Sunteți pe pagina 1din 1

Key Plan

A
BL
QI
Notes

FIRE PUMPS SCHEDULE


U4 U5 U6 COLUMN No. 1 2 3
150mm BREECHING INLET PIPE AT U/G
FOR CONT. REFER DWG. NO. 76-10526-F101 UNIT No. FP-1 FP-2 JP
PUMP TYPE CENTRIFUGAL PUMP
SYSTEM SERVED SPRINKLER, LV, FHR, & FH
BUILDING
UC MAIN BUILDING
FLOOR BASEMENT FLOOR
ROOM BASMENT PUMP ROOM
SPECIFICATION TYPE DIESEL WATER
ELECTRIC COOLED ELECTRIC
FLUID WATER
TEMPERATURE (C) 40 40 40
FLOW RATE (GPM) 750 750 15
TOTAL HEAD (PSI) 157 157 167
FIRE WATER TANK FIRE WATER TANK
POWER (H.P) 132 132 7.5
WATER VOLUME = 85 m3 WATER VOLUME = 85 m3
WATER HEIGHT 2.25 m WATER HEIGHT 2.25 m RPM
GRP WATER TANK 2960 3000 2850
5.60 m (L) x 6.70 (W) x 2.75 (H) 5.60 m (L) x 6.70 (W) x 2.75 (H)
FOR DETAIL REFER DWG. NO. MINIMUM SUCTION PIPE SIZE (IN) mm 200 200 50
76-10526-W111
MINIMUM VORTEX SIZE mm 400 400 N/A
100 mm TANK VENT
MINIMUM DISCHARGE PIPE SIZE (IN) mm A ISSUED FOR TENDER ARN BM* AH* 05.03.15
80mm CIRCULATION PIPE (SUCTION) 600 x 600 mm TANK PIT
150 150 40
80mm CIRCULATION PIPE (DISCHARGE) MINIMUM RELIEF VALVE SIZE (IN) No Revision
Job Project
Drawn Manager Director Date
N/A 100 N/A
VORTEX PLATE (300x300) MINIMUM RELIEF VALVE DISCHARGE SIZE (IN) N/A 200 N/A
150 mm AIR RELEASE PIPE
100mm WATER OVERFLOW PIPE BASE TYPE CONCRETE CONCRETE CONCRETE
Note: * indicates signatures on original issue of drawing or last revision of drawing
100 mm WATER OVER FLOW PIPE 80mm CIRCULATION PIP (SUCTION)
Conditions of Use. This document may only be used by GHD's client (and any other
QUANTITY 1 1 1 person who GHD has agreed can use this document) for the purpose for which it was
150mm METERING & TESTING PIPE 80mm CIRCULATION PIP (DISCHARGE) prepared and must not be used by any other person or for any other purpose.
PUDDLE FLANGE (TYPICCAL) UB REMARKS DUTY STANDBY DUTY
WATER LEVEL INDICATOR WATER LEVEL INDICATOR
100mm TANK VENT SIZE OF METER DEVICE 150
1000mm x 1000mm ACCESS PANEL Master Developper / Owner

1000mm x 1000mm ACCESS PANEL * FINAL PUMP HEAD TO BE VERIFIED BY CONTRACTOR UPON APPROVED FULL HYDRAULIC CALCULATION AND
ACTUAL SELECTION OF EQUIPMENT. Abu Dhabi Airports Company PJSC
Planning & Development
GALVANIZED LADDER GALVANIZED LADDER * ALL ISOLATING VALVES INSTALLED ON THE FIRE FIGHTING PUMPS TO BE PROVIDED WITH TAMPER SWITCH PO Box 94449, Abu Dhabi, U.A.E
TRENCH DRAIN WITH GRATING CONNECTED TO BMS AND MAIN FIRE ALARM PANEL. T: +971 (0) 2 505 5000
DOMESTIC WATER CIRCULATION PUMPS FWCP-1 & 2 150mm OS & Y GATE VALVE * ALL TANKS LOW, HIGH LEVEL INDICATORS SHALL BE CONNECTED WITH BMS SYSTEMS. F: +971 (0) 2 575 8300
(DWCP-1 & 2) FOR DETAIL REFER OS&Y OS&Y
DWG. NO. 76-10526-W111 200mm SUCTION HEADER * ALL PUMP PLINTH DIMENSIONS SHALL BE 100mm LARGER THAN PUMP DIMENSION IN BOTH SIDES. REFER
TO STRUCTURE PACKAGE
200mm FP-1 SUCTION PIPE

