PHRASEOLOGY
DEMOLITION
Information
Note :
The Tenderer is required to visit the site to inspect the construction of the
structure, etc to be demolished, adjacent property, to ascertain from the
Authorities the presence of underground cables, service pipes, safety
precaution and protection require
Temporary works
Temporary screens
Weather proof and dustproof screens; hardboard faced both sides with
timber framing; emulsion painted; dismantling and clearing away on M2
completion
Intruder resistant; 50 x 100 timber framing; lined one side with 25 mesh wire
netting; faced both sides with 12mm plywood; emulsion painted; M2
dismantling and clearing away on completion
Temporary roofs
Metal decking with timber roof trusses; gutter and rainwater complete when
ITEM
necessary; dismantling and clearing away on completion
Demolishing works
Demolishing down to ground floor level; making good structure and finishing
disturbed
Reinforced concrete staircase; .......... nos. total riser, ..........mm wide, in two
flights with one half landing; making good demolish surfaces and carting ITEM
away debris to contractor's own dump
Brick walls 230mm thick; making good all works disturbed; making good
ITEM
and extending finishings disturbed (approximately .m2)
Page 2 DEMOLITION
Code Description Unit
Reinforced concrete walls ...mm thick; making good all works disturbed;
ITEM
making good and extending finishings disturbed (approximately .m2)
Chain link fencing ...m high including making good demolish surfaces and
ITEM
carting away debris to contractor's own dump (approximately .m long)
Cutting through ...mm thick reinforced concrete walls to form openings; making
good all parts of the structure disturbed; extending finishings and making good
finishings disturbed
Cutting through 230mm thick brick walls to form openings; making good all parts
of the structure disturbed; extending finishings and making good finishings
disturbed
.mm x ..mm; forming square jambs and sill or threshold and inserting
ITEM
lintel or beam (supply included elsewhere)
Reinforced concrete walls; overall size .mm x .mm x .mm thick ITEM
Removing fitting and fixtures prior to demolition; carting away to contractor's own
dump
Paneled doors; ..mm x .mm; locks to be stored for re-use (. nos.) ITEM
Wash hand basin including tap ; overall size ..mm x ..mm x ..mm
ITEM
(.nos)
Page 3 DEMOLITION
Code Description Unit
Removing fitting and fixtures prior to demolition; set aside for re-fixing; make
good all works disturbed
Removing fitting and fixtures prior to demolition; to be stored for Employer; make
good all works disturbed
Wash hand basin; overall size ..mm x ..mm x ..mm; tap to be stored
ITEM
for re-use (..nos)
Steel floor duct; to be stored for re-use; replacing after services installations
ITEM
(approximately ..m)
Removing finishings
Floor finishings;
Ceramic tiles or similar floor tiles including screed; cleaning off for new
ITEM
finishing (approximately .m2)
Carpet or similar floor finishes including underlay; cleaning off for new
ITEM
finishing (approximately ...m2)
Carpet or similar floor finishes; underlay remain for reuse; cleaning off for
ITEM
new finishing (approximately .m2)
Wall finishings;
Ceramic tiles or similar wall tiles including screed; cleaning off for new
ITEM
finishing (approximately ..m2)
Wood paneling or similar wall finishes including timber frame; cleaning off
ITEM
for new finishing (approximately ..m2)
Wall paper or similar wall finishes; cleaning off for new finishing
ITEM
(approximately ..m2)
Ceiling finishings;
Mineral fibre board or similar ceiling finishes with metal and wire suspension
ITEM
system (approximately .m2)
Mineral fibre board or similar ceiling finishes; metal and wire suspension
ITEM
system remain for reuse (approximately ..m2)
Cement board or similar ceiling finishes with metal and wire suspension
ITEM
system (approximately ...m2)
Page 4 DEMOLITION
Code Description Unit
Concrete roof tiles; covered pitched roof; timber construction; put aside for
ITEM
re-use (approximately ..m2)
Maintaining
Clearing away
Sundries
The Contractor is to state here the Credit amounts that he will allow for old
materials arising from the demolition works. A separate detailed list is to be ITEM
submitted with the tender and each item on which a credit is allowed shall
be clearly indicated by ..................
Page 5 DEMOLITION
Page 6 DEMOLITION
Code Description Unit
SITE PREPARATION
Soil descriptions
For description of soil, trial pits, bore holes, existing services and work near
water please refer to 'Measurement Amplification And Pricing Factor'
Clearing undergrowth
Removing trees; cutting down and grubbing up roots; filling voids left with material
arising from excavation
Tree stumps; removing existing tree stumps and grubbing up roots; filling voids
left with material arising from excavation
Clear all vegetation, trees irrespective of girth, etc., all buildings, structures
or other obstructions which interfere with the execution of the work and ITEM
remove all debris off site; area approximately ......... hectares as per drawing
no. ............
Page 7 EXECAVATION
Code Description Unit
Cutting down trees and clearing site of undergrowth, bushes, scrub and
hedges and grubbing up their roots and filling voids left by removal of roots ITEM
with selected material arising from excavation; approximately ................M2
as per drawing no........
Cutting down trees and removing tree stumps (irrespective of girth), clearing
site of undergrowth, bushes, scrub and hedges and grubbing up their roots ITEM
and filling voids with selected material arising from excavation; area
approximately ....... Hectares, as per drawing no........
EXCAVATION
Page 8 EXECAVATION
Maximum depth exceeding ........m but not exceeding .......m (In No: ) M3
Page 9 EXECAVATION
Code Description Unit
DISPOSAL OF WATER
Surface water
Keeping the surface of the site and the excavations free from surface water ITEM
Ground water
Disposal on site
Topsoil
FILLING
Filling to excavation M3
Page 10 EXECAVATION
Filling to excavation; depositing in layers; 250mm maximum thickness M3
Hardcore as specified
.....mm x .....mm M
Sand as specified
Filling to excavation M3
Approved sand blinding laid and compacted in trench to receive pipe (pipe
measured separately)
..mm Wide x ..mm thick bed under ..mm diameter pipe, compact by
M
hand or mechanical rammer as specified
Information:
Page 11 EXECAVATION
Method of treatment shall be submitted to the S. O. for approval. All
relevant documents, certificate of approval, guarantee letter, brouchers and
technical catalogues shall be submitted to the S. O. before commencement NOTE
of works.
The Contractor shall be held responsible on all works done by the termite
NOTE
control company.
Surface treatment
Carry out anti termite treatment as specified to underside of the pile caps,
footings, ground beams and the lowest ground slabs and other structures M2
as directed by the S.O
Anti termite chemical soil treatment as specified to the whole site to the
M2
extent shown on drawing no.
ROCK SURFACE
Carry out the JKR Probes or Mackintoch to the depth as specified; each
probes should not be less than 30 blows/300mm penetration; all as per NO
S.O. Instruction
Page 12 EXECAVATION
Page 13 EXECAVATION
Code Description Unit
INFORMATION
For description of soil, trial pits, bore holes, existing services and work near
NOTE
water please refer to 'Measurement Amplification And Pricing Factor'
Starting Level
The piling work is expected to start at and measurement have been taken
NOTE
from level as shown on drawing No.........
Plant
Bringing to site and removing from site all plant required for this section of
ITEM
the work.
Maintaining on site all plant required for this section of the work. ITEM
M
Pre boring
EXTRA OVER for boring through rock; anticipated strata at ........m depth. M
Jetting M
.......mm Diameter high yield deformed bar as straight and bend bar; vertical
KG
....... - .......mm long.
Page 14 PILING
Code Description Unit
Allow for ....... number subsequent testing on a single .......mm Diameter pile
ITEM
to a total combined load of .......KN.
Dynamic Test
Allow for ....... numbers pile dynamic analyzer test (PDA) on ......mm
Diameter piles ITEM
Starting Level
The piling work is expected to start at and measurement have been taken
NOTE
from level as shown on drawing No.........
Plant
Bringing to site and removing from site all plant required for this section of
ITEM
the work.
Maintaining on site all plant required for this section of the work. ITEM
Micro Piles
Pre boring M
EXTRA OVER for boring through rock commencing average .......m below
M
starting level
Page 15 PILING
Code Description Unit
Allow for ....... number subsequent testing on a single .......mm Diameter pile
ITEM
to a total combined load of .......KN.
