Sunteți pe pagina 1din 3

MUNICIPAL DISASTER RISK REDUCTION AND

MANAGEMENT OFFICE (MDRRMO)

LA NIA ACTION PLAN


JUNE 7, 2016

PERSONS/AGE IMPLEMENTA
MATERIALS
ACTIVITIES NCIES TION EXPECTED OUTPUT
NEEDED
INVOLVED DATE
ORGANIZING AND PLANNING
1. Meeting with 3 clusters (Security, Medical and
PNP, BFP, MHO, La Nia action plan formulated and
SRR, Camp Management and Kitchen, JUNE 2016 None
MSWD, MNAO prepared
Communication Team)
2. Conduct Infrastructure Audit and check its JUNE TO JULY Flood and Landslide Prone Facilities
MEO Transportation
baseline data by Engineering department 2016 and infrastructures are inspected
Various Office
3. Prepare hazard, risk, social vulnerability JUNE TO JULY Disaster Risk Assessment is updated
16 BDRRMC Supplies
assessment and flush point maps 2016 and prepared
Transportation
16 BDRRMC
4. Develop and disseminate a community/family
DEPED, MSWD Community/Family Evacuation guide Various Office
guide for disaster preparedness and response JUNE 2016
RELIGIOUS is developed and disseminated Supplies Printer
including evacuation plan/guide
SECTOR
Barangay command post and
5. Designate a command post, operation center for
16 BDRRMC JUNE 2016 operation center is established, None
every Barangay
identified and designated
INSTITUTIONALIZE PLANS AND POLICIES
1. Direct PB to convene BDRRMC about their
16 BDRRMC JUNE 2016 BDRRMC is created and convened None
preparation and response plan to La Nia
2. Assign Municipal Engineer to: MEO JULY TO Water level marker, Disaster Prone Tarpaulins
a. Establish/Create a Water Level Marker in BDRRMO AUGUST 2016 Signages, Flood/ Storm Warning 1x2 sticks (for
Sungay, Taparak, Lourdes and Horno Bridge Signals, Evacuation Guide are posted frames)
b. Put up signs/directions going to the Paint
evacuation center
c. Designate shelter for livestock/animal relief
Transportation
park
Nails
d. Install Flood/Landslide Prone Signages, Storm
Digging and
Warning Signals and Early Warning Signs in
construction tools
Poblacion, Loguilo and Baybay
3. Prepare templates for suspension of classes, pre- Templates are developed and
MDRRMO JUNE 2016 none
emptive/forced evacuation, etc. prepared
MSWDO
4. Profiling of IDPs (Household name, members, Various Office
MPO, BNS JUNE TO Potential IDPs in flood and landslide
sex, elderly, children, PWD, etc.) and identify Supplies
BHW AUGUST 2016 prone areas are identified
their place of evacuation Transportation
BDRRMC
BUILD COMPETENCIES
Projector
COMMUNICATIO
1. Training of information and awareness personnel Transportation
N& Communications & Early Warning
(flood prone barangays) on Hazard and Risk JULY 2016 Various Office
EARLY WARNING Teams are trained
Assessment Supplies
TEAMS
Sound System
Transportation
2. Training on Flood/swift water search and rescue SRR TEAM JUNE 2016 Search and Rescue Team are trained
Meals and Snacks
Transportation
3. Training on High angle rescue SRR TEAM AUGUST 2016 Search and Rescue Team are trained
Meals and Snacks
4. Training on Evacuation and Camp Management MSWDO, MNAO AUGUST 2016 Search and Rescue Team are trained Meals and Snacks
BDRRMC Transportation
DEPED Communities and Responders are Megaphone
5. Conduct flood emergency drills MSWD AUGUST 2016 trained on emergency and disaster 2Way Radio
LGU situation Meals and Snacks
SRR IEC Materials
EQUIP HARDWARE AND SUPPLIES
A. Security, Search and Rescue, Medical and BFP, PNP, MHO, SEPTEMBER Search & Rescue and Medical Vouchers
Clearing Resources: BHW 2016 Equipment are purchased PPMP
First aid kits VOLUNTEERS Purchase Request
Spine boards Canvass
Cadaver bags
Ropes and throw bags
Search light
Helmet
Reflectorize vest
Spine board
Shovel
Gasoline and extra batteries
Standby vehicle (2 patrol car, 1 firetruck, 1
fuego pick-up)
Two-way radio
Food packs
B. Humanitarian Resources:
Instruct PB that every household has E-balde
Stockpiling of relief goods
Community kitchen supplies and equipment
Vouchers
Registration logbook MSWDO Equipments and Materials for Camp
SEPTEMBER PPMP
Standby vehicles (1 SB truck, 1 ERV, 1 mini MNAO Management and Community Kitchen
2016 Purchase Request
dumptruck) LGU DRIVERS are purchased
Canvass
Megaphone
Whistle
Two-way radio
Flashlight and extra batteries
C. Communication and Awareness Resources
Vouchers
Centralized hotline
Early Warning Monitoring equipment PPMP
Internet connection MDRRMO JUNE 2016
are purchased Purchase Request
Flashlight and extra batteries
Canvass
Portable generator and gasoline

S-ar putea să vă placă și