Sunteți pe pagina 1din 6

ATG system

introduction
system picture

Product Solution
Solution
Name Product list
No.
1 Modbus Probe

2 Probe+TCM-1 Console

3 Probe+TCM-1 Console+PC software


Automatic
Tank Gauge 4 Probe+TCM-1 Console+PC software+Internet Remote Query

Probe + TCM-1 Console + Gas Station Management System(other


5
brands)

6 Probe (Modbus protocol)+ Other brands Controller

1 PC software

Software 2 Remote Internet Remote Query

3 Others Customized
Composition

Note: Above picture is for one console +six probe

Detail:

Particulars and Use of Main Accessories


Name of Parts Specification Unit Quantity Function of Parts
Magnetostric N (contract
Probe piece Sensing part of level gauge
tive probe quantity)
Touch X (contract
Touch console set Display part of level gauge
console quantity)
G3/4 internal
Blind plate joint & external piece N*1 Used for blind plate sealing
wire
Used by all positions to be
Seal gasket 23-5-5 piece N*5
sealed
G3/4 internal Used for connection of blind
Reducing bend & external piece N*1 plate joint with anti-explosion
wire hose
Used for connection of
Inner connection G3/4 piece N*1 anti-explosion box and
anti-explosion hose
G3/4, 900
Anti-explosion hose piece N*1 Soft connection
mm
Anti-explosion box G3/4 internal Used for wiring in dangerous
piece N*1
(two-head) wire zones
Grounding wire (with Used for grounding of
2m piece N*1
wiring terminal) anti-explosion box
Bridging copper bar Piece N*1 Used for bridging between
blind plate and flange
Aviation plug wire
2.5 m piece N*1 Communication line for probe
(with seal ring)
Upper separator and Used to ensure vertical probe
Set N*1
lower separator and prevent from impacting
For separation of probe from
Lower gasket piece N*1
oil tank
To prevent the floating ball
Buckle piece N*1
from falling off
For wiring among
Wire joint piece N*5
communication lines
Ribbon 3*150 piece N*5 To fasten 2m grounding wire
For sealing inside the
Anti-explosion mud KG N*0.2 Kg
anti-explosion box
Used when required for
Insulated tape Roll 1
wiring of communication line
Used by probe to measure the
Fluid-level floating ball Y piece N*1
oil level
Used by probe to measure the
Interface floating ball J piece Actual
water level
Touching pen piece X*1 For operating console
Online communication For center control online (if
4*0.75 piece 1
line any)
Expansion tube piece 4 For fastening of wall surface
Cross wood screw piece 4 For fastening of wall surface
1. Interface floating ball QS + Interface floating ball CS = Fluid-level floating ball YM;
2. E.g., 23-5-5, 23 is outer diameter of seal gasket, 5 is hole diameter of seal gasket and 5
is thickness of seal gasket.
Picture as follow:
We include all accessory for you ,when you get them ,you just prepare the
connect cable for connect the probe to the console .it is communication
cable four shield RVVP 4*0.5 or RVVP 4*0.75 is ok
Installation
picture:

Picture 1 --how to get the probe data ,

Probe length = h1+h2


(hi is tank height + manhole well thickness ; h2= riser tube height )

Picture 2 : before installation and finish

Before finish picture


Station ofice : console keep in the
petrol station ofice

Display

Note:
1.we can set diferent oil type use diferent color or according your demand
2.We can show you five point temperature
3.Probe ID can change according your demand
4. Oil volume can be liter or gallon
5.OEM logo
6. Can support 12 or 16 tanks max
7. PC software
8.Report & alarm : such as unloading , shift ,leak detector ,alarm ,high& lower
level alarm ,oil &
water temperature alarm ......

S-ar putea să vă placă și