS SECTION G1


-23.0m PILE TOE -25.0m PILE TOE - 20.00 m TOE LEVEL
TOE LEVEL CROSS SECTION D1
-25.0m 800 800 800
DETAIL (L) 800 SECTION G-G&G' -G' SECTION P-P&P'' -P''
SECTION D-D & D'-D'
SHORING IN THIS DRAWING P1-P438 TOTAL : P438
SECTION T-T & T'-T'
PLOT LIMIT

PLOT LIMIT
01 20-MAY-2014

PLOT LIMIT
LEVEL-+ 0.00m LEVEL-+ 0.00m

OUTSIDE CAPPING BEAM OUTSIDE CAPPING BEAM 800mm


CAPPING BEAM
00
INSIDE INSIDE +0.25 m
28-DEC-2013
-1.70 m -1.70 m OUTSIDE INSIDE
+0.25m
Retaining Wall

Retaining Wall

Retaining Wall
TOP OF STEEL
1.00m

1.00m
-0.75m

3.85m
REV. DATE DESCRIPTION
800 -3.60 m SECTION "W"
Master developer

3850mm
CAPPING BEAM
10@150

10@150

10@150
5cm 75 75 5cm
5cm

17T 32 27T 32 16T 40 AS-PER STRUCTURAL


DRAWING
FULL LENGTH
FULL LENGTH
17 T 32 MAIN STEEL

T10 @150 SPIRALS channel for wailr


2-[260X90X35) or Equivalent

N1 THICKENS AS-PER THE Steel plate 18mm


THICKENS AS-PER THE
PLAN O.D. X 16MM CROSS SECTION N1
THICKENS AS-PER THE
PLAN O.D. X 16MM
PLAN O.D. X 16MM
STEEL PIPE (HORZ. STRUT) -3.60 m
Lock Nut
PLOT.NO SECTOR AREA JOB NO.
STEEL PIPE (HORZ. STRUT) STEEL PIPE (HORZ. STRUT) WITH 1.1 X 1.2 X 20MM

20
WITH 1.1 X 1.2 X 20MM WITH 1.1 X 1.2 X 20MM THK. PLATE

C-23 W-5 ABU DHABI


THK. PLATE THK. PLATE BOLTED TO WALER BEAM
-4.00 m
10@120

10@120

BOLTED TO WALER BEAM BOLTED TO WALER BEAM


CP-484

10@120
SIZE OF WELDS = 20mm
SIZE OF WELDS = 20mm SIZE OF WELDS = 20mm
800 SECANT PILE

30
LEVEL OF STRUT
LEVEL OF STRUT LEVEL OF STRUT
3.0m

3.0m

75 75 Steel wedge plate

3.0m
-4.60m -4.60m -4.60m

800
Strands
PROJECT:
800 Fcu = 60N/mm2
17 T 32 MAIN STEEL
75 75
75 75 Fy = 460N/mm 2 3 Basements + Ground + Mezzanine
SECTION-K" T10 @120 SPIRALS
SECTION-K" SECTION-K" Working.Load=4500KN + 35 Typical Floors + Roof
CROSS SECTION N2 Principal Consultant
N2 27 T 32 MAIN STEEL
16 T 40 MAIN STEEL CAPPING BEAM (l.e.v: +0.25m)
T10 @150 SPIRALS

23.25m
21.30m
19.30m

800 T10 @150 SPIRALS

75 75 A1
800mm
A1 CROSS SECTION A1
EXCAVATION CROSS SECTION A1 -1.70 m
EXCAVATION LEVEL
EXCAVATION 17 T 32 MAIN STEEL
LEVEL -14.85 m
LEVEL T10 @150 SPIRALS -14.85 m
-13.70 m Structural HVAC :
CROSS SECTION N3

CAPPING BEAM SECTION 6"

1000mm
AS-PER STRUCTURAL
10@150

DRAWING T: 02-6767976 Po Box 127489


F: 02-6767990 Abu Dhabi, UAE
www.implement-ae.com

10@150
10@150

-2.70 m
channel for wailr
2-[260X90X35) or Equivalent
MAIN CONTRACTING
ARABIAN
Steel plate 18mm
Lock Nut