Dynamic Test
Allow for ....... numbers pile dynamic analyzer test (PDA) on ......mm
Diameter piles ITEM
Starting Level
The piling work is expected to start at and measurement have been taken
NOTE
from level as shown on drawing No.........
Plant
Bringing to site and removing from site all plant required for this section of
ITEM
the work.
Maintaining on site all plant required for this section of the work. ITEM
Preliminary Piles
Test Piles
Page 16 PILING
Cutting off top of pile to required level. NO
Allow for ....... number subsequent testing on a single .......mm Diameter pile
ITEM
to a total combined load of .......KN.
Dynamic Test
Allow for ....... numbers pile dynamic analyzer test (PDA) on ......mm
Diameter piles ITEM
Starting Level
The piling work is expected to start at and measurement have been taken
NOTE
from level as shown on drawing No.........
Plant
Bringing to site and removing from site all plant required for this section of
ITEM
the work.
Maintaining on site all plant required for this section of the work. ITEM
Preliminary Piles
Test Piles
Allow for ....... number subsequent testing on a single .......mm Diameter pile
ITEM
to a total combined load of .......KN.
Dynamic Test
Allow for ....... numbers pile dynamic analyzer test (PDA) on ......mm
Diameter piles ITEM
Starting Level
The piling work is expected to start at and measurement have been taken
NOTE
from level as shown on drawing No.........
Plant
Bringing to site and removing from site all plant required for this section of
ITEM
the work.
Maintaining on site all plant required for this section of the work. ITEM
.......mm x .......mm x .......kg/m Universal bearing piles complete with head and shoe
all as per Engineer's drawings
Preliminary Piles
Test Piles
Allow for ....... number subsequent testing on a single .......mm Diameter pile
ITEM
to a total combined load of .......KN.
Dynamic Test
Allow for ....... numbers pile dynamic analyzer test (PDA) on ......mm
Diameter piles ITEM
Starting Level
The piling work is expected to start at and measurement have been taken
NOTE
from level as shown on drawing No.........
Plant
Bringing to site and removing from site all plant required for this section of
ITEM
the work.
Maintaining on site all plant required for this section of the work. ITEM
Weldable steel, as specified grade ....... ; .......mm Interlock centres x .......mm web
x .......kg/m Frodingham section ref .......
Weldable steel, as specified grade 50B; 300mm Interlock centres x 150mm web x
50kg/m Larssen section ref ABC
EXTRA OVER for one coat Lowca Varnish, as specified type B;before driving M2
Page 20 PILING
Code Description Unit
CONCRETE WORK
Plain In-Situ Concrete Grade 7 as specified; blinding screed; laid on earth or hardcore
In apron slab
In ground slab
In ramp
Not exceeding 100mm thick; laid to slope not exceeding 15 degree from M3
horizontal
Not exceeding 100mm thick; laid to slope exceeding 15 degree from horizontal M3
100mm - 150mm Thick; laid to slope not exceeding 15 degree from horizontal M3
150mm - 300mm Thick; laid to slope not exceeding 15 degree from horizontal M3
Exceeding 300mm thick; laid to slope not exceeding 15 degree from horizontal M3
Page 21 CONCRETE
Code Description Unit
In foundations in trenches M3
In column stumps M3
In ground beams M3
In pile caps, trowelling top to slope not exceeding 15 degree from horizontal to
M3
unset concrete (In No. )
In pad footings, trowelling top to slope not exceeding 15 degree from horizontal to unset
M3
concrete (In No. )
In pad footings, trowelling top to slope exceeding 15 degree from horizontal to unset concrete (In M3
No. )
In apron slab
In ramp
Not exceeding 100mm thick; laid on hardcore to slope not exceeding 15 degree from horizontal
M3
Not exceeding 100mm thick; laid on hardcore to slope exceeding 15 degree from horizontal M3
100mm - 150mm Thick; laid on hardcore to slope not exceeding 15 degree from horizontal M3
100mm - 150mm Thick; laid on hardcore to slope exceeding 15 degree from horizontal M3
Page 22 CONCRETE
Code Description Unit
150mm - 300mm Thick; laid on hardcore to slope not exceeding 15 degree from horizontal M3
150mm - 300mm Thick; laid on hardcore to slope exceeding 15 degree from horizontal M3
Exceeding 300mm thick; laid on hardcore to slope not exceeding 15 degree from horizontal M3
Exceeding 300mm thick; laid on hardcore to slope exceeding 15 degree from horizontal M3
In suspended slab
In roof slab
In gutter slab
In coffered slab
In troughed slab
Not exceeding 100mm thick; laid to slope not exceeding 15 degree from M3
horizontal
Not exceeding 100mm thick; laid to slope exceeding 15 degree from horizontal M3
100mm - 150mm Thick; laid to slope not exceeding 15 degree from horizontal M3
150mm - 300mm Thick; laid to slope not exceeding 15 degree from horizontal M3
Exceeding 300mm thick; laid to slope not exceeding 15 degree from horizontal M3
In upstands beam M3
In kerbs M3
In copings M3
In sills M3
In wall
In fascia wall
In fins wall
In gutter wall
In top of dormers
In cheek of dormers
In floor beam M3
In roof beam M3
In isolated beam M3
In ring beam M3
In columns M3
In isolated columns M3
In isolated pillars M3
In stiffeners M3
Joints
In foundation in trenches
In isolated foundations
In ground beams
In pile caps
In pad footings
In column stumps
In apron slab
In floor slab
In suspended slab
In roof slab
In columns
In isolated pillars
In stiffeners
In floor beams
In roof beams
In upper beams
In ring beams
In wall
In fascia wall
In fins wall
In gutter wall
In top of dormers
In cheek of dormers
In isolated columns
In isolated beams
Page 26 CONCRETE
...mm Diameter; straight and bent KG
In foundation in trenches
In isolated foundations
In ground beams
In pile caps
In pad footings
In column stumps
In apron slab
In floor slab
In suspended slab
In roof slab
In columns
In isolated pillars
In stiffeners
In floor beams
In roof beams
Page 27 CONCRETE
In upper beams
In ring beams
In wall
In fascia wall
In fins wall
In gutter wall
In top of dormers
In cheek of dormers
In isolated columns
In isolated beams
Type BRC Ref. No. A193 weighing 3.02 kg/m2, lapped 225mm both sides M2
Type BRC Ref. No. A252 weighing 3.95 kg/m2, lapped 225mm both sides M2
Type BRC Ref. No. A318 weighing 4.99 kg/m2, lapped 225mm both sides M2
Type BRC Ref. No. A393 weighing 6.16 kg/m2, lapped 225mm both sides M2
Type BRC Ref. No. A565 weighing 8.88 kg/m2, lapped 225mm both sides M2
Type BRC Ref. No. .. weighing ..kg/m2, lapped ...mm both sides M2
Type BRC Ref. No. A.. weighing .. kg/m2, lapped ..mm both sides, as
M
tension strip ...........mm wide
Type BRC Ref. No. B385 weighing 4.53 kg/m2, 225mm side and 125 end laps M2
Type BRC Ref. No. B503 weighing 5.93 kg/m2, 225mm side and 125 end laps M2
Type BRC Ref. No. B636 weighing 6.97 kg/m2, 225mm side and 125 end laps M2
Type BRC Ref. No. B785 weighing 8.14 kg/m2, 225mm side and 125 end laps M2
Type BRC Ref. No. B1131 weighing 10.90 kg/m2, 225mm side and 125 end laps M2
Type BRC Ref. No. B.. weighing .. kg/m2, lapped ..mm both sides, as
M
tension strip ...........mm wide
Page 28 CONCRETE
Code Description Unit
To edges of beds
To edges of slabs
To ground beams
To Column Stumps
To soffits of coffered slabs square pan overall size 600mm x 600mm x 200mm deep
To soffits of staircases
To soffits of landings
Horizontal M2
Horizontal; soffits exceeding 3.50m high but not exceeding 5.00m high M2
Sloping not exceeding 15 degree from horizontal; soffits exceeding 3.50m high
M2
but not exceeding 5.00m high
Sloping over 15 degree from horizontal; soffits exceeding 3.50m high but not exceeding 5.00m
M2
high
To edges of slab
To risers
To faces of walls
To one side of wall, other side uphold by existing brick or concrete wall
Vertical surfaces M2
To ends of walls
To ends of battered walls, tapering .........mm at top and .........mm at bottom ends
To soffits of walls
Class F..... formwork as specified to beams, casings, cantilevers and the like
Class U..... formwork as specified to beams, casings, cantilevers and the like
Horizontal M2
Horizontal; soffits exceeding 3.50m high but not exceeding 5.00m high M2
Sloping not exceeding 15 degree from horizontal; soffits exceeding 3.50m high
M2
but not exceeding 5.00m high
Sloping over 15 degree from horizontal; soffits exceeding 3.50m high but not
M2
exceeding 5.00m high
Sloping over 15 degree from horizontal; soffits exceeding .............m high but
M2
not exceeding ...............m high
Columns
Pilasters
To sides of columns M2
To sides of pilasters M2
To sides of stiffeners M2
Page 32 CONCRETE
To sides of columns, tapering .......mm at top and ......mm at bottom ends M2
PRECAST CONCRETE
Lintels
Padstones
Heel stones
Cover slab
Pavement
Marker Post
Precast concrete Grade 25 as specified marker post, including all moulds finishing
on exposed surfaces and planted in ground, including symbol, lettering and
painting
COMPOSITE CONSTRUCTION
Information:
If in the opinion of the contractor, the precast components may be cast into
smaller/larger units, he should seek clarification and approval from the S.O. All
costs in connection with any amendments to the precast components shall be
borne by the contract
The contractor shall note that all unplastered surfaces to precast concrete shall
be finished smooth.He shall allow for this in his prices accordingly.
