Effects of industria! Loads
11 Typical protection scheme tor utlity feeder ane industrial plant
Protection of Systems with Dispersed Storage and Generation
102 _ Utility distribution systom with DS
262 Minimum protection scheme fora dicrbution system with OSG
362 Typical DSG protection scheme fora medium-size ganerator
4402 Typical DSG protection requirements fora large generation facility
C2 Short-circut current contioutons during faulis for a vlty alone, and for utilty with OSG
662 Yor tree-phase faults on three sizes of syncnronous machines and with
available fault current of 2500 amperes
702. Ptfor three-phase faults on three sizes ot synchronous machines and with
avaliable fault eyrent of 1260amacres
C2. tTorasingle-lino-to-ground fait on three sizes of synchronous machines
9862 Snort-crcult current contributions during temporary faults
1062 _Effect of zero-sequence voltage on grounded-wye/Celta DG transformer bank
1162 Gireult conditions conducive o resonance during a single line-to-ground faut
1202 Gusting ata wind generation facility may cause fluctuation in generation output
Protection of Systems with Automated Distribution
103 Loadbreak switch for automated distibution-system application .
2C3_ Radial feeder with al reclovers and switches closed
S03 Fault occurs at F and sclesredby recloser 8
4463. Fault indicator in switch 81 responds to system ntorrogation =
‘503 Systom control commands switch Bt fo open and closer B to close
TABLE
Effects of Industria! Loads
1C1 Electric service deviation tolerances for load-and-control equipment
2C1 ~ Elocvic powersystom disturbances
C1 Restoration of service ater loss of voltage
Protection of Systems with Dispersed Storage and Generation
G2 __Ulilty requirements for connection of DSG to cistnbution system
262 Recommended protective ely functions for DSG installations «.
5C2 Standard device orrelay entifications
Protection of Systems with Aulomated Distribution
103 Ratings of loadoreak switch for automated distribution systems,
Page
249
285
256
2s7
287
261
262
"262
262
250
251
262
254
254
261
28
Distribution Impact Study Robinsons Land Corporation 500 KW On-Grid Three Phase Photovoltaic Power Plant Located in Robinsons Cybergate Bacolod, Araneta St. Brgy. Singcang, Bacolod City