20
N3 -4.00 m CONSTRUCTION CO. (ACC)
SECANT PILE

30
Piling Contractor
Steel wedge plate

Strands

TOE LEVEL
Australian Piling
TOE LEVEL
-21.00 m
TOE LEVEL
-23.00 m
800
-23.0m
Technology
800 800
SECTION (N-N)&(N'-N') SECTION A-A&A'-A' SECTION Q-Q & Q''-Q'' CAPPING BEAM (l.e.v: -1.70)
TEL: (02)5504222 P.O. BOX: 48181 FAX: (02)5504221
Drawing Title
X 120 thick 20mm
SHORING LAYOUT ,DETAILS & SECTIONS
200

DETAIL OF
CORBEL(2) FOR channel for wailr
DETAILS&SECTIONS
Drawing No. Revision No.
m

2-[260X90X35) or Equivalent
840

0
84

STRUT
m

00
AN

110
00

Steel plate 18mm 0


1 03
PL

THICKENS AS-PER THE


01
12

Lock Nut
R
200

PE

PLAN O.D. X 16MM


AS

PLATE STEEL PIPE (HORZ. STRUT)


GUIDE WALL X (120X120X20mm)
WITH 1.1 X 1.2 X 20MM Submission Date Scale
thick 16mm

20
THK. PLATE
UB(1016X305X349)
45

BOLTED TO WALER BEAM


Secant Pile

SIZE OF WELDS = 20mm


-7.90 m STRUT 1000 mm O.D. X 16mmCONFECTION 09-DEC-2013
200 840 200 THICKENS AS-PER THE PLAN O.D. X 20MM FOR FIRST LAYER
STEEL PIPE (HORZ. STRUT)
WITH 1.2m X 1.1m WITH THK 20 mm. PLATE LEVEL OF STRUT Project ID Plan ID
STIRRUPS T10 @ 250 mm BOLTED TO WALER BEAM
35

-4.60m
Secant Pile 42675 856756
120 thick 20mm
Steel wedge plate
Official Use Only
4 T 10
10mm Stiffener Strands
Braket
@200mm
12 bolt grade 4.8 M16
00

110
PLAN SECTION-K"(WAILER BEAM ) 9

1000mm Anchor in Level (l.e.v: -7.90) thick 20mm

800 (DETAIL - F)
TOP VIEW STRUT 900 mm O.D. X 20mm CONFECTION
SECTION X-X FOR FIRST LAYER
General Notes

PLAY GROUND
EQUIPMENT
PERIMETER: 266 m

DIM No.Of F.cu TOE


WASHROOM kiosk BUILDING PILE PILE Anchor No.of
(N/mm) LEVEL
BUILDING TYPE LEGEND (mm) Piles Type Anchor
WATER (m)
FOUNTAIN
7366cm

HARD 800 62 50
-20.00 61
A
SOFT 800 61 20

BASEMENT LIMIT 332cm


295cm
BASEMENT LIMIT HARD 800 23 60
E 231344.6567 E 231362.0135 W -23.00

P121
P106

P110

P119
P114

P116
P105

P107

P109

P115

P117
P101
P102

P104

P112
P113

P120
P100

P103

P108

P118
P111
120cm

P37

NW
P68
P45

120cm
P39

P50

P66
P13

P67
P14

P42

P44

P54
P32

P40

P47

P99
P17

P21

P34

P53
P33

P49

P63

P69
P70

P72
P16

P35

P43

P60

P62

P65

P85
P26

P36

P38

P57

P61

P95
P30
P18
P10

P12

P56

P64

P71

P78

P91

P96
P11

P46

P97
P15

P58

P77
P24

P27

P75

P80

P86
P19
P20

P23

P29

P48

P51

P59
P52

P55

P81

P98
P22

P82
P83

P87

P92
P93
P28

P31

P73
P25

P41

P89
P90

P94
P88
P74

P76

P79

P84
P2
P1

P3
P4
P5
P6
P7
P8
P9
N 2710276.3567 P438 P122 N 2710347.9426 SW SOFT 800 23 20
P437 P123

5cm
P436 P124
P125 NE
P435
P434 P126
P127
S
HARD 800 43 60

SE
34
P433
-25.00 B
P432 P128 E
P129
P431
SOFT 800 44
P130
20
P430
P429 P131
P428 P132
P427 P133
SNG PLANT P134
P426
HARD 800 50
P135
31
P425
P424 P136
P423
P422
P137
P138
-23.00
SOFT 800 31
P421 P139
P420 P140
P141
20
P419
P418 P142

