Sunteți pe pagina 1din 5

MEMBER OF CRANES

S.NO BOOSTER PUMP 20T

1 MRIR ATTACHED

Civil MRI (if applicable


Survey, Foundation, Groun
Structural/Column E
Wall Erection
Roof Erection RFI

EOT Crane for Main Pump at Combined


EOT Crane for Booster Pump at Combi
EOT Crane for Main Pump at Combine
Firewater Pumps Building (
EOT CRANE DOCUMENTS TO BE COLLECTED

(if applicable)
Survey, Foundation, Ground Elevation/Level Construction RFI
Structural/Column Erection RFI
Wall Erection RFI

Civil Checklist

Main Pump at Combined Pump House Building (50T + 5T)


r Booster Pump at Combined Pump House Building (20T)
or Main Pump at Combined Pump House Building (16T)
rewater Pumps Building (Monorail Crane) (5T)
MEMBER OF CRANES

S.NO BOOSTER PUMP 20T MAIN PUMP 50 T + 5

1 MRIR ATTACHED

Civil MRI (if applicable


Survey, Foundation, Groun
Structural/Column E
Wall Erection
Roof Erection RFI

EOT Crane for Main Pump at Combined


EOT Crane for Booster Pump at Combi
EOT Crane for Main Pump at Combine
Firewater Pumps Building (
EOT CRANE DOCUMENTS TO BE COLLECTED

MAIN PUMP 50 T + 5 T MAIN PUMP 16 T FIRE WATER PUMP BUILDI

(if applicable)
Survey, Foundation, Ground Elevation/Level Construction RFI
Structural/Column Erection RFI
Wall Erection RFI

Civil Checklist

Main Pump at Combined Pump House Building (50T + 5T)


r Booster Pump at Combined Pump House Building (20T)
or Main Pump at Combined Pump House Building (16T)
rewater Pumps Building (Monorail Crane) (5T)
ER PUMP BUILDING

S-ar putea să vă placă și