Rates to include for casting in conduits, forming chases, openings etc. for
mechanical and electrical installation.It is the contractor's responsibility to check
the extent of this work from the Mechanical and Electrical drawings.
Supply, load, transport, unload, handle and hoist the following precast concrete
components to required floor level from ground level including placing in position,
additional reinforcement, fixing and bedding, jointing and grouting, temporary formwork,
p
Beam Type ..........; size ..........mm x ..........mm x ..........mm high; fair finished to
all faces; hoisting to level 2 approximately ..........m high from ground level; as
per drawing no. ....................
Page 34 CONCRETE
Column Type ..........; size ..........mm x ..........mm x ..........mm high; fair finished
to all faces; hoisting to level 2 approximately ..........m high from ground level;
as per drawing no......................
Hollow cored slab panel Type ...........; size ..........mm x ..........mm x ..........mm NO
Thick; reinforced with lattice girder and main bar; complete with bracket, sealer
and peripheral ties; fair finished to all faces; hoist to .......... level approximately
Wall panel Type .........; ..........mm x ..........mm x ..........mm thick; complete with NO
and including all reinforcement, formwork/moulding blockouts, forming pockets
and irregular profiles, anchors, spacers, distance piece, fixings, attachments
Page 35 CONCRETE
Code Description Unit
BRICKWORK
FOUNDATION
Walls
Retaining walls
Lift walls
Core walls
Isolated piers
Page 36 BRICK
Code Description Unit
Walls
Retaining walls
Lift walls
Core walls
Isolated piers
Parapet walls
Balustrade walls
Kerbs
Gutter walls
EXTRA OVER; rough arches, bricks on end flat, ....mm thick, .... no. of rings M
EXTRA OVER; rough arches, bricks on edge flat, ....mm thick,... no. of rings M
EXTRA OVER; rough arches, segmental, .......mm thick, ...... no. of rings M
Projections
Plain bands; projecting .......mm x ......mm from face of wall; facing and
M
pointing margins; horizontal
Tapering Walls
Cutting pocket in existing works and extra material for bonding; ......mm thickness M
BRICK FACEWORK
Facing brick as specified; in cement and sand (1:6) and pointing as specified
Walls
Page 38 BRICK
Retaining walls
Lift walls
Core walls
Isolated piers
Parapet walls
Balustrade walls
Kerbs
Gutter walls
Half brick thick; entirely facing brick; curved ...... mm radius on face M2
75mm Thick brick on edge; entirely facing brick; curved ...... mm radius on face M2
One brick thick; entirely facing brick; curved ......mm radius on face M2
Facework to margin M
EXTRA OVER tile creasing; sunk ; ......... courses; ..........mm depth set-back; horizontal M
EXTRA OVER tile creasing; projecting; ......... courses; .......mm depth set-forward; horizontal M
Plain bands
Facework to dentil and corbel bands; one course of alternate stretchers and
headers, headers projecting 50mm from face of wall, stretchers flush; one M
course all headers projecting 50mm from face of wall; facing and pointing
margins; 150mm wide; horizontal
Quoins
Facework to quoins; flush; ......mm average girth; straight jointed to general facework M
Flat arches; .......mm width on face; ..........mm width of exposed soffit; bricks-on-edge M
Flat arches; ........mm width on face; ..........mm width of exposed soffit; bricks-on-ends M
Segmental arches; ........mm width on face; ..........mm width of exposed soffit; bricks-on-ends M
Semi-circular arches; ........mm width on face; ..........mm width of exposed soffit; bricks-on-en M
Bullseyes arches; ........mm width on face; ..........mm width of exposed soffit; bricks-on-ends M
Page 40 BRICK
Tumblings of buttresses size ........mm x ......mm; bricks-on-end M
Sills; single cant as specified bricks-on-edge; pointing top and one side
Sills; single bullnose as specified bricks-on-edge; pointing top and one side
Copings; double bullnose as specified bricks-on-edge; pointing top and each side
Kerbs; single bullnose as specified bricks-on-edge; pointing top and one side
225mm x 113mm; horizontal; set weathering; projecting 100mm from general face of wall M
Page 41 BRICK
Bonding ends to existing brick facework
Half brick walls; cutting 110mm x 110mm x 235mm pockets and block
M
bonding - 1 no./m; extra material
One brick walls; cutting 235mm x 110mm x 235mm pockets and block
M
bonding - 1no./m; extra material
BLOCKWORK
Concrete hollow blocks as specified; in white coloured cement mortar (1:6); flush smooth
pointing as work proceeds; work designed to be built without cutting blocks
Walls or partitions
Isolated casings
......mm Thick M2
........mm thick of two ........mm thick skins; galvanised expanded steel mesh
M2
ties - 4/m2 built in; finishing fair and pointing each side
EXTRA OVER; filling ends of hollow blocks with clay slips in cement mortar (1:4) M
Page 42 BRICK
EXTRA OVER; solid end blocks M
........mm Blockwork; cutting ........mm deep pockets and bonding every third
M
course; extra material
Glass block as specified, jointing in cement mortar (1:4); flush smooth pointing in
white cement as work proceeds; work designed to be built without cutting blocks
Walls or partitions
.....mm Thick M2
On horizontal surfaces
On raking surfaces
On vertical surfaces
On curved surfaces
..........mm Wide M
On horizontal surfaces
On curve surfaces
Cavity tray unit; 253mm maximum girth x 400mm long; three times bent;
NO
forming cavity gutters in hollow wall
SUNDRIES
Raking out joints in brickwork for turned in edges of flashings; pointing with
cement mortar (1:3)
Raking out joints in existing brickwork for turned in edges of flashings; pointing
with cement mortar (1:3)
Raking out and enlarging joints in brickwork for nibs of asphalt; pointing with
cement mortar (1:3)
Raking out and enlarging joints in existing brickwork for nibs of asphalt; pointing
with cement mortar (1:3)
Horizontal M
Raking M
Stepped M
Vertical M
Curved M
Page 44 BRICK
Expansion joints in blockwork
15mm Wide; vertical; in 230mm thick wall; filling with approved filler as
M
specified, pointing each side
50mm Wide x 100mm high; lugs to brick jambs; plugging and screwing to
NO
brick sill and concrete head
Building in metal windows; cutting and pinning lugs; bedding in cement mortar
(1:3), pointing with approved standard mastic one side
50mm Wide x 100mm high; lugs to existing brick jambs; plugging and
NO
screwing to brick sill and concrete head
50mm Wide x 100mm high; plugging and screwing to brick jambs and sill
NO
and concrete head
Forming openings
.........mm x .........mm ; through .........mm brick wall; making good fair face
NO
or facings one side Page 45 BRICK
.........mm x .........mm ; through .........mm brick wall; making good fair face
NO
or facings one side
Air bricks as specified, clay; square hole pattern; building into prepared openings
.......mm span, .......mm wide; ......mm rise; supports 3.50m - 5.00m high NO
Page 46 BRICK
Page 47 BRICK
Code Description Unit
MASONRY
Walls
Facework built against 230mm backing with 3.5mm wall ties - 4/m2 built in;
cutting and pinning to existing work
Natural stone rubble work as specified; bedding and jointing in mason's mortar