PRESSURE RELIEF VALVE


PG PG PG PG Lead Consultant

200mm FP-1 DISCHARGE PIPE OS&Y JP OS&Y FIRE WATER CIRCULATION PUMP SCHEDULE
200mm FP-2 SUCTION PIPE
FP-1 FP-2
METERING FOR TESTING 150mm FLEXIBLE PIPE
OS&Y
50mm JP SUCTION PIPE UNIT NO. FWCP - 1 FWCP - 2
DOMESTIC WATER TRANSPER PUMPS NRV
OS&Y 200mm FP-2 DISCHARGE PIPE
(DWTP-1 & 2) FOR DETAIL REFER NRV FS TS NRV SYSTEM SERVED FIRE WATER FIRE WATER GHD GLOBAL PTY LTD
DWG. NO. 76-10526-W111 NRV DIESEL PUMP DISCHARGE MANIFOLD
OS&Y 3rd Floor, Guardian Tower, Danet Community
OS&Y PO Box 45921 Abu Dhabi United Arab Emirates
200mm DISCHARGE HEADER TS DIESEL TANK 526.1 LITERS(139 GALLONS) BUILDING MAIN BLDG. MAIN BUILDING
TS T 971 2 6968700 F 971 2 4472915
E abumail@ghd.com W www.ghd.com
BASEMENT FIRE BASEMENT FIRE
OS&Y FUEL PIT 1m (L) x 1m (W) x 0.55m (D) ROOM
150mm PIPE FOR PUMP ROOM PUMP ROOM
BREECHING INLET T/A TS
Specialist Consultant
CONTROL PANEL FOR PUMP ROOM STAIR # 4 SPECIFIC TYPE CIRCULATION PUMP CIRCULATION PUMP
JOCKEY PUMP (JP-1 & 2) 100mm MAIN SPRINKLER PIPE T/A
CONTROL PANEL FOR FHC FOR UTILITY BUILDING FLUID FIRE WATER FIRE WATER
CIRCULATING PUMPS (FWCP-1 & 2)
UA TEMPERATURE (C) 40 40
Fire Life Safety, Planning
and Regulatory Specialist
TANK VENT
CONTROL PANEL FOR
DIESEL FIRE PUMP (FP-2) FLOW RATE (M3/HR) 28.33 28.33
CONTROL PANEL FOR 150mm MAIN SPRINKLER PIPE TO U/G
ELECTRICAL FIRE PUMP (FP-1) FOR MAIN BUILDING TOTAL HEAD (m OF WATER) 15.0 15.0
150mm MAIN LV & FHR PIPE TO U/G Specialist Consultant
FOR MAIN BUILDING RPM 2910 2910
150mm LV & FHR PIPE AT U/G 50mm JP DISCHARGE PIPE
FOR MAIN BUILDING BASE TYPE CONCRETE CONCRETE
FOR CONT. REFER DWG. NO. 76-10526-F101 PUMP ROOM DOOR LOUVERED TYPE
THE LOUVER SHALL BE AUTOMATICALLY OPENED DURING Third Party
THE DIESEL PUMP OPERATION QUANTITY 1 1 Operational Advisor
150mm SPRINKLER PIPE AT U/G
KW 2.2 2.2
FOR MAIN BUILDING
FOR CONT. REFER DWG. NO. 76-10526-F101 1-WORKING & 1 STAND-BY WITH EMERGENCY POWER
REMARKS SUPPLY FOR BOTH PUMPS
Client
ADAC

FIRE PROTECTION SERVICES - PUMP


Project
MIDFIELD TERMINAL FIRE
1 ROOM ENLARGED PLAN STATION
F124 SCALE 1 : 50 Title

FIRE PROTECTION SERVICES -


PUMP ROOM ENLARGED PLAN
Scale As indicated DO NOT SCALE
Drawn A. NOCEJA Designer P. MOHD.
Drafting Design
Check Check
Approved
(Project Director)
Date
0 500 1000 1500 2000 2500 mm This Drawing must not be used for Construction unless signed as Approved
Original Size
SCALE 1: 50 AT ORIGINAL SIZE Drawing No:
A1
DETAIL DESIGN 76-10526- F301 Rev: A
Plot Date: 7/03/2015 10:17:30 PM Cad File No: C:\Users\fvillete\Documents\76-10526_Midfield Fire Station MEP-Central_fvillete.rvt