Sunteți pe pagina 1din 3

- BETTER EFFICIENT TRANSFORMERS

Low loss Transformers are called `better efficient transformers.' Operating losses are less
causing less heat generation and effecting longer life. One of the prime components of losses is
the no-load loss which can be drastically reduced by better design and using superior grades of
electrical steels. It can be further reduced in case conventional electrical steel is replaced by
Amorphous metal.

By using improved grades of CRGO laminations, the no load loss can be reduced to 32
per cent than that specified by REC upto and including 100 KVA transformers. Numerically, the
no-load loss specified by REC for 25 KVA transformers as 100 watts may be brought down to 68
watts with the use of superior grades of CRGO lamination. Similarly for other ratings like 63
KVA and 100 KVA transformers, the no-load loss may be reduced to 123 watts and 176 watts
from REC specified values of 180 watts and 260 watts respectively.

Further, there is a huge scope of reducing the load losses to a much lower value to make
the transformers more energy efficient. Maintaining the maximum efficiency to occur at 38 per
cent loading, as recommended by REC, the load losses may further be reduced to 466 watts, 844
watts and 1192 watts as against 685 watts, 1235 watts and 1760 watts specified earlier by REC
for 25 KVA, 63 KVA and 100 KVA transformers respectively.

The numerical computations of other higher rated transformers could not be made as both
REC and ISS are silent on the specific requirements of losses in their standards. These have been
left to the choice of the individual buyer to specify their need to restrict the total losses in the
Tender specification.

On the whole, the manufacturers have the ability and resources to offer a better cost
effective, low loss, energy efficient transformers having conventional stack core construction,
which have a definite scope of reducing the total losses to 32 per cent.
We should not forget to mention here the excellent low no-load loss property of Amorphous
metal transformers. There has been constant search for transformer core, materials, which may
have the least loss. Iron-Boron-Silicon amorphous alloy has evolved, as the low loss material for
distribution transformers. Molten metal when cooled to solid state at a very high-speed rate,
retain a random atomic structure which is not crystalline. This metal is called amorphous. This
resembles with glass and also referred as `glass metal'. Need to achieve the required cooling rate
restrict the thickness of the metal to 0.025 mm i.e. almost 1/10'h of the thickness of conventional
CRGO steel.

Due to small thickness and low saturation factor, larger core and consequently larger coils
and tank size are required as compared to CRGO core transformers. The problem of small
thickness has been overcome to some extent with the development of amorphous metal strips.
This is achieved by compacting number of thin ribbons. This strip is commonly known as
`POWER CORE' and upto a thickness of 0.25 mm having been developed.

Amorphous strips are four times harder than CRGO steel. Hardness along with reduced
thickness make slitting and shearing difficult. The brittleness property of amorphous metal has
also make it un-friendly to the transformer manufacturers. Due to these and other limitations, the
amorphous core technology has been limited at present to very few customers in India and
abroad. Amorphous metal core has some merits. The non-crystalline structure and random
arrangement of atoms give low field magnetization and high electrical resistively. Due to low
field magnetization, hysteresis loss is low and due to low electrical resistively eddy current is
suppressed. As such core losses of amorphous metal alloys are reduced to by 42 per cent and
magnetizing current by 53 per cent.

The most attractive characteristic of amorphous alloy is obviously its extremely low core
loss and low magnetizing current. Except these two properties, practically all other properties o
amorphous alloy are inferior to those of CRGO steel, which offer a challenge to the engineers to
overcome them so that the low no-load property is exploited in the most cost effective way.
The amorphous metal saturates almost at 1.55 tesla whereas CRGO steel saturates at almost 2.03
tesla. Thus amorphous metal core-transformer results in increase of core size, conductor, tank
and insulating oil. Overall cost of amorphous core transformer is approximate 20 to 30 per cent
costlier than conventional core transformers.

Looking to such limitations, it is advisable that the buyers should not get mixed up the
issues of CRGO steel transformers with amorphous metal transformers. They should be deltwith
separately. A separate tender may be invited for amorphous metal transformers if the buyer so
desires to purchase such transformers on academic point of view. It is further stressed that the
SEBs may go in for buying a limited quantity of amorphous metal transformers for monitoring
their performances in the present days distribution network as well as make themselves friendly
in maintenance and repair of such transformers.