(1:3:12); flush smooth pointing as work proceeds; slurrying with weak lime mortar
and cleaning down on completion
Walls
Facework built against 230mm backing with 3.5mm wall ties - 4/m2 built in;
cutting and pinning to existing work
Page 48 MASONRY
Page 49 MASONRY
Code Description Unit
Linings to cesspools; two coats of asphalt, totalling 20mm thick; to concrete base
Linings to sumps; two coats of asphalt, totalling 20mm thick; to concrete base
Page 50 WATERPROOFING
Code Description Unit
Collars to pipes or the like; two coats of asphalt, totalling 20mm thick to metal
base; priming base with bitumen
PAVING
Page 51 WATERPROOFING
Code Description Unit
ROOFING
Roofing as specified (limestone aggregate); covering with 13mm limestone chippings in hot
bitumen; sheathing felt isolating membrane as specified butt joints
Roofing as specified; (natural rock aggregate); covering with 13mm white spar
chippings in hot bitumen; glass fibre tissue isolating membrane; 25mm resin
bonded glass fibre slab underlay; 0.127mm polythene vapour barrier; bonding
underlay to vapour barrie
Coverings; 2 coats of asphalt, totalling 20mm thick; bonding underlay with hot
bitumen compound to concrete base, priming base with bitumen
Coverings; 2 coats of asphalt, totalling 20mm thick; fixing lathing with galvanised
steel clout nails to timber
Page 52 WATERPROOFING
Fascias; 2 coats of asphalt, totalling 20mm thick, no isolating membrane; to
concrete base; priming base with bitumen
Skirtings; 2 coats of asphalt, totalling 20mm thick; fixing lathing with galvanised
steel clout nails to timber base
Average 80mm wide on face; internal angle fillets - 1; turning into grooves - 1 M
100mm Wide on face, on roof slopes; internal angle fillets - 1; dressing over
M
tilting fillets - 1; subsequently covered
SUNDRIES
Roof ventilators
Hydrovent Type ..........; fixing with galvanised steel screws to concrete; plugging NO
Page 53 WATERPROOFING
Page 54 WATERPROOFING
Code Description Unit
ROOFING
Roof coverings; clay tiles as specified; fixing, lapping and battens all as per
manufacturer's instructions
Wall cladding; plain concrete tiles as specified; fixing, lapping and battens all as
per manufacturer's instructions
Vertical M2
Page 55 ROOFING
Code Description Unit
Roof coverings; asbestos cement slates as specified; fixing each slate with one
copper disc rivet and two copper nails to 100mm lap; 38mm x 25mm timber
battens fixed with aluminium alloy round plain head nails
EXTRA OVER for triple course at eaves, with under eaves course slates,
M
eaves course slates and standard slates
EXTRA OVER for triple course at eaves, with under eaves course slates,
M
eaves course slates and standard slates; raking
EXTRA OVER for triple course at eaves, with under eaves course slates,
M
eaves course slates and standard slates; curved, radius ........mm
EXTRA OVER for double course at top edges; curved, radius ..........mm M
EXTRA OVER for ridge tiles, angular; in ........mm effective lengths; socketed; M
supplementary fixing with copper disc rivets and stainless steel clips
EXTRA OVER for ridge tiles, 120 degrees roll top angular; in .......mm effective M
lengths; rebate jointed; supplementary fixing with stainless steel clips
EXTRA OVER for ridge tiles, half round tapering; in .........mm effective
lengths; lap jointed; supplementary fixing with copper disc rivets and M
stainless steel clips
Cladding; asbestos cement slates as specified; fixing each slate with one copper
disc rivet and two copper nails to 100mm lap; 38mm x 25mm timber battens fixed
with aluminium alloy round plain head nails
Vertical M2
Page 56 ROOFING
Code Description Unit
Underlay
EXTRA OVER for sheets with soaker flanges for ........mm diameter pipes NO
Page 57 ROOFING
Code Description Unit
Vertical M2
Underlay
Vertical M2
Page 58 ROOFING
Approved equivalent vertical angle capping to match metal decking M
Underlay
.............. sided aluminium foil insulation as specified; 50mm thick fibre glass
quilt, weighting not less than 9.60 kg/m3; laid on 13mm galvanised chicken M2
wire netting with requisite trying wire
Flashings; galvanised iron sheet as specified; ........ gauge; 150mm lapped joints;
fixing with matching clips and wedges
Flashings; zinc sheet as specified; ........ gauge; 150mm lapped joints; fixing with
matching clips and wedges
.........mm Girth; ........ times bent; top edges dressed over battens M
..........mm Girth; one ends wedging into grooves; other ends dressing along
M
corrugations of roof tiling
Gutters; galvanised iron sheet as specified; ..... gauge linings to sloping gutters;
fixing with zinc clips
Gutters; zinc sheet as specified; ..... gauge linings to sloping gutters; fixing with
zinc clips
Gutters; aluminium sheet as specified; ..... gauge linings to sloping gutters; fixing
with zinc clips
..........mm Girth M
Page 59 ROOFING
Page 60 ROOFING
Code Description Unit
WOODWORK
FLOORS
..........mm x ..........mm M
....mm x ....mm in one continuous lengths exceeding 5.00m but n.e. 5.60m M
........mm Thick M2
Skirting
.......mm x .......mm M
Page 61 WOODWORK
.......mm x .......mm; . M
...mm diameter holes through ....mm thick timber; all as per drawing No. .... NO
Not exceeding 0.025m2 cross section area through 150mm thick timber NO
Not exceeding 0.025m2 cross section area through .........mm thick timber NO
Exceeding 0.025m2 but not exceeding 0.050m2 cross section area through
NO
150mm thick timber
.........mm Diameter M.S. bolts; .........mm long, including drilling through and
NO
fixing to.........mm thick timber
.........mm Diameter M.S. bolts; .........mm long, including drilling through and
NO
fixing to.........mm thick timber ; all as per drawing No. .........
16mm Diameter M.S. anchor bolt; 200mm long with one end bend and cast
NO
into concrete
16mm Diameter M.S. anchor bolt; 200mm long with one end fishtailed and
NO
cast into concrete
.........mm Diameter M.S. anchor bolt; .........mm long with one end fishtailed
NO
and cast into concrete
..........mm x ..........mm M
....mm x ....mm in one continuous lengths exceeding 5.00m but n.e. 5.60m M
Sheet Linings and Casings to sides of isolated column, reveals of opening, pipe
casings and the like Page 63 WOODWORK
Sheet Linings and Casings to sides of isolated column, reveals of opening, pipe
casings and the like
Cement Board
Fibrous Plasterboard
Plastic Sheet
Edges of isolated column, reveals of opening, pipe casings and the like
Cement Board
Fibrous Plasterboard
Plastic Sheet
Architraves
.......mm x .......mm M
....mm diameter holes through ....mm thick timber; all as per drawing No. ..... NO
Not exceeding 0.025m2 cross section area through .........mm thick timber NO
.........mm Diameter M.S. bolts; .........mm long, including drilling through and
NO
fixing to.........mm thick timber
.........mm Diameter M.S. bolts; .........mm long, including drilling through and
NO
fixing to.........mm thick timber ; all as per drawing No. .........
..mm Diameter M.S. anchor bolt; ..mm long with one end bend and cast
NO
into concrete
Page 65 WOODWORK
..mm Diameter M.S. anchor bolt; ..mm long with one end fishtailed and
NO
cast into concrete
INSULATIONS
..... insulation; ....mm thick as specified all as per Manufacturer's detail and
drawing No ........