D 62
P417 P143
P416
P415
P144
P145 HARD 800 60 50
P146
P414
P413 P147 -21.00
P148
SOFT 800 60
P412
P411 P149 20
P410 P150
P409 P151

P1-P438 P438
P408 P152
P407 P153 SHORING IN THIS DRAWING TOTAL :
P406 P154
P405 P155
P404 P156
P157
01 20-MAY-2014
P403
4464cm

00
P402 P158
P401 P159 28-DEC-2013
P400 P160
P399 P161
P398 P162 REV. DATE DESCRIPTION
P163
P397 5cm P164 Master developer
P396
P395 P165
P394 P166
P393 P167
P392 P168
P391 P169
P390 P170
P171
PLOT.NO SECTOR AREA JOB NO.
P389
P172

ABU DHABI
P388
P387
P386
P173
P174 C-23 W-5 CP-484
P175
P385 5cm

6642cm
P384 P176 PROJECT:
P177
P383
P382 P178 3 Basements + Ground + Mezzanine
P381
P380
P179
P180
+ 35 Typical Floors + Roof
P379 P181 Principal Consultant
P378 P182
P377 P183
P376 P184
P375 P185
P374 P186
P373 P187
P188
P372
P189 Structural HVAC :
P371
P370 P190
P369 P191
P368 P192
P193
P367
P366 P194
P195 T: 02-6767976 Po Box 127489
P365 F: 02-6767990 Abu Dhabi, UAE
P196
150cm

www.implement-ae.com
P3 64

P197
MAIN CONTRACTING
P3
P 63

P198
P3 362

ARABIAN
P3 61

P199
P3 60

P200
P 59

PLOT LIMIT PLOT LIMIT


P3 358

P201
332cm CONSTRUCTION CO. (ACC)
P 57

P202
P3 356

BASEMENT LIMIT
P3 55

231404.980 P203
P3 54

Piling Contractor
P3 53

P204
E 231388.3896
P3 52

P205
P 51

2710334.179 P206
Australian Piling
P3 350

N 2710265.7532
P 49

P207
P3 348

m
P3 47

P208
5c

Technology
P3 46

P209
P3 45
P3 44

P210
P3 43

TOE LEVEL
P3 42

P211 TEL: (02)5504222 P.O. BOX: 48181 FAX: (02)5504221


P3 41

P212
P3 40

= -23.0m Drawing Title


P 39

P213
P3 338
P3 37

P214
SHORING LAYOUT ,DETAILS & SECTIONS
P3 36

P215
P3 35
P3 34

P216
P3 33

P217
SITE PLAN
P3 32
P 31

P218
P3 330
P3 29

P219
P3 28

P220 Drawing No. Revision No.


P 27
P3 326

P221
P 25

34
04
P3 324

P222
12
01
P3 23

cm P223
P3 22
P3 21

P224
P3 20

P225
P 19

BASEMENT LIMIT Submission Date Scale


P3 318

P226
96cm P P31617

P227

5cm
E 231426.5012
P 15

P228
09-DEC-2013
P3 314
3

P3 13

P229
P3 12

P230
N 2710332.3069
P 11

PLOT LIMIT Plan ID


P3 310

P231 Project ID
09

P301
P308

P304

P302
P305
P307
P306

P303

P299
P298

P295

P285

P282
P297
P296

P291
P292
P294

P286

P281

P278
P290

P279
P300

P287
P293

P289

P277

P275

P267
P288

P283

P268
P284

P280

P274
P273
P272

P270
P276

P271

P269

P261
P265

P263

P257

P251
P266

P264

P256
P262

P255

P247
P254
P260
P259

P252

P250

P244
P258

P238
P237
P253

P249
P248

P243
P246

P242
P241

P239
P245

P234
P236
P240

P235

P233
P232
E 231415.2299 42675 856756
N 2710286.8489 295cm
PLOT LIMIT Official Use Only
TOE LEVEL E 231425.7186
= -25.0m
N 2710329.1503
4685cm
General Notes

