Documente Academic
Documente Profesional
Documente Cultură
2 | Page
19. Management Review (review for the Should be endorsed by Verification Head office
audit findings and recommendations to Signature, time and date
evaluate the performance)
20. Drinking Water analysis records Should be endorsed by Verification Base camp
Signature, time and date
21. Water cut in and out quality reports Should be endorsed by Verification N/A
(PPM) Signature, time and date
22. Bioremediation environmental Should be endorsed by Verification N/A
parameters reports Signature, time and date
23. Periodical Noise and Air monitoring Should be endorsed by Verification N/A
reports for power plant station Signature, time and date
3 | Page