CEILINGS
Page 66 WOODWORK
..........mm x ..........mm Beading in one continuous lengths
M
exceeding ........m but n.e. ......m
Boarding to ceiling or beams, tongued, grooved and veed joints laid diagonally
..mm thick; horizontal; not exceeding 3.50m high above floor level M2
.......mm thick; horizontal; exceeding 3.50m but not exceeding 5.00m high
M2
above floor level
.......mm thick; sloping; not exceeding 3.50m high above floor level M2
.......mm thick; sloping; exceeding 3.50m but not exceeding 5.00m high
M2
above floor level
........mm thick; sloping; exceeding ..........m but not exceeding ..........m high
M2
above floor level
.......mm thick; horizontal; secret fixing; not exceeding 3.50m high above
M2
floor level
........mm thick; sloping; secret fixing; not exceeding 3.50m high above floor
M2
level
.......mm thick; sloping; secret fixing; exceeding 3.50m but not exceeding
M2
5.00m high above floor level
........mm Thick, NO
Page 67 WOODWORK
........mm Thick, .........mm wide M
Sheet linings and casings to sides and soffit of beams and ceilings
Cement Board
Fibrous Plasterboard
Plastic Sheet
.. Board
....mm x ....mm x ....mm Thick set out symetricall from centre of room;
M2
horizontal
....mm x .....mm x ....mm Thick set out symetricall from centre of room;
horizontal; exceeding 3.50m but not exceeding 5.00m high from ground M2
floor level
....mm x .....mm x ....mm Thick set out symetricall from centre of roo;
horizontal; exceeding ...m but not exceeding ...m high from ground floor
M2
level
....mm x ....mm x ...mm Thick set out symetricall from centre of room;
M2
sloping Page 68 WOODWORK
....mm x ....mm x ...mm Thick set out symetricall from centre of room;
M2
sloping
....mm x .....mm x ....mm Thick set out symetricall from centre of room;
sloping; exceeding 3.50m but not exceeding 5.00m high from ground floor M2
level
....mm x .....mm x ....mm Thick set out symetricall from centre of room;
M2
sloping; exceeding ...m but not exceeding ....m high from ground floor level
....mm x ....mm Thick; ....mm wide; set out symetricall from centre of room;
M
horizontal
......mm x ....mm Thick; ....mm wide; set out symetricall from centre of
room; horizontal; exceeding 3.50m but not exceeding 5.00m high from M
ground floor level
......mm x ...mm Thick; ....mm wide; set out symetricall from centre of room;
horizontal; exceeding ....m but not exceeding ...m high from ground floor M
level
EXTRA OVER for forming ........mm x ........mm access panel; not exceeding
NO
3.50m high from floor level
.......mm diameter holes through .......mm thick timber; all as per drawing
NO
No. ...........
Not exceeding 0.025m2 cross section area through .........mm thick timber NO
Wall plate
Valley rafter
Hip rafter
Page 69 WOODWORK
Joist
Strut
Bracing
Post
Purlin
Ridge board
......mm x ......mm M
....mm x ....mm in one continuous lengths exceeding 5.00m but n.e. 5.60m M
The following roof truss Type TT1, overall span 7850mm long x 2300mm high
including hoisting into position approximately 16.80m high from ground floor
level; all as per Drawing No.......... (In Nos. 1)
The following roof truss Type .........., overall span ..........mm long x ..........mm
high including hoisting into position approximately ..........m high from ground
floor level; all as per Drawing No.......... (In Nos. ......)
Roof Trusses
Supply and erect timber roof truss Type ....... comprising of rafter, strut, tie
beam and etc., overall span ........mm long and ........mm high, all jointed
together with and including all necessary fixing accessories all as per drawing
No............
Page 70 WOODWORK
Paternted Roof Trusses
Notes:
Design, supply and erect timber roof truss Type TT1 comprising of rafter, strut,
tie beam and etc., overall span 7850mm long and 2300mm high, all jointed
together with and including all necessary fixing accessories
Design, supply and erect timber roof truss Type ....... comprising of rafter, strut,
tie beam and etc., overall span ........mm long and ........mm high, all jointed
together with and including all necessary fixing accessories
........mm thick M2
.......mm x ........mm M2
.....mm x ....mm x ....mm Thick mild steel plates cut and bend to shape NO
.........mm Diameter M.S. bolts; .........mm long, including drilling through and
NO
fixing to.........mm thick timber
Page 71 WOODWORK
........mm Diameter M.S. bolts; .........mm long, including drilling through and
NO
fixing to.........mm thick timber ; all as per drawing No. .........
........mm Diameter M.S. anchor bolt; .........mm long with one end bend and
NO
cast into concrete
........mm Diameter M.S. anchor bolt; .........mm long with one end fishtailed
NO
and cast into concrete
DOORS
Flush Door
Timber doors; .....mm thick as specified complete with all necessary timber
framing
Overall size ....mm x .....mm high door (Type ...) all as per drawing No ..... NO
Panelled Door
Louvred Door
Timber doors; .....mm thick as specified complete with all necessary timber
framing
Overall size ....mm x .....mm high door (Type ...) all as per drawing No ..... NO
Timber door; ..... hour rated as specified; all manufactured to the approval of
Fire Authorities including obtaining the related testing certificates
Timber door; ..... hour rated as specified all as per Manufacturer's detail and to
the approval of Fire Authorities including obtaining the related testing
certificates
Timber door; ..... hour rated as specified complete with all necessary timber
framing and ironmongeries; all manufactured to the approval of Fire Authorities
including obtaining the related testing certificates
Overall size ....mm x .....mm high door (Type ...) all as per drawing No ..... NO
PVC Door
Page 72 WOODWORK
Supply and fix in position approved PVC door complete with all necessary
timber framing
Overall size ....mm x .....mm high door (Type ...) all as per drawing No ..... NO
Jamb
Head
Mullion
Transome
Overall size ....mm x ....mm high (Type ....) all as per drawing No................. NO
Overall size ....mm x ....mm high (Type ....) all as per manufacturer's detail
NO
and drawing No .....
Overall size ....mm x ....mm high door (Type ....) all as per drawing No....... NO
Overall size ....mm x ....mm high (Type ....) all as per manufacturer's detail
NO
and drawing No .....
Architraves
Cover Fillet
Stops
Glazing beads
.......mm x .......mm M
Page 73 WOODWORK
.......mm x .......mm; countersinking and pellating M
.......mm x .......mm; M
.......mm x .......mm; M
Ironmongery
Supply and fix the following ironmongery to timber or metal including providing
requisite matching screws all as per drawing No..............
Supply and fix the following ironmongery to timber or metal including providing
requisite matching screws all as per manufacturer's details
Lockset
Upright three lever mortices lockset with stainless steel finish lever handles
NO
furniture
Upright three lever mortices lockset with satin chrome finish lever handle
NO
furniture
Cylindrical lockset with satin chrome steel finish lever handles furniture NO
Cylindrical lockset with stainless steel finish lever handle furniture approved
NO
manufacture fixed to timber door
Casement lockset NO
Bathroom hook NO
Hinges
Page 74 WOODWORK
`.......' or approved equivalent ........mm x ....mm x ......mm thick stainless
NO
steel hinges
Cranked hinges NO
Hurling hinges NO
Lift-off hinges NO
Rising hinges NO
Spring hinges NO
Tee hinges NO
Floor spring
Door closer
Door stopper
Catches
Magnetic catches NO
Mortices catches NO
Roller catches NO
Accessories
Composite Window
Sash Window
Window Surrounds
Latern Lights
Skylight Sets
Overall size .....mm x .....mm high window (Type ...), complete with all
necessary framing, accessories, beading, fixing screws and glazing panel NO
(measured seperately) all to manufacturer's detail
Overall size .....mm x .....mm high window (Type ...), complete with all
necessary framing, accessories, beading, fixing screws and ............. NO
glazing panel all to manufacturer's detail
Overall size .....mm x .....mm high window (Type .....) all as per drawing
No ...... NO
Cill
Architraves
Cover Fillet
Stops
Glazing beads
Window Boards
Nosings
Bed Moulds
.......mm x .......mm M
....mm wide x ....mm high (overall) in ..... No of .......mm thick x .....mm wide
NO
steps and landing all as per drawing No .........