W PERIMETER: 266 m

NW

SW DIM No.Of F.cu TOE
PILE PILE (N /mm) Anchor No.of
(mm) LEVEL Type
TYPE LEGEND Piles (m) Anchor

S
NE
HARD 800 62 50

40

41

42

43

44

45

46

47

48

49

60

61
39

50

51

52

53

54

55

56

57

58

59
E

SE
A A A A A A A A A A A A A A A A A A A A A A A -20.00
BASEMENT LIMIT

BASEMENT LIMIT A 61

SOFT 800 61 20
E 231362.0135

E 231344.6567

P121
P106

P110

P119
P114

P116
P105

P107

P109

P115

P117
P101
P102

P104

P112
P113

P120
P100

P103

P108

P118
P111
P37

P68
P45
P39

P50
P13

P66
P67
P42

P44

P54
P14

P99
P32

P40

P47
P17

P34

P53
P21

P72
P33

P49

P63

P69
P70
P16

P35

P43

P60

P62

P65

P85
P26

P36

P38

P57

P61

P95
P18

P30
P10

P12

P56

P91
P64

P71

P78

P96
P11

P46

P97
P15

P58

P77
P20

P24

P27

P51

P59

P75

P80

P86
P19

P23

P29

P48

P52

P55

P81

P98
P22

P82
P83

P87

P92
P28

P31

P93
P73
P41

P89
P25

P94
P88

P90
P74
N 2710347.9426

P76

P79

P84
N 2710276.3567 P438

P2
P1

P3
P4
P5
P6
P7
P8
P9
HARD 800 23 60
P122
P437 P123 -23.00
P436 P124
A
38 SOFT 800 23


P125
20

45

P435


45

P126

45
P434
P433 P127


A
37


P128


P432


HARD 800 43


P129
60


P431


P130
34
P430
A
36 P429 U
T) P131 -25.00 B

TR M
P428
S
P132


. 0M

SOFT 800 44
RZ 2

20


P133
O .X


P427
35 45
(H .D
PE O
PI M P134


P426 T) EL 0 M

P425 RUM
E
P135


ST 90

120cm 120cm
T
P424
T) . S 0M
P136
A
34
RZ 2
U M
P137
HARD 800 31 50
TR 6M O .X
P423
S
. 1 H
( .D
RZ X

PE O
P138


O D.
P422 (H O. PI M

-23.00


L
PE EE 0 M
P139


P421
A
PI MM


33 T) EL 00 ST 90


P420 U E 0 P140


800 31
R
T M ST 1

SOFT

P141
20
. S 16M
P419 Z


P142
R
P418 O .X
A
32


(H O.D


P143


P417 PE

PI M P144
D


62
P416


L M


HARD 800 60 50
EE000 P145
P415
A


31
T UC

P146
S 1 (457 X 191 X 98)

P414

P147
-21.00
0cm
P413
m
100c
UC

P148
(457 X 191 X 98)

P412
A
30
9


P149
SOFT 800 60 20


P411
120cm
120cm

P410 P150
P409 P151
A
29 P152


P438
P408
TYPICAL P1-P438


SHORING IN THIS DRAWING TOTAL :


P407 P153

A
28 P406

DETAIL -F 45
P154


P405 P155

P404 P156


P157


P403
A
27



P402 20mm 20mm P158
00 20-MAY-2014

P159

A
26
P401
P400 M24 Bolt 20mm M24 Bolt 20mm P160
P399 P161 REV. DATE DESCRIPTION
Grade 8.8 Grade 8.8

P398 P162
Master developer


P163
A
25 P397
P396 P164
45

P395 P165



P394 14.4cm 14.4cm P166
A


24 P393 P167

P392 P168
14.4cm 14.4cm JOB NO.
P391 P169 PLOT.NO SECTOR AREA
A
23 P390 P170

C-23 W-5 ABU DHABI CP-484


P389 P171
P388 P172
A
22 P387 P173
PROJECT:

P386 14.4cm 14.4cm P174

A
21
P385 P175 3 Basements + Ground + Mezzanine


+ 35 Typical Floors + Roof


P384 P176
14.4cm 14.4cm
P383 P177
P382 P178 Principal Consultant
P381 P179
P180
P380
P379 CASE 1 CASE 2 P181
P378
P377
FOR STRUT 100cm FOR STRUT 90cm
P182
P183
P184
P376
PLOT LIMIT
TYPICAL DETAIL -F
P375 P185
P186 Structural HVAC :
P374
P187
DETAIL -L P373


P188
P372
45 P189


P371
P370 P190
P369 900 MM O.D. X 20MM P191 T: 02-6767976 Po Box 127489

26
F: 02-6767990 Abu Dhabi, UAE

P192
www.implement-ae.com

P368 STEEL PIPE (HORZ. STRUT)


P367
P193 MAIN CONTRACTING
P366
P365
P194
P195 ARABIAN
CONSTRUCTION CO. (ACC)
P196

45 P197
P3 64

P198
P3
P 63

.Q -

Piling Contractor
P3 362

P199


SEC
P3 61

PLOT LIMIT Australian Piling


P3 60

P200
P 59


P201
P3 358


P 57

BASEMENT LIMIT
P202
Technology
P3 356

P203
P 55


Q P3 354

E 231388.390 P204
P3 53


P3 52

P205 TEL: (02)5504222 FAX: (02)5504221


P.O. BOX: 48181
UC
P 51

(457 X 191 X 98)

P206
N 2710265.750
P3 350

M ) Drawing Title
P 49

M UT P207
.Q -

UC
P3 348

(457 X 191 X 98)

16 TR P208
SHORING LAYOUT ,DETAILS & SECTIONS
P3 47
SEC

.X .S SEC. .A -A SEC.A -A
P3 46

.D Z P209
P3 45

O OR
45



3 4

H P210
4

M (
CONNECTION DETAILS FOR STRUT

DETAIL -F
P3 43

TOE LEVEL M IPE


P211
P 2

0
0 P
4
P

P3 341

TYPICAL
10 EL P212
= -23.0m
P 40

ST
E M
M T) P213 Drawing No. Revision No.
P3 339

16 RU

SEC

. X . ST
P 38

.D P214
M T)
P3 337

O RZ
. .G
A20

20MTRU
01
O

01
P3 36

M (H P215
-G


P3 35

M PE .X .S
00 PI
.D RZ P216
P3 34

10 EL
O O
1A9

E
P3 33

ST (H
M E P217
P3 32

M P
0 PI
Submission Date Scale
P 31

90 EL P218
1A8


P3 330

E M T)
ST 45 P219
P3 29

M U
20 TR
P3 28

X .S
P220
20-MAY-2014

SEC

.
1A7

.D RZ
P3 27

O O
(H P221
.G-G

3 6

M PE
2
P3 25

M
0 PI


P222
1A6

90 EL
P 24

E
Project ID
P

P3 323

ST
P223 Plan ID
P 22


1A5

P224
P3 321


42675
P3 20


BASEMENT LIMIT
P225
SEC. .P-P

P3 19


1A4

P 18


SEC.T - T P226
P3 317

P227
E 231426.5012

P3 16

45

45
45

45
1A3


Official Use Only
P3 15

P228
P3 14


P229
P3 13
12

N 2710332.3069
P 12

P230
A


P3 311


P231
P3 10
1A1

09

P301
P308


P304

P302
P305
P307
P306

P303

P299
P298

P295

P285
P297

P282
P296

P291
P292

P286

P281
P294

P278
P290

P279
P300

P287
P293

P289

P277

P275

P267
P288

P268
P283
P284

P280

P274
P273
P272

P270
P276

P271

P269

P261
P265

P263

P257

P251
P266

P264

P256
P262

P255

P247
P254
P260
P259

P252

P250

P244
P258

P238
P237
P253

P249
P248

P243
P246

P242
P241

P239
P245

P234
P236
P240

P235

P233
P232


1A0


A9

PLOT LIMIT

SEC.
.P-P

TOE LEVEL SEC.T - T
E 231425.720
PLOT LIMIT A A = -25.0m
A2
A4

3
A5
6

A1
A7
A8

E 231415.230 N 2710329.150
N 2710286.850

S-ar putea să vă placă și