The other components of losses are the load loss. Load loss can be reduced by using thicker
conductors. With use of superior grades of electrical steels and thicker conductors for the
windings, the losses of transformers may be brought down to minimum. But it increases the
initial cost of the transformers and thus become uneconomical during Tender evaluation. This is
understood by everybody in the industries, especially a section of the manufacturers who have
been shouting all these days in various seminars and in other common platforms.

As have been suggested by the many authors, ITMA also have the same opinion that to
accommodate low loss transformers the tenders may be evaluated on `Total owning cost' (TOC)
basis. It would have been the right choice which buyers need to look into. We fully agree to the
proposal of evaluating a Tender on the basis of `TOC' with some modifications on the indices of
`TOC' formula. It may be proposed to give a thought to the average life of distribution
transformers in our unplanned distribution system, which is hardly at best 5 to 6 years. Poor
workmanship, bad materials, overloads, short-circuit, single phasing, unbalance load and over
and above, power theft etc. are some of the reasons which do not allow distribution transformers
stay for a longer period. We propose to calculate the indices of `TOC' formula on the basis of an
average life of 10 years, instead of taking 15 years, which is a too long period for distribution
transformers. However power transformers may be evaluated on the basis of 15 years average
life on the present technology may become obsolete by then.
Banning import of spurious, defective and used electrical steel is again a critical issue
which is discussed these days in every seminar. Authors from the manufacturers and power
utilities have stressed the need to ban the import of such defective electrical steel, which will not
only make everybody to play in a bigger field, but also increase the life expectancy of
transformers in service. Probably there must be some constraints for the Govt. to ban the import
of such material which we may not be aware. .

We have a unique proposal which can counter the use of such defective materials in the
manufacturing of transformers. Let ITMA make a panel constituted by the eminent engineers
from its association who should be given charge of carrying out third party inspection on behalf
of buyers with a minimum service charge. Manufacturers who are still indulging in these
spurious materials may also be included in the panel. With such a combination, the things will be
exposed even in the 1st inspection as nothing can be hidden out from the inspection team. It will
then be a responsibility of the manufacturers themselves to discourage others from using such
bad materials. The modalities may further be discussed when the proposal sounds good and
acceptable to the buyers.

- REDUCTION OF LINE LOSSES

Various modalities have been discussed in the Seminar, of which the high voltage
Distribution System (HVHS) may be the ideal sfep to reduce line losses. It helps to reduce the
length of L.T lines and makes the power available at site close to the users. Reduction of L.T
lines effect in reduction of line losses considerably. The high voltage power distribution system
also reduces the probability of power theft by hooking HVDS suggests an increase' in installation
of small capacity single-phase transformers in the network which again save considerable energy.

The theft of electrical energy has been made a cognizable offence under Indian Electricity
Acts, 2003. However the implementation leaves much to be desired. Most of the energy theft are
through connivance of lower employee level. In case the situation is to be improved, it would be
necessary to plug all loop holes and ensure that the energy theft is substantially reduced (if not
eliminated). In some states the enforcement drive has shown encouraging results. However a
great effort in implementation is necessary. Inadequate billing may be another aspect which
create a huge gap between power generation and economic realization. This aspect remained
untouched in the seminar as author had failed to discuss this issue. Inadequate billing and
realization is a hot subject and require further discussion in the open forums.

The sharply increasing costs of electrical energy are forcing electrical supply authorities
to recognize the critical importance of the cost of electrical losses. Electrical utilities are
increasingly required to operate their networks more efficiently and to reduce the total real
running costs of the equipments. Transformers (after transmission lines) are the largest loss
making components in the electrical networks. There are about 25,26,239 nos. transformers with
a total installed capacity of 75,92,39 MW (as on 31.3.2004) in the power system networks. It is
estimated that about 35 billion Kwh of energy is lost due to high loss transformers every year.
The total losses due to transformers in the electrical network in India exceeds 6 per cent of the
total electricity generated which is equivalent to about 8 to 10 per cent of the total loss from the
system.

The enormous stock of transformers is often overlooked as a source of cost saving. In


fact, avoidable losses from the distribution transformers currently in service would mean release
of about 650 mw of generating capacity, which could instead be used to serve customer loads.

S-ar putea să vă placă și