BALUSTRADES
Overall size .....mm x .....mm high (Type ...) timber balustrades including all
NO
connection joints; all as per drawing No.................
Overall size .....mm x .....mm high (Type ...) decorative timber balustrades
NO
including all connection joints; all as per drawing No...........
Timber Grille
Page 77 WOODWORK
Handrails
Picture Rails
Dado Rails
.......mm x .......mm M
FITTINGS
Kitchen cabinet; overall size .....mm x .......mm x ........mm high (Type .....)
NO
as per drawing No.........
High level wall hung cabinet; overall size .....mm x ......mm x .........mm high
NO
(Type.......) as per drawing No.........
'L' Shaped cabinet; overall size .....mm x ......mm x ........mm high (Type .....)
NO
as per drawing No.........
....... cabinet; overall size .......mm x .......mm x ........mm high (Type .....) as
NO
per drawing No.........
Solid surface 'L' shaped counter; overall size ......mm x .......mm x ........mm
NO
high (Type.....) as per drawing No.........
.......mm x .......mm M
Page 79 WOODWORK
Code Description Unit
STRUCTURAL STEELWORK
INFORMATION
UNFABRICATED STEELWORK
Hot Rolled Structural Steel Works as specified welded fabrication and bolted site
connections
Beams
Girders
Columns
Stanchions
Purlins
Joist
Hanger
Single members; .....mm x .....mm x ..... kg/m universal beams; each .....mm
KG
long; (In No .....)
Single members; .....mm x .....mm x ..... kg/m Lip channel; each .....mm
KG
long; (In No .....)
Single members; .....mm x .....mm x ..... kg/m angle; each .....mm long; (In
KG
No .....)
Single members; .....mm x .....mm x ...... kg/m angle cleat; each .....mm
KG
long; (In No .....)
Single members; .....mm x .....mm x ..... kg/m Hollow section each .....mm
KG
long; (In No .....)
KG
Single members; .....mm x .....mm x ..... kg/m; each .....mm long; (In No .....)
FABRICATED
Hot Rolled Structural Steel Works as specified welded fabrication and bolted site
connections; at ..... Level
Cold Formed Structural Steel as specified fabricated, welded and bolted; at .....
Level
Built-up members; Portal frames; at ... level; as per drawing no ... (In No .....)
....mm x .....mm x ..... kg/m; universal columns; each ....mm long;(In No ...) KG
.....mm x .....mm x.... kg/m; universal beams; each .....mm long; (In No ...) KG
Built-up members; Roof trusses; at ..... level, overall size each .....mm
span, .....mm high rise, as per drawing No ..... (In No .....)
.....mm x .....mm x ..... kg/m rafter each .....mm long; (In No .....) KG
.....mm x .....mm x ..... kg/m strut each .....mm long; (In No .....) KG
.....mm x .....mm x ..... kg/m tie each .....mm long; (In No .....) KG
.....mm x .....mm x ..... kg/m tie beam each .....mm long; (In No .....) KG
Fittings
Notes:
Pitch roof with and including all necessary supports and associated ITEM
members as specified, overall area approximately .....m2
(measured flat on plan) including design and built, supply,
fabrication, erection, fixing and hoisting in position
Flat roof with and including all necessary supports and associated ITEM
members as specified, overall area approximately .....m2
(measured flat on plan) including design and built, supply,
fabrication, erection, fixing and hoisting in position
SURFACE TREATMENT
Surface treatments off site; blast cleaning; one coat red lead primer
Surface treatments off site; blast cleaning; one coat zinc chromate primer
Surface treatments off site; power wire brushing; two coats red lead primer
Surface treatments off site; blast cleaning; one coat epoxy resin two pack zinc
rich primer; one coat calcium plumbate primer
ERECTION
Erection of structural steelwork including all sites operations and off loading
METALWORK
DOORS
Sliding door; glazed with ....mm thick ..... sheet glass; complete to
manufacturer's detail; as per drawings No ......
Glass door; glazed with ....mm thick ..... sheet glass; complete to
manufacturer's detail; as per drawings No ......
WINDOWS
Casement window; glazed with .....mm thick ....... sheet glass; complete to
manufacturer's detail; as per drawings No ......
Casement window; consisting of .....no top hung panels and .....no side hung
panels; glazed with .....mm thick ...... sheet glass; coupling mullion,
assembling; fixing by bolting; fixing with screws complete with matching
restrainer and latch set and .......
...... in aluminium framing, including all necessary fixing and all as per
drawings No .......
NO
Page 85 METALWORK
.......mm Wide x ..... mm length
Stainless steel
Wrought iron
Staircases; composite
.....mm x .....mm (overall length); in ..... no. of risers and ..... no. of landings NO
Handrails
Handrails brackets NO
Isolated balustrades
Newels
SUNDRIES
Stainless steel
Wrought iron
Page 86 METALWORK
Code Description Unit
.....mm x .....mm x .....mm ; Storage racks; Type ...; as per drawings No .... NO
Grilles
Grilles complete with framing, ironmongeries and painting, all as per drawings
No .....
Security grille comprising of .....mm x .....mm x .....mm thick framing and filled
with .....mm diameter rod at every .....mm centres and set vertically in welded
joints; as per drawings No .....
Grille panel; fixed to concrete and brickwall with and including requisite fixing
and plates; all as per drawings No .....
Gratings
Grating comprising of .....mm .....mm x .....mm thick angle framing and filled
with .....mm diameter rod at every .....mm centres and set vertically in welded
joints
Grating for sump cover, all welded connections, comprising ....mm x .....mm
x ....mm thick angle framing welded to anchor bar with fishtail and embedded
to concrete, ....mm thick cover framing and filled with ......mm diameter bar
at ....mm centres ..
Ladders
Refuse bin
Letter box
Letter box; stainless steel with seamless welding construction and smooth
polish; with individual compartments each size ....mm x ....mm x .....mm deep;
openable front panel with requisite lockset and keys fixed to concrete or
brickwall including all necessary.............
Clothes lines
PLATES, BARS
Floor plates
Expanded metal
Page 89 METALWORK
Code Description Unit
Supply pipes and fittings, from and including first stopcock from incoming
mains to water storage tanks to sanitary appliances and scour and overflow ITEM
pipes from water storage tanks, including all necessary excavation,
connections with requisite connectors
Poly water tank as specified complete with all accessories and fittings
of approved manufacturer to JBA approval, hoisted and placed in
position at approximately .......mm above ground level in accordance to
manufacturer's instruction all as per drawing No.
Waste water, soil and vent pipes with and including all requisite fittings from
sanitary appliances and from floor traps and outlet grating to connecting ITEM
manholes or water channel drains including all necessary excavation,
concrete casing around pipework,..............
Page 90 PLUMBING
Code Description Unit
Supply and fix the following Sanitary Fittings and accessories, including jointing
and connecting to services and soil and waste pipes and making good all work
disturbed; internally
Basin
Approved 560mm x 410mm x 300mm deep in vitreous china for clinical with
one 30mm diameter chromium-plated tap,one vitreous china blank tap hole NO
stopper, 30mm diameter chromium-plated waste outlet trap with 40mm seal
and set in opening in concrete worktop
Approved 560mm x 410mm vitreous china counter top vanity basin
complete with plastic bottle trap; waste plug and chain complete with pillar
tap; bright chrome plated with metal handle including making good wall NO
tiling around
Sink
Approved 1200mm x 410mm x 300mm deep stainless steel with single bowl
with single drainer complete with two 30mm diameter chromium-plated NO
inclined high neck pillar tap, 30mm diameter chromium-plated waste outlet
fittings with plugs and chain stay, ........
Water Closet
Supply and fix disable toilet set equipment in pack set for the disabled
NO
unisex water closet facility complete as per drawing no.
Approved back inlet squatting in white vitreous china pan with S or P trap
conversion bend; complete with pair of tread plates and high level cistern NO
with flush pipe, cover and brackets with 20mm diameter ball valve and
chromium plated chain pull; bedding .......
Shower
Approved equivalent complete with arm and hand wall flanged with stop
NO
cock handle
Soap Holder
Soap Dispenser
Page 91 PLUMBING
Approved equivalent 100mm x 100mm x 300mm deep; 1 litres in container
with elbow arm level dispensing complete with key insert opening and self NO
locking cover.
Robe Hook
Towel Rail
Screw to wall complete with 900mm chrome plated bar, plastic rail insert
NO
and accessories fixing screws and plug
Approved hand bidet set with 12mm chrome plated right angle valve with
ball level metal handle and quarter-turn ceramic disc headparts complete NO
with flexible hose with nozzle spray and wall hook.
Mirror
Floor Trap
Cast iron half round gutters and fittings; bolted and mastic joints
uPVC half round gutters and fittings; push fit connector joints;
gutterwork and supports self coloured grey as specified
uPVC box gutters and fittings; push fit connector joints; gutterwork and
supports self coloured grey as specified
100 mm diameter; joints in the running length; supports at average 500 centres
Page 92 PLUMBING
In standard fascia brackets fixed with self tapping screws to plain metal M
In standard galvanized steel side rafter brackets fixed with galvanized bolts
M
to plain metal
uPVC pipes and fittings; push fit joints; pipework and supports self coloured grey
as specified; externally
Laid in position M
Sundries
.mm Diameter NO
Dome complete with frame and mesh grating embedded to concrete and suit to
..mm diameter pipe outlet
.mm Diameter NO
Page 93 PLUMBING
Code Description Unit
BUILDER'S WORK
Stool
Rolled steel joist water tank support, hoisted and placed in position at
approximately 3500mm above ground floor level, and painted with one
coat undercoat and one coat gloss enamel paint
Plinth
TESTING
Pipework
On completion of the plumbing installation test all cold water piping ITEM
and make good any defects and leave the whole in perfect working
order to the entire satisfaction of the Superintending Officer
Sanitary Installation
Page 95 PLUMBING
Page 96 PLUMBING
Code Description Unit
FLOOR
In situ Finishings
..mm Thick to floors; level, falls,falls and crossfalls and to slope not
M2
exceeding 15 degrees from horizontal
..mm Thick to floors; level, falls, falls and crossfalls and to slope
M2
exceeding 15 degrees from horizontal
.mm Thick to receive tile; level, falls, falls and crossfalls and to slope not
M2
exceeding 15 degree from horizontal; on concrete base
.mm Thick to receive tile; level, falls, falls and crossfalls and to slope
M2
exceeding 15 degree from horizontal; on concrete base
Page 97 FINISHES
Code Description Unit
Level, falls, falls and crossfalls and to slope not exceeding 15 degrees from
M2
horizontal
Level, falls, falls and crossfalls and to slope exceeding 15 degrees from
M2
horizontal
Level, falls, falls and crossfalls and to slope not exceeding 15 degrees from
M2
horizontal; work to a pattern or in more than one colour as per drawing No.
Page 98 FINISHES
Work in one piece overall size ..mm x...mm as per drawing No. NO
Work in one piece overall size ..mm x...mm as per drawing No. NO
Sundries
WALL
In situ Finishings
Page 99 FINISHES
Code Description Unit
To wall M2
To wall; work to a pattern or in more than one colour as per drawing No. M2
To isolated column M2
Work in one piece overall size ..mm x ..mm as per drawing No. NO
Moulding
Glass Reinforced Concrete as per manufacturer's instruction and S.O's
approval
Fibrous Plaster
Plain slab covering ...mm thick on and including all necessary framing; butt
joint and filled with approved filling as per drawing No.
Panelled slab covering ..mm thick on and including all necessary framing;
butt joint and filled with approved filling as per drawing No.
To wall M2
To isolated column M2
To isolated pilaster M2
CEILING
In situ Finishings
Approved ..mm thick skim coat as per manufacturer's instruction and S.O's
approval
..mm Thick to ceiling on concrete work surface; ..m -..m above floor
M2
level
..mm Thick to top, sides and soffit of isolated beam; 3.50m - 5.00m above
M2
floor level
..mm Thick to top, sides and soffit of isolated beam; ...m - ..m above
M2
floor level
Moulding
EXTRA OVER for forming ..mm x ...mm access panel and including all NO
necessary framing
EXTRA OVER for forming ..mm x ..mm access panel and including all NO
necessary framing
Fibrous Plaster
Linings to ceilings M2
STAIRCASE AREA
In situ Finishings
..mm Thick to landing slab; level,falls, falls and crossfalls and to slope not M2
exceeding 15 degrees from horizontal
...mm Thick to landing slab; level,falls, falls and crossfalls and to slope M2
not exceeding 15 degrees from horizontal
To landing slab; level,falls, falls and crossfalls and to slope not exceeding M2
15 degrees from horizontal
Fitted Carpeting
Underlay
To landing slab; level,falls, falls and crossfalls and to slope not exceeding M2
15 degrees from horizontal
Riser;..mm high M
To landing slab; level,falls, falls and crossfalls and to slope not exceeding M2
15 degrees from horizontal
Riser;.mm high M
Lining on both sides with and including zinc coated frameworks and all
necessary accessories all as per drawing No.
Lining on both sides with and including aluminium frameworks and all
necessary accessories all as per drawing No.
GLAZING
GLASS IN OPENINGS
0.10m2 - 0.50m2
0.50m2 - 1.00m2
Over 1.00m2
Glass Louvres
Size ....mm long x ....mm wide x ....mm thick with grouted edges and
house in grooves of timber frame
Size .....mm long x .....mm wide x .....mm thick with grouted edges and
house in grooves of metal frame
Size .....mm long x .....mm wide x .....mm thick with grouted edges and
house in clips of adjustable louvred metal frame
Labours On Glass
.......mm long x.......mm wide onto .......mm long x .......mm wide x .......mm
thick pane; fully obscured
Embossing
Code Description
Patent Glazing
Domelights
............ glass as specified, .....mm x .....mm x .....mm high overall size all
as per drawing No.....
MIRRORS
.....mm x .....mm x .....mm Thick approved bevelled edge plate glass mirror
complete with 20mm thick waterproof plywood backing and fixed with
chromium plated dome headed fixing screws and cork washers
M2
M2
M2
M2
M2
M2
Unit
M2
M2
M2
M2
NO
NO
NO
NO
NEW WORK
Walls
Painting to Woodwork
Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified
Painting to Metalwork
Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified
...... coat red iron oxide metal primer and ...... coats high gloss enamel
paint as specified
Ceilings
Code Description
Painting to Woodwork
Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified
Painting to Metalwork
Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified
..... coat red iron oxide metal primer and ..... coats high gloss enamel
paint as specified
Code Description
Painting to Woodwork
Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified
Painting to Metalwork
Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified
Cornices
Painting to Woodwork
Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified
Code Description
Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified
Floor
Painting to Woodwork
Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified
Code Description
Painting to Metalwork
Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified
Structural Metalwork
Painting to Metalwork
Etching one coat metallic primer, one undercoat and two coats
gloss enamel paint as specified
..... coat red iron oxide metal primer and ..... coats high gloss
enamel paint as specified
Code Description
Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified
Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified
..... coat red iron oxide metal primer and ..... coats high gloss enamel
paint as specified
Code Description
Gutters
Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified
Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified
Signwriting
xxxxxxx
Decorative Paper
xxxxxxx
NO
M2
M2
M2
NO
M2
NO
M2
NO
M2
M2
M2
M2
Unit
NO
M2
NO
M2
M2
M2
M2
Unit
NO
M2
M2
M2
M2
Unit
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Unit
M2
M2
M2
M2
M2
M2
M2
M2
NO
M2
Unit
M2
M2
M2
M2
M2
M2
M2
Unit
M2
M2
M2
M2
M2
M2
M2
DRAINAGE
EXCAVATION
Soil descriptions
For description of soil, trial pits, bore holes, existing services and work near
Note
water please refer to 'Measurement Amplification And Pricing Factor'
Excavating trenches starting from formation level; earthwork support, part return,
fill in and ram and remainder deposit, spread and level within site
To receive drain pipes not exceeding 200mm nominal size, not exceeding
M
2.00m average 1.00m deep
To receive drain pipes not exceeding 200mm nominal size, not exceeding
M
2.00m average 1.00m deep, curved on plan
To receive drain pipes not exceeding 200mm nominal size, .....m - .....m;
M
average .....m deep
To receive drain pipes not exceeding 200mm nominal size, .....m - .....m;
M
average .....m deep, curved on plan
To receive drain pipes .....mm nominal size, .....m - .....m; average .....m dee M
To receive drain pipes .....mm nominal size, .....m - .....m; average .....m
M
deep, curved on plan
To receive surface water drain not exceeding 300mm wide; average ...m
deep
M
To receive surface water drain not exceeding 300mm wide; average ......m
M
deep, curved on plan
To receive surface water drain exceeding 300mm wide; maximum depth not
M3
exceeding ........m
To receive surface water drain exceeding 300mm wide; maximum depth not
M3
exceeding ........m, curved on plan
DRAIN
Pipework
Vitrified clay pipe and fittings as specified; laid and jointed in trench on
and including Class ........ bedding as specified
Precast concrete block drain with minimum 75mm thick sides and
bottom, cast in suitable lengths, finished fair on exposed surfaces;
bedded, jointed and pointed in cement mortar (1:3); on and including
150mm thick reinforced concrete Grade 30, reinforced with one layer
of BRC DA8; all as per drawing no. ..
EXTRA OVER for cascaded drain, ....... no of steps and ........mm total drop NO
ALTERNATIF 1
ALTERNATIF 2
ALTERNATIF 1
The Contractor shall take note that the following scope of work shall
be under his responsibilities and shall price the works in accordance
with drawing Nos. .....
Testing Drains
Test the whole of the Sewerage System in the presence of the S.O
with water or other approved means before trenches are filled in, ITEM
make good any defect, re-test and on completion leave the whole
system in perfect working order to the entire satisfaction of the S.O
SITE PREPARATION
Soil descriptions
For description of soil, trial pits, bore holes, existing services and work near
water please refer to 'Measurement Amplification And Pricing Factor'
Cutting down trees and grubbing up roots; removing from site; filling voids left
with material arising from excavation
Grubbing up stumps and roots of previously felled trees; removing from site; filling
voids left with material arising from excavation
Clearing site
Information
Clear all vegetation, trees irrespective of girth, etc., all buildings, structures
or other obstructions which interfere with the execution of the work and ITEM
remove all debris off site; area approximately 4.50 hectares as per drawing
no.
Cutting down trees and clearing site of undergrowth, bushes, scrub and
hedges and grubbing up their roots and filling voids left by removal of roots
ITEM
with selected material arising from excavation; approximately 1.00m
EARTHWORKS
Excavate to formation level in all types of soil except rock, including grading
M3
sides to slope
Disposal on site
Top soil, preserved topsoil from temporary spoil heap spread on site
Removing preserved top soil from site including provision of a shoot, dump,
M3
payment for royalties, fees, levies and other charges
FILLING
Filling to excavation M3
ROAD WORKS
ROADS
Subgrade Preparation
Excavate surface to reduce level commencing from formation level, get out
and deposit excavated material within road shoulder as specified
Sub-base
Road-base
Surfacing
..mm Thick M2
Form road side table with material arising from excavation for making up
M3
level, well spread, grade, level and compact
Concrete barrier kerb Type . overall size ..mm x ...mm high using
kerb extrusion machine line, level and gradient including prepared bases as M
per Drawing No.
.....mm long x .....mm wide x .....mm high Precast concrete Grade ..... as
specified kerbs Type ..... (standard Barrier), splayed top, finished fair on M
exposed surfaces, bedded, jointed and pointed in cement mortar (1:3),
including all necessary formwork, reinforcement
.....mm long x .....mm wide x .....mm high Precast concrete Grade .....as
specified kerbs Type *....(semi Mountable), splayed top, finished fair on M
exposed surfaces, bedded, jointed and pointed in cement mortar (1:3),
including all necessary formwork, reinforcement
Prepare and apply .. coat approved alkali resisting primer sealer and
M
..coats emulsion paint as specified to concrete kerbs
Scupper Drain
...mm Diameter scupper drain cast in short length and laid to falls on and
including ...mm thick concrete Grade 15 surround, bedded and jointed in M
cement mortar (1:3) including all
Pagenecessary
146 formwork ROAD
...mm Diameter scupper drain cast in short length and laid to falls on and
including ...mm thick concrete Grade 15 surround, bedded and jointed in M
cement mortar (1:3) including all necessary formwork
Labour and materials connecting scupper drain outlet drain pipe to roadside
NO
drain including making good on completion
Road Marking
Road Furniture
Road Signage
.......... signage overall size 600mm diameter in circular shaped sign plate
moulded on including 75mm diameter x 3.2mm thick steel post 2700mm NO
long complete with necessary foundation, painting, lettering and fixing
brackets.etc
Road Hump signage plate overall size 600mm x 600mm in square shapes
sign plate moulded on including 75mm diameter x 3.2mm thick steel post NO
2700mm long complete with necessary foundation, painting, lettering and
fixing brackets.etc all as per drawing No.
......... signage plate overall size 600mm x 600mm in square shapes sign
plate moulded on including 75mm diameter x 3.2mm thick steel post NO
2700mm long complete with necessary foundation, painting, lettering and
fixing brackets.etc all as per drawing No.
Guardrail
Supply and install in position corrugated steel beam guardrail; Double Rail
inclusive of galvanised steel post at .. centres spacing, bedded into M
concrete ..mm depth; reflector strip and including all necessary
excavation, filling, compaction
Road Hump
Pavement
Precast concrete paving blocks; ..joints, symmetrical half bond layout; covering
with washed non-staining sand, compacting with plate vibrator, sweeping off
surplus; external
Post-and-wire Fencing
Post-and-rail Fencing
......mm Square mesh, ....... gauge PVC coated chain link fence; .......
strands ....... gauge PVC coated straining wires; ......mm x.......mm
x ......mm thick mild steel angle post at ......mm centres; mild steel
angle braces at turns, corners and at every......
Cleft-pale Fencing
Palisade Fencing
Closed-boarded Fencing
...........mm x ...........mm Mild steel hollow section post ...........
at ........... centers with ........... number ...........mm x ...........mm hollow
section horizontal rails; welded all members together; ...........mm
x ...........mm timber board
Corrrugated Fencing
Decorative Fencing
GATES
...mm x .....mm Decorative double leaf mild steel sliding gate;
comprising .....mm x .....mm x .....mm thick mild steel as frame
including fabrication and welding, ironmongeries and bottom of NO
each leaf fitted with rollers and all necessary accessories,
complete......
SUNDRIES
Special Post
Spot Turfing
To flat ground M2
Close Turfing
To flat ground M2
To flat ground M2
Hydro seeding
To flat ground M2
PLANTING
Tree
Palm
Shrub
Dug up, prepare for, relocated within site and maintain all as specified
and as shown in drawing no......
Tree
Shrub
Excavation
Bedding
Pipework
..mm Diameter double office flanged end air valve with isolating
NO
valve complete with off-take tee
Pillar Hydrant
Thrust Block
Diaphram block, concrete support, thrust block, end cap, anchor block
and the like
Indicator Post
Valve chamber
....mm x .....mm (internal dimension) precast concrete valve
chamber constructed of 100mm thick (wall thickness) standard
block sections covered with 6mm thick steel plate cover including all NO
excavation, backfilling and removal surplus excavated material
and .........
Sampling point
Sterrillisation
Connection
Testing
PROVISIONAL SUMS
Allow a Provisional Sum of Ringgit Malaysia One Hundred And Ten SUM
Thousand Only (RM110,000.00) for Hot Water System Installation.
ELECTRICAL WORKS
Electrical Installation
Allow a Provisional Sum of Ringgit Malaysia One Million Eight
Hundred Thousand Only (RM1,800,000.00) for Electrical SUM
Installation.
ARCHITECTURAL WORKS
Interior Design
Built-in Furniture
Ironmongeries
Landscaping
Allow a Provisional Sum of Ringgit Malaysia One Hundred And Fifty SUM
Thousand Only (RM150,000.00) for Landscaping works.
MISCELLANEOUS
The following Prime Cost Sums are provided for works to be executed by
Nominated Sub-Contractors
MECHANICAL WORKS
Lift System
ELECTRICAL WORKS
Electrical Installation
Allow a Provisional Sum of Ringgit Malaysia One Million Eight
Hundred Thousand Only (RM1,800,000.00) for Electrical SUM